Drawbridge Operation Regulation; Long Island, New York Inland Waterway From East Rockaway Inlet to Shinnecock Canal, Hempstead, NY, Maintenance, 28757 [2010-12342]
Download as PDF
Federal Register / Vol. 75, No. 99 / Monday, May 24, 2010 / Rules and Regulations
Impacts: Policies and Procedures.’’ This
airspace action is not expected to cause
any potentially significant
environmental impacts, and no
extraordinary circumstances exist that
warrant preparation of an
environmental assessment.
List of Subjects in 14 CFR Part 73
Airspace, Prohibited areas, Restricted
areas.
Adoption of the Amendment
In consideration of the foregoing, the
Federal Aviation Administration
amends 14 CFR part 73 as follows:
■
PART 73—SPECIAL USE AIRSPACE
1. The authority citation for part 73
continues to read as follows:
■
Authority: 49 U.S.C. 106(g), 40103, 40113,
40120; E.O. 10854, 24 FR 9565, 3 CFR, 1959–
1963 Comp., p. 389.
§ 73.25
[Amended]
2. § 73.25 is amended as follows:
*
*
*
*
*
■
R–2502A
Fort Irwin, CA [Amended]
Under Controlling agency, remove the
words ‘‘FAA, Hi-Desert TRACON,
Edwards, CA’’ and insert the words
‘‘FAA, Los Angeles ARTCC.’’
Issued in Washington, DC, May 18, 2010.
Edith V. Parish,
Manager, Airspace and Rules Group.
[FR Doc. 2010–12415 Filed 5–21–10; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[USCG–2010–0325]
Drawbridge Operation Regulation;
Long Island, New York Inland
Waterway From East Rockaway Inlet to
Shinnecock Canal, Hempstead, NY,
Maintenance
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
WReier-Aviles on DSKGBLS3C1PROD with RULES
ACTION:
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Wantagh State
Parkway Bridge across Sloop Channel at
mile 15.4, at Jones Beach, New York.
Under this temporary deviation the
bridge may operate on a special
operating schedule for five months to
VerDate Mar<15>2010
12:32 May 21, 2010
Jkt 220001
facilitate the completion of new bridge
construction.
DATES: This deviation is effective from
May 15, 2010 through October 30, 2010.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2010–
0325 and are available online at https://
www.regulations.gov, inserting USCG–
2010–0325 in the ‘‘Keyword’’ and then
clicking ‘‘Search’’. They are also
available for inspection or copying at
the Docket Management Facility (M–30),
U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
e-mail Ms. Judy Leung-Yee, Project
Officer, First Coast Guard District,
telephone (212) 668–7165. If you have
questions on viewing the docket, call
Renee V. Wright, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION: The
Wantagh State Parkway Bridge has a
vertical clearance in the closed position
of 20 feet at mean high water and 23 at
mean low water. The existing
drawbridge operation regulations are
listed at 33 CFR 117.5.
The New York State Department of
Transportation, requested a temporary
deviation for the existing bridge to
operate on special schedule to facilitate
the completion of the new bridge
construction.
The waterway has seasonal
recreational vessels of various sizes.
We contacted the New York Marine
Trades Association, South Bay Cruising
Club, and Sector Long Island Sound. No
objection to the proposed temporary
deviation schedule was received.
Under this temporary deviation, in
effect from May 15, 2010 through
October 30, 2010, the Wantagh State
Parkway Bridge at mile 15.4, across
Sloop Channel, at Jones Beach, New
York, shall operate as follows: The draw
shall open on signal after at least a halfhour advance notice is given by calling
the number posted at the bridge. From
6:30 a.m. through 12 noon and from
12:15 p.m. through 4 p.m., Monday
through Friday, one bascule lift span
may remain in the closed position. A
full two lift span opening shall be given
between 12 noon and 12:15 p.m.
provided at least a one-hour advance
notice is given by calling the number
posted at the bridge.
From 7:30 a.m. through 8:30 p.m. on
Saturday, Sunday and Federal holidays
PO 00000
Frm 00007
Fmt 4700
Sfmt 4700
28757
the draw shall open on the hour and
half-hour provided at least a half-hour
advance notice is given by calling the
number posted at the bridge.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: May 7, 2010.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 2010–12342 Filed 5–21–10; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 165
[Docket No. USCG–2010–0405]
RIN 1625–AA87
Security Zone; Potomac River,
Washington Channel, Washington, DC
Coast Guard, DHS.
