Environmental Impacts Statements; Notice Of Availability, 33299-33300 [2010-14080]
Download as PDF
Federal Register / Vol. 75, No. 112 / Friday, June 11, 2010 / Notices
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–14024 Filed 6–10–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP10–446–000]
Florida Gas Transmission Company,
LLC; Notice of Request Under Blanket
Authorization
WReier-Aviles on DSKGBLS3C1PROD with NOTICES
June 4, 2010.
Take notice that on May 28, 2010,
Florida Gas Transmission Company,
LLC (FGT), 5444 Westheimer Road,
Houston, Texas 77056, filed a prior
notice request pursuant to sections
157.205, 157.208, and 157.211 of the
Commission’s regulations under the
Natural Gas Act (NGA) for authorization
to construct, own, and operate
approximately 5.37 miles of 12-inch
diameter natural gas pipeline looping of
FGT’s existing 18-inch Mainline
Pipeline (Mainline), all as more fully set
forth in the application, which is on file
with the Commission and open to
public inspection. The filing may also
be viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Specifically, FGT proposes to
construct, own, and operate
approximately 5.37 miles of 12-inch
diameter natural gas pipeline,
associated metering and regulating
facilities, and auxiliary facilities, all of
which are located in Miami-Dade
County, Florida. FGT states the pipeline
modifications are required to
accommodate the hydrostatic testing of
a portion of its Mainline as part of its
integrity management program to ensure
the continued safe operation of the
pipeline, and to ensure continued
deliverability of natural gas. FGT
estimates the total cost of the subject
facilities is $20.4 million.
Any questions regarding the
application should be directed to
Stephen Veatch, Senior Director of
Certificates & Tariffs, Florida Gas
Transmission Company, LLC, 5444
Westheimer Road, Houston, Texas
77056, by telephone at (713) 989–2024,
VerDate Mar<15>2010
15:04 Jun 10, 2010
Jkt 220001
or by facsimile at (713) 989–1158, or by
e-mail at stephen.veatch@SUG.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
33299
[Docket No. RP10–690–002]
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comments: 5 p.m. Eastern Time on
Tuesday, June 8, 2010.
Guardian Pipeline, L.L.C.; Notice of
Revised Filing
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–14032 Filed 6–10–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2010–14086 Filed 6–10–10; 8:45 am]
June 4, 2010.
Take notice that on May 14, 2010,
Guardian Pipeline, L.L.C. submitted a
revised filing to its filing made on May
14, 2010, in the above referenced
proceeding.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
PO 00000
Frm 00062
Fmt 4703
Sfmt 4703
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8990–8]
Environmental Impacts Statements;
Notice Of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly Receipt of Environmental
Impact Statements Filed 05/31/2010
Through 06/04/2010 Pursuant to 40 CFR
1506.9
Notice: In accordance with Section
309(a) of the Clean Air Act, EPA is
required to make its comments on EISs
issued by other Federal agencies public.
E:\FR\FM\11JNN1.SGM
11JNN1
WReier-Aviles on DSKGBLS3C1PROD with NOTICES
33300
Federal Register / Vol. 75, No. 112 / Friday, June 11, 2010 / Notices
Historically, EPA has met this mandate
by publishing weekly notices of
availability of EPA comments, which
includes a brief summary of EPA’s
comment letters, in the Federal
Register. Since February 2008, EPA has
been including its comment letters on
EISs on its Web site at: https://
www.epa.gov/compliance/nepa/
eisdata.html. Including the entire EIS
comment letters on the Web site
satisfies the Section 309(a) requirement
to make EPA’s comments on EISs
available to the public. Accordingly, on
March 31, 2010, EPA discontinued the
publication of the notice of availability
of EPA comments in the Federal
Register.
EIS No. 20100208, Draft EIS, USA, VA,
Fort Monroe U.S. Army Garrison Base
Realignment and Closure (BRAC)
2005 Disposal and Reuse of Surplus
Non-reverting Property, Fort Monroe,
VA, Comment Period Ends: 07/12/
2010, Contact: Bob Ross 703–602–
2878.
