Notice Announcing Preliminary Permit Drawing, 32459-32460 [2010-13559]
Download as PDF
32459
Federal Register / Vol. 75, No. 109 / Tuesday, June 8, 2010 / Notices
CER Generation, LLC .....................................................................................................................................................
Day County Wind, LLC .................................................................................................................................................
Northeastern Power Company ......................................................................................................................................
EC&R Papalote Creek II, LLC ........................................................................................................................................
EDF EN Canada Inc. ......................................................................................................................................................
Take notice that during the month of
April 2010, the status of the abovecaptioned entities as Exempt Wholesale
Generators or Foreign Utility Companies
became effective by operation of the
Commission’s regulations, 18 CFR
366.7(a).
Kimberly D. Bose,
Secretary.
Renewable Energy (EE–1), 1000
Independence Avenue, SW.,
Washington, DC 20585 Attn: National
Energy Rating Program for Homes,
Jessica Balsam.
FOR FURTHER INFORMATION CONTACT: Joan
Glickman at
buildingratingRFI@ee.doe.gov.
Issued in Washington, DC, on June 2, 2010.
Cathy Zoi,
Assistant Secretary, Energy Efficiency and
Renewable Energy.
[FR Doc. 2010–13556 Filed 6–7–10; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2010–13679 Filed 6–7–10; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6450–01–P
Energy Efficiency and Renewable
Energy
DEPARTMENT OF ENERGY
National Energy Rating Program for
Homes
Federal Energy Regulatory
Commission
Energy Efficiency and
Renewable Energy, Department of
Energy.
ACTION: Request for Information (RFI).
emcdonald on DSK2BSOYB1PROD with NOTICES
AGENCY:
SUMMARY: The Department of Energy
(DOE) is seeking comments and
information from interested parties to
assist DOE in developing a voluntary
National Energy Rating Program for
Homes. The purpose of this program is
to encourage consumers to invest in
energy improvements in existing homes
by providing reliable information to
them at low cost. The Department is
considering a wide range of issues
including how to measure energy
performance, what performance metrics
to use, and how to present the
information to consumers, among other
questions. For a full discussion of these
issues, please view
www.buildings.energy.gov/
home_rating_rfi.html.
DATES: Comments must be postmarked
by no later than July 5, 2010. Comments
must be received by no later than July
10, 2010.
ADDRESSES: You may submit comments,
identified by ‘‘RFI: National Energy
Rating Program for Homes,’’ by any of
the following methods: Federal
eRulemaking Portal: https://
www.regulations.gov. Follow the
instructions for submitting comments.
E-mail:
buildingratingRFI@EE.DOE.GOV.
Include ‘‘RFI: National Energy Rating
Program for Homes’’ in the subject line
of the message. Mail: U.S. Department of
Energy, Office of Energy Efficiency and
VerDate Mar<15>2010
18:21 Jun 07, 2010
Jkt 220001
Notice Announcing Preliminary Permit
Drawing
May 28, 2010.
In the matter of: Three Rivers Park District,
Project No. 13457–000, BOST1 Hydroelectric
LLC, Project No. 13458–000.
On May 1, 2009, at 8:30 a.m., the
Commission received two preliminary
permit applications for proposed
projects to be located at the existing
Coon Rapids Dam on the Mississippi
River in Hennepin and Anoka Counties,
Minnesota.1 The applications were filed
by Three Rivers Park District, for Project
No. 13457 and BOST1 Hydroelectric
LLC, for Project No. 13458.
Where all permit applicants are
municipalities or all permit applicants
are non-municipalities, and no
applicant’s plans are better adapted than
the others’ to develop, conserve, and
utilize in the public interest the water
resources of a region, the Commission
issues a permit to the applicant who
filed first in time.2 In this case, because
two applications from entities not
claiming municipal preference are
deemed filed at the same time, the
Commission will conduct a random tie
1 The Commission is open each day from 8:30
a.m. to 5 p.m., except Saturdays, Sundays, and
holidays. 18 CFR 375.101(c) (2009). The
applications were filed between 5 p.m. on Thursday
April 30, 2009, and 8:30 a.m. on Friday May 1,
2009. Under the Commission’s Rules of Practice
and Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2009).
2 18 CFR 4.37 (2009). See, e.g., BPUS Generation
Development, LLC, 126 FERC ¶ 61,132 (2009).
PO 00000
Frm 00105
Fmt 4703
Sfmt 4703
Docket
Docket
Docket
Docket
Docket
No.
No.
No.
No.
No.
EG10–18–000
EG10–19–000
EG10–20–000
EG10–22–000
FC10–1–000
breaker to determine priority. In the
event that the Commission concludes
that neither applicant’s plans are better
adapted than the other, priority will be
determined accordingly.
