Natural Gas Pipeline Company of America LLC; Notice of Request Under Blanket Authorization, 32460 [2010-13557]

Download as PDF 32460 Federal Register / Vol. 75, No. 109 / Tuesday, June 8, 2010 / Notices the others’ to develop, conserve, and utilize in the public interest the water resources of a region, the Commission issues a permit to the applicant who filed first in time.2 In this case, because two applications from entities not claiming municipal preference are deemed filed at the same time, the Commission will conduct a random tie breaker to determine priority. In the event that the Commission concludes that neither applicant’s plans are better adapted than the other, priority will be determined accordingly. On June 8, 2010, at 2 p.m. (eastern time), the Secretary of the Commission, or her designee, will, by random drawing, determine the filing priority for the two applicants identified in this notice. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St., NE., Washington, DC 20426. The results of the drawing will be recorded by the Secretary or her designee. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Kimberly D. Bose, Secretary. [FR Doc. 2010–13559 Filed 6–7–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP10–438–000] Natural Gas Pipeline Company of America LLC; Notice of Request Under Blanket Authorization emcdonald on DSK2BSOYB1PROD with NOTICES May 28, 2010. Take notice that on May 20, 2010, Natural Gas Pipeline Company of America LLC (Natural), 3250 Lacey Road, Suite 700, Downers Grove, Illinois 60515, filed in Docket No. CP10–438– 000, an application pursuant to sections 157.205, 157.208, 157.211 and 157.212 of the Commission’s Regulations under the Natural Gas Act (NGA) as amended, to construct and operate facilities necessary to deliver natural gas to its affiliate, Kinder Morgan Louisiana Pipeline LLC (KMLP) in Johnsons Bayou, Cameron Parish, Louisiana, under Natural’s blanket certificate issued in Docket No. CP82–402–000,1 all as more fully set forth in the application which is on file with the 2 18 CFR 4.37 (2009). See, e.g., BPUS Generation Development, LLC, 126 FERC ¶ 61,132 (2009). 1 20 FERC ¶ 62,415 (1982). VerDate Mar<15>2010 16:31 Jun 07, 2010 Jkt 220001 Commission and open to the public for inspection. Natural proposes to construct and operate a delivery interconnect off its UTOS Lateral with the Southwest Louisiana lateral (Southwest Loop). To accomplish this, Natural would construct and operate approximately 320 feet of 12-inch diameter pipeline; a dual 8-inch meter on a new metering platform; and such other appurtenant facilities required to effect the interconnects to deliver up to 200,000 Dth/day of natural gas from its UTOS Lateral to KMLP. Natural would also construct certain section 2.55(a) nonjurisdictional facilities such as instrumentation and cathodic protection for all piping and equipment. Natural also states that KMLP would reimburse Natural for the estimated $2,500,000 construction cost of the proposed facilities. Any questions concerning this application may be directed to Bruce H. Newsome, Vice President, Regulatory Products and Services, Natural Gas Pipeline Company of America LLC, 3250 Lacey Road, 7th Floor, Downers Grove, Illinois 60515–7918, or via telephone at (630) 725–3070, or by email bruce_newsome@kindermorgan.com. This filing is available for review at the Commission or may be viewed on the Commission’s Web site at https:// www.ferc.gov, using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number filed to access the document. For assistance, please contact FERC Online Support at FERC OnlineSupport@ferc.gov or call toll-free at (866) 206–3676, or, for TTY, contact (202) 502–8659. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages intervenors to file electronically. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request PO 00000 Frm 00106 Fmt 4703 Sfmt 4703 shall be treated as an application for authorization pursuant to section 7 of the NGA. Kimberly D. Bose, Secretary. [FR Doc. 2010–13557 Filed 6–7–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP10–431–000] Natural Gas Pipeline Company of America LLC; Notice of Request Under Blanket Authorization May 28, 2010. Take notice that on May 14, 2010, Natural Gas Pipeline Company of America LLC (Natural), 3250 Lacey Road, Suite 700, Downers Grove, Illinois 60515, filed in Docket No. CP10–431– 000, an application pursuant to sections 157.205, 157.208, 157.211 and 157.212 of the Commission’s regulations under the Natural Gas Act (NGA) as amended, to construct and operate facilities necessary to deliver natural gas to Bridgeline Holdings L.P. (Bridgeline) in Johnsons Bayou, Cameron Parish, Louisiana, under Natural’s blanket certificate issued in Docket No. CP82– 402–000,1 all as more fully set forth in the application which is on file with the Commission and open to the public for inspection. Natural proposes to construct and operate a delivery interconnect off its UTOS Lateral in order to deliver natural gas volumes to Bridgeline. To accomplish this, Natural would construct and operate a 16-inch tap; approximately 530 feet of 12-inch diameter pipeline; a metering platform; a dual 8-inch meter on the metering platform; and such other appurtenant facilities required to effect the interconnects to deliver up to 200,000 Dth/day of natural gas from its UTOS Lateral to Bridgeline. Natural further states that it would construct approximately 180 feet of 16-inch diameter interconnecting pipeline between the metering facilities located on the platform and the UTOS Lateral. Through the proposed piping, Natural would deliver natural gas from the platform and metering equipment to Bridgeline’s existing pipeline system, where Bridgeline has already constructed the tap for this interconnection. Natural would also construct certain section 2.55(a) non1 20 E:\FR\FM\08JNN1.SGM FERC ¶ 62,415 (1982). 08JNN1

