EnerNOC, Inc. v. FirstEnergy; Notice of Complaint, 26219-26220 [2010-11107]
Download as PDF
emcdonald on DSK2BSOYB1PROD with NOTICES
Federal Register / Vol. 75, No. 90 / Tuesday, May 11, 2010 / Notices
Accession Number: 20100503–0283.
Comment Date: 5 p.m. Eastern Time
on Monday, May 24, 2010.
Docket Numbers: ER10–1173–000.
Applicants: Portland General Electric
Company.
Description: Portland General Electric
Company submits Notice of cancellation
of service Agreement 2007001 under
PGE’s Open Access Transmission Tariff,
FERC Electric Tariff Third Revised
Volume 8.
Filed Date: 05/03/2010.
Accession Number: 20100504–0209.
Comment Date: 5 p.m. Eastern Time
on Monday, May 24, 2010.
Applicants: Arizona Public Service
Company.
Description: Arizona Public Service
Company submits amendment to
Exhibit B to the 1991 Operation,
Maintenance, and Replacement of
Facilities Agreement with Western Area
Power Administration.
Filed Date: 05/03/2010.
Accession Number: 20100504–0208.
Comment Date: 5 p.m. Eastern Time
on Monday, May 24, 2010.
Docket Numbers: ER10–1175–000.
Applicants: Champlain Hudson
Power Express, Inc.
Description: Champlain Hudson
Power Express, Inc submits application
for authority to sell transmission rights
at negotiated rates and request for
expedited action.
Filed Date: 05/03/2010.
Accession Number: 20100504–0207.
Comment Date: 5 p.m. Eastern Time
on Monday, May 24, 2010.
Docket Numbers: ER10–1176–000.
Applicants: Meadow Lake Wind Farm
III LLC.
Description: Petition of Meadow Lake
Wind Farm III, LLC for order accepting
market- based rate tariff for filing and
granting waivers and blanket approvals
and request for expedited treatment.
Filed Date: 05/03/2010.
Accession Number: 20100504–0206.
Comment Date: 5 p.m. Eastern Time
on Monday, May 24, 2010.
Docket Numbers: ER10–1177–000.
Applicants: Meadow Lake Wind Farm
IV LLC.
Description: Meadow Lake Wind
Farm IV LLC submits petition for order
accepting market-based rate tariff for
filing and granting waivers and blanket
approvals.
Filed Date: 05/03/2010.
Accession Number: 20100504–0205.
Comment Date: 5 p.m. Eastern Time
on Monday, May 24, 2010.
Docket Numbers: ER10–1178–000.
Applicants: Southwest Power Pool,
Inc.
VerDate Mar<15>2010
19:22 May 10, 2010
Jkt 220001
Description: Southwest Power Pool,
Inc submits notices of cancellation for
four Point-to-Point Transmission
Service Agreement between SPP as
Transmission Provider and Kansas
Municipal energy Agency etc.
Filed Date: 05/03/2010.
Accession Number: 20100504–0204.
Comment Date: 5 p.m. Eastern Time
on Monday, May 24, 2010.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES10–32–000.
Applicants: NSTAR Electric
Company.
Description: Supplemental
Information of NSTAR Electric
Company.
Filed Date: 05/04/2010.
Accession Number: 20100504–5083.
Comment Date: 5 p.m. Eastern Time
on Friday, May 14, 2010.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
26219
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2010–11091 Filed 5–10–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL10–63–000]
EnerNOC, Inc. v. FirstEnergy; Notice of
Complaint
May 3, 2010.
Take notice that on April 30, 2010,
pursuant to section 206 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.206 (2009) and
section 206 of the Federal Power Act,
EnerNOC, Inc. (Complainant) filed a
formal complaint against FirstEnergy 1
(Respondent) alleging that recent ASTI
Integration Auctions held from March
15 to March 19, 2010 failed to comply
with directives as established by the
Commission in its Order, 129 FERC
¶ 61,249, issued in Dockets ER09–1589–
000 and EL10–6–000.2
The Complainant certifies that copies
of the complaint were served on the
contacts for the Respondent.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
1 For purposes of this filing (except as otherwise
indicated by context), FirstEnergy is FirstEnergy
Service Company acting on behalf of six of its
affiliates: American Transmission Systems, Inc.
(ATSI), The Cleveland Electric Illuminating
Company, Ohio Edison Company, The Toledo
Edison Company, Pennsylvania Power Company,
and FirstEnergy Solutions Corp.
2 Order Addressing RTO Realignment Request
and Complaint, Docket No. ER09–1589–000 and
EL10–6–000, 129 FERC ¶ 61,249 (December 17,
2009).
