DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13417–001]
Western Technical College; Notice of
Intent To File License Application,
Filing of Pre-Application Document,
and Approving Use of the Traditional
Licensing Process
WReier-Aviles on DSKGBLS3C1PROD with NOTICES
June 3, 2010.
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 13417–001.
c. Date Filed: December 21, 2009.
d. Submitted By: Western Technical
College (Western).
e. Name of Project: Angelo Dam
Hydroelectric Project.
f. Location: On the La Crosse River, in
Monroe County, Wisconsin. The project
would not occupy any federal lands.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact:
Michael Pieper, Vice President of
Finance and Operations, Western
Technical College, 400 Seventh Street,
North, La Crosse, WI 54602–0908; (608)
785–9200.
i. FERC Contact: Steve Hocking at
(202) 502–8753; or e-mail at
steve.hocking@ferc.gov.
j. Western filed a request to use the
Traditional Licensing Process on
December 21, 2009, and provided public
notice of this request on November 23,
2009. In a letter dated February 26,
2010, the Director of the Office of
Energy Projects approved Western’s
request to use the Traditional Licensing
Process.
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service and/or the
National Marine Fisheries Service
(NMFS) under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402; (b) NMFS under section
305(b) of the Magnuson-Stevens Fishery
Conservation and Management Act and
implementing regulations at 50 CFR
600.920; and (c) the Illinois State
Historic Preservation Officer, as
required by Section 106, National
Historical Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. Western filed a Pre-Application
Document (PAD; including a proposed
process plan and schedule) with the
Commission pursuant to 18 CFR 5.6 of
the Commission’s regulations.
VerDate Mar<15>2010
15:04 Jun 10, 2010
Jkt 220001
m. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCONlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY, (202)
502–8659. A copy of the PAD is also
available for inspection and
reproduction at the address in
paragraph h.
n. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–14030 Filed 6–10–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance at North American Electric
Reliability Corporation Meetings From
July–December 2010
June 2, 2010.
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission and
Commission staff may attend the
following NERC related meetings:
NERC Planning Committee Meetings
and its sub-committee meetings on, but
not limited to:
• Tuesday—Wednesday, September
14–15, 2010 Denver, CO (TBD).
• Tuesday—Wednesday, December
7–8, 2010 Tampa, FL (TBD).
NERC Operating Committee Meetings
and its sub-committee meetings on, but
not limited to:
• Tuesday—Wednesday, September
14–15, 2010 Denver, CO (TBD).
• Tuesday—Wednesday, December
7–8, 2010 Tampa, FL (TBD).
NERC Reliability Assessment
Subcommittee on, but not limited to:
• Tuesday—Wednesday, August 10–
11, 2010 Salt Lake City, UT (TBD).
• Tuesday—Wednesday, October 12–
13, 2010 New York, NY (2).
• Tuesday, December 7, 2010
Teleconference (TBD).
NERC Reliability Metrics Working
Group on, but not limited to:
PO 00000
Frm 00060
Fmt 4703
Sfmt 4703
33297
• Wednesday, July 14, 2010
Teleconference (TBD).
• Wednesday, August 18, 2010
Teleconference (TBD).
• Wednesday—Thursday, September
22–23, 2010 (TBD).
• Wednesday, October 20, 2010
Teleconference (TBD).
• Wednesday, November 17, 2010
Teleconference (TBD).
NERC Resources Subcommittee
Meetings on, but not limited to:
• Wednesday—Thursday, July 28–29,
2010 Pensacola, FL (3).
• Wednesday—Thursday, October
27–28, 2010 Valley Forge, PA (TBD).
NERC Standards Committee Meetings
and its sub-committee meetings on, but
not limited to:
• Wednesday—Thursday, July 14–15,
2010 Toronto, Ontario (TBD).
• Thursday, August 12, 2010,
Teleconference (1).
• Thursday, September 9, 2010
Teleconference (1).
• Wednesday—Thursday, October
13–14, 2010 Houston, TX (TBD).
• Thursday, November 11, 2010,
Teleconference (1).
• Thursday, December 9, 2010,
Teleconference (1).
NERC Transmission Issues
Subcommittee on, but not limited to:
• Wednesday—Thursday, July 21–22,
2010 (TBD).
• Wednesday—Thursday, October
13–14, 2010 (TBD).
NERC Board of Trustees Meetings:
• Wednesday—Thursday, August 4–
5, 2010 Toronto, Ontario (4).
• Wednesday—Thursday, November
3–4, 2010 Atlanta, GA (TBD).
