Sunshine Act Meeting Notice, 33801-33802 [2010-14448]
Download as PDF
Federal Register / Vol. 75, No. 114 / Tuesday, June 15, 2010 / Notices
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–14300 Filed 6–14–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER10–1403–000]
Stephentown Regulation Services LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
June 8, 2010.
This is a supplemental notice in the
above-referenced proceeding of
Stephentown Regulation Services LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is June 28,
2010.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov or call
33801
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–14303 Filed 6–14–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meeting Notice
June 10, 2010.
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. No. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
DATE AND TIME: June 17, 2010, 10 a.m.
PLACE: Room 2C, 888 First Street, NE.,
Washington, DC 20426.
STATUS: Open.
MATTERS TO BE CONSIDERED: Agenda.
Note: Items listed on the agenda may be
deleted without further notice.
CONTACT PERSON FOR MORE INFORMATION:
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400.
For a recorded message listing items
struck from or added to the meeting, call
(202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
Web site at https://www.ferc.gov using
the eLibrary link, or may be examined
in the Commission’s Public Reference
Room.
960TH—MEETING
Item No.
Docket No.
Company
Administrative
A–1 ........
A–2 ........
A–3 ........
AD02–1–000 ................................................
AD02–7–000 ................................................
AD09–10–000 ..............................................
Agency Administrative Matters.
Customer Matters, Reliability, Security and Market Operations.
National Action Plan on Demand Response.
mstockstill on DSKH9S0YB1PROD with NOTICES
Electric
E–1
E–2
E–3
E–4
E–5
E–6
E–7
E–8
E–9
........
........
........
........
........
........
........
........
........
ER09–1048–000, ER06–615–059 ..............
ER09–1049–000 ..........................................
ER09–1050–000, ER09–1192–000 ............
OMITTED.
ER09–1063–000, ER09–1063–001 ............
ER09–1142–000 ..........................................
ER10–1069–000 ..........................................
OMITTED.
RM10–23–000 .............................................
VerDate Mar<15>2010
17:15 Jun 14, 2010
Jkt 220001
PO 00000
California Independent System Operator Corporation.
Midwest Independent Transmission System Operator, Inc.
Southwest Power Pool, Inc.
PJM Interconnection, L.L.C.
New York Independent System Operator, Inc.
Southwest Power Pool, Inc.
Transmission Planning and Cost Allocation by Transmission Owning and Operating
Public Utilities.
Frm 00043
Fmt 4703
Sfmt 4703
E:\FR\FM\15JNN1.SGM
15JNN1
33802
Federal Register / Vol. 75, No. 114 / Tuesday, June 15, 2010 / Notices
960TH—MEETING—Continued
Item No.
Docket No.
Company
E–10
E–11
E–12
E–13
......
......
......
......
RM09–25–000 .............................................
OMITTED.
ER10–1117–000 ..........................................
EL10–48–000, EC10–52–000 .....................
E–14
E–15
E–16
E–17
E–18
E–19
E–20
E–21
E–22
......
......
......
......
......
......
......
......
......
ER09–1717–001 ..........................................
ER04–449–021 ............................................
OMITTED.
ER09–1051–000 ..........................................
EL10–52–000 ..............................................
OMITTED.
EL09–72–001 ..............................................
EL09–12–000, EL09–12–001 ......................
RM10–24–000 .............................................
System Personnel Training Reliability Standards.
Evergreen Wind Power V, LLC and Stetson Wind II, LLC.
Ameren Corporation.
Illinois Power Company.
Central Illinois Light Company.
Central Illinois Public Service Company.
Ameren Energy Resources Company, LLC.
Ameren Energy Resources Generating Company.
Duke Energy Carolinas, LLC.
New York Independent System Operator, Inc. and New York Transmission Owners.
ISO New England Inc. and New England Power Pool.
Central Transmission, LLC v. PJM Interconnection, L.L.C.
Pacific Gas and Electric Company.
United States Department of Energy—Bonneville Power Administration.
Regional Transmission Organization/Independent System Operator Responsiveness to
Customers and Other Stakeholders: Best Practices.
Miscellaneous
M–1 ........
RM07–9–003 ...............................................
Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines.
Gas
G–1 ........
G–2 ........
RM07–10–002 .............................................
RP09–1086–001 ..........................................
