Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 30388-30389 [2010-12994]

Download as PDF 30388 Federal Register / Vol. 75, No. 104 / Tuesday, June 1, 2010 / Notices 4:30 p.m ............................... Richard O’Neill, FERC—Conclusion and Next Steps. [FR Doc. 2010–12990 Filed 5–28–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13682–000] Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications erowe on DSK5CLS3C1PROD with NOTICES May 24, 2010. On May 5, 2010, Natural Currents Energy Services, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Hoffmans Marina Tidal Energy Project, which would be located on the Manasquan River, in Monmouth County, New Jersey. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. Natural Currents proposes to develop this project, in conjunction with Hoffmans Marina, to install and operate in-stream tidal turbines to power the office building and marina on site. Natural Currents Red Hawk TM Tidal InStream Energy Conversion (TISEC) modules will generate electricity in the free flow of the tides. The initial installations would consist of ten instream 20-kilowatt (kW) turbines with an initial peak output of 200 kW. Applicant Contact: Mr. Roger Bason, Natural Currents Energy Services, LLC, 24 Roxanne Boulevard, Highland, NY 12561; phone (845) 691–4009. FERC Contact: John M. Mudre, (202) 502–8902. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web VerDate Mar<15>2010 15:41 May 28, 2010 Jkt 220001 site (https://www.ferc.gov/docs-filing/ ferconline.asp) under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–13682) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–12991 Filed 5–28–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13725–000] Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications May 24, 2010. On May 6, 2010, Natural Currents Energy Services, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Highlands New Jersey Tidal Energy Project, which would be located on the Shrewsbury River, in Monmouth County, New Jersey. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. Natural Currents proposes to develop this project, in conjunction with various PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 marinas as well as private, public and commercial properties within the project footprint, potentially including 42 South Bay Ave, LLC, Twin Lights Marina, Barhs Marina, and other property owners in the Highlands, NJ area. The purpose of this project is to install and operate in-stream tidal turbines to power the office buildings and marinas within the site. Natural Currents Red Hawk TM Tidal In-Stream Energy Conversion (TISEC) modules would generate electricity in the free flow of the tides. The initial installations will consist of twenty instream 150-kilowatt (kW) turbines with an initial peak output of 3,000 kW. Applicant Contact: Mr. Roger Bason, Natural Currents Energy Services, LLC, 24 Roxanne Boulevard, Highland, NY 12561; phone (845) 691–4009. FERC Contact: John M. Mudre, (202) 502–8902. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov/docs-filing/ ferconline.asp) under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–13725) in the docket number field to access the E:\FR\FM\01JNN1.SGM 01JNN1 Federal Register / Vol. 75, No. 104 / Tuesday, June 1, 2010 / Notices document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–12994 Filed 5–28–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13727–000] City of Santa Fe, NM; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions erowe on DSK5CLS3C1PROD with NOTICES May 24, 2010. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Conduit Exemption. b. Project No.: 13727–000. c. Date filed: May 10, 2010. d. Applicant: City of Santa Fe, New Mexico. e. Name of Project: Santa Fe Canyon Hydroelectric Project. f. Location: The proposed Santa Fe Canyon Hydroelectric Project would be located on a pipeline in the City of Santa Fe’s water distribution system located in Santa Fe County, New Mexico. The land on which all the project structures are located is owned by the applicant. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a–825r. h. Applicant Contact: Mr. Dale Lyons, Water Resources Coordinator, City of Santa Fe Water Division, 801 West San Mateo Road, Santa Fe, New Mexico 87505; telephone (505) 955–4204. i. FERC Contact: Linda Stewart, telephone (202) 502–6680, and e-mail address linda.stewart@ferc.gov. j. Status of Environmental Analysis: This application is ready for environmental analysis at this time, and the Commission is requesting comments, reply comments, recommendations, terms and conditions, and prescriptions. k. Deadline for filing responsive documents: Due to the small size and location of the proposed project in a closed system, as well as the resource agency consultation letters filed with the application, the 60-day timeframe specified in 18 CFR 4.43(b) for filing all comments, motions to intervene, protests, recommendations, terms and VerDate Mar<15>2010 15:41 May 28, 2010 Jkt 220001 conditions, and prescriptions is shortened to 30 days from the issuance date of this notice. All reply comments filed in response to comments submitted by any resource agency, Indian tribe, or person, must be filed with the Commission within 45 days from the issuance date of this notice. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. l. Description of Project: The proposed Santa Fe Canyon Hydroelectric Project would consist of: (1) A proposed new concrete vault containing one turbine generating unit having an installed capacity of 90 kilowatts; and (2) appurtenant facilities. The project would have an estimated annual generation of 394,900 kilowatt-hours that would be sold to a local utility. m. This filing is available for review and reproduction at the Commission in the Public Reference Room, Room 2A, 888 First Street, NE., Washington, DC 20426. The filing may also be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number, here P–13727, in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for review and reproduction at the address in item h above. n. Development Application—Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified deadline date for the particular application, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified deadline date for the particular application. Applications for preliminary permits will not be accepted in response to this notice. PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 30389 o. Notice of Intent—A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a competing development application. A notice of intent must be served on the applicant(s) named in this public notice. p. Protests or Motions to Intervene— Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. q. All filings must (1) Bear in all capital letters the title ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION’’, ‘‘COMPETING APPLICATION’’, ‘‘COMMENTS’’, ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Any of these documents must be filed by providing the original and eight copies to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An additional copy must be sent to Director, Division of Hydropower Administration and Compliance, Office of Energy Projects, Federal Energy Regulatory Commission, at the above address. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. E:\FR\FM\01JNN1.SGM 01JNN1

