Environmental Impacts Statements; Notice of Availability, 31785 [2010-13458]

Download as PDF Federal Register / Vol. 75, No. 107 / Friday, June 4, 2010 / Notices Alexis Strauss, Director, Water Division, EPA Region 9. Dated: May 26, 2010. Michael A. Bussell, Director, Office of Water and Watersheds, EPA Region 10. [FR Doc. 2010–13468 Filed 6–3–10; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8990–7] Environmental Impacts Statements; Notice of Availability srobinson on DSKHWCL6B1PROD with NOTICES Responsible Agency: Office of Federal Activities, General Information (202) 564–1399 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements. Filed 05/24/2010 through 05/28/2010. Pursuant to 40 CFR 1506.9. Notice In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA has met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA’s comment letters, in the Federal Register. Since February 2008, EPA has been including its comment letters on EISs on its Web site at: https:// www.epa.gov/compliance/nepa/ eisdata.html. Including the entire EIS comment letters on the Web site satisfies the Section 309(a) requirement to make EPA’s comments on EISs available to the public. Accordingly, on March 31, 2010, EPA discontinued the publication of the notice of availability of EPA comments in the Federal Register. EIS No. 20100201, Draft EIS, FHWA, 00, Southeast High Speed Rail RichmondRaleigh Project, Addresses the 162 mile Segment between Richmond, VA to Raleigh, NC, Comment Period Ends: 08/30/2010, Contact: John Winkle 202–493–60607. EIS No. 20100202, Draft EIS, USFS, TX, Comal County Regional Habitat Conservation Plan, Application for Incidental Take Permit, Comal County, TX, Comment Period Ends: 07/28/2010, Contact: Bill Seawell 512–490–0057. EIS No. 20100203, Draft Supplement, USFS, AK, Programmatic EIS—Exxon Valdez Oil Spill Restoration Plan DOI/DOC, New Circumstances Bearing on the Council’s Restoration VerDate Mar<15>2010 16:01 Jun 03, 2010 Jkt 220001 Effort, Implementation, Prince William Sound, Gulf of Alaska, AK, Comment Period Ends: 07/19/2010, Contact: Laurel Jennings 206–526– 4525. EIS No. 20100204, Final EIS, USN, GU, Mariana Islands Range Complex (MIRC), To Address Ongoing and Proposed Military Training Activities, Mariana Islands, GU, Wait Period Ends: 07/06/2010, Contact: Nora Macariola-See 808–472–1402. EIS No. 20100205, Draft Supplement, USFS, CA, Beaverslide Timber Sale and Fuel Treatment Project, Additional Analysis and New Information, Six Rivers National Forest, Mad River Range District, Trinity County, CA, Comment Period Ends: 07/19/2010, Contact: Thomas Hudson 707–574–6233. EIS No. 20100206, Draft EIS, FHWA, OR, Newberg Dundee Bypass Project, Proposal to Build a Four Lane Expressway and Reduce Congestion on OR 99W, from OR 99W/OR 8 to the top of Rex Hill, USACE 404/Removal Fill Permits, Funding, Yamhill and Washington Counties, OR, Comment Period Ends: 07/19/2010, Contact: Michelle Eraut 503–587–4716. EIS No. 20100207, Draft EIS, USFS, SD, Nautilus Project Area, Multiple Resource Management Actions, Implementation, Black Hills National Forest, Northern Hills Ranger District, Lawrence, Meade and Pennington, SD, Comment Period Ends: 07/19/ 2010, Contact: Chris Stores 605–642– 4622. Amended Notices EIS No. 20100189, Final EIS, NPS, AK, Legislative—Glacier Bay National Park Project, Authorize Harvest of Glaucous-Winged Gull Eggs by the Huna Tlingit, Implementation, AK, Wait Period Ends: 06/28/2010, Contact: Cherry Payne 907–697–2230. Revision to FR Notice Published 5/28/ 2010: Correction to Lead Agency from BLM to NPS. EIS No. 20100193, Final EIS, FRA, CA, Adoption—March 2004 Transbay Terminal/Caltrain Downtown Extension/Redevelopment Program (Transbay Program) Phase 1, San Francisco, San Mateo and Santa Clara, CA, Wait Period Ends: 06/28/2010, Contact: David Valenstein 202–493– 6368. Revision to FR Notice Published 05/ 28/2010: Correction to Contact Person Name and Telephone. PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 31785 Dated: June 1, 2010. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2010–13458 Filed 6–3–10; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2010–0421; FRL–8826-1] Pesticide Products; Registration Applications AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: EPA has received applications to register pesticide products containing Fluxapyroxad, an active ingredient not included in any previously registered pesticide product. Pursuant to the provisions of section 3(c)(4) of the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA), EPA is hereby providing notice of receipt and opportunity to comment on these applications. DATES: Comments must be received on or before July 6, 2010. ADDRESSES: Submit your comments, identified by docket identification (ID) number EPA–HQ–OPP–2010–0421, by one of the following methods: • Federal eRulemaking Portal: https://www.regulations.gov. Follow the on-line instructions for submitting comments. • Mail: Office of Pesticide Programs (OPP) Regulatory Public Docket (7502P), Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460–0001. • Delivery: OPP Regulatory Public Docket (7502P), Environmental Protection Agency, Rm. S–4400, One Potomac Yard (South Bldg.), 2777 S. Crystal Dr., Arlington, VA. Deliveries are only accepted during the Docket Facility’s normal hours of operation (8:30 a.m. to 4 p.m., Monday through Friday, excluding legal holidays). Special arrangements should be made for deliveries of boxed information. The Docket Facility telephone number is (703) 305–5805. Instructions: Direct your comments to docket ID number EPA–HQ–OPP–2010– 0421. EPA’s policy is that all comments received will be included in the docket without change and may be made available on-line at https:// www.regulations.gov, including any personal information provided, unless the comment includes information claimed to be Confidential Business E:\FR\FM\04JNN1.SGM 04JNN1

