Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 30388 [2010-12991]
Download as PDF
30388
Federal Register / Vol. 75, No. 104 / Tuesday, June 1, 2010 / Notices
4:30 p.m ...............................
Richard O’Neill, FERC—Conclusion and Next Steps.
[FR Doc. 2010–12990 Filed 5–28–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13682–000]
Natural Currents Energy Services,
LLC; Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
erowe on DSK5CLS3C1PROD with NOTICES
May 24, 2010.
On May 5, 2010, Natural Currents
Energy Services, LLC filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Hoffmans Marina Tidal
Energy Project, which would be located
on the Manasquan River, in Monmouth
County, New Jersey. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
Natural Currents proposes to develop
this project, in conjunction with
Hoffmans Marina, to install and operate
in-stream tidal turbines to power the
office building and marina on site.
Natural Currents Red Hawk TM Tidal InStream Energy Conversion (TISEC)
modules will generate electricity in the
free flow of the tides. The initial
installations would consist of ten instream 20-kilowatt (kW) turbines with
an initial peak output of 200 kW.
Applicant Contact: Mr. Roger Bason,
Natural Currents Energy Services, LLC,
24 Roxanne Boulevard, Highland, NY
12561; phone (845) 691–4009.
FERC Contact: John M. Mudre, (202)
502–8902.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
VerDate Mar<15>2010
15:41 May 28, 2010
Jkt 220001
site (https://www.ferc.gov/docs-filing/
ferconline.asp) under the ‘‘eFiling’’ link.
For a simpler method of submitting text
only comments, click on ‘‘Quick
Comment.’’ For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13682) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–12991 Filed 5–28–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13725–000]
Natural Currents Energy Services,
LLC; Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
May 24, 2010.
On May 6, 2010, Natural Currents
Energy Services, LLC filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Highlands New Jersey
Tidal Energy Project, which would be
located on the Shrewsbury River, in
Monmouth County, New Jersey. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
Natural Currents proposes to develop
this project, in conjunction with various
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
marinas as well as private, public and
commercial properties within the
project footprint, potentially including
42 South Bay Ave, LLC, Twin Lights
Marina, Barhs Marina, and other
property owners in the Highlands, NJ
area. The purpose of this project is to
install and operate in-stream tidal
turbines to power the office buildings
and marinas within the site. Natural
Currents Red Hawk TM Tidal In-Stream
Energy Conversion (TISEC) modules
would generate electricity in the free
flow of the tides. The initial
installations will consist of twenty instream 150-kilowatt (kW) turbines with
an initial peak output of 3,000 kW.
Applicant Contact: Mr. Roger Bason,
Natural Currents Energy Services, LLC,
24 Roxanne Boulevard, Highland, NY
12561; phone (845) 691–4009.
FERC Contact: John M. Mudre, (202)
502–8902.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov/docs-filing/
ferconline.asp) under the ‘‘eFiling’’ link.
For a simpler method of submitting text
only comments, click on ‘‘Quick
Comment.’’ For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13725) in
the docket number field to access the
E:\FR\FM\01JNN1.SGM
01JNN1
Agencies
[Federal Register Volume 75, Number 104 (Tuesday, June 1, 2010)]
[Notices]
[Page 30388]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-12991]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13682-000]
Natural Currents Energy Services, LLC; Notice of Preliminary
Permit Application Accepted for Filing and Soliciting Comments, Motions
To Intervene, and Competing Applications
May 24, 2010.
On May 5, 2010, Natural Currents Energy Services, LLC filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act, proposing to study the feasibility of the Hoffmans
Marina Tidal Energy Project, which would be located on the Manasquan
River, in Monmouth County, New Jersey. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
Natural Currents proposes to develop this project, in conjunction
with Hoffmans Marina, to install and operate in-stream tidal turbines
to power the office building and marina on site. Natural Currents Red
Hawk \TM\ Tidal In-Stream Energy Conversion (TISEC) modules will
generate electricity in the free flow of the tides. The initial
installations would consist of ten in-stream 20-kilowatt (kW) turbines
with an initial peak output of 200 kW.
Applicant Contact: Mr. Roger Bason, Natural Currents Energy
Services, LLC, 24 Roxanne Boulevard, Highland, NY 12561; phone (845)
691-4009.
FERC Contact: John M. Mudre, (202) 502-8902.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site (https://www.ferc.gov/docs-filing/ferconline.asp) under the
``eFiling'' link. For a simpler method of submitting text only
comments, click on ``Quick Comment.'' For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov; call toll-free at
(866) 208-3676; or, for TTY, contact (202) 502-8659. Although the
Commission strongly encourages electronic filing, documents may also be
paper-filed. To paper-file, mail an original and eight copies to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13682) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-12991 Filed 5-28-10; 8:45 am]
BILLING CODE 6717-01-P