Transparency Provisions of Section 23 of the Natural Gas Act.
Texican N. La. Transport, LLC v. Southern Natural Gas Company.
Hydro
H–1
H–2
H–3
H–4
........
........
........
........
P–2283–072 ................................................
P–2355–013 ................................................
P–2496–219 ................................................
P–382–085 ..................................................
FPL Energy Maine Hydro LLC.
Exelon Corporation Company, LLC.
Eugene Water and Electric Board.
Southern California Edison Company.
Certificates
C–1 ........
C–2 ........
OMITTED.
CP08–6–004 ................................................
mstockstill on DSKH9S0YB1PROD with NOTICES
Kimberly D. Bose,
Secretary.
A free Webcast of this event is
available through https://www.ferc.gov.
Anyone with Internet access who
desires to view this event can do so by
navigating to https://www.ferc.gov’s
Calendar of Events and locating this
event in the Calendar. The event will
contain a link to its Webcast. The
Capitol Connection provides technical
support for the free Webcasts. It also
offers access to this event via television
in the DC area and via phone bridge for
a fee. If you have any questions, visit
https://www.CapitolConnection.org or
contact Danelle Springer or David
Reininger at 703–993–3100.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
VerDate Mar<15>2010
17:15 Jun 14, 2010
Jkt 220001
Midcontinent Express Pipeline, LLC.
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
[FR Doc. 2010–14448 Filed 6–11–10; 11:15 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12470–001—Oklahoma]
City of Broken Bow, OK; Broken Bow
Re-Regulation Dam; Hydropower
Project; Notice of Proposed Restricted
Service List for a Programmatic
Agreement for Managing Properties
Included in or Eligible for Inclusion in
the National Register of Historic Places
June 8, 2010.
Rule 2010 of the Federal Energy
Regulatory Commission’s (Commission)
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
Rules of Practice and Procedure
provides that, to eliminate unnecessary
expense or improve administrative
efficiency, the Secretary may establish a
restricted service list for a particular
phase or issue in a proceeding.1 The
restricted service list should contain the
names of persons on the service list
who, in the judgment of the decisional
authority establishing the list, are active
participants with respect to the phase or
issue in the proceeding for which the
list is established.
The Commission staff is consulting
with the Oklahoma State Historic
Preservation Officer (hereinafter,
Oklahoma SHPO), and the Advisory
Council on Historic Preservation
(hereinafter, Advisory Council)
pursuant to the Advisory Council’s
regulations, 36 CFR Part 800,
implementing section 106 of the
National Historic Preservation Act, as
amended (16 U.S.C. section 470 f), to
1 18
E:\FR\FM\15JNN1.SGM
CFR section 385.2010.
15JNN1
Agencies
[Federal Register Volume 75, Number 114 (Tuesday, June 15, 2010)]
[Notices]
[Pages 33801-33802]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-14448]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meeting Notice
June 10, 2010.
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. No. 94-409), 5
U.S.C. 552b:
Agency Holding Meeting: Federal Energy Regulatory Commission.
Date and Time: June 17, 2010, 10 a.m.
Place: Room 2C, 888 First Street, NE., Washington, DC 20426.
Status: Open.
Matters To Be Considered: Agenda.
Note: Items listed on the agenda may be deleted without further
notice.
Contact Person for More Information: Kimberly D. Bose, Secretary,
Telephone (202) 502-8400.
For a recorded message listing items struck from or added to the
meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents relevant to the items on
the agenda. All public documents, however, may be viewed on line at the
Commission's Web site at https://www.ferc.gov using the eLibrary link,
or may be examined in the Commission's Public Reference Room.
960th--Meeting
----------------------------------------------------------------------------------------------------------------
Item No. Docket No. Company
----------------------------------------------------------------------------------------------------------------
Administrative
----------------------------------------------------------------------------------------------------------------
A-1..................... AD02-1-000...................... Agency Administrative Matters.
A-2..................... AD02-7-000...................... Customer Matters, Reliability, Security and Market
Operations.
A-3..................... AD09-10-000..................... National Action Plan on Demand Response.
----------------------------------------------------------------------------------------------------------------
Electric
----------------------------------------------------------------------------------------------------------------
E-1..................... ER09-1048-000, ER06-615-059..... California Independent System Operator Corporation.
