Cellu Tissue Corporation; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 28000-28001 [2010-11910]

Download as PDF jlentini on DSKJ8SOYB1PROD with NOTICES 28000 Federal Register / Vol. 75, No. 96 / Wednesday, May 19, 2010 / Notices toll-free, (886) 208–3676 or TTY, (202) 502–8659. Any questions concerning this application may be directed to Michelle Willis, Manager, Regulatory & Compliance, CenterPoint Energy Gas Transmission Company, P.O. Box 21734, Shreveport, Louisiana 71151, at (318) 429–3708. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: June 2, 2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–11912 Filed 5–18–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2851–016] Cellu Tissue Corporation; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments May 12, 2010. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 2851–016. c. Date Filed: April 29, 2010. d. Applicant: Cellu Tissue Corporation. e. Name of Project: Natural Dam Hydroelectric Project. f. Location: On the Oswegatchie River in the town of Gouverneur, St. Lawrence County, New York. The project would not occupy any Federal lands. g. Filed Pursuant to: 18 CFR part 5 of the Commission’s Regulations. h. Agent Contact: Chris Fiedler or Robin Gaumes, Cellu Tissue Corp., Natural Dam Mill, 4921 Route 58N, Gouverneur, NY 13642, (315) 287–7190. i. FERC Contact: John Baummer, (202) 502–6837. j. This application is not ready for environmental analysis at this time. k. Project Description: The existing project consists of: (1) A 155 foot-longdam and spillway with a inflatable rubber crest at a deflated crest elevation of 394.0 feet National Geodetic Vertical Datum (NGVD); (2) a 180-foot-long auxiliary dam/spillway with a crest elevation of 397.3 feet NGVD; (3) a 570acre impoundment with a normal water surface elevation of 396.0 feet NGVD; (4) a 152-foot-long gated headpond structure leading to an intake structure and a 412-foot-long flume along the west bank of the river; (5) a 570-footlong bypass reach; (6) a powerhouse containing three turbine generating units with a total installed capacity of 1,020 kW; and (7) electrical transformers located in a transformer yard adjacent to the north wall of the powerhouse that supply power for use at the Natural Dam Mill to produce specialty paper products. Cellu Tissue Corporation proposes to: (1) Operate the project in a run-of river mode with a minimum impoundment elevation of 395.85 feet; (2) maintain a minimum bypass flow of 77 cubic feet per second (cfs) or inflow, whichever is less; (3) upgrade water level monitoring equipment for the impoundment; and (4) install equipment to allow for automatic pond level control. l. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Procedural Schedule: The application will be processed according to the following Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone Target date Notice of Acceptance/Notice of Ready for Environmental Analysis ....................................................................................... Filing of Recommendations, preliminary terms and conditions, and fishway prescriptions ................................................... Commission issues Non-Draft EA ........................................................................................................................................... Comments on EA .................................................................................................................................................................... VerDate Mar<15>2010 16:07 May 18, 2010 Jkt 220001 PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 E:\FR\FM\19MYN1.SGM 19MYN1 June 29, 2010. August 28, 2010. December 26, 2010. January 25, 2011. Federal Register / Vol. 75, No. 96 / Wednesday, May 19, 2010 / Notices Milestone Target date Modified Terms and Conditions ............................................................................................................................................... o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Kimberly D. Bose, Secretary. [FR Doc. 2010–11910 Filed 5–18–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1992–003] Ken Willis; Notice of Authorization for Continued Project Operation jlentini on DSKJ8SOYB1PROD with NOTICES May 12, 2010. On April 25, 2008, Ken Willis, licensee for the Fire Mountain Lodge Hydroelectric Project, filed an Application for a New License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Fire Mountain Lodge Hydroelectric Project is located in Fern Springs, in Tehama County, California near the town of Chester, Plumas County, California. The license for Project No. 1992 was issued for a period ending April 30, 2010. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a VerDate Mar<15>2010 16:07 May 18, 2010 Jkt 220001 license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 1992 is issued to Ken Willis for a period effective May 1, 2010 through April 30, 2011, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before April 30, 2011, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that Ken Willis is authorized to continue operation of the Fire Mountain Lodge Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. Kimberly D. Bose, Secretary. [FR Doc. 2010–11909 Filed 5–18–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 May 10, 2010. Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC10–66–000. Applicants: Black Hills Power, Inc. Description: Application of Black Hills Power, Inc. Filed Date: 05/07/2010. Accession Number: 20100507–5116. Comment Date: 5 p.m. Eastern Time on Friday, May 28, 2010. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER05–1232–024; ER07–1358–014. Applicants: J.P. Morgan Ventures Energy Corporation, BE Louisiana LLC. Description: J.P. Morgan Ventures Energy Corporation and BE Louisiana LLC’s Supplement to Updated Market Power Analysis and Order No. 697 Compliance Filing. PO 00000 Frm 00023 Fmt 4703 28001 Sfmt 4703 March 26, 2011. Filed Date: 05/05/2010. Accession Number: 20100505–5111. Comment Date: 5 p.m. Eastern Time on Wednesday, May 26, 2010. Docket Numbers: ER07–930–002; ER06–146–004; ER98–2782–017; ER98– 2782–018; ER98–2782–019. Applicants: AER NY–Gen, LLC; Alliance Energy Marketing, LLC; AG– Energy, LP. Description: AER NY–Gen, LLC et al. submits market power update for the Northeast Region in compliance with Order No 697. Filed Date: 05/06/2010. Accession Number: 20100510–0205. Comment Date: 5 p.m. Eastern Time on Tuesday, July 06, 2010. Docket Numbers: ER10–1052–000. Applicants: Public Service Electric and Gas Company. Description: Public Service Electric and Gas Company submits an executed transmission facilities agreement with Atlantic City Electric Company substituting Original Service Agreement 1877 etc. Filed Date: 04/29/2010. Accession Number: 20100429–0073. Comment Date: 5 p.m. Eastern Time on Thursday, May 20, 2010. Docket Numbers: ER10–1207–000. Applicants: Edgewood Energy, LLC. Description: Edgewood Energy, LLC et al. submits Notice of Succession and revised market-based rate wholesale power sales tariff, FERC Electric Tariff, Original Volume 1. Filed Date: 05/07/2010. Accession Number: 20100510–0201. Comment Date: 5 p.m. Eastern Time on Friday, May 28, 2010. Docket Numbers: ER10–1208–000. Applicants: Shoreham Energy, LLC. Description: Edgewood Energy, LLC et al. submits Notice of Succession and revised market-based rate wholesale power sales tariff, FERC Electric Tariff, Original Volume 1. Filed Date: 05/07/2010 Accession Number: 20100510–0201. Comment Date: 5 p.m. Eastern Time on Friday, May 28, 2010. Docket Numbers: ER10–1209–000. Applicants: PPL Electric Utilities Corporation. Description: PPL Electric Utilities Corporation submits revised tariff sheets to the PJM Interconnection, LLC Open Access Transmission Tariff. Filed Date: 05/07/2010. Accession Number: 20100510–0202. E:\FR\FM\19MYN1.SGM 19MYN1

