Notice Announcing Preliminary Permit Drawing, 32459 [2010-13558]

Download as PDF 32459 Federal Register / Vol. 75, No. 109 / Tuesday, June 8, 2010 / Notices CER Generation, LLC ..................................................................................................................................................... Day County Wind, LLC ................................................................................................................................................. Northeastern Power Company ...................................................................................................................................... EC&R Papalote Creek II, LLC ........................................................................................................................................ EDF EN Canada Inc. ...................................................................................................................................................... Take notice that during the month of April 2010, the status of the abovecaptioned entities as Exempt Wholesale Generators or Foreign Utility Companies became effective by operation of the Commission’s regulations, 18 CFR 366.7(a). Kimberly D. Bose, Secretary. Renewable Energy (EE–1), 1000 Independence Avenue, SW., Washington, DC 20585 Attn: National Energy Rating Program for Homes, Jessica Balsam. FOR FURTHER INFORMATION CONTACT: Joan Glickman at buildingratingRFI@ee.doe.gov. Issued in Washington, DC, on June 2, 2010. Cathy Zoi, Assistant Secretary, Energy Efficiency and Renewable Energy. [FR Doc. 2010–13556 Filed 6–7–10; 8:45 am] BILLING CODE 6717–01–P [FR Doc. 2010–13679 Filed 6–7–10; 8:45 am] DEPARTMENT OF ENERGY BILLING CODE 6450–01–P Energy Efficiency and Renewable Energy DEPARTMENT OF ENERGY National Energy Rating Program for Homes Federal Energy Regulatory Commission Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Request for Information (RFI). emcdonald on DSK2BSOYB1PROD with NOTICES AGENCY: SUMMARY: The Department of Energy (DOE) is seeking comments and information from interested parties to assist DOE in developing a voluntary National Energy Rating Program for Homes. The purpose of this program is to encourage consumers to invest in energy improvements in existing homes by providing reliable information to them at low cost. The Department is considering a wide range of issues including how to measure energy performance, what performance metrics to use, and how to present the information to consumers, among other questions. For a full discussion of these issues, please view www.buildings.energy.gov/ home_rating_rfi.html. DATES: Comments must be postmarked by no later than July 5, 2010. Comments must be received by no later than July 10, 2010. ADDRESSES: You may submit comments, identified by ‘‘RFI: National Energy Rating Program for Homes,’’ by any of the following methods: Federal eRulemaking Portal: https:// www.regulations.gov. Follow the instructions for submitting comments. E-mail: buildingratingRFI@EE.DOE.GOV. Include ‘‘RFI: National Energy Rating Program for Homes’’ in the subject line of the message. Mail: U.S. Department of Energy, Office of Energy Efficiency and VerDate Mar<15>2010 18:21 Jun 07, 2010 Jkt 220001 Notice Announcing Preliminary Permit Drawing May 28, 2010. In the matter of: Three Rivers Park District, Project No. 13457–000, BOST1 Hydroelectric LLC, Project No. 13458–000. On May 1, 2009, at 8:30 a.m., the Commission received two preliminary permit applications for proposed projects to be located at the existing Coon Rapids Dam on the Mississippi River in Hennepin and Anoka Counties, Minnesota.1 The applications were filed by Three Rivers Park District, for Project No. 13457 and BOST1 Hydroelectric LLC, for Project No. 13458. Where all permit applicants are municipalities or all permit applicants are non-municipalities, and no applicant’s plans are better adapted than the others’ to develop, conserve, and utilize in the public interest the water resources of a region, the Commission issues a permit to the applicant who filed first in time.2 In this case, because two applications from entities not claiming municipal preference are deemed filed at the same time, the Commission will conduct a random tie 1 The Commission is open each day from 8:30 a.m. to 5 p.m., except Saturdays, Sundays, and holidays. 18 CFR 375.101(c) (2009). The applications were filed between 5 p.m. on Thursday April 30, 2009, and 8:30 a.m. on Friday May 1, 2009. Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2009). 2 18 CFR 4.37 (2009). See, e.g., BPUS Generation Development, LLC, 126 FERC ¶ 61,132 (2009). PO 00000 Frm 00105 Fmt 4703 Sfmt 4703 Docket Docket Docket Docket Docket No. No. No. No. No. EG10–18–000 EG10–19–000 EG10–20–000 EG10–22–000 FC10–1–000 breaker to determine priority. In the event that the Commission concludes that neither applicant’s plans are better adapted than the other, priority will be determined accordingly. On June 8, 2010, at 2 p.m. (eastern time), the Secretary of the Commission, or her designee, will, by random drawing, determine the filing priority for the two applicants identified in this notice. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St., NE., Washington, DC 20426. The results of the drawing will be recorded by the Secretary or her designee. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Kimberly D. Bose, Secretary. [FR Doc. 2010–13558 Filed 6–7–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice Announcing Preliminary Permit Drawing May 28, 2010. In the matter of: Green Power Development, LLC, Alaska Power & Telephone Company, Project No. 12661–001, Project No. 13599–000. On October 1, 2009, at 8:30 a.m., the Commission received two preliminary permit applications for proposed projects to be located at an unnamed lake designated as Lake 3160 in an unorganized borough near Juneau, Alaska.1 The applications were filed by Green Power Development, LLC, for Project No. 12661–001 and Alaska Power & Telephone Company, for Project No. 13599–000. Where all permit applicants are municipalities or all permit applicants are non-municipalities, and no applicant’s plans are better adapted than 1 The Commission is open each day from 8:30 a.m. to 5 p.m., except Saturdays, Sundays, and holidays. 18 CFR 375.101(c) (2009). The applications were filed between 5 p.m. on Wednesday September 30, 2009, and 8:30 a.m. on Thursday October 1, 2009. Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2009). E:\FR\FM\08JNN1.SGM 08JNN1