E-2..................... ER09-1049-000................... Midwest Independent Transmission System Operator,
Inc.
E-3..................... ER09-1050-000, ER09-1192-000.... Southwest Power Pool, Inc.
E-4..................... OMITTED. ....................................................
E-5..................... ER09-1063-000, ER09-1063-001.... PJM Interconnection, L.L.C.
E-6..................... ER09-1142-000................... New York Independent System Operator, Inc.
E-7..................... ER10-1069-000................... Southwest Power Pool, Inc.
E-8..................... OMITTED. ....................................................
E-9..................... RM10-23-000..................... Transmission Planning and Cost Allocation by
Transmission Owning and Operating Public Utilities.
[[Page 33802]]
E-10.................... RM09-25-000..................... System Personnel Training Reliability Standards.
E-11.................... OMITTED. ....................................................
E-12.................... ER10-1117-000................... Evergreen Wind Power V, LLC and Stetson Wind II,
LLC.
E-13.................... EL10-48-000, EC10-52-000........ Ameren Corporation.
Illinois Power Company.
Central Illinois Light Company.
Central Illinois Public Service Company.
Ameren Energy Resources Company, LLC.
Ameren Energy Resources Generating Company.
E-14.................... ER09-1717-001................... Duke Energy Carolinas, LLC.
E-15.................... ER04-449-021.................... New York Independent System Operator, Inc. and New
York Transmission Owners.
E-16.................... OMITTED. ....................................................
E-17.................... ER09-1051-000................... ISO New England Inc. and New England Power Pool.
E-18.................... EL10-52-000..................... Central Transmission, LLC v. PJM Interconnection,
L.L.C.
E-19.................... OMITTED. ....................................................
E-20.................... EL09-72-001..................... Pacific Gas and Electric Company.
E-21.................... EL09-12-000, EL09-12-001........ United States Department of Energy--Bonneville Power
Administration.
E-22.................... RM10-24-000..................... Regional Transmission Organization/Independent
System Operator Responsiveness to Customers and
Other Stakeholders: Best Practices.
----------------------------------------------------------------------------------------------------------------
Miscellaneous
----------------------------------------------------------------------------------------------------------------
M-1..................... RM07-9-003...................... Revisions to Forms, Statements, and Reporting
Requirements for Natural Gas Pipelines.
----------------------------------------------------------------------------------------------------------------
Gas
----------------------------------------------------------------------------------------------------------------
G-1..................... RM07-10-002..................... Transparency Provisions of Section 23 of the Natural
Gas Act.
G-2..................... RP09-1086-001................... Texican N. La. Transport, LLC v. Southern Natural
Gas Company.
----------------------------------------------------------------------------------------------------------------
Hydro
----------------------------------------------------------------------------------------------------------------
H-1..................... P-2283-072...................... FPL Energy Maine Hydro LLC.
H-2..................... P-2355-013...................... Exelon Corporation Company, LLC.
H-3..................... P-2496-219...................... Eugene Water and Electric Board.
H-4..................... P-382-085....................... Southern California Edison Company.
----------------------------------------------------------------------------------------------------------------
Certificates
----------------------------------------------------------------------------------------------------------------
C-1..................... OMITTED. ....................................................
C-2..................... CP08-6-004...................... Midcontinent Express Pipeline, LLC.
----------------------------------------------------------------------------------------------------------------
Kimberly D. Bose,
Secretary.
A free Webcast of this event is available through https://www.ferc.gov. Anyone with Internet access who desires to view this
event can do so by navigating to https://www.ferc.gov's Calendar of
Events and locating this event in the Calendar. The event will contain
a link to its Webcast. The Capitol Connection provides technical
support for the free Webcasts. It also offers access to this event via
television in the DC area and via phone bridge for a fee. If you have
any questions, visit https://www.CapitolConnection.org or contact
Danelle Springer or David Reininger at 703-993-3100.
Immediately following the conclusion of the Commission Meeting, a
press briefing will be held in the Commission Meeting Room. Members of
the public may view this briefing in the designated overflow room. This
statement is intended to notify the public that the press briefings
that follow Commission meetings may now be viewed remotely at
Commission headquarters, but will not be telecast through the Capitol
Connection service.
[FR Doc. 2010-14448 Filed 6-11-10; 11:15 am]
BILLING CODE 6717-01-P