Agencies

[Federal Register Volume 75, Number 96 (Wednesday, May 19, 2010)]
[Notices]
[Pages 28000-28001]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-11910]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2851-016]


Cellu Tissue Corporation; Notice of Application Tendered for 
Filing With the Commission and Establishing Procedural Schedule for 
Licensing and Deadline for Submission of Final Amendments

May 12, 2010.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2851-016.
    c. Date Filed: April 29, 2010.
    d. Applicant: Cellu Tissue Corporation.
    e. Name of Project: Natural Dam Hydroelectric Project.
    f. Location: On the Oswegatchie River in the town of Gouverneur, 
St. Lawrence County, New York. The project would not occupy any Federal 
lands.
    g. Filed Pursuant to: 18 CFR part 5 of the Commission's 
Regulations.
    h. Agent Contact: Chris Fiedler or Robin Gaumes, Cellu Tissue 
Corp., Natural Dam Mill, 4921 Route 58N, Gouverneur, NY 13642, (315) 
287-7190.
    i. FERC Contact: John Baummer, (202) 502-6837.
    j. This application is not ready for environmental analysis at this 
time.
    k. Project Description: The existing project consists of: (1) A 155 
foot-long-dam and spillway with a inflatable rubber crest at a deflated 
crest elevation of 394.0 feet National Geodetic Vertical Datum (NGVD); 
(2) a 180-foot-long auxiliary dam/spillway with a crest elevation of 
397.3 feet NGVD; (3) a 570-acre impoundment with a normal water surface 
elevation of 396.0 feet NGVD; (4) a 152-foot-long gated headpond 
structure leading to an intake structure and a 412-foot-long flume 
along the west bank of the river; (5) a 570-foot-long bypass reach; (6) 
a powerhouse containing three turbine generating units with a total 
installed capacity of 1,020 kW; and (7) electrical transformers located 
in a transformer yard adjacent to the north wall of the powerhouse that 
supply power for use at the Natural Dam Mill to produce specialty paper 
products.
    Cellu Tissue Corporation proposes to: (1) Operate the project in a 
run-of river mode with a minimum impoundment elevation of 395.85 feet; 
(2) maintain a minimum bypass flow of 77 cubic feet per second (cfs) or 
inflow, whichever is less; (3) upgrade water level monitoring equipment 
for the impoundment; and (4) install equipment to allow for automatic 
pond level control.
    l. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for 
inspection and reproduction at the address in item (h) above.
    m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.
    n. Procedural Schedule: The application will be processed according 
to the following Hydro Licensing Schedule. Revisions to the schedule 
may be made as appropriate.

------------------------------------------------------------------------
              Milestone                           Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready  June 29, 2010.
 for Environmental Analysis.
Filing of Recommendations,            August 28, 2010.
 preliminary terms and conditions,
 and fishway prescriptions.
Commission issues Non-Draft EA......  December 26, 2010.
Comments on EA......................  January 25, 2011.

[[Page 28001]]

 
Modified Terms and Conditions.......  March 26, 2011.
------------------------------------------------------------------------

    o. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-11910 Filed 5-18-10; 8:45 am]