E:\FR\FM\11MYN1.SGM
11MYN1
26220
Federal Register / Vol. 75, No. 90 / Tuesday, May 11, 2010 / Notices
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on May 20, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–11107 Filed 5–10–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2157–188]
Public Utility District No. 1 of
Snohomish County, WA; Notice of
Availability of Draft Environmental
Assessment
emcdonald on DSK2BSOYB1PROD with NOTICES
May 4, 2010.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission or FERC’s)
regulations, 18 Code of Federal
Regulations (CFR) part 380 (Order No.
486, 52 Federal Register [FR] 47897),
the Office of Energy Projects has
reviewed Public Utility District No. 1 of
Snohomish County’s application for
license for the Henry M. Jackson
Hydroelectric Project (FERC Project No.
2157–188), located on the Sultan River
20 miles east of the city of Everett,
Snohomish County. The project
currently underlies a total of 10.9 acres
of federal lands in the Mount Baker-
VerDate Mar<15>2010
19:22 May 10, 2010
Jkt 220001
Snoqualmie National Forest
administered by the U.S. Department of
Agriculture, Forest Service.
Staff prepared a draft environmental
assessment (EA), which analyzes the
potential environmental effects of
relicensing the project, and concludes
that licensing the project, with
appropriate environmental protective
measures, would not constitute a major
federal action that would significantly
affect the quality of the human
environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
202–502–8659.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
45 days from the date of this notice and
should be addressed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Please affix Project No. 2157 to all
comments. Comments may be filed
electronically via the Internet in lieu of
paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov) under the
‘‘e-Filing’’ link.
For further information, contact David
Turner by telephone at 202–502–6091 or
by e-mail at David.Turner@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–11102 Filed 5–10–10; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Leader One Energy, LLC]
Notice of Intent to Prepare an
Environmental Assessment for the
Planned Leader One Gas Storage
Project, Request for Comments on
Environmental Issues, and Notice of a
Site Visit
April 30, 2010.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Leader One Gas Storage Project
involving construction and operation of
facilities by Leader One Energy, LLC
(Leader One) in Adams County,
Colorado. This EA will be used by the
Commission in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
staff determine what issues need to be
evaluated in the EA. Please note that the
scoping period will close on June 2,
2010.
On May 18, 2010, the Office of Energy
Projects staff will be in Adams County,
Colorado, to gather data related to the
environmental analysis of the planned
project. Staff will examine the areas
where the planned project facilities
would be constructed and operated
including the storage field and pipeline
route filed by Leader One on April 30,
2010. This will assist staff in completing
its comparative evaluation of
environmental impacts of the proposed
project. Viewing of this area is
anticipated to be from public access
points.
All interested parties planning to
attend must provide their own
transportation. Those attending should
meet at the following date, time, and
location:
• May 18, 2010 at 10 a.m. at Byers
General Store (Parking Lot), 568 U.S. 36,
Byers, CO 80103.
Staff will also be attending Leader
One’s open house meeting at the
following date, time, and location:
• Tuesday, May 18, 2010—6 to 8
p.m., May Farms, 64001 US 36, Byers,
CO 80103.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
E:\FR\FM\11MYN1.SGM
11MYN1
Agencies
[Federal Register Volume 75, Number 90 (Tuesday, May 11, 2010)]
[Notices]
[Pages 26219-26220]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-11107]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL10-63-000]
EnerNOC, Inc. v. FirstEnergy; Notice of Complaint
May 3, 2010.
Take notice that on April 30, 2010, pursuant to section 206 of the
Federal Energy Regulatory Commission's (Commission) Rules of Practice
and Procedure, 18 CFR 385.206 (2009) and section 206 of the Federal
Power Act, EnerNOC, Inc. (Complainant) filed a formal complaint against
FirstEnergy \1\ (Respondent) alleging that recent ASTI Integration
Auctions held from March 15 to March 19, 2010 failed to comply with
directives as established by the Commission in its Order, 129 FERC ]
61,249, issued in Dockets ER09-1589-000 and EL10-6-000.\2\
---------------------------------------------------------------------------
\1\ For purposes of this filing (except as otherwise indicated
by context), FirstEnergy is FirstEnergy Service Company acting on
behalf of six of its affiliates: American Transmission Systems, Inc.
(ATSI), The Cleveland Electric Illuminating Company, Ohio Edison
Company, The Toledo Edison Company, Pennsylvania Power Company, and
FirstEnergy Solutions Corp.
\2\ Order Addressing RTO Realignment Request and Complaint,
Docket No. ER09-1589-000 and EL10-6-000, 129 FERC ] 61,249 (December
17, 2009).
---------------------------------------------------------------------------
The Complainant certifies that copies of the complaint were served
on the contacts for the Respondent.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
[[Page 26220]]
intervention or motion to intervene, as appropriate. The Respondent's
answer and all interventions, or protests must be filed on or before
the comment date. The Respondent's answer, motions to intervene, and
protests must be served on the Complainants.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on May 20, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-11107 Filed 5-10-10; 8:45 am]
BILLING CODE 6717-01-P