Entergy Arkansas, Inc.; Notice of Availability of Environmental Assessment, 27550 [2010-11632]

Download as PDF 27550 Federal Register / Vol. 75, No. 94 / Monday, May 17, 2010 / Notices srobinson on DSKHWCL6B1PROD with NOTICES Description: Compliance Filing of NERC in Response to Paragraphs 297, 308, 310, 311, and 312 of Order No. 733 Revised Violation Risk Factors and Violation Severity Levels for PRC–023– 1 Transmission Relay Loadability. Filed Date: 04/19/2010. Accession Number: 20100419–5214. Comment Date: 5 p.m. Eastern Time on Wednesday, May 19, 2010. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or VerDate Mar<15>2010 17:36 May 14, 2010 Jkt 220001 call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Kimberly D. Bose, Secretary. [FR Doc. 2010–11623 Filed 5–14–10; 8:45 am] [Project Nos. 271–128] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Entergy Arkansas, Inc.; Notice of Availability of Environmental Assessment Bonneville Power Administration May 10, 2010. Electrical Interconnection of the Juniper Canyon I Wind Project In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed an application to delegate authority to Entergy Arkansas, Inc (licensee) for approving excavation and dredging activities at the CarpenterRemmel Hydroelectric Project (FERC No. 271). An environmental assessment (EA) has been prepared as part of staff’s review of the proposal. The project is located on the Ouachita River, in Hot Springs and Garland Counties, Arkansas. In the application, the licensee proposes a procedure that establishes guidance for removing rock, soil, and silt materials from Lakes Catherine and Hamilton, the project’s two reservoirs, without prior Commission approval. The EA contains Commission staff’s analysis of the probable environmental impacts of the proposed procedure and concludes that approval of the proposal would not constitute a major federal action significantly affecting the quality of the human environment. The EA is attached to a Commission order titled ‘‘Order Modifying and Approving Dredging and Excavation Permitting Procedure,’’ which was issued May 4, 2010, and is available for review and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426. The EA may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘elibrary’’ link. Enter the docket number (P–271) in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3372, or for TTY, (202) 502–8659. AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of Availability of Record of Decision (ROD). SUMMARY: The Bonneville Power Administration (BPA) has decided to offer Iberdrola Renewables, LLC, a Large Generator Interconnection Agreement for interconnection of up to 150 megawatts of power into the Federal Columbia River Transmission System. The power would be generated from their proposed Juniper Canyon I Wind Energy Project (Wind Project) in Klickitat County, Washington. To interconnect the Wind Project, BPA will expand an existing substation (Rock Creek Substation) by approximately .25 acres. This decision to interconnect the Wind Project is consistent with and tiered to BPA’s Business Plan Environmental Impact Statement (DOE/ EIS–0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 1995). Copies of this tiered ROD and the Business Plan EIS may be obtained by calling BPA’s toll-free document request line, 1–800–622– 4520. The RODs and EIS are also available on our Web site, https:// www.efw.bpa.gov. ADDRESSES: FOR FURTHER INFORMATION CONTACT: Makary Hutson, Bonneville Power Administration—KEC–4, P.O. Box 3621, Portland, Oregon 97208–3621; toll-free telephone number 1–800–622–4519; fax number 503–230–5699; or e-mail mahutson@bpa.gov. Issued in Portland, Oregon, on May 10, 2010. Stephen J. Wright, Administrator and Chief Executive Officer. [FR Doc. 2010–11672 Filed 5–14–10; 8:45 am] Kimberly D. Bose, Secretary. BILLING CODE 6450–01–P [FR Doc. 2010–11632 Filed 5–14–10; 8:45 am] PO 00000 BILLING CODE 6717–01–P Frm 00015 Fmt 4703 Sfmt 9990 E:\FR\FM\17MYN1.SGM 17MYN1

Agencies

[Federal Register Volume 75, Number 94 (Monday, May 17, 2010)]
[Notices]
[Page 27550]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-11632]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project Nos. 271-128]


Entergy Arkansas, Inc.; Notice of Availability of Environmental 
Assessment

May 10, 2010.
    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's (Commission) 
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office 
of Energy Projects has reviewed an application to delegate authority to 
Entergy Arkansas, Inc (licensee) for approving excavation and dredging 
activities at the Carpenter-Remmel Hydroelectric Project (FERC No. 
271). An environmental assessment (EA) has been prepared as part of 
staff's review of the proposal. The project is located on the Ouachita 
River, in Hot Springs and Garland Counties, Arkansas.
    In the application, the licensee proposes a procedure that 
establishes guidance for removing rock, soil, and silt materials from 
Lakes Catherine and Hamilton, the project's two reservoirs, without 
prior Commission approval. The EA contains Commission staff's analysis 
of the probable environmental impacts of the proposed procedure and 
concludes that approval of the proposal would not constitute a major 
federal action significantly affecting the quality of the human 
environment.
    The EA is attached to a Commission order titled ``Order Modifying 
and Approving Dredging and Excavation Permitting Procedure,'' which was 
issued May 4, 2010, and is available for review and reproduction at the 
Commission's Public Reference Room, located at 888 First Street, NE., 
Room 2A, Washington, DC 20426. The EA may also be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``elibrary'' 
link. Enter the docket number (P-271) in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3372, or for TTY, 
(202) 502-8659.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-11632 Filed 5-14-10; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.