On June 8, 2010, at 2 p.m. (eastern
time), the Secretary of the Commission,
or her designee, will, by random
drawing, determine the filing priority
for the two applicants identified in this
notice. The drawing is open to the
public and will be held in room 2C, the
Commission Meeting Room, located at
888 First St., NE., Washington, DC
20426. The results of the drawing will
be recorded by the Secretary or her
designee. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–13558 Filed 6–7–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice Announcing Preliminary Permit
Drawing
May 28, 2010.
In the matter of: Green Power
Development, LLC, Alaska Power &
Telephone Company, Project No. 12661–001,
Project No. 13599–000.
On October 1, 2009, at 8:30 a.m., the
Commission received two preliminary
permit applications for proposed
projects to be located at an unnamed
lake designated as Lake 3160 in an
unorganized borough near Juneau,
Alaska.1 The applications were filed by
Green Power Development, LLC, for
Project No. 12661–001 and Alaska
Power & Telephone Company, for
Project No. 13599–000.
Where all permit applicants are
municipalities or all permit applicants
are non-municipalities, and no
applicant’s plans are better adapted than
1 The Commission is open each day from 8:30
a.m. to 5 p.m., except Saturdays, Sundays, and
holidays. 18 CFR 375.101(c) (2009). The
applications were filed between 5 p.m. on
Wednesday September 30, 2009, and 8:30 a.m. on
Thursday October 1, 2009. Under the Commission’s
Rules of Practice and Procedure, any document
received after regular business hours is considered
filed at 8:30 a.m. on the next regular business day.
18 CFR 385.2001(a)(2) (2009).
E:\FR\FM\08JNN1.SGM
08JNN1
32460
Federal Register / Vol. 75, No. 109 / Tuesday, June 8, 2010 / Notices
the others’ to develop, conserve, and
utilize in the public interest the water
resources of a region, the Commission
issues a permit to the applicant who
filed first in time.2 In this case, because
two applications from entities not
claiming municipal preference are
deemed filed at the same time, the
Commission will conduct a random tie
breaker to determine priority. In the
event that the Commission concludes
that neither applicant’s plans are better
adapted than the other, priority will be
determined accordingly.
On June 8, 2010, at 2 p.m. (eastern
time), the Secretary of the Commission,
or her designee, will, by random
drawing, determine the filing priority
for the two applicants identified in this
notice. The drawing is open to the
public and will be held in room 2C, the
Commission Meeting Room, located at
888 First St., NE., Washington, DC
20426. The results of the drawing will
be recorded by the Secretary or her
designee. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–13559 Filed 6–7–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP10–438–000]
Natural Gas Pipeline Company of
America LLC; Notice of Request Under
Blanket Authorization
emcdonald on DSK2BSOYB1PROD with NOTICES
May 28, 2010.
Take notice that on May 20, 2010,
Natural Gas Pipeline Company of
America LLC (Natural), 3250 Lacey
Road, Suite 700, Downers Grove, Illinois
60515, filed in Docket No. CP10–438–
000, an application pursuant to sections
157.205, 157.208, 157.211 and 157.212
of the Commission’s Regulations under
the Natural Gas Act (NGA) as amended,
to construct and operate facilities
necessary to deliver natural gas to its
affiliate, Kinder Morgan Louisiana
Pipeline LLC (KMLP) in Johnsons
Bayou, Cameron Parish, Louisiana,
under Natural’s blanket certificate
issued in Docket No. CP82–402–000,1
all as more fully set forth in the
application which is on file with the
2 18 CFR 4.37 (2009). See, e.g., BPUS Generation
Development, LLC, 126 FERC ¶ 61,132 (2009).
1 20 FERC ¶ 62,415 (1982).
VerDate Mar<15>2010
16:31 Jun 07, 2010
Jkt 220001
Commission and open to the public for
inspection.
Natural proposes to construct and
operate a delivery interconnect off its
UTOS Lateral with the Southwest
Louisiana lateral (Southwest Loop). To
accomplish this, Natural would
construct and operate approximately
320 feet of 12-inch diameter pipeline; a
dual 8-inch meter on a new metering
platform; and such other appurtenant
facilities required to effect the
interconnects to deliver up to 200,000
Dth/day of natural gas from its UTOS
Lateral to KMLP. Natural would also
construct certain section 2.55(a) nonjurisdictional facilities such as
instrumentation and cathodic protection
for all piping and equipment. Natural
also states that KMLP would reimburse
Natural for the estimated $2,500,000
construction cost of the proposed
facilities.
Any questions concerning this
application may be directed to Bruce H.
Newsome, Vice President, Regulatory
Products and Services, Natural Gas
Pipeline Company of America LLC,
3250 Lacey Road, 7th Floor, Downers
Grove, Illinois 60515–7918, or via
telephone at (630) 725–3070, or by email
bruce_newsome@kindermorgan.com.
