Duke Energy Indiana, Inc.; Indiana; Notice of Availability of Environmental Assessment, 30013 [2010-12850]
Download as PDF
jlentini on DSKJ8SOYB1PROD with NOTICES
Federal Register / Vol. 75, No. 103 / Friday, May 28, 2010 / Notices
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the title ‘‘PROTEST’’,
‘‘MOTION TO INTERVENE’’,
‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND
CONDITIONS,’’ or ‘‘FISHWAY
PRESCRIPTIONS’’; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). All comments,
recommendations, terms and conditions
or prescriptions should relate to project
works which are the subject of the
license amendment. Agencies may
obtain copies of the application directly
from the applicant. A copy of any
protest or motion to intervene must be
served upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
p. As provided for in 18 CFR
4.34(b)(5)(i), a license applicant must
file, no later than 60 days following the
date of issuance of this notice of
acceptance and ready for environmental
analysis: (1) A copy of the water quality
certification; (2) a copy of the request for
certification, including proof of the date
VerDate Mar<15>2010
17:43 May 27, 2010
Jkt 220001
on which the certifying agency received
the request; or (3) evidence of waiver of
water quality certification.
q. e-Filing: Motions to intervene,
protests, comments, recommendations,
terms and conditions, and fishway
prescriptions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the ‘‘eFiling’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–12852 Filed 5–27–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2211–004]
Duke Energy Indiana, Inc.; Indiana;
Notice of Availability of Environmental
Assessment
May 21, 2010.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the application
for a new license for the Markland
Hydroelectric Project, located at the U.S.
Army Corps of Engineers’ (Corps)
existing Markland Locks and Dam on
the Ohio River in Switzerland County,
Indiana, and has prepared an
Environmental Assessment (EA) for the
project. Parts of the project occupy 6.21
acres of federal land administered by
the Corps; Duke Energy Indiana, Inc.
proposes changing the project boundary
to include a total of 10.2 acres of federal
land to accommodate new and existing
project facilities.
The EA contains the staff’s analysis of
the potential environmental impacts of
continued operation and maintenance of
the project and concludes that
relicensing the project, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
30013
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice.
Comments may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov/docs-filing/ferconline.asp)
under the ‘‘eFiling’’ link. For a simpler
method of submitting text-only
comments, click on ‘‘Quick Comment.’’
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Please affix Project No. 2211–004 to all
comments.
For further information, contact
Dianne Rodman at (202) 502–6077.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–12850 Filed 5–27–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2088–075]
South Feather Water and Power
Agency; Notice of Availability of
Environmental Assessment
May 20, 2010.
In accordance with the National
Environmental Policy Act of 1969, as
amended, and the Federal Energy
Regulatory Commission’s (Commission)
regulations, (18 CFR Part 380),
Commission staff has prepared an
environmental assessment (EA)
regarding South Feather Water and
Power Agency’s (SFWPA) request to
raise the dam crest and modify the
spillway at Sly Creek Dam, part of the
Sly Creek development of the South
Feather Power Project (FERC No. 2088).
Sly Creek is located on Sly Creek
E:\FR\FM\28MYN1.SGM
28MYN1
Agencies
[Federal Register Volume 75, Number 103 (Friday, May 28, 2010)]
[Notices]
[Page 30013]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-12850]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2211-004]
Duke Energy Indiana, Inc.; Indiana; Notice of Availability of
Environmental Assessment
May 21, 2010.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office
of Energy Projects has reviewed the application for a new license for
the Markland Hydroelectric Project, located at the U.S. Army Corps of
Engineers' (Corps) existing Markland Locks and Dam on the Ohio River in
Switzerland County, Indiana, and has prepared an Environmental
Assessment (EA) for the project. Parts of the project occupy 6.21 acres
of federal land administered by the Corps; Duke Energy Indiana, Inc.
proposes changing the project boundary to include a total of 10.2 acres
of federal land to accommodate new and existing project facilities.
The EA contains the staff's analysis of the potential environmental
impacts of continued operation and maintenance of the project and
concludes that relicensing the project, with appropriate environmental
protective measures, would not constitute a major federal action that
would significantly affect the quality of the human environment.
A copy of the EA is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY,
(202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
Any comments should be filed within 30 days from the date of this
notice. Comments may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (https://www.ferc.gov/docs-filing/ferconline.asp) under the
``eFiling'' link. For a simpler method of submitting text-only
comments, click on ``Quick Comment.'' For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov; call toll-free at
(866) 208-3676; or, for TTY, contact (202) 502-8659. Although the
Commission strongly encourages electronic filing, documents may also be
paper-filed. To paper-file, mail an original and eight copies to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Please affix Project No. 2211-
004 to all comments.
For further information, contact Dianne Rodman at (202) 502-6077.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-12850 Filed 5-27-10; 8:45 am]
BILLING CODE 6717-01-P