EIS No. 20100209, Final EIS, FHWA,
NC, Monroe Connector/Bypass
Project, Construction from Near I–485
at US 74 to US 74 between the Tons
of Wingate and Marshville, Funding
and U.S. COE 404 Permit, North
Carolina Turnpike Authority,
Meckleburg and Union Counties, NC,
Wait Period Ends: 07/12/2010,
Contact: Jennifer Harris 919–571–
3004.
EIS No. 20100210, Draft EIS, USACE,
00, Fargo-Moorhead Metropolitan
Area Flood Risk Management,
Proposed Construction of Flood
Protection Measures, Red River of the
North Basin, ND and MN, Comment
Period Ends: 07/26/2010, Contact:
Aaron Snyder 651–290–5489.
EIS No. 20100211, Final EIS, FHWA,
NV, I–15 Corridor Improvement and
Local Arterial Improvements Project,
Collectively Known as Project NEON,
To Improve the Safety and Travel
Efficiency in the I–15 Corridor, City of
Las Vegas, Clark County, NV, Wait
Period Ends: 07/16/2010, Contact:
Abdelmoez Abdalla 775–687–1204.
EIS No. 20100212, Draft EIS, BLM, NM,
Taos Resource Management Plan, To
Provide Broad-Scale Guidance for the
Management of Public Lands and
Resource Administered by Taos Field
Office, Colfax, Harding, Los Alamos,
Mora, Rio Arriba, Santa Fe, Taos and
Union Counties, NM, Comment
Period Ends: 09/08/2010, Contact:
Brad Higdon 575–751–4725.
EIS No. 20100213, Final EIS, FRA, PA,
Pennsylvania High-Speed Maglev
Project, Construction between
Pittsburgh International Airport (PIA)
VerDate Mar<15>2010
15:04 Jun 10, 2010
Jkt 220001
and Greensburg Area, The
Pennsylvania Project of Magnetic
Levitation Transportation Technology
Deployment Program, Allegheny and
Westmoreland Counties, PA, Wait
Period Ends: 07/16/2010, Contact:
John Winkle 202–493–6067.
EIS No. 20100214, Draft EIS, FHWA,
UT, Provo Westside Connector
Project, Improvements to Interstate
15/University Avenue/1860 South
Interchange to 3110 West Street in
Provo, UT, Comment Period Ends: 08/
10/2010, Contact: Edward Woolford
801–963–0182.
EIS No. 20100215, Final EIS, USFS, CO,
Hermosa Park/Mitchell Lakes Land
Exchange Project, Proposed Land
Exchange between Federal and NonFederal Lands, Implementation,
Federal Land in LaPlata County and
Non-Federal Land in San Juan
County, CO, Wait Period Ends: 07/12/
2010, Contact: Cindy Hockelberg 970–
884–1418.
EIS No. 20100216, Draft Supplemental
EIS, USACE, LA, Louisiana Coastal
Area (LCA)—Louisiana, Terrebonne
Basin Barrier Shoreline Restoration,
Feasibility Study, Implementation.
Terrebonne Parish, LA Comment
Period Ends: 07/26/2010, Contact: Dr.
William P. Klein, Jr., 504–862–2540.
Amended Notices
EIS No. 20100205, Draft Supplement,
USFS, CA, Beaverslide Timber Sale
and Fuel Treatment Project,
Additional Analysis and New
Information, Six Rivers National
Forest, Mad River Range District,
Trinity County, CA, Comment Period
Ends: 07/26/2010, Contact: Thomas
Hudson 707–574–6233.
Revision to FR Notice Published 06/
04/2010: Due to Non-Distribution of EIS
the Comment Period is being
Recalculated from 07/19/2010 to 07/26/
2010.
Dated: June 8, 2010.