This filing is available for review at
the Commission or may be viewed on
the Commission’s Web site at https://
www.ferc.gov, using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document. For
assistance, please contact FERC Online
Support at FERC
OnlineSupport@ferc.gov or call toll-free
at (866) 206–3676, or, for TTY, contact
(202) 502–8659. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
intervenors to file electronically.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
PO 00000
Frm 00106
Fmt 4703
Sfmt 4703
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–13557 Filed 6–7–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP10–431–000]
Natural Gas Pipeline Company of
America LLC; Notice of Request Under
Blanket Authorization
May 28, 2010.
Take notice that on May 14, 2010,
Natural Gas Pipeline Company of
America LLC (Natural), 3250 Lacey
Road, Suite 700, Downers Grove, Illinois
60515, filed in Docket No. CP10–431–
000, an application pursuant to sections
157.205, 157.208, 157.211 and 157.212
of the Commission’s regulations under
the Natural Gas Act (NGA) as amended,
to construct and operate facilities
necessary to deliver natural gas to
Bridgeline Holdings L.P. (Bridgeline) in
Johnsons Bayou, Cameron Parish,
Louisiana, under Natural’s blanket
certificate issued in Docket No. CP82–
402–000,1 all as more fully set forth in
the application which is on file with the
Commission and open to the public for
inspection.
Natural proposes to construct and
operate a delivery interconnect off its
UTOS Lateral in order to deliver natural
gas volumes to Bridgeline. To
accomplish this, Natural would
construct and operate a 16-inch tap;
approximately 530 feet of 12-inch
diameter pipeline; a metering platform;
a dual 8-inch meter on the metering
platform; and such other appurtenant
facilities required to effect the
interconnects to deliver up to 200,000
Dth/day of natural gas from its UTOS
Lateral to Bridgeline. Natural further
states that it would construct
approximately 180 feet of 16-inch
diameter interconnecting pipeline
between the metering facilities located
on the platform and the UTOS Lateral.
Through the proposed piping, Natural
would deliver natural gas from the
platform and metering equipment to
Bridgeline’s existing pipeline system,
where Bridgeline has already
constructed the tap for this
interconnection. Natural would also
construct certain section 2.55(a) non1 20
E:\FR\FM\08JNN1.SGM
FERC ¶ 62,415 (1982).
08JNN1
Agencies
[Federal Register Volume 75, Number 109 (Tuesday, June 8, 2010)]
[Notices]
[Pages 32459-32460]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-13559]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice Announcing Preliminary Permit Drawing
May 28, 2010.
In the matter of: Green Power Development, LLC, Alaska Power &
Telephone Company, Project No. 12661-001, Project No. 13599-000.
On October 1, 2009, at 8:30 a.m., the Commission received two
preliminary permit applications for proposed projects to be located at
an unnamed lake designated as Lake 3160 in an unorganized borough near
Juneau, Alaska.\1\ The applications were filed by Green Power
Development, LLC, for Project No. 12661-001 and Alaska Power &
Telephone Company, for Project No. 13599-000.
---------------------------------------------------------------------------
\1\ The Commission is open each day from 8:30 a.m. to 5 p.m.,
except Saturdays, Sundays, and holidays. 18 CFR 375.101(c) (2009).
The applications were filed between 5 p.m. on Wednesday September
30, 2009, and 8:30 a.m. on Thursday October 1, 2009. Under the
Commission's Rules of Practice and Procedure, any document received
after regular business hours is considered filed at 8:30 a.m. on the
next regular business day. 18 CFR 385.2001(a)(2) (2009).
---------------------------------------------------------------------------
Where all permit applicants are municipalities or all permit
applicants are non-municipalities, and no applicant's plans are better
adapted than
[[Page 32460]]
the others' to develop, conserve, and utilize in the public interest
the water resources of a region, the Commission issues a permit to the
applicant who filed first in time.\2\ In this case, because two
applications from entities not claiming municipal preference are deemed
filed at the same time, the Commission will conduct a random tie
breaker to determine priority. In the event that the Commission
concludes that neither applicant's plans are better adapted than the
other, priority will be determined accordingly.
---------------------------------------------------------------------------
\2\ 18 CFR 4.37 (2009). See, e.g., BPUS Generation Development,
LLC, 126 FERC ] 61,132 (2009).
---------------------------------------------------------------------------
On June 8, 2010, at 2 p.m. (eastern time), the Secretary of the
Commission, or her designee, will, by random drawing, determine the
filing priority for the two applicants identified in this notice. The
drawing is open to the public and will be held in room 2C, the
Commission Meeting Room, located at 888 First St., NE., Washington, DC
20426. The results of the drawing will be recorded by the Secretary or
her designee. A subsequent notice will be issued by the Secretary
announcing the results of the drawing.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-13559 Filed 6-7-10; 8:45 am]
BILLING CODE 6717-01-P