East Texas Electric Cooperative, Inc. (Cooperative); Notice Soliciting Comments and Final Recommendations, Terms and Conditions, and Prescriptions, 31431 [2010-13369]

Download as PDF Federal Register / Vol. 75, No. 106 / Thursday, June 3, 2010 / Notices assistance, please contact FERC Online Support at FERC OnlineSupport@ferc.gov or call toll-free at (866)206–3676, or, for TTY, contact (202)502–8659. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages intervenors to file electronically. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Kimberly D. Bose, Secretary. [FR Doc. 2010–13370 Filed 6–2–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12632–001] East Texas Electric Cooperative, Inc. (Cooperative); Notice Soliciting Comments and Final Recommendations, Terms and Conditions, and Prescriptions sroberts on DSKD5P82C1PROD with NOTICES May 27, 2010. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Original Major License—Existing Dam. b. Project No.: P–12632–001. c. Date Filed: March 31, 2009. d. Applicant: East Texas Electric Cooperative, Inc. (Cooperative). e. Name of Project: Lake Livingston Hydroelectric Project. f. Location: On the Trinity River, in San Jacinto, Polk, Trinity, and Walker Counties, Texas. The project would not occupy any Federal lands. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)–825(r). VerDate Mar<15>2010 18:21 Jun 02, 2010 Jkt 220001 h. Applicant Contact: Edd Hargett, East Texas Electric Cooperative, Inc., 2905 Westward Drive, P.O. Box 631623, Nacogdoches, TX 75963; (936) 560– 9532; eddh@gtpower.com. i. FERC Contact: Sarah Florentino at (202) 502–6863, or sarah.florentino@ferc.gov. j. Deadline for filing comments and recommendations, terms and conditions, and prescriptions is 60 days from the issuance of this notice; reply comments are due 105 days from the issuance date of this notice. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov/docs-filing/ ferconline.asp) under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted for filing and is now ready for environmental analysis. l. Project Description: The proposed project would use the following existing facilities: (1) The Trinity River Authority’s (TRA) existing 14,400-footlong (approximate) Lake Livingston dam, which has a crest elevation of 145.0 feet mean sea level (msl) and consists of (a) A basic earth embankment section, (b) outlet works, and (c) a spillway; and (2) the 83,000acre Lake Livingston, which has a normal water surface elevation of 131.0 feet msl and gross storage capacity of 1,750,000 acre-feet. In addition to the existing structures, the proposed project would consist of the following new facilities: (1) An intake structure and headrace channel approximately 300 feet long; (2) three steel penstocks, about 12 feet in PO 00000 Frm 00020 Fmt 4703 Sfmt 9990 31431 diameter and 750 feet in length; (3) a powerhouse containing three generating units, having a total installed capacity of 24 MW; (4) an approximate 1,200-feetlong tailrace channel; (5) an approximate 2.8-mile-long, 138-kilovolt transmission line interconnecting the project with Entergy’s existing Rich substation near Goodrich; and (6) an electric switchyard and other appurtenant facilities. The project would have an estimated annual generation of 124 gigawatt-hours, which the Cooperative would sell at wholesale to its constituent electric cooperatives. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov, using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits, in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. All filings must: (1) Bear in all capital letters the title ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person submitting the filing; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b), and 385.2010. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–13369 Filed 6–2–10; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\03JNN1.SGM 03JNN1

Agencies

[Federal Register Volume 75, Number 106 (Thursday, June 3, 2010)]
[Notices]
[Page 31431]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-13369]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12632-001]


East Texas Electric Cooperative, Inc. (Cooperative); Notice 
Soliciting Comments and Final Recommendations, Terms and Conditions, 
and Prescriptions

May 27, 2010.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Original Major License--Existing Dam.
    b. Project No.: P-12632-001.
    c. Date Filed: March 31, 2009.
    d. Applicant: East Texas Electric Cooperative, Inc. (Cooperative).
    e. Name of Project: Lake Livingston Hydroelectric Project.
    f. Location: On the Trinity River, in San Jacinto, Polk, Trinity, 
and Walker Counties, Texas. The project would not occupy any Federal 
lands.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Edd Hargett, East Texas Electric Cooperative, 
Inc., 2905 Westward Drive, P.O. Box 631623, Nacogdoches, TX 75963; 
(936) 560-9532; eddh@gtpower.com.
    i. FERC Contact: Sarah Florentino at (202) 502-6863, or 
sarah.florentino@ferc.gov.
    j. Deadline for filing comments and recommendations, terms and 
conditions, and prescriptions is 60 days from the issuance of this 
notice; reply comments are due 105 days from the issuance date of this 
notice.
    All documents may be filed electronically via the Internet. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (https://www.ferc.gov/docs-filing/ferconline.asp) under the 
``eFiling'' link. For a simpler method of submitting text only 
comments, click on ``Quick Comment.'' For assistance, please contact 
FERC Online Support at FERCOnlineSupport@ferc.gov; call toll-free at 
(866) 208-3676; or, for TTY, contact (202) 502-8659. Although the 
Commission strongly encourages electronic filing, documents may also be 
paper-filed. To paper-file, mail an original and eight copies to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. Project Description: The proposed project would use the 
following existing facilities: (1) The Trinity River Authority's (TRA) 
existing 14,400-foot-long (approximate) Lake Livingston dam, which has 
a crest elevation of 145.0 feet mean sea level (msl) and consists of 
(a) A basic earth embankment section, (b) outlet works, and (c) a 
spillway; and (2) the 83,000-acre Lake Livingston, which has a normal 
water surface elevation of 131.0 feet msl and gross storage capacity of 
1,750,000 acre-feet.
    In addition to the existing structures, the proposed project would 
consist of the following new facilities: (1) An intake structure and 
headrace channel approximately 300 feet long; (2) three steel 
penstocks, about 12 feet in diameter and 750 feet in length; (3) a 
powerhouse containing three generating units, having a total installed 
capacity of 24 MW; (4) an approximate 1,200-feet-long tailrace channel; 
(5) an approximate 2.8-mile-long, 138-kilovolt transmission line 
interconnecting the project with Entergy's existing Rich substation 
near Goodrich; and (6) an electric switchyard and other appurtenant 
facilities. The project would have an estimated annual generation of 
124 gigawatt-hours, which the Cooperative would sell at wholesale to 
its constituent electric cooperatives.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov, using the ``eLibrary'' 
link. Enter the docket number, excluding the last three digits, in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    All filings must: (1) Bear in all capital letters the title 
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND 
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person submitting the filing; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. Each filing must be 
accompanied by proof of service on all persons listed on the service 
list prepared by the Commission in this proceeding, in accordance with 
18 CFR 4.34(b), and 385.2010.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.

Kimberly D. Bose,
 Secretary.
[FR Doc. 2010-13369 Filed 6-2-10; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.