Ken Mittelholtz,
Deputy Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 2010–14080 Filed 6–10–10; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2010–0481; FRL–8829–5]
FIFRA Scientific Advisory Panel;
Notice of Public Meeting
AGENCY: Environmental Protection
Agency (EPA).
ACTION: Notice.
PO 00000
Frm 00063
Fmt 4703
Sfmt 4703
SUMMARY: There will be a 4–day
meeting of the Federal Insecticide,
Fungicide, and Rodenticide Act
Scientific Advisory Panel (FIFRA SAP)
to consider and review a set of scientific
issues related to the Re-Evaluation of
Human Health Effects of Atrazine:
Review of Non-Cancer Effects and
Drinking Water Monitoring Frequency.
DATES: The meeting will be held on
September 14 – 17, 2010, from
approximately 8:30 a.m. to 5 p.m.
Comments. The Agency encourages
that written comments be submitted by
August 31, 2010, and requests for oral
comments be submitted by September 7,
2010. However, written comments and
requests to make oral comments may be
submitted until the date of the meeting,
but anyone submitting written
comments after August 31, 2010, should
contact the Designated Federal Official
(DFO) listed under FOR FURTHER
INFORMATION CONTACT. For additional
instructions, see Unit I.C. of the
SUPPLEMENTARY INFORMATION.
Nominations. Nominations of
candidates to serve as ad hoc members
of FIFRA SAP for this meeting should
be provided on or June 25, 2010.
Webcast. This meeting may be
webcasted. Please refer to the FIFRA
SAP’s website, https://www.epa.gov/
scipoly/SAP for information on how to
access the webcast. Please note that the
webcast is a supplementary public
process provided only for convenience.
If difficulties arise resulting in
webcasting outages, the meeting will
continue as planned.
Special accommodations. For
information on access or services for
individuals with disabilities, and to
request accommodation for a disability,
please contact the DFO listed under FOR
FURTHER INFORMATION CONTACT at least
10 days prior to the meeting to give EPA
as much time as possible to process
your request.
ADDRESSES: The meeting will be held at
the Environmental Protection Agency,
Conference Center, Lobby Level, One
Potomac Yard (South Bldg.), 2777 S.
Crystal Dr., Arlington, VA 22202.
Comments. Submit your comments,
identified by docket identification (ID)
number EPA–HQ–OPP–2010–0481, by
one of the following methods:
• Federal eRulemaking Portal: https://
www.regulations.gov. Follow the on-line
instructions for submitting comments.
• Mail: Office of Pesticide Programs
(OPP) Regulatory Public Docket (7502P),
Environmental Protection Agency, 1200
Pennsylvania Ave., NW., Washington,
DC 20460–0001.
• Delivery: OPP Regulatory Public
Docket (7502P), Environmental
E:\FR\FM\11JNN1.SGM
11JNN1
Agencies
[Federal Register Volume 75, Number 112 (Friday, June 11, 2010)]
[Notices]
[Pages 33299-33300]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-14080]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8990-8]
Environmental Impacts Statements; Notice Of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly Receipt of Environmental Impact Statements Filed 05/31/2010
Through 06/04/2010 Pursuant to 40 CFR 1506.9
Notice: In accordance with Section 309(a) of the Clean Air Act, EPA
is required to make its comments on EISs issued by other Federal
agencies public.
[[Page 33300]]
Historically, EPA has met this mandate by publishing weekly notices of
availability of EPA comments, which includes a brief summary of EPA's
comment letters, in the Federal Register. Since February 2008, EPA has
been including its comment letters on EISs on its Web site at: https://www.epa.gov/compliance/nepa/eisdata.html. Including the entire EIS
comment letters on the Web site satisfies the Section 309(a)
requirement to make EPA's comments on EISs available to the public.
Accordingly, on March 31, 2010, EPA discontinued the publication of the
notice of availability of EPA comments in the Federal Register.
