Questar Pipeline Company; Notice of Intent to Prepare an Environmental Assessment for the Planned Mainline 104 Expansion Project and Request for Comments on Environmental Issues, 24938-24940 [2010-10641]

Download as PDF 24938 Federal Register / Vol. 75, No. 87 / Thursday, May 6, 2010 / Notices assistance, call toll-free 1–866–208– 3372. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Kimberly D. Bose, Secretary. [FR Doc. 2010–10635 Filed 5–5–10; 8:45 am] [Project No. 12667–029] BILLING CODE 6717–01–P City of Hamilton, Ohio American Municipal Power, Inc.; Notice of Application for Transfer of License and Soliciting Comments and Motions To Intervene DEPARTMENT OF ENERGY Federal Energy Regulatory Commission mