Environmental Impact Statements; Notice of Availability, 28612 [2010-12262]
Download as PDF
28612
Federal Register / Vol. 75, No. 98 / Friday, May 21, 2010 / Notices
listed in the index, some information is
not publicly available, e.g., CBI or other
information whose disclosure is
restricted by statute. Certain other
material, such as copyrighted material,
will be publicly available only in hard
copy. Publicly available docket
materials are available either
electronically at https://
www.regulations.gov or in hard copy at
the OEI Docket in the EPA Headquarters
Docket Center.
Dated: May 17, 2010.
Rebecca Clark,
Acting Director, National Center for
Environmental Assessment.
[FR Doc. 2010–12280 Filed 5–20–10; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8990–5]
Environmental Impact Statements;
Notice of Availability
emcdonald on DSK2BSOYB1PROD with NOTICES
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements Filed 05/10/2010 Through
05/14/2010 Pursuant to 40 CFR
1506.9.
Notice
In accordance with Section 309(a) of
the Clean Air Act, EPA is required to
make its comments on EISs issued by
other Federal agencies public.
Historically, EPA has met this mandate
by publishing weekly notices of
availability of EPA comments, which
includes a brief summary of EPA’s
comment letters, in the Federal
Register. Since February 2008, EPA has
been including its comment letters on
EISs on its Web site at: https://
www.epa.gov/compliance/nepa/
eisdata.html. Including the entire EIS
comment letters on the Web site
satisfies the Section 309(a) requirement
to make EPA’s comments on EISs
available to the public. Accordingly, on
March 31, 2010, EPA discontinued the
publication of the notice of availability
of EPA comments in the Federal
Register.
EIS No. 20100174, Final EIS, USFS, 00,
Wallowa-Whitman National Forest
Invasive Plants Treatment Project, To
Protect Native Vegetation by
Controlling, Containing, or
Eradicating Invasive Plant, Wallowa,
Baker, Malheur and Grant Counties,
OR and Adams and Nez Perce
Counties, ID, Wait Period Ends: 06/
VerDate Mar<15>2010
16:40 May 20, 2010
Jkt 220001
21/2010, Contact: Robert W. Rock
541–523–1242.
EIS No. 20100175, Draft EIS, USN, 00,
United States Marine Corps Joint
Strike Fighter F–35B West Coast
Basing, To Efficiently and Effectively
Maintain Combat Capability and
Mission Readiness, CA and AZ,
Comment Period Ends: 07/05/2010,
Contact: Adrianne Saboya 619–532–
4742.
EIS No. 20100176, Final EIS, USN, WA,
Naval Sea Systems Command
(NAVSEA). Naval Undersea Warfare
Center (NUWC), Keyport Complex
Extension, Propose to Extend the
Operational Areas, Three Distinct
Range Sites: Keyport Range Site;
Dabob Bay Range Complex (DBRC)
Site, Quinault Underwater Tracking
Range Site, Gray Harbor, Jefferson,
Kitsap and Mason Counties, WA, Wait
Period Ends: 06/21/2010, Contact:
Kimberly Kler 360–396–0927.
EIS No. 20100177, Draft EIS, USFS, MN,
Tracks Project, Proposing Forest
Vegetation Management and Related
Transportation System Activities,
Superior National Forest, St. Louis
and Lake Counties, MN, Comment
Period Ends: 07/05/2010, Contact:
Susan Duffy 218–365–2097.
EIS No. 20100178, Draft EIS, USACE,
LA, Medium Diversion at White
Ditch, Integrated Feasibility Study,
Louisiana Coastal Area (LCA)
Ecosystem Restoration,
Implementation, Plaquemines Parish,
LA, Comment Period Ends: 07/05/
2010, Contact: Dr. Nathan Dayan 504–
862–2530.
EIS No. 20100179, Final EIS, TVA, AL,
Bellefonte Site Single Nuclear Unit
Project, Proposes to Complete or
Construct and Operate a Single 1,100–
1, 200 MW Nuclear Generation Unit,
Jackson County, AL, Wait Period
Ends: 06/21/2010, Contact: Ruth
Horton 865–632–3719.