Agencies

[Federal Register Volume 75, Number 104 (Tuesday, June 1, 2010)]
[Notices]
[Pages 30388-30389]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-12994]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13725-000]


Natural Currents Energy Services, LLC; Notice of Preliminary 
Permit Application Accepted for Filing and Soliciting Comments, Motions 
To Intervene, and Competing Applications

May 24, 2010.
    On May 6, 2010, Natural Currents Energy Services, LLC filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act, proposing to study the feasibility of the Highlands 
New Jersey Tidal Energy Project, which would be located on the 
Shrewsbury River, in Monmouth County, New Jersey. The sole purpose of a 
preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    Natural Currents proposes to develop this project, in conjunction 
with various marinas as well as private, public and commercial 
properties within the project footprint, potentially including 42 South 
Bay Ave, LLC, Twin Lights Marina, Barhs Marina, and other property 
owners in the Highlands, NJ area. The purpose of this project is to 
install and operate in-stream tidal turbines to power the office 
buildings and marinas within the site. Natural Currents Red Hawk \TM\ 
Tidal In-Stream Energy Conversion (TISEC) modules would generate 
electricity in the free flow of the tides. The initial installations 
will consist of twenty in-stream 150-kilowatt (kW) turbines with an 
initial peak output of 3,000 kW.
    Applicant Contact: Mr. Roger Bason, Natural Currents Energy 
Services, LLC, 24 Roxanne Boulevard, Highland, NY 12561; phone (845) 
691-4009.
    FERC Contact: John M. Mudre, (202) 502-8902.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site (https://www.ferc.gov/docs-filing/ferconline.asp) under the 
``eFiling'' link. For a simpler method of submitting text only 
comments, click on ``Quick Comment.'' For assistance, please contact 
FERC Online Support at FERCOnlineSupport@ferc.gov; call toll-free at 
(866) 208-3676; or, for TTY, contact (202) 502-8659. Although the 
Commission strongly encourages electronic filing, documents may also be 
paper-filed. To paper-file, mail an original and eight copies to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13725) in the docket number field to access 
the

[[Page 30389]]

document. For assistance, contact FERC Online Support.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-12994 Filed 5-28-10; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.