NERC Finance and Audit Committee
Meetings:
• TBD.
Critical Infrastructure Protection
Committee Quarterly Meetings and its
sub-committee meetings on, but not
limited to:
• Wednesday—Thursday, September
15–16, 2010 (TBD).
• Wednesday—Thursday, December
8–9, 2010 (TBD).
The meetings above will be held at
the following locations:
1. North American Electric Reliability
Corporation, 866.740.1260.
2. NPCC Offices, 1515 Broadway, New
York, NY 10036, 917.934.7960.
3. Gulf Power Co. Headquarters, Room
596, Pensacola, FL 32502, 205.257.6209.
4. Marriott Toronto Eaton Centre, 525
Bay Street, Toronto, Ontario MSG 2L2,
416.597.9200.
Further information may be found at
https://www.nerc.com.
The above-referenced meetings are
open to the public.
For more information, contact Mary
Agnes Nimis, Office of Electric
E:\FR\FM\11JNN1.SGM
11JNN1
33298
Federal Register / Vol. 75, No. 112 / Friday, June 11, 2010 / Notices
Reliability, Federal Energy Regulatory
Commission at (202) 502–8235 or
maryagnes.nimis@ferc.gov or Nicholas
Snyder, Office of Electric Reliability,
Federal Energy Regulatory Commission
at (202) 502–6408 or
nicholas.snyder@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–14033 Filed 6–10–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM98–1–000]
Records Governing Off-the-Record
Communications; Public Notice
June 4, 2010.
This constitutes notice, in accordance
with 18 CFR 385.2201(b), of the receipt
of prohibited and exempt off-the-record
communications.
Order No. 607 (64 FR 51222,
September 22, 1999) requires
Commission decisional employees, who
make or receive a prohibited or exempt
off-the-record communication relevant
to the merits of a contested proceeding,
to deliver to the Secretary of the
Commission, a copy of the
communication, if written, or a
summary of the substance of any oral
communication.
Prohibited communications are
included in a public, non-decisional file
associated with, but not a part of, the
decisional record of the proceeding.
Unless the Commission determines that
the prohibited communication and any
responses thereto should become a part
of the decisional record, the prohibited
off-the-record communication will not
be considered by the Commission in
reaching its decision. Parties to a
proceeding may seek the opportunity to
respond to any facts or contentions
made in a prohibited off-the-record
communication, and may request that
the Commission place the prohibited
communication and responses thereto
in the decisional record. The
Commission will grant such a request
only when it determines that fairness so
requires. Any person identified below as
having made a prohibited off-the-record
Docket No.
communication shall serve the
document on all parties listed on the
official service list for the applicable
proceeding in accordance with Rule
2010, 18 CFR 385.2010.
Exempt off-the-record
communications are included in the
decisional record of the proceeding,
unless the communication was with a
cooperating agency as described by 40
CFR 1501.6, made under 18 CFR
385.2201(e)(1)(v).
The following is a list of off-therecord communications recently
received by the Secretary of the
Commission. The communications
listed are grouped by docket numbers in
ascending order. These filings are
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the eLibrary
link. Enter the docket number,
excluding the last three digits, in the
docket number field to access the
document. For assistance, please contact
FERC, Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659.
File date
Prohibited:
1. ER08–386–000 ER08–386–001 ......................................................................................
2. ER09–1063–000 ..............................................................................................................
Exempt:
1. P–2232–516 .....................................................................................................................
1 (1)
Presenter or requester
5–24–10
5–25–10
James Roberts. 1
Matthew White. 2
5–18–10
Hon. Patrick T. McHenry.
of 504 form comments on index cards, addressed to the Chairman, concerning the PATH project.
of telephone call received by Matthew White from Dr. Joe Bowring and Dr. Howard Hass, the IMM for PJM.
2 Record
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–14029 Filed 6–10–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP10–439–000]
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization
WReier-Aviles on DSKGBLS3C1PROD with NOTICES
June 4, 2010.
Take notice that on May 20, 2010
Columbia Gas Transmission, LLC
(Columbia), 5151 San Felipe, Suite
2500, Houston, TX 77056, filed in the
above Docket, a prior notice request
pursuant to sections 157.205, 157.208
and 157.216 of the Commission’s
regulations under the Natural Gas Act
(NGA) and Columbia’s authorization in
Docket No. CP83–76–000, for
VerDate Mar<15>2010
15:04 Jun 10, 2010
Jkt 220001
authorization to construct and abandon
certain natural gas facilities located in
Marshall County, West Virginia and
Greene and Washington Counties,
Pennsylvania, all as more fully set forth
in the application which is on file with
the Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Any questions concerning this
application may be directed to Fredic J.
