Notice Announcing Preliminary Permit Drawing, 32459 [2010-13558]
Download as PDF
32459
Federal Register / Vol. 75, No. 109 / Tuesday, June 8, 2010 / Notices
CER Generation, LLC .....................................................................................................................................................
Day County Wind, LLC .................................................................................................................................................
Northeastern Power Company ......................................................................................................................................
EC&R Papalote Creek II, LLC ........................................................................................................................................
EDF EN Canada Inc. ......................................................................................................................................................
Take notice that during the month of
April 2010, the status of the abovecaptioned entities as Exempt Wholesale
Generators or Foreign Utility Companies
became effective by operation of the
Commission’s regulations, 18 CFR
366.7(a).
Kimberly D. Bose,
Secretary.
Renewable Energy (EE–1), 1000
Independence Avenue, SW.,
Washington, DC 20585 Attn: National
Energy Rating Program for Homes,
Jessica Balsam.
FOR FURTHER INFORMATION CONTACT: Joan
Glickman at
buildingratingRFI@ee.doe.gov.
Issued in Washington, DC, on June 2, 2010.
Cathy Zoi,
Assistant Secretary, Energy Efficiency and
Renewable Energy.
[FR Doc. 2010–13556 Filed 6–7–10; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2010–13679 Filed 6–7–10; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6450–01–P
Energy Efficiency and Renewable
Energy
DEPARTMENT OF ENERGY
National Energy Rating Program for
Homes
Federal Energy Regulatory
Commission
Energy Efficiency and
Renewable Energy, Department of
Energy.
ACTION: Request for Information (RFI).
emcdonald on DSK2BSOYB1PROD with NOTICES
AGENCY:
SUMMARY: The Department of Energy
(DOE) is seeking comments and
information from interested parties to
assist DOE in developing a voluntary
National Energy Rating Program for
Homes. The purpose of this program is
to encourage consumers to invest in
energy improvements in existing homes
by providing reliable information to
them at low cost. The Department is
considering a wide range of issues
including how to measure energy
performance, what performance metrics
to use, and how to present the
information to consumers, among other
questions. For a full discussion of these
issues, please view
www.buildings.energy.gov/
home_rating_rfi.html.
DATES: Comments must be postmarked
by no later than July 5, 2010. Comments
must be received by no later than July
10, 2010.
ADDRESSES: You may submit comments,
identified by ‘‘RFI: National Energy
Rating Program for Homes,’’ by any of
the following methods: Federal
eRulemaking Portal: https://
www.regulations.gov. Follow the
instructions for submitting comments.
E-mail:
buildingratingRFI@EE.DOE.GOV.
Include ‘‘RFI: National Energy Rating
Program for Homes’’ in the subject line
of the message. Mail: U.S. Department of
Energy, Office of Energy Efficiency and
VerDate Mar<15>2010
18:21 Jun 07, 2010
Jkt 220001
Notice Announcing Preliminary Permit
Drawing
May 28, 2010.
In the matter of: Three Rivers Park District,
Project No. 13457–000, BOST1 Hydroelectric
LLC, Project No. 13458–000.
On May 1, 2009, at 8:30 a.m., the
Commission received two preliminary
permit applications for proposed
projects to be located at the existing
Coon Rapids Dam on the Mississippi
River in Hennepin and Anoka Counties,
Minnesota.1 The applications were filed
by Three Rivers Park District, for Project
No. 13457 and BOST1 Hydroelectric
LLC, for Project No. 13458.
Where all permit applicants are
municipalities or all permit applicants
are non-municipalities, and no
applicant’s plans are better adapted than
the others’ to develop, conserve, and
utilize in the public interest the water
resources of a region, the Commission
issues a permit to the applicant who
filed first in time.2 In this case, because
two applications from entities not
claiming municipal preference are
deemed filed at the same time, the
Commission will conduct a random tie
1 The Commission is open each day from 8:30
a.m. to 5 p.m., except Saturdays, Sundays, and
holidays. 18 CFR 375.101(c) (2009). The
applications were filed between 5 p.m. on Thursday
April 30, 2009, and 8:30 a.m. on Friday May 1,
2009. Under the Commission’s Rules of Practice
and Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2009).
2 18 CFR 4.37 (2009). See, e.g., BPUS Generation
Development, LLC, 126 FERC ¶ 61,132 (2009).
PO 00000
Frm 00105
Fmt 4703
Sfmt 4703
Docket
Docket
Docket
Docket
Docket
No.
