27550
Federal Register / Vol. 75, No. 94 / Monday, May 17, 2010 / Notices
srobinson on DSKHWCL6B1PROD with NOTICES
Description: Compliance Filing of
NERC in Response to Paragraphs 297,
308, 310, 311, and 312 of Order No. 733
Revised Violation Risk Factors and
Violation Severity Levels for PRC–023–
1 Transmission Relay Loadability.
Filed Date: 04/19/2010.
Accession Number: 20100419–5214.
Comment Date: 5 p.m. Eastern Time
on Wednesday, May 19, 2010.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or
VerDate Mar<15>2010
17:36 May 14, 2010
Jkt 220001
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–11623 Filed 5–14–10; 8:45 am]
[Project Nos. 271–128]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Entergy Arkansas, Inc.; Notice of
Availability of Environmental
Assessment
Bonneville Power Administration
May 10, 2010.
Electrical Interconnection of the
Juniper Canyon I Wind Project
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed an application to
delegate authority to Entergy Arkansas,
Inc (licensee) for approving excavation
and dredging activities at the CarpenterRemmel Hydroelectric Project (FERC
No. 271). An environmental assessment
(EA) has been prepared as part of staff’s
review of the proposal. The project is
located on the Ouachita River, in Hot
Springs and Garland Counties,
Arkansas.
In the application, the licensee
proposes a procedure that establishes
guidance for removing rock, soil, and
silt materials from Lakes Catherine and
Hamilton, the project’s two reservoirs,
without prior Commission approval.
The EA contains Commission staff’s
analysis of the probable environmental
impacts of the proposed procedure and
concludes that approval of the proposal
would not constitute a major federal
action significantly affecting the quality
of the human environment.
The EA is attached to a Commission
order titled ‘‘Order Modifying and
Approving Dredging and Excavation
Permitting Procedure,’’ which was
issued May 4, 2010, and is available for
review and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426. The EA may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘elibrary’’ link. Enter the docket
number (P–271) in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3372, or for TTY,
(202) 502–8659.
AGENCY: Bonneville Power
Administration (BPA), Department of
Energy (DOE).
ACTION: Notice of Availability of Record
of Decision (ROD).
SUMMARY: The Bonneville Power
Administration (BPA) has decided to
offer Iberdrola Renewables, LLC, a Large
Generator Interconnection Agreement
for interconnection of up to 150
megawatts of power into the Federal
Columbia River Transmission System.
The power would be generated from
their proposed Juniper Canyon I Wind
Energy Project (Wind Project) in
Klickitat County, Washington. To
interconnect the Wind Project, BPA will
expand an existing substation (Rock
Creek Substation) by approximately .25
acres. This decision to interconnect the
Wind Project is consistent with and
tiered to BPA’s Business Plan
Environmental Impact Statement (DOE/
EIS–0183, June 1995), and the Business
Plan Record of Decision (BP ROD,
August 1995).
Copies of this tiered ROD
and the Business Plan EIS may be
obtained by calling BPA’s toll-free
document request line, 1–800–622–
4520. The RODs and EIS are also
available on our Web site, https://
www.efw.bpa.gov.
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
Makary Hutson, Bonneville Power
Administration—KEC–4, P.O. Box 3621,
Portland, Oregon 97208–3621; toll-free
telephone number 1–800–622–4519; fax
number 503–230–5699; or e-mail
mahutson@bpa.gov.
Issued in Portland, Oregon, on May 10,
2010.
Stephen J. Wright,
Administrator and Chief Executive Officer.
[FR Doc. 2010–11672 Filed 5–14–10; 8:45 am]
Kimberly D. Bose,
Secretary.
BILLING CODE 6450–01–P
[FR Doc. 2010–11632 Filed 5–14–10; 8:45 am]
PO 00000
BILLING CODE 6717–01–P
Frm 00015
Fmt 4703
Sfmt 9990
E:\FR\FM\17MYN1.SGM
17MYN1
Agencies
[Federal Register Volume 75, Number 94 (Monday, May 17, 2010)]
[Notices]
[Page 27550]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-11632]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 271-128]
Entergy Arkansas, Inc.; Notice of Availability of Environmental
Assessment
May 10, 2010.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office
of Energy Projects has reviewed an application to delegate authority to
Entergy Arkansas, Inc (licensee) for approving excavation and dredging
activities at the Carpenter-Remmel Hydroelectric Project (FERC No.
271). An environmental assessment (EA) has been prepared as part of
staff's review of the proposal. The project is located on the Ouachita
River, in Hot Springs and Garland Counties, Arkansas.
In the application, the licensee proposes a procedure that
establishes guidance for removing rock, soil, and silt materials from
Lakes Catherine and Hamilton, the project's two reservoirs, without
prior Commission approval. The EA contains Commission staff's analysis
of the probable environmental impacts of the proposed procedure and
concludes that approval of the proposal would not constitute a major
federal action significantly affecting the quality of the human
environment.
The EA is attached to a Commission order titled ``Order Modifying
and Approving Dredging and Excavation Permitting Procedure,'' which was
issued May 4, 2010, and is available for review and reproduction at the
Commission's Public Reference Room, located at 888 First Street, NE.,
Room 2A, Washington, DC 20426. The EA may also be viewed on the
Commission's Web site at https://www.ferc.gov using the ``elibrary''
link. Enter the docket number (P-271) in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3372, or for TTY,
(202) 502-8659.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-11632 Filed 5-14-10; 8:45 am]