Northern New Mexico Resource Advisory Committee Meeting, 29717-29718 [2010-12751]
Download as PDF
Federal Register / Vol. 75, No. 102 / Thursday, May 27, 2010 / Notices
D. Financial Management Systems
1. Grantee will provide a Financial
Management System in accordance with
Departmental regulations as codified in 7
CFR parts 3000 through 3099, including but
not necessarily limited to 7 CFR parts 3015
through 3019, 7 CFR part 3021, and 7 CFR
part 3052, and successor regulations to these
parts, including but not limited to:
(i) Records that identify adequately the
source and application of funds for grantsupported activities. Those records shall
contain information pertaining to grant
awards and authorizations, obligations,
unobligated balances, assets, liabilities,
outlays, and income;
(ii) Effective control over and
accountability for all funds, property, and
other assets. Grantees shall adequately
safeguard all such assets and ensure that they
are used solely for authorized purposes;
(iii) Accounting records prepared in
accordance with generally accepted
accounting principles (GAAP) and supported
by source documentation; and
(iv) Grantee tracking of fund usage and
records that show matching funds and grant
funds are used proportionally. Grantee will
provide verifiable documentation regarding
matching funds usage, i.e., bank statements
or copies of funding obligations from the
matching source.
2. Grantee will retain financial records,
supporting documents, statistical records,
and all other records pertinent to the grant
for a period of at least 3 years after
completion of grant activities, except that the
records shall be retained beyond the 3-year
period if audit findings have not been
resolved or if directed by the United States.
Grantor and the Comptroller General of the
United States, or any of their duly authorized
representatives, shall have access to any
books, documents, papers, and records of
Grantee which are pertinent to the grant for
the purpose of making audits, examinations,
excerpts, and transcripts.
E. Procurement
Grantee will comply with the applicable
procurement requirements of 7 CFR part
3015 regarding standards of conduct, open
and free competition, access to contractor
records, and equal employment opportunity
requirements.
wwoods2 on DSK1DXX6B1PROD with NOTICES
F. Reporting
1. Grantee will after grant approval through
project completion:
(i) Provide periodic reports as required by
Grantor. A federal financial report and a
project performance report will be required
on a semiannual basis (due 30 working days
after end of the semiannual period). For the
purposes of this grant, semiannual periods
end on June 30 and December 31. The federal
financial report must show how grant funds
and leveraged funds have been used to date
and project the funds needed and their
purposes for the next quarter. Grantee shall
constantly monitor performance to ensure
that time schedules are being met and
projected goals by time periods are being
accomplished. The project performance
reports shall include the following:
VerDate Mar<15>2010
15:26 May 26, 2010
Jkt 220001
(A) Semiannual performance reports.
Project performance reports shall include,
but not be limited to, the following:
(1) A comparison of actual
accomplishments to the objectives
established for that period (e.g., the number
of audits performed, number of recipients of
renewable energy development assistance);
(2) A list of recipients, each recipient’s
location, and each recipient’s North
American Industry Classification System
code;
(3) Problems, delays, or adverse conditions,
if any, which have affected or will affect
attainment of overall project objectives,
prevent meeting time schedules or objectives,
or preclude the attainment of particular
project work elements during established
time periods. This disclosure shall be
accompanied by a statement of the action
taken or planned to resolve the situation;
(4) Percentage of financial resources
expended on contractors; and
(5) Objectives and timetable established for
the next reporting period.
(B) Final performance report. A final
performance report will be required with the
final federal financial Report.
(1) For energy audit projects, the final
performance report must provide the
information required in a semiannual
performance report; complete information
regarding the number of audits conducted; a
list of recipients with each recipient’s North
American Industry Classification System
code; the location of each recipient; the cost
of each audit; the expected energy saved for
each audit conducted if the audit is
implemented; the number of jobs created and
saved for an agricultural producer or rural
small business, as applicable, as a result of
the grant; and the percentage of financial
resources expended on contractors.
(2) For renewable energy development
assistance projects, the final performance
report must provide the information required
in a semiannual performance report; a list of
recipients with each recipient’s North
American Industry Classification System
code; the location of each recipient; the
expected renewable energy that would be
generated if the projects were implemented;
and the percentage of financial resources
expended on contractors.
(ii) For the year(s) in which grant funds are
received, Grantee will provide an annual
financial statement to Grantor.
