Natural Gas Pipeline Company of America LLC; Notice of Request Under Blanket Authorization, 27774 [2010-11794]
Download as PDF
27774
Federal Register / Vol. 75, No. 95 / Tuesday, May 18, 2010 / Notices
https://www.CapitolConnection.org or
contact Danelle Springer or David
Reininger at 703–993–3100.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
[FR Doc. 2010–11914 Filed 5–14–10; 11:15 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern time
on Tuesday, May 19, 2010.
Kimberly D. Bose,
Secretary.
[Docket No. PR10–22–000]
[FR Doc. 2010–11793 Filed 5–17–10; 8:45 am]
Eagle Rock Desoto Pipeline, L.P.;
Notice of Rate Election
BILLING CODE 6717–01–P
mstockstill on DSKH9S0YB1PROD with NOTICES
May 11, 2010.
Take notice that on May 3, 2010,
Eagle Rock Desoto Pipeline, L.P.,
(Desoto) filed a Notice of Rate Election
pursuant to section 284.123(b)(1)(ii) of
the Commission’s regulations. Desoto
proposes to utilize its presently effective
Texas Railroad Commission city-gate
transportation rate for interruptible
transportation service on its Central and
North System pursuant to section 311 of
the Natural Gas Act. The interruptible
transportation rate for both systems is
20.5 cents/MMBtu plus 0.5 percent fuel
reimbursement.
Any person desiring to participate in
this rate filing must file in accordance
with Rules 211 and 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
VerDate Mar<15>2010
17:22 May 17, 2010
Jkt 220001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP10–424–000]
Natural Gas Pipeline Company of
America LLC; Notice of Request Under
Blanket Authorization
May 11, 2010.
Take notice that on May 6, 2010,
Natural Gas Pipeline Company of
America LLC (Natural), 3250 Lacey
Road, Suite 700, Downers Grove, Illinois
60515, filed in Docket No. CP10–424–
000, a prior notice request pursuant to
sections 157.205 and 157.208 of the
Commission’s regulations under the
Natural Gas Act (NGA). Natural seeks
authorization to acquire from Cheniere
Creole Trail Pipeline, L.P., formerly
Cheneiere Sabine Pass Pipeline, L.P.
(Creole Trail) approximately 1,316 feet
of 16-inch diameter pipeline which is
part of a lateral connecting Creole
Trail’s facilities transporting gas from its
Sabine Pass LNG Terminal to Natural’s
pipeline facilities, all in Cameron
Parish, Louisiana. On April 29, 2010,
Creole Trail filed a separate prior notice
request, in Docket No. CP10–256–000,
for authorization to abandon the subject
facilities under its blanket certificate
authority. The cost of the facilities to be
acquired by Natural is approximately
$363,000. Natural proposes to acquire
the facilities under its blanket certificate
issued in Docket No. CP82–402–000, all
as more fully set forth in the application
PO 00000
Frm 00074
Fmt 4703
Sfmt 9990
which is on file with the Commission
and open to public inspection.
The filing may be viewed on the Web
at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application may be directed to Bruce H.
Newsome, Vice President, Regulatory
Products and Services, Natural Gas
Pipeline Company of America LLC,
3250 Lacey Road, 7th Floor, Downers
Grove, Illinois 60515–7918, or via
telephone at (630) 725–3070, or by
e-mail at
bruce_newsome@kindermorgan.com.
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the NGA (18 CFR
157.205) a protest to the request. If no
protest is filed within the time allowed,
the proposed activity shall be deemed to
be authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–11794 Filed 5–17–10; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\18MYN1.SGM
18MYN1
Agencies
[Federal Register Volume 75, Number 95 (Tuesday, May 18, 2010)]
[Notices]
[Page 27774]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-11794]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP10-424-000]
Natural Gas Pipeline Company of America LLC; Notice of Request
Under Blanket Authorization
May 11, 2010.
Take notice that on May 6, 2010, Natural Gas Pipeline Company of
America LLC (Natural), 3250 Lacey Road, Suite 700, Downers Grove,
Illinois 60515, filed in Docket No. CP10-424-000, a prior notice
request pursuant to sections 157.205 and 157.208 of the Commission's
regulations under the Natural Gas Act (NGA). Natural seeks
authorization to acquire from Cheniere Creole Trail Pipeline, L.P.,
formerly Cheneiere Sabine Pass Pipeline, L.P. (Creole Trail)
approximately 1,316 feet of 16-inch diameter pipeline which is part of
a lateral connecting Creole Trail's facilities transporting gas from
its Sabine Pass LNG Terminal to Natural's pipeline facilities, all in
Cameron Parish, Louisiana. On April 29, 2010, Creole Trail filed a
separate prior notice request, in Docket No. CP10-256-000, for
authorization to abandon the subject facilities under its blanket
certificate authority. The cost of the facilities to be acquired by
Natural is approximately $363,000. Natural proposes to acquire the
facilities under its blanket certificate issued in Docket No. CP82-402-
000, all as more fully set forth in the application which is on file
with the Commission and open to public inspection.
The filing may be viewed on the Web at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-
free, (886) 208-3676 or TYY, (202) 502-8659.
Any questions regarding this application may be directed to Bruce
H. Newsome, Vice President, Regulatory Products and Services, Natural
Gas Pipeline Company of America LLC, 3250 Lacey Road, 7th Floor,
Downers Grove, Illinois 60515-7918, or via telephone at (630) 725-3070,
or by e-mail at bruce_newsome@kindermorgan.com.
Any person or the Commission's Staff may, within 60 days after the
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and, pursuant to section 157.205 of
the Commission's Regulations under the NGA (18 CFR 157.205) a protest
to the request. If no protest is filed within the time allowed, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for protest. If a protest is filed and not
withdrawn within 30 days after the time allowed for filing a protest,
the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (https://www.ferc.gov) under the ``e-Filing'' link. Persons unable
to file electronically should submit an original and 14 copies of the
protest or intervention to the Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC 20426.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-11794 Filed 5-17-10; 8:45 am]
BILLING CODE 6717-01-P