Agencies

[Federal Register Volume 75, Number 109 (Tuesday, June 8, 2010)]
[Notices]
[Page 32459]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-13558]



-----------------------------------------------------------------------



DEPARTMENT OF ENERGY



Federal Energy Regulatory Commission




Notice Announcing Preliminary Permit Drawing



May 28, 2010.

    In the matter of: Three Rivers Park District, Project No. 13457-

000, BOST1 Hydroelectric LLC, Project No. 13458-000.



    On May 1, 2009, at 8:30 a.m., the Commission received two 

preliminary permit applications for proposed projects to be located at 

the existing Coon Rapids Dam on the Mississippi River in Hennepin and 

Anoka Counties, Minnesota.\1\ The applications were filed by Three 

Rivers Park District, for Project No. 13457 and BOST1 Hydroelectric 

LLC, for Project No. 13458.

---------------------------------------------------------------------------



    \1\ The Commission is open each day from 8:30 a.m. to 5 p.m., 

except Saturdays, Sundays, and holidays. 18 CFR 375.101(c) (2009). 

The applications were filed between 5 p.m. on Thursday April 30, 

2009, and 8:30 a.m. on Friday May 1, 2009. Under the Commission's 

Rules of Practice and Procedure, any document received after regular 

business hours is considered filed at 8:30 a.m. on the next regular 

business day. 18 CFR 385.2001(a)(2) (2009).

---------------------------------------------------------------------------



    Where all permit applicants are municipalities or all permit 

applicants are non-municipalities, and no applicant's plans are better 

adapted than the others' to develop, conserve, and utilize in the 

public interest the water resources of a region, the Commission issues 

a permit to the applicant who filed first in time.\2\ In this case, 

because two applications from entities not claiming municipal 

preference are deemed filed at the same time, the Commission will 

conduct a random tie breaker to determine priority. In the event that 

the Commission concludes that neither applicant's plans are better 

adapted than the other, priority will be determined accordingly.

---------------------------------------------------------------------------



    \2\ 18 CFR 4.37 (2009). See, e.g., BPUS Generation Development, 

LLC, 126 FERC ] 61,132 (2009).

---------------------------------------------------------------------------



    On June 8, 2010, at 2 p.m. (eastern time), the Secretary of the 

Commission, or her designee, will, by random drawing, determine the 

filing priority for the two applicants identified in this notice. The 

drawing is open to the public and will be held in room 2C, the 

Commission Meeting Room, located at 888 First St., NE., Washington, DC 

20426. The results of the drawing will be recorded by the Secretary or 

her designee. A subsequent notice will be issued by the Secretary 

announcing the results of the drawing.



Kimberly D. Bose,

Secretary.

[FR Doc. 2010-13558 Filed 6-7-10; 8:45 am]

BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.