Lock+ Hydro Friends Fund VII; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 27769 [2010-11790]

Download as PDF Federal Register / Vol. 75, No. 95 / Tuesday, May 18, 2010 / Notices document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–11784 Filed 5–17–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13697–000] Mississippi 16 Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications mstockstill on DSKH9S0YB1PROD with NOTICES May 11, 2010. On April 5, 2010 Mississippi 16 Hydro, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Mississippi River Lock and Dam #16 Hydroelectric Project, located on the Mississippi River, in Rock Island County, Iowa. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of: (1) The powerhouse; (2) installation of four 5.2 megawatt bulb turbines; (3) a proposed 1.5-mile-long, 69-kilovolt transmission line; (4) switchyard; and (5) appurtenant facilities. The proposed Mississippi River Lock and Dam #16 Hydroelectric Project would have an average annual generation of 95.5 gigawatt-hours. Applicant Contact: Brent L. Smith, COO, Symbiotics, LLC, P.O. Box 535, Rigby, Idaho 83442; phone: (208) 745– 0834. FERC Contact: Bryan Roden-Reynolds at (202) 502–6618, or via e-mail at bryan.roden-reynolds@ferc.gov. The deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications is 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR VerDate Mar<15>2010 17:22 May 17, 2010 Jkt 220001 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov/docs-filing/ferconline. asp), under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies of the correspondence to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the Commission’s ‘‘eLibrary’’ link at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–13697) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–11786 Filed 5–17–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13711–000] Lock+ Hydro Friends Fund VII; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications May 11, 2010. On April 13, 2010 Lock+ Hydro Friends Fund VII filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Green Wave Project, located on the Mississippi River, in Pike County, Missouri. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of: (1) One lock frame module of ten hydropower turbines, which will be installed in a single row; (2) a new gate; PO 00000 Frm 00069 Fmt 4703 Sfmt 9990 27769 (3) a proposed 3.5-mile-long, 69-kilovolt transmission line; (4) flow control door assemblies; and (5) appurtenant facilities. The proposed Domage Project would have an average annual generation of 65.745 gigawatt-hours. Applicant Contact: Wayne F. Krouse, Chairman & CEO, Hydro Green Energy, LLC, 5090 Richmond Ave, #390, Houston, Texas, 77056. FERC Contact: Bryan Roden-Reynolds at (202) 502–6618, or via e-mail at bryan.roden-reynolds@ferc.gov. The deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications is 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov/docs-filing/ferconline .asp), under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies of the correspondence to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the Commission’s ‘‘eLibrary’’ link at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–13711) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–11790 Filed 5–17–10; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\18MYN1.SGM 18MYN1

Agencies

[Federal Register Volume 75, Number 95 (Tuesday, May 18, 2010)]
[Notices]
[Page 27769]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-11790]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13711-000]


Lock+ Hydro Friends Fund VII; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

May 11, 2010.
    On April 13, 2010 Lock+ Hydro Friends Fund VII filed an application 
for a preliminary permit, pursuant to section 4(f) of the Federal Power 
Act, proposing to study the feasibility of the Green Wave Project, 
located on the Mississippi River, in Pike County, Missouri. The sole 
purpose of a preliminary permit, if issued, is to grant the permit 
holder priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' express permission.
    The proposed project would consist of: (1) One lock frame module of 
ten hydropower turbines, which will be installed in a single row; (2) a 
new gate; (3) a proposed 3.5-mile-long, 69-kilovolt transmission line; 
(4) flow control door assemblies; and (5) appurtenant facilities. The 
proposed Domage Project would have an average annual generation of 
65.745 gigawatt-hours.
    Applicant Contact: Wayne F. Krouse, Chairman & CEO, Hydro Green 
Energy, LLC, 5090 Richmond Ave, 390, Houston, Texas, 77056.
    FERC Contact: Bryan Roden-Reynolds at (202) 502-6618, or via e-mail 
at bryan.roden-reynolds@ferc.gov.
    The deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications is 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site (https://www.ferc.gov/docs-filing/ferconline.asp), under the 
``eFiling'' link. For a simpler method of submitting text only 
comments, click on ``Quick Comment.'' For assistance, please contact 
FERC Online Support at FERCOnlineSupport@ferc.gov; call toll-free at 
(866) 208-3676; or, for TTY, contact (202) 502-8659. Although the 
Commission strongly encourages electronic filing, documents may also be 
paper-filed. To paper-file, mail an original and eight copies of the 
correspondence to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the Commission's ``eLibrary'' 
link at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket 
number (P-13711) in the docket number field to access the document. For 
assistance, contact FERC Online Support.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-11790 Filed 5-17-10; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.