No.
No.
No.
No.
EG10–18–000
EG10–19–000
EG10–20–000
EG10–22–000
FC10–1–000
breaker to determine priority. In the
event that the Commission concludes
that neither applicant’s plans are better
adapted than the other, priority will be
determined accordingly.
On June 8, 2010, at 2 p.m. (eastern
time), the Secretary of the Commission,
or her designee, will, by random
drawing, determine the filing priority
for the two applicants identified in this
notice. The drawing is open to the
public and will be held in room 2C, the
Commission Meeting Room, located at
888 First St., NE., Washington, DC
20426. The results of the drawing will
be recorded by the Secretary or her
designee. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–13558 Filed 6–7–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice Announcing Preliminary Permit
Drawing
May 28, 2010.
In the matter of: Green Power
Development, LLC, Alaska Power &
Telephone Company, Project No. 12661–001,
Project No. 13599–000.
On October 1, 2009, at 8:30 a.m., the
Commission received two preliminary
permit applications for proposed
projects to be located at an unnamed
lake designated as Lake 3160 in an
unorganized borough near Juneau,
Alaska.1 The applications were filed by
Green Power Development, LLC, for
Project No. 12661–001 and Alaska
Power & Telephone Company, for
Project No. 13599–000.
Where all permit applicants are
municipalities or all permit applicants
are non-municipalities, and no
applicant’s plans are better adapted than
1 The Commission is open each day from 8:30
a.m. to 5 p.m., except Saturdays, Sundays, and
holidays. 18 CFR 375.101(c) (2009). The
applications were filed between 5 p.m. on
Wednesday September 30, 2009, and 8:30 a.m. on
Thursday October 1, 2009. Under the Commission’s
Rules of Practice and Procedure, any document
received after regular business hours is considered
filed at 8:30 a.m. on the next regular business day.
18 CFR 385.2001(a)(2) (2009).
E:\FR\FM\08JNN1.SGM
08JNN1
Agencies
[Federal Register Volume 75, Number 109 (Tuesday, June 8, 2010)]
[Notices]
[Page 32459]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-13558]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice Announcing Preliminary Permit Drawing
May 28, 2010.
In the matter of: Three Rivers Park District, Project No. 13457-
000, BOST1 Hydroelectric LLC, Project No. 13458-000.
On May 1, 2009, at 8:30 a.m., the Commission received two
preliminary permit applications for proposed projects to be located at
the existing Coon Rapids Dam on the Mississippi River in Hennepin and
Anoka Counties, Minnesota.\1\ The applications were filed by Three
Rivers Park District, for Project No. 13457 and BOST1 Hydroelectric
LLC, for Project No. 13458.
---------------------------------------------------------------------------
\1\ The Commission is open each day from 8:30 a.m. to 5 p.m.,
except Saturdays, Sundays, and holidays. 18 CFR 375.101(c) (2009).
The applications were filed between 5 p.m. on Thursday April 30,
2009, and 8:30 a.m. on Friday May 1, 2009. Under the Commission's
Rules of Practice and Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on the next regular
business day. 18 CFR 385.2001(a)(2) (2009).
---------------------------------------------------------------------------
Where all permit applicants are municipalities or all permit
applicants are non-municipalities, and no applicant's plans are better
adapted than the others' to develop, conserve, and utilize in the
public interest the water resources of a region, the Commission issues
a permit to the applicant who filed first in time.\2\ In this case,
because two applications from entities not claiming municipal
preference are deemed filed at the same time, the Commission will
conduct a random tie breaker to determine priority. In the event that
the Commission concludes that neither applicant's plans are better
adapted than the other, priority will be determined accordingly.
---------------------------------------------------------------------------
\2\ 18 CFR 4.37 (2009). See, e.g., BPUS Generation Development,
LLC, 126 FERC ] 61,132 (2009).
---------------------------------------------------------------------------
On June 8, 2010, at 2 p.m. (eastern time), the Secretary of the
Commission, or her designee, will, by random drawing, determine the
filing priority for the two applicants identified in this notice. The
drawing is open to the public and will be held in room 2C, the
Commission Meeting Room, located at 888 First St., NE., Washington, DC
20426. The results of the drawing will be recorded by the Secretary or
her designee. A subsequent notice will be issued by the Secretary
announcing the results of the drawing.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-13558 Filed 6-7-10; 8:45 am]
BILLING CODE 6717-01-P