George, Senior Counsel, Columbia Gas
Transmission, LLC, P.O. Box 1273,
Charleston, West Virginia 25314–1273
at (304) 357–2359.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
Natural Gas Act (NGA) (18 CFR 157.205)
file a protest to the request. If no protest
is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
E:\FR\FM\11JNN1.SGM
11JNN1
Agencies
[Federal Register Volume 75, Number 112 (Friday, June 11, 2010)]
[Notices]
[Pages 33297-33298]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-14033]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commission Staff Attendance at North American Electric
Reliability Corporation Meetings From July-December 2010
June 2, 2010.
The Federal Energy Regulatory Commission hereby gives notice that
members of the Commission and Commission staff may attend the following
NERC related meetings:
NERC Planning Committee Meetings and its sub-committee meetings on,
but not limited to:
Tuesday--Wednesday, September 14-15, 2010 Denver, CO
(TBD).
Tuesday--Wednesday, December 7-8, 2010 Tampa, FL (TBD).
NERC Operating Committee Meetings and its sub-committee meetings
on, but not limited to:
Tuesday--Wednesday, September 14-15, 2010 Denver, CO
(TBD).
Tuesday--Wednesday, December 7-8, 2010 Tampa, FL (TBD).
NERC Reliability Assessment Subcommittee on, but not limited to:
Tuesday--Wednesday, August 10-11, 2010 Salt Lake City, UT
(TBD).
Tuesday--Wednesday, October 12-13, 2010 New York, NY (2).
Tuesday, December 7, 2010 Teleconference (TBD).
NERC Reliability Metrics Working Group on, but not limited to:
Wednesday, July 14, 2010 Teleconference (TBD).
Wednesday, August 18, 2010 Teleconference (TBD).
Wednesday--Thursday, September 22-23, 2010 (TBD).
Wednesday, October 20, 2010 Teleconference (TBD).
Wednesday, November 17, 2010 Teleconference (TBD).
NERC Resources Subcommittee Meetings on, but not limited to:
Wednesday--Thursday, July 28-29, 2010 Pensacola, FL (3).
Wednesday--Thursday, October 27-28, 2010 Valley Forge, PA
(TBD).
NERC Standards Committee Meetings and its sub-committee meetings
on, but not limited to:
Wednesday--Thursday, July 14-15, 2010 Toronto, Ontario
(TBD).
Thursday, August 12, 2010, Teleconference (1).
Thursday, September 9, 2010 Teleconference (1).
Wednesday--Thursday, October 13-14, 2010 Houston, TX
(TBD).
Thursday, November 11, 2010, Teleconference (1).
Thursday, December 9, 2010, Teleconference (1).
NERC Transmission Issues Subcommittee on, but not limited to:
Wednesday--Thursday, July 21-22, 2010 (TBD).
Wednesday--Thursday, October 13-14, 2010 (TBD).
NERC Board of Trustees Meetings:
Wednesday--Thursday, August 4-5, 2010 Toronto, Ontario
(4).
Wednesday--Thursday, November 3-4, 2010 Atlanta, GA (TBD).
NERC Finance and Audit Committee Meetings:
TBD.
Critical Infrastructure Protection Committee Quarterly Meetings and
its sub-committee meetings on, but not limited to:
Wednesday--Thursday, September 15-16, 2010 (TBD).
Wednesday--Thursday, December 8-9, 2010 (TBD).
The meetings above will be held at the following locations:
1. North American Electric Reliability Corporation, 866.740.1260.
2. NPCC Offices, 1515 Broadway, New York, NY 10036, 917.934.7960.
3. Gulf Power Co. Headquarters, Room 596, Pensacola, FL 32502,
205.257.6209.
4. Marriott Toronto Eaton Centre, 525 Bay Street, Toronto, Ontario
MSG 2L2, 416.597.9200.
Further information may be found at https://www.nerc.com.
The above-referenced meetings are open to the public.
For more information, contact Mary Agnes Nimis, Office of Electric
[[Page 33298]]
Reliability, Federal Energy Regulatory Commission at (202) 502-8235 or
maryagnes.nimis@ferc.gov or Nicholas Snyder, Office of Electric
Reliability, Federal Energy Regulatory Commission at (202) 502-6408 or
nicholas.snyder@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-14033 Filed 6-10-10; 8:45 am]
BILLING CODE 6717-01-P