Frequency Regulation Compensation in the Organized Wholesale Power Markets; Notice Establishing Date for Comments, 31430 [2010-13371]
Download as PDF
31430
Federal Register / Vol. 75, No. 106 / Thursday, June 3, 2010 / Notices
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern time
on Monday, June 7, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–13365 Filed 6–2–10; 8:45 am]
BILLING CODE 6717–01–P
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. You may also register
online at https://www.ferc.gov/docsfiling/esubscription.asp to be notified
via e-mail of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the issuance date of this
notice, and should be addressed to the
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Room 1–A, Washington, DC 20426.
Please affix ‘‘Lake Creek Project No.
2594–013’’ to all comments. Comments
may be filed electronically via Internet
in lieu of paper.
The Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘eFiling’’ link. For further information,
contact Shana Murray at (202) 502–
8333.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2010–13368 Filed 6–2–10; 8:45 am]
BILLING CODE 6717–01–P
[Project No. 2594–013–MT]
DEPARTMENT OF ENERGY
Northern Lights, Inc.; Notice of
Availability of Environmental
Assessment
Federal Energy Regulatory
Commission
sroberts on DSKD5P82C1PROD with NOTICES
May 27, 2010.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission (Commission) regulations,
18 CFR part 380 (Order No. 486, 52 FR
47879), the Office of Energy Projects has
reviewed the application for a new
license for the existing Lake Creek
Hydroelectric Project, located on Lake
Creek in Lincoln County, Montana, near
the City of Troy and prepared a draft
environmental assessment (EA). The
project does not occupy Federal lands.
The draft EA contains the staff’s
analysis of the potential environmental
impacts of the project and concludes
that licensing the project would not
constitute a major federal action that
would significantly affect the quality of
the human environment.
A copy of the draft EA is on file with
the Commission and is available for
public inspection. The draft EA may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
VerDate Mar<15>2010
18:21 Jun 02, 2010
Jkt 220001
[Docket No. AD10–11–000]
Frequency Regulation Compensation
in the Organized Wholesale Power
Markets; Notice Establishing Date for
Comments
May 27, 2010.
On May 26, 2010, Commission staff
convened a technical conference
regarding frequency regulation in the
organized wholesale power markets, as
previously announced.1
Entities wishing to submit further,
written comments regarding the matters
discussed at the technical conference
should submit their comments in this
docket on or before June 16, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–13371 Filed 6–2–10; 8:45 am]
BILLING CODE 6717–01–P
1 Notice of Technical Conference re Frequency
Compensation in the Organized Wholesale Power
Markets, 75 FR 23,759, as supplemented by
Supplemental Notice of Technical Conference re
Frequency Compensation in the Organized
Wholesale Power Markets, issued April 27, 2010.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP10–441–000]
Transcontinental Gas Pipe Line
Company, LLC; Notice of Request
Under Blanket Authorization
May 27, 2010.
Take notice that on May 24, 2010,
Transcontinental Gas Pipe Line
Company, LLC (Transco), Post Office
Box 1396, Houston, Texas 77251, filed
in Docket No. CP10–441–000, an
application pursuant to sections
157.205, 157.208, and 157.212 of the
Commission’s Regulations under the
Natural Gas Act (NGA) as amended, to
construct and operate a new
interconnection on Transco’s Southwest
Louisiana Lateral to allow Transco to
receive natural gas and regasified
liquefied natural gas (LNG) in Johnsons
Bayou, Cameron Parish, Louisiana,
under Transco’s blanket certificate
issued in Docket No. CP82–426–000,1
all as more fully set forth in the
application which is on file with the
Commission and open to the public for
inspection.
Transco proposes to construct and
operate a delivery interconnect off its
Southwest Louisiana Lateral to allow
Transco to receive natural gas and
regasified LNG either from or via
Natural Gas Pipeline Company of
America (NGPL). Transco states that it
would design, construct, own, and
operate one 30-inch by 16-inch hot tap
fitting with one 16-inch tap assembly,
flow and pressure control facility,
overpressure protection valve and
controls, a 12-foot by 8-foot skid
mounted instrument building, and other
such other appurtenant facilities
required to effect the interconnect to
receive up to 200 MMcf per day of
natural gas in Transco’s Zone 2. Transco
also states that NGPL would reimburse
Transco for the estimated $1,140,000
construction cost of the proposed
facilities.
Any questions concerning this
application may be directed to Bela
Patel, Transcontinental Gas Pipe Line
Company, LLC, Post Office Box 1396,
Houston, Texas 77251 or via telephone
at (713) 215–2659.
This filing is available for review at
the Commission or may be viewed on
the Commission’s Web site at https://
www.ferc.gov, using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document. For
1 20
E:\FR\FM\03JNN1.SGM
FERC ¶ 62,420 (1982).
03JNN1
Agencies
[Federal Register Volume 75, Number 106 (Thursday, June 3, 2010)]
[Notices]
[Page 31430]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-13371]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. AD10-11-000]
Frequency Regulation Compensation in the Organized Wholesale
Power Markets; Notice Establishing Date for Comments
May 27, 2010.
On May 26, 2010, Commission staff convened a technical conference
regarding frequency regulation in the organized wholesale power
markets, as previously announced.\1\
---------------------------------------------------------------------------
\1\ Notice of Technical Conference re Frequency Compensation in
the Organized Wholesale Power Markets, 75 FR 23,759, as supplemented
by Supplemental Notice of Technical Conference re Frequency
Compensation in the Organized Wholesale Power Markets, issued April
27, 2010.
---------------------------------------------------------------------------
Entities wishing to submit further, written comments regarding the
matters discussed at the technical conference should submit their
comments in this docket on or before June 16, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-13371 Filed 6-2-10; 8:45 am]
BILLING CODE 6717-01-P