2. Grantee will, after project completion:
(i) Allow Grantor access to the records and
performance information obtained under the
scope of the project; and
(ii) One year after submittal of the final
semiannual performance report, Grantee will
provide Grantor a final status report on the
number of projects that are proceeding with
one or all of Grantee’s recommendations,
including the amount of energy saved and
the amount of renewable energy generated, as
applicable.
G. Grant Disbursement
Unless required by funding partners to be
provided on a pro rata basis with other
funding sources, grant funds will be
disbursed after all other funding sources have
been expended.
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
29717
1. Requests for reimbursement may be
submitted monthly or more frequently if
authorized to do so by Grantor. Ordinarily,
payment will be made within 30 days after
receipt of a proper request for
reimbursement.
2. Grantee shall not request reimbursement
for the Federal share of amounts withheld
from contractors to ensure satisfactory
completion of work until after it makes those
payments.
3. Payment shall be made by electronic
funds transfer.
4. Standard Form 270, ‘‘Request for
Advance or Reimbursement,’’ or other format
prescribed by Grantor shall be used to
request Grant reimbursements.
H. Use of Remaining Grant Funds
Grant funds not expended within 24
months from date of this agreement will be
cancelled by Grantor. Prior to the actual
cancellation, Grantor will notify Grantee, in
writing, of Grantor’s intent to cancel the
remaining funds.
IN WITNESS WHEREOF, Grantee has this
day authorized and caused this Agreement to
be signed in its name and its corporate seal
to be hereunto affixed and attested by its
duly authorized officer(s), and Grantor has
caused this Agreement to be duly executed
in its behalf by
GRANTOR:
[SEAL] lllllllllllllllll
Name:
Title:
UNITED STATES OF AMERICA
DEPARTMENT OF AGRICULTURE RURAL
DEVELOPMENT
lllllllllllllllllllll
Date
GRANTEE:
[SEAL] lllllllllllllllll
Name:
Title:
lllllllllllllllllllll
Date
[FR Doc. 2010–12583 Filed 5–26–10; 8:45 am]
BILLING CODE 3410–XY–P
DEPARTMENT OF AGRICULTURE
Forest Service
Northern New Mexico Resource
Advisory Committee Meeting
Forest Service, USDA.
Notice of meeting.
AGENCY:
ACTION:
SUMMARY: The Northern New Mexico
Resource Advisory Committee will meet
in Albuquerque, New Mexico. The
committee is meeting as authorized
under the Secure Rural Schools and
Community Self-Determination Act of
2000 (Pub. L. 110–343) and in
compliance with the Federal Advisory
Committee Act (5 U.S.C. Appendix 2
§§ 1–15, October 6, 1972, as amended
1976, 1980 and 1982). The purpose is to
hold the first meeting of the newly
formed committee.
E:\FR\FM\27MYN1.SGM
27MYN1
29718
Federal Register / Vol. 75, No. 102 / Thursday, May 27, 2010 / Notices
DATES: The meeting will be held on June
22, 2010, beginning at 10 a.m. A second
day of the meeting, on June 23, 2010,
will begin at 8 a.m.
ADDRESSES: The meeting will be held at
the Drury Inn, 4310 The 25 Way, NE.,
in the Taos Room, Albuquerque, New
Mexico. Written comments should be
sent to Ignacio Peralta, Carson National
Forest, 208 Cruz Alta Road, Taos, NM
87571. Comments may also be sent via
e-mail to iperalta@fs.fed.us or via
facsimile to 575–758–6213.
All comments, including names and
addresses when provided, are placed in
the record and are available for public
inspection and copying. The public may
inspect comments received at Carson
National Forest, 208 Cruz Alta Road,
Taos, NM. Visitors are encouraged to
call ahead to 575–758–6344 to facilitate
entry into the building.
FOR FURTHER INFORMATION CONTACT: RAC
Coordinator USDA, Carson National
Forest: Ignacio Peralta, 575–758–6344,
208 Cruz Alta Rd., Taos, NM 87571.
E-mail: iperalta@fs.fed.us. RAC
Coordinator, USDA, Santa Fe National
Forest: Ruben Montes, 505–438–5356,
11 Forest Lane, Santa Fe, NM 87508.
E-mail: rmontes@fs.fed.us.