EIS No. 20100208, Draft EIS, USA, VA, Fort Monroe U.S. Army Garrison
Base Realignment and Closure (BRAC) 2005 Disposal and Reuse of Surplus
Non-reverting Property, Fort Monroe, VA, Comment Period Ends: 07/12/
2010, Contact: Bob Ross 703-602-2878.
EIS No. 20100209, Final EIS, FHWA, NC, Monroe Connector/Bypass Project,
Construction from Near I-485 at US 74 to US 74 between the Tons of
Wingate and Marshville, Funding and U.S. COE 404 Permit, North Carolina
Turnpike Authority, Meckleburg and Union Counties, NC, Wait Period
Ends: 07/12/2010, Contact: Jennifer Harris 919-571-3004.
EIS No. 20100210, Draft EIS, USACE, 00, Fargo-Moorhead Metropolitan
Area Flood Risk Management, Proposed Construction of Flood Protection
Measures, Red River of the North Basin, ND and MN, Comment Period Ends:
07/26/2010, Contact: Aaron Snyder 651-290-5489.
EIS No. 20100211, Final EIS, FHWA, NV, I-15 Corridor Improvement and
Local Arterial Improvements Project, Collectively Known as Project
NEON, To Improve the Safety and Travel Efficiency in the I-15 Corridor,
City of Las Vegas, Clark County, NV, Wait Period Ends: 07/16/2010,
Contact: Abdelmoez Abdalla 775-687-1204.
EIS No. 20100212, Draft EIS, BLM, NM, Taos Resource Management Plan, To
Provide Broad-Scale Guidance for the Management of Public Lands and
Resource Administered by Taos Field Office, Colfax, Harding, Los
Alamos, Mora, Rio Arriba, Santa Fe, Taos and Union Counties, NM,
Comment Period Ends: 09/08/2010, Contact: Brad Higdon 575-751-4725.
EIS No. 20100213, Final EIS, FRA, PA, Pennsylvania High-Speed Maglev
Project, Construction between Pittsburgh International Airport (PIA)
and Greensburg Area, The Pennsylvania Project of Magnetic Levitation
Transportation Technology Deployment Program, Allegheny and
Westmoreland Counties, PA, Wait Period Ends: 07/16/2010, Contact: John
Winkle 202-493-6067.
EIS No. 20100214, Draft EIS, FHWA, UT, Provo Westside Connector
Project, Improvements to Interstate 15/University Avenue/1860 South
Interchange to 3110 West Street in Provo, UT, Comment Period Ends: 08/
10/2010, Contact: Edward Woolford 801-963-0182.
EIS No. 20100215, Final EIS, USFS, CO, Hermosa Park/Mitchell Lakes Land
Exchange Project, Proposed Land Exchange between Federal and Non-
Federal Lands, Implementation, Federal Land in LaPlata County and Non-
Federal Land in San Juan County, CO, Wait Period Ends: 07/12/2010,
Contact: Cindy Hockelberg 970-884-1418.
EIS No. 20100216, Draft Supplemental EIS, USACE, LA, Louisiana Coastal
Area (LCA)--Louisiana, Terrebonne Basin Barrier Shoreline Restoration,
Feasibility Study, Implementation. Terrebonne Parish, LA Comment Period
Ends: 07/26/2010, Contact: Dr. William P. Klein, Jr., 504-862-2540.
Amended Notices
EIS No. 20100205, Draft Supplement, USFS, CA, Beaverslide Timber Sale
and Fuel Treatment Project, Additional Analysis and New Information,
Six Rivers National Forest, Mad River Range District, Trinity County,
CA, Comment Period Ends: 07/26/2010, Contact: Thomas Hudson 707-574-
6233.
Revision to FR Notice Published 06/04/2010: Due to Non-Distribution
of EIS the Comment Period is being Recalculated from 07/19/2010 to 07/
26/2010.
Dated: June 8, 2010.
Ken Mittelholtz,
Deputy Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 2010-14080 Filed 6-10-10; 8:45 am]