Agencies

[Federal Register Volume 75, Number 109 (Tuesday, June 8, 2010)]
[Notices]
[Page 32460]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-13557]



-----------------------------------------------------------------------



DEPARTMENT OF ENERGY



Federal Energy Regulatory Commission



[Docket No. CP10-438-000]




Natural Gas Pipeline Company of America LLC; Notice of Request 

Under Blanket Authorization



May 28, 2010.

    Take notice that on May 20, 2010, Natural Gas Pipeline Company of 

America LLC (Natural), 3250 Lacey Road, Suite 700, Downers Grove, 

Illinois 60515, filed in Docket No. CP10-438-000, an application 

pursuant to sections 157.205, 157.208, 157.211 and 157.212 of the 

Commission's Regulations under the Natural Gas Act (NGA) as amended, to 

construct and operate facilities necessary to deliver natural gas to 

its affiliate, Kinder Morgan Louisiana Pipeline LLC (KMLP) in Johnsons 

Bayou, Cameron Parish, Louisiana, under Natural's blanket certificate 

issued in Docket No. CP82-402-000,\1\ all as more fully set forth in 

the application which is on file with the Commission and open to the 

public for inspection.

---------------------------------------------------------------------------



    \1\ 20 FERC ] 62,415 (1982).

---------------------------------------------------------------------------



    Natural proposes to construct and operate a delivery interconnect 

off its UTOS Lateral with the Southwest Louisiana lateral (Southwest 

Loop). To accomplish this, Natural would construct and operate 

approximately 320 feet of 12-inch diameter pipeline; a dual 8-inch 

meter on a new metering platform; and such other appurtenant facilities 

required to effect the interconnects to deliver up to 200,000 Dth/day 

of natural gas from its UTOS Lateral to KMLP. Natural would also 

construct certain section 2.55(a) non-jurisdictional facilities such as 

instrumentation and cathodic protection for all piping and equipment. 

Natural also states that KMLP would reimburse Natural for the estimated 

$2,500,000 construction cost of the proposed facilities.

    Any questions concerning this application may be directed to Bruce 

H. Newsome, Vice President, Regulatory Products and Services, Natural 

Gas Pipeline Company of America LLC, 3250 Lacey Road, 7th Floor, 

Downers Grove, Illinois 60515-7918, or via telephone at (630) 725-3070, 

or by e-mail bruce_newsome@kindermorgan.com.

    This filing is available for review at the Commission or may be 

viewed on the Commission's Web site at https://www.ferc.gov, using the 

``eLibrary'' link. Enter the docket number excluding the last three 

digits in the docket number filed to access the document. For 

assistance, please contact FERC Online Support at FERC 

OnlineSupport@ferc.gov or call toll-free at (866) 206-3676, or, for 

TTY, contact (202) 502-8659. Comments, protests and interventions may 

be filed electronically via the Internet in lieu of paper. See, 18 CFR 

385.2001(a)(1)(iii) and the instructions on the Commission's Web site 

under the ``e-Filing'' link. The Commission strongly encourages 

intervenors to file electronically.

    Any person or the Commission's staff may, within 60 days after 

issuance of the instant notice by the Commission, file pursuant to Rule 

214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 

intervene or notice of intervention and pursuant to section 157.205 of 

the regulations under the NGA (18 CFR 157.205), a protest to the 

request. If no protest is filed within the time allowed therefore, the 

proposed activity shall be deemed to be authorized effective the day 

after the time allowed for filing a protest. If a protest is filed and 

not withdrawn within 30 days after the allowed time for filing a 

protest, the instant request shall be treated as an application for 

authorization pursuant to section 7 of the NGA.



Kimberly D. Bose,

Secretary.

[FR Doc. 2010-13557 Filed 6-7-10; 8:45 am]