EIS No. 20100180, Draft EIS, USACE,
LA, Convey Atchafalaya River Water
to Northern Terrebonne Marshes and
Multipurpose Operation of Houma
Navigation Lock, Integrated
Feasibility Study, Louisiana Coastal
Area (LCA) Implementation,
Lafourche, Terrebonne, St. Mary
Parish, LA, Comment Period Ends:
07/05/2010, Contact: Dr. Nathan
Dayan 504–862–2530.
EIS No. 20100181, Final EIS, DOE, MS,
Kemper County Integrated
Gasification Combined-Cycle (IGCC)
Project, Construction and Operation
of Advanced Power Generation Plant,
U.S. Army COE Section 404 Permit,
Kemper County, MS, Wait Period
Ends: 06/21/2010, Contact: Richard A.
Hargis, Jr. 888–322–7426 Ext. 6065.
PO 00000
Frm 00071
Fmt 4703
Sfmt 4703
EIS No. 20100182, Draft EIS, USACE,
LA, Small Diversion at Convent/Blind
River, Proposes to construct a
Freshwater Diversion Project,
Integrated Feasibility Study,
Louisiana Coastal Area, St. James
Parish, LA, Comment Period Ends:
07/05/2010, Contact: Dr. William P.
Klein, Jr. 504–862–2540.
EIS No. 20100183, Draft EIS, USACE,
LA, Amite River Diversion Canal
Modification Element of the Section
7006(E)(3) Ecosystem Restoration
Project, Feasibility Study, Louisiana
Coastal Area (LCA) Ascension and
Livingston Parishes, LA, Comment
Period Ends: 07/05/2010, Contact: Dr.
William P. Klein, Jr. 504–862–2540.
Dated: May 18, 2010.
Ken Mittelholtz,
Deputy Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 2010–12262 Filed 5–20–10; 8:45 am]
BILLING CODE 6560–50–P
DEPARTMENT OF THE TREASURY
Office of the Comptroller of the
Currency
FEDERAL RESERVE SYSTEM
FEDERAL DEPOSIT INSURANCE
CORPORATION
DEPARTMENT OF THE TREASURY
Office of Thrift Supervision
Proposed Agency Information
Collection Activities; Comment
Request
AGENCIES: Office of the Comptroller of
the Currency (OCC), Treasury; Board of
Governors of the Federal Reserve
System (Board); Federal Deposit
Insurance Corporation (FDIC); and
Office of Thrift Supervision (OTS),
Treasury.
ACTION: Joint notice and request for
comment.
SUMMARY: In accordance with the
requirements of the Paperwork
Reduction Act (PRA) of 1995 (44 U.S.C.
chapter 35), the OCC, the Board, the
FDIC, and the OTS (the ‘‘agencies’’) may
not conduct or sponsor, and the
respondent is not required to respond
to, an information collection unless it
displays a currently valid Office of
Management and Budget (OMB) control
number. The Federal Financial
Institutions Examination Council
(FFIEC), of which the agencies are
members, has approved the agencies’
publication for public comment of a
E:\FR\FM\21MYN1.SGM
21MYN1
Agencies
[Federal Register Volume 75, Number 98 (Friday, May 21, 2010)]
[Notices]
[Page 28612]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-12262]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8990-5]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements Filed 05/10/2010
Through 05/14/2010 Pursuant to 40 CFR 1506.9.
Notice
In accordance with Section 309(a) of the Clean Air Act, EPA is
required to make its comments on EISs issued by other Federal agencies
public. Historically, EPA has met this mandate by publishing weekly
notices of availability of EPA comments, which includes a brief summary
of EPA's comment letters, in the Federal Register. Since February 2008,
EPA has been including its comment letters on EISs on its Web site at:
https://www.epa.gov/compliance/nepa/eisdata.html. Including the entire
EIS comment letters on the Web site satisfies the Section 309(a)
requirement to make EPA's comments on EISs available to the public.
Accordingly, on March 31, 2010, EPA discontinued the publication of the
notice of availability of EPA comments in the Federal Register.