Individuals who use
telecommunication devices for the deaf
(TDD) may call the Federal Information
Relay Service (FIRS) at 1–800–877–8339
between 8 a.m. and 8 p.m., Eastern
Standard Time, Monday through Friday.
SUPPLEMENTARY INFORMATION: The
meeting is open to the public. The
following business will be conducted:
(1) Introductions of all committee
members, replacement members, and
Forest Service personnel; (2) Selection
of a chairperson by the committee
members; (3) Review of Act and RAC
Charter; (4) Administrative budget; (5)
Receive materials explaining the process
for considering and recommending Title
II projects; and (6) Public Comment.
Persons who wish to bring related
matters to the attention of the
Committee may file written statements
with the Committee staff before or after
the meeting.
Dated: May 21, 2010.
Kendall Clark,
Forest Supervisor, Carson National Forest.
[FR Doc. 2010–12751 Filed 5–26–10; 8:45 am]
wwoods2 on DSK1DXX6B1PROD with NOTICES
BILLING CODE 3410–11–P
DEPARTMENT OF COMMERCE
Dated: May 21, 2010.
Gwellnar Banks,
Management Analyst, Office of the Chief
Information Officer.
Submission for OMB Review;
Comment Request
The Department of Commerce will
submit to the Office of Management and
VerDate Mar<15>2010
15:26 May 26, 2010
Jkt 220001
Budget (OMB) for clearance the
following proposal for collection of
information under the provisions of the
Paperwork Reduction Act (44 U.S.C.
Chapter 35).
Agency: Office of the Secretary, Office
of Administrative Services.
Title: DOC National Environmental
Policy Act Environmental Questionnaire
and Checklist.
OMB Control Number: 0690–0028.
Form Number(s): CD–593.
Type of Request: Regular submission.
Number of Respondents: 200.
Average Hours per Response: 2 hours.
Burden Hours: 400.
Needs and Uses: The Environmental
Questionnaire and Checklist is designed
to be used by both grants applicants and
Federal entities proposing construction
or infrastructure projects. The questions
address a diverse range of potential
environmental issues covered under
Federal environmental laws and
regulations and are designed to provide
a reviewer enough information to
determine the level of NEPA
documentation necessary to comply
with the law.
Affected Public: Business or other forprofit organizations; not-for-profit
institutions; individuals and
households.
Frequency: On occasion.
Respondent’s Obligation: Required to
obtain a benefit.
OMB Desk Officer: Nicholas Fraser,
(202) 395–5887.
Copies of the above information
collection proposal can be obtained by
calling or writing Diana Hynek,
Departmental Paperwork Clearance
Officer, (202) 482–0266, Department of
Commerce, Room 6625, 14th and
Constitution Avenue, NW., Washington,
DC 20230 (or via the Internet at
dHynek@doc.gov).
Written comments and
recommendations for the proposed
information collection should be sent
within 30 days of publication of this
notice to Nicholas Fraser, OMB Desk
Officer, FAX number (202) 395–5806, or
via the Internet at
Nicholas_A._Fraser@omb.eop.gov.
[FR Doc. 2010–12695 Filed 5–26–10; 8:45 am]
BILLING CODE 3510–NW–P
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
DEPARTMENT OF COMMERCE
International Trade Administration
[A–533–838, A–570–892]
Carbazole Violet Pigment 23 From
India and the People’s Republic of
China: Continuation of Antidumping
Duty Orders
AGENCY: Import Administration,
International Trade Administration,
Department of Commerce.
SUMMARY: As a result of the
determinations by the Department of
Commerce (Department) and the
International Trade Commission (ITC)
that revocation of the antidumping duty
orders on carbazole violet pigment 23
(CVP–23) from India and the People’s
Republic of China (PRC) would likely
lead to a continuation or recurrence of
dumping and material injury to an
industry in the United States, the
Department is publishing a notice of
continuation for the antidumping duty
orders.
DATES: Effective Date: May 27, 2010.
FOR FURTHER INFORMATION CONTACT:
Bryan Hansen or Minoo Hatten, AD/
CVD Operations, Office 5, Import
Administration, International Trade
Administration, U.S. Department of
Commerce, 14th Street and Constitution
Avenue, NW., Washington, DC 20230;
telephone: (202) 482–3683 or (202) 482–
1690, respectively.
SUPPLEMENTARY INFORMATION:
Background
On November 2, 2009, the Department
initiated and the ITC instituted sunset
reviews of the antidumping duty orders
on CVP–23 from India and the PRC 1
pursuant to section 751(c) of the Tariff
Act of 1930, as amended (the Act). See
Initiation of Five-Year (‘‘Sunset’’)
Review, 74 FR 56593 (November 2,
2009); See also Carbazole Violet
Pigment 23 From China and India, 74
FR 56663 (November 2, 2009).
As a result of these sunset reviews,
the Department determined that
revocation of the antidumping duty
orders would likely lead to continuation
or recurrence of dumping and, therefore,
notified the ITC of the magnitude of the
margins likely to prevail should the
orders be revoked. See Carbazole Violet
Pigment 23 from India and the People’s
1 On December 29, 2004, the Department
published the following antidumping duty orders:
Antidumping Duty Order: Carbazole Violet Pigment
23 From the People’s Republic of China, 69 FR
77987 (December 29, 2004); Notice of Amended
Final Determination of Sales at Less Than Fair
Value and Antidumping Duty Order: Carbazole
Violet Pigment 23 From India, 69 FR 77988
(December 29, 2004).
E:\FR\FM\27MYN1.SGM
27MYN1
Agencies
[Federal Register Volume 75, Number 102 (Thursday, May 27, 2010)]
[Notices]
[Pages 29717-29718]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-12751]
-----------------------------------------------------------------------
DEPARTMENT OF AGRICULTURE
Forest Service
Northern New Mexico Resource Advisory Committee Meeting
AGENCY: Forest Service, USDA.
ACTION: Notice of meeting.
-----------------------------------------------------------------------
SUMMARY: The Northern New Mexico Resource Advisory Committee will meet
in Albuquerque, New Mexico. The committee is meeting as authorized
under the Secure Rural Schools and Community Self-Determination Act of
2000 (Pub. L. 110-343) and in compliance with the Federal Advisory
Committee Act (5 U.S.C. Appendix 2 Sec. Sec. 1-15, October 6, 1972, as
amended 1976, 1980 and 1982). The purpose is to hold the first meeting
of the newly formed committee.
[[Page 29718]]
DATES: The meeting will be held on June 22, 2010, beginning at 10 a.m.
A second day of the meeting, on June 23, 2010, will begin at 8 a.m.
ADDRESSES: The meeting will be held at the Drury Inn, 4310 The 25 Way,
NE., in the Taos Room, Albuquerque, New Mexico. Written comments should
be sent to Ignacio Peralta, Carson National Forest, 208 Cruz Alta Road,
Taos, NM 87571. Comments may also be sent via e-mail to
iperalta@fs.fed.us or via facsimile to 575-758-6213.
All comments, including names and addresses when provided, are
placed in the record and are available for public inspection and
copying. The public may inspect comments received at Carson National
Forest, 208 Cruz Alta Road, Taos, NM. Visitors are encouraged to call
ahead to 575-758-6344 to facilitate entry into the building.
FOR FURTHER INFORMATION CONTACT: RAC Coordinator USDA, Carson National
Forest: Ignacio Peralta, 575-758-6344, 208 Cruz Alta Rd., Taos, NM
87571. E-mail: iperalta@fs.fed.us. RAC Coordinator, USDA, Santa Fe
National Forest: Ruben Montes, 505-438-5356, 11 Forest Lane, Santa Fe,
NM 87508. E-mail: rmontes@fs.fed.us.
Individuals who use telecommunication devices for the deaf (TDD)
may call the Federal Information Relay Service (FIRS) at 1-800-877-8339
between 8 a.m. and 8 p.m., Eastern Standard Time, Monday through
Friday.
SUPPLEMENTARY INFORMATION: The meeting is open to the public. The
following business will be conducted: (1) Introductions of all
committee members, replacement members, and Forest Service personnel;
(2) Selection of a chairperson by the committee members; (3) Review of
Act and RAC Charter; (4) Administrative budget; (5) Receive materials
explaining the process for considering and recommending Title II
projects; and (6) Public Comment.
Persons who wish to bring related matters to the attention of the
Committee may file written statements with the Committee staff before
or after the meeting.
Dated: May 21, 2010.
Kendall Clark,
Forest Supervisor, Carson National Forest.
[FR Doc. 2010-12751 Filed 5-26-10; 8:45 am]
BILLING CODE 3410-11-P