East Texas Electric Cooperative, Inc. (Cooperative); Notice Soliciting Comments and Final Recommendations, Terms and Conditions, and Prescriptions, 31431 [2010-13369]
Download as PDF
Federal Register / Vol. 75, No. 106 / Thursday, June 3, 2010 / Notices
assistance, please contact FERC Online
Support at FERC
OnlineSupport@ferc.gov or call toll-free
at (866)206–3676, or, for TTY, contact
(202)502–8659. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
intervenors to file electronically.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–13370 Filed 6–2–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12632–001]
East Texas Electric Cooperative, Inc.
(Cooperative); Notice Soliciting
Comments and Final
Recommendations, Terms and
Conditions, and Prescriptions
sroberts on DSKD5P82C1PROD with NOTICES
May 27, 2010.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original Major
License—Existing Dam.
b. Project No.: P–12632–001.
c. Date Filed: March 31, 2009.
d. Applicant: East Texas Electric
Cooperative, Inc. (Cooperative).
e. Name of Project: Lake Livingston
Hydroelectric Project.
f. Location: On the Trinity River, in
San Jacinto, Polk, Trinity, and Walker
Counties, Texas. The project would not
occupy any Federal lands.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
VerDate Mar<15>2010
18:21 Jun 02, 2010
Jkt 220001
h. Applicant Contact: Edd Hargett,
East Texas Electric Cooperative, Inc.,
2905 Westward Drive, P.O. Box 631623,
Nacogdoches, TX 75963; (936) 560–
9532; eddh@gtpower.com.
i. FERC Contact: Sarah Florentino at
(202) 502–6863, or
sarah.florentino@ferc.gov.
j. Deadline for filing comments and
recommendations, terms and
conditions, and prescriptions is 60 days
from the issuance of this notice; reply
comments are due 105 days from the
issuance date of this notice.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov/docs-filing/
ferconline.asp) under the ‘‘eFiling’’ link.
For a simpler method of submitting text
only comments, click on ‘‘Quick
Comment.’’ For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
l. Project Description: The proposed
project would use the following existing
facilities: (1) The Trinity River
Authority’s (TRA) existing 14,400-footlong (approximate) Lake Livingston
dam, which has a crest elevation of
145.0 feet mean sea level (msl) and
consists of (a) A basic earth
embankment section, (b) outlet works,
and (c) a spillway; and (2) the 83,000acre Lake Livingston, which has a
normal water surface elevation of 131.0
feet msl and gross storage capacity of
1,750,000 acre-feet.
In addition to the existing structures,
the proposed project would consist of
the following new facilities: (1) An
intake structure and headrace channel
approximately 300 feet long; (2) three
steel penstocks, about 12 feet in
PO 00000
Frm 00020
Fmt 4703
Sfmt 9990
31431
diameter and 750 feet in length; (3) a
powerhouse containing three generating
units, having a total installed capacity of
24 MW; (4) an approximate 1,200-feetlong tailrace channel; (5) an
approximate 2.8-mile-long, 138-kilovolt
transmission line interconnecting the
project with Entergy’s existing Rich
substation near Goodrich; and (6) an
electric switchyard and other
appurtenant facilities. The project
would have an estimated annual
generation of 124 gigawatt-hours, which
the Cooperative would sell at wholesale
to its constituent electric cooperatives.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov, using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits,
in the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
All filings must: (1) Bear in all capital
letters the title ‘‘COMMENTS,’’ ‘‘REPLY
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND
CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’
(2) set forth in the heading the name of
the applicant and the project number of
the application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
submitting the filing; and (4) otherwise
comply with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Each filing must be
accompanied by proof of service on all
persons listed on the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b), and 385.2010.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–13369 Filed 6–2–10; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\03JNN1.SGM
03JNN1
Agencies
[Federal Register Volume 75, Number 106 (Thursday, June 3, 2010)]
[Notices]
[Page 31431]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-13369]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12632-001]
East Texas Electric Cooperative, Inc. (Cooperative); Notice
Soliciting Comments and Final Recommendations, Terms and Conditions,
and Prescriptions
May 27, 2010.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original Major License--Existing Dam.
b. Project No.: P-12632-001.
c. Date Filed: March 31, 2009.
d. Applicant: East Texas Electric Cooperative, Inc. (Cooperative).
e. Name of Project: Lake Livingston Hydroelectric Project.
f. Location: On the Trinity River, in San Jacinto, Polk, Trinity,
and Walker Counties, Texas. The project would not occupy any Federal
lands.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Edd Hargett, East Texas Electric Cooperative,
Inc., 2905 Westward Drive, P.O. Box 631623, Nacogdoches, TX 75963;
(936) 560-9532; eddh@gtpower.com.
i. FERC Contact: Sarah Florentino at (202) 502-6863, or
sarah.florentino@ferc.gov.
j. Deadline for filing comments and recommendations, terms and
conditions, and prescriptions is 60 days from the issuance of this
notice; reply comments are due 105 days from the issuance date of this
notice.
All documents may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (https://www.ferc.gov/docs-filing/ferconline.asp) under the
``eFiling'' link. For a simpler method of submitting text only
comments, click on ``Quick Comment.'' For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov; call toll-free at
(866) 208-3676; or, for TTY, contact (202) 502-8659. Although the
Commission strongly encourages electronic filing, documents may also be
paper-filed. To paper-file, mail an original and eight copies to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted for filing and is now ready
for environmental analysis.
l. Project Description: The proposed project would use the
following existing facilities: (1) The Trinity River Authority's (TRA)
existing 14,400-foot-long (approximate) Lake Livingston dam, which has
a crest elevation of 145.0 feet mean sea level (msl) and consists of
(a) A basic earth embankment section, (b) outlet works, and (c) a
spillway; and (2) the 83,000-acre Lake Livingston, which has a normal
water surface elevation of 131.0 feet msl and gross storage capacity of
1,750,000 acre-feet.
In addition to the existing structures, the proposed project would
consist of the following new facilities: (1) An intake structure and
headrace channel approximately 300 feet long; (2) three steel
penstocks, about 12 feet in diameter and 750 feet in length; (3) a
powerhouse containing three generating units, having a total installed
capacity of 24 MW; (4) an approximate 1,200-feet-long tailrace channel;
(5) an approximate 2.8-mile-long, 138-kilovolt transmission line
interconnecting the project with Entergy's existing Rich substation
near Goodrich; and (6) an electric switchyard and other appurtenant
facilities. The project would have an estimated annual generation of
124 gigawatt-hours, which the Cooperative would sell at wholesale to
its constituent electric cooperatives.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov, using the ``eLibrary''
link. Enter the docket number, excluding the last three digits, in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
All filings must: (1) Bear in all capital letters the title
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Each filing must be
accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b), and 385.2010.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-13369 Filed 6-2-10; 8:45 am]
BILLING CODE 6717-01-P