EIS No. 20100174, Final EIS, USFS, 00, Wallowa-Whitman National Forest
Invasive Plants Treatment Project, To Protect Native Vegetation by
Controlling, Containing, or Eradicating Invasive Plant, Wallowa, Baker,
Malheur and Grant Counties, OR and Adams and Nez Perce Counties, ID,
Wait Period Ends: 06/21/2010, Contact: Robert W. Rock 541-523-1242.
EIS No. 20100175, Draft EIS, USN, 00, United States Marine Corps Joint
Strike Fighter F-35B West Coast Basing, To Efficiently and Effectively
Maintain Combat Capability and Mission Readiness, CA and AZ, Comment
Period Ends: 07/05/2010, Contact: Adrianne Saboya 619-532-4742.
EIS No. 20100176, Final EIS, USN, WA, Naval Sea Systems Command
(NAVSEA). Naval Undersea Warfare Center (NUWC), Keyport Complex
Extension, Propose to Extend the Operational Areas, Three Distinct
Range Sites: Keyport Range Site; Dabob Bay Range Complex (DBRC) Site,
Quinault Underwater Tracking Range Site, Gray Harbor, Jefferson, Kitsap
and Mason Counties, WA, Wait Period Ends: 06/21/2010, Contact: Kimberly
Kler 360-396-0927.
EIS No. 20100177, Draft EIS, USFS, MN, Tracks Project, Proposing Forest
Vegetation Management and Related Transportation System Activities,
Superior National Forest, St. Louis and Lake Counties, MN, Comment
Period Ends: 07/05/2010, Contact: Susan Duffy 218-365-2097.
EIS No. 20100178, Draft EIS, USACE, LA, Medium Diversion at White
Ditch, Integrated Feasibility Study, Louisiana Coastal Area (LCA)
Ecosystem Restoration, Implementation, Plaquemines Parish, LA, Comment
Period Ends: 07/05/2010, Contact: Dr. Nathan Dayan 504-862-2530.
EIS No. 20100179, Final EIS, TVA, AL, Bellefonte Site Single Nuclear
Unit Project, Proposes to Complete or Construct and Operate a Single
1,100-1, 200 MW Nuclear Generation Unit, Jackson County, AL, Wait
Period Ends: 06/21/2010, Contact: Ruth Horton 865-632-3719.
EIS No. 20100180, Draft EIS, USACE, LA, Convey Atchafalaya River Water
to Northern Terrebonne Marshes and Multipurpose Operation of Houma
Navigation Lock, Integrated Feasibility Study, Louisiana Coastal Area
(LCA) Implementation, Lafourche, Terrebonne, St. Mary Parish, LA,
Comment Period Ends: 07/05/2010, Contact: Dr. Nathan Dayan 504-862-
2530.
EIS No. 20100181, Final EIS, DOE, MS, Kemper County Integrated
Gasification Combined-Cycle (IGCC) Project, Construction and Operation
of Advanced Power Generation Plant, U.S. Army COE Section 404 Permit,
Kemper County, MS, Wait Period Ends: 06/21/2010, Contact: Richard A.
Hargis, Jr. 888-322-7426 Ext. 6065.
EIS No. 20100182, Draft EIS, USACE, LA, Small Diversion at Convent/
Blind River, Proposes to construct a Freshwater Diversion Project,
Integrated Feasibility Study, Louisiana Coastal Area, St. James Parish,
LA, Comment Period Ends: 07/05/2010, Contact: Dr. William P. Klein, Jr.
504-862-2540.
EIS No. 20100183, Draft EIS, USACE, LA, Amite River Diversion Canal
Modification Element of the Section 7006(E)(3) Ecosystem Restoration
Project, Feasibility Study, Louisiana Coastal Area (LCA) Ascension and
Livingston Parishes, LA, Comment Period Ends: 07/05/2010, Contact: Dr.
William P. Klein, Jr. 504-862-2540.
Dated: May 18, 2010.
Ken Mittelholtz,
Deputy Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 2010-12262 Filed 5-20-10; 8:45 am]
BILLING CODE 6560-50-P