Agencies

[Federal Register Volume 75, Number 107 (Friday, June 4, 2010)]
[Notices]
[Page 31785]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-13458]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8990-7]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements.
Filed 05/24/2010 through 05/28/2010.
Pursuant to 40 CFR 1506.9.

Notice

    In accordance with Section 309(a) of the Clean Air Act, EPA is 
required to make its comments on EISs issued by other Federal agencies 
public. Historically, EPA has met this mandate by publishing weekly 
notices of availability of EPA comments, which includes a brief summary 
of EPA's comment letters, in the Federal Register. Since February 2008, 
EPA has been including its comment letters on EISs on its Web site at: 
https://www.epa.gov/compliance/nepa/eisdata.html. Including the entire 
EIS comment letters on the Web site satisfies the Section 309(a) 
requirement to make EPA's comments on EISs available to the public. 
Accordingly, on March 31, 2010, EPA discontinued the publication of the 
notice of availability of EPA comments in the Federal Register.

EIS No. 20100201, Draft EIS, FHWA, 00, Southeast High Speed Rail 
Richmond-Raleigh Project, Addresses the 162 mile Segment between 
Richmond, VA to Raleigh, NC, Comment Period Ends: 08/30/2010, Contact: 
John Winkle 202-493-60607.
EIS No. 20100202, Draft EIS, USFS, TX, Comal County Regional Habitat 
Conservation Plan, Application for Incidental Take Permit, Comal 
County, TX, Comment Period Ends: 07/28/2010, Contact: Bill Seawell 512-
490-0057.
EIS No. 20100203, Draft Supplement, USFS, AK, Programmatic EIS--Exxon 
Valdez Oil Spill Restoration Plan DOI/DOC, New Circumstances Bearing on 
the Council's Restoration Effort, Implementation, Prince William Sound, 
Gulf of Alaska, AK, Comment Period Ends: 07/19/2010, Contact: Laurel 
Jennings 206-526-4525.
EIS No. 20100204, Final EIS, USN, GU, Mariana Islands Range Complex 
(MIRC), To Address Ongoing and Proposed Military Training Activities, 
Mariana Islands, GU, Wait Period Ends: 07/06/2010, Contact: Nora 
Macariola-See 808-472-1402.
EIS No. 20100205, Draft Supplement, USFS, CA, Beaverslide Timber Sale 
and Fuel Treatment Project, Additional Analysis and New Information, 
Six Rivers National Forest, Mad River Range District, Trinity County, 
CA, Comment Period Ends: 07/19/2010, Contact: Thomas Hudson 707-574-
6233.
EIS No. 20100206, Draft EIS, FHWA, OR, Newberg Dundee Bypass Project, 
Proposal to Build a Four Lane Expressway and Reduce Congestion on OR 
99W, from OR 99W/OR 8 to the top of Rex Hill, USACE 404/Removal Fill 
Permits, Funding, Yamhill and Washington Counties, OR, Comment Period 
Ends: 07/19/2010, Contact: Michelle Eraut 503-587-4716.
EIS No. 20100207, Draft EIS, USFS, SD, Nautilus Project Area, Multiple 
Resource Management Actions, Implementation, Black Hills National 
Forest, Northern Hills Ranger District, Lawrence, Meade and Pennington, 
SD, Comment Period Ends: 07/19/2010, Contact: Chris Stores 605-642-
4622.

Amended Notices

EIS No. 20100189, Final EIS, NPS, AK, Legislative--Glacier Bay National 
Park Project, Authorize Harvest of Glaucous-Winged Gull Eggs by the 
Huna Tlingit, Implementation, AK, Wait Period Ends: 06/28/2010, 
Contact: Cherry Payne 907-697-2230.

    Revision to FR Notice Published 5/28/2010: Correction to Lead 
Agency from BLM to NPS.

EIS No. 20100193, Final EIS, FRA, CA, Adoption--March 2004 Transbay 
Terminal/Caltrain Downtown Extension/Redevelopment Program (Transbay 
Program) Phase 1, San Francisco, San Mateo and Santa Clara, CA, Wait 
Period Ends: 06/28/2010, Contact: David Valenstein 202-493-6368.

    Revision to FR Notice Published 05/28/2010: Correction to Contact 
Person Name and Telephone.

    Dated: June 1, 2010.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2010-13458 Filed 6-3-10; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.