Temporary final rule.
AGENCY:
ACTION:
SUMMARY: The Coast Guard is
establishing a temporary security zone
in certain waters of Washington
Channel on the Potomac River. The
security zone is necessary to provide for
the security and safety of life and
property of event participants,
spectators and mariners during the U.S.
Coast Guard Vice Commandant’s
Change of Watch ceremony from 6 a.m.
through 5 p.m. on May 24, 2010. Entry
into this zone is prohibited unless
authorized by the Captain of the Port,
Baltimore, Maryland, or his designated
representative.
DATES: This rule is effective from 6 a.m.
through 5 p.m. on May 24, 2010.
ADDRESSES: Documents indicated in this
preamble as being available in the
docket are part of docket USCG–2010–
0405 and are available online by going
to https://www.regulations.gov, inserting
USCG–2010–0405 in the ‘‘Keyword’’
box, and then clicking ‘‘Search.’’ They
are also available for inspection or
copying at the Docket Management
Facility (M–30), U.S. Department of
Transportation, West Building Ground
Floor, Room W12–140, 1200 New Jersey
Avenue, SE., Washington, DC 20590,
between 9 a.m. and 5 p.m., Monday
through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
E:\FR\FM\24MYR1.SGM
24MYR1
Agencies
[Federal Register Volume 75, Number 99 (Monday, May 24, 2010)]
[Rules and Regulations]
[Page 28757]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-12342]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[USCG-2010-0325]
Drawbridge Operation Regulation; Long Island, New York Inland
Waterway From East Rockaway Inlet to Shinnecock Canal, Hempstead, NY,
Maintenance
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Wantagh State Parkway Bridge across Sloop Channel at mile 15.4, at
Jones Beach, New York. Under this temporary deviation the bridge may
operate on a special operating schedule for five months to facilitate
the completion of new bridge construction.
DATES: This deviation is effective from May 15, 2010 through October
30, 2010.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2010-0325 and are available online
at https://www.regulations.gov, inserting USCG-2010-0325 in the
``Keyword'' and then clicking ``Search''. They are also available for
inspection or copying at the Docket Management Facility (M-30), U.S.
Department of Transportation, West Building Ground Floor, Room W12-140,
1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5
p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or e-mail Ms. Judy Leung-Yee, Project Officer, First Coast Guard
District, telephone (212) 668-7165. If you have questions on viewing
the docket, call Renee V. Wright, Program Manager, Docket Operations,
telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Wantagh State Parkway Bridge has a
vertical clearance in the closed position of 20 feet at mean high water
and 23 at mean low water. The existing drawbridge operation regulations
are listed at 33 CFR 117.5.
The New York State Department of Transportation, requested a
temporary deviation for the existing bridge to operate on special
schedule to facilitate the completion of the new bridge construction.
The waterway has seasonal recreational vessels of various sizes.
We contacted the New York Marine Trades Association, South Bay
Cruising Club, and Sector Long Island Sound. No objection to the
proposed temporary deviation schedule was received.
Under this temporary deviation, in effect from May 15, 2010 through
October 30, 2010, the Wantagh State Parkway Bridge at mile 15.4, across
Sloop Channel, at Jones Beach, New York, shall operate as follows: The
draw shall open on signal after at least a half-hour advance notice is
given by calling the number posted at the bridge. From 6:30 a.m.
through 12 noon and from 12:15 p.m. through 4 p.m., Monday through
Friday, one bascule lift span may remain in the closed position. A full
two lift span opening shall be given between 12 noon and 12:15 p.m.
provided at least a one-hour advance notice is given by calling the
number posted at the bridge.
From 7:30 a.m. through 8:30 p.m. on Saturday, Sunday and Federal
holidays the draw shall open on the hour and half-hour provided at
least a half-hour advance notice is given by calling the number posted
at the bridge.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: May 7, 2010.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 2010-12342 Filed 5-21-10; 8:45 am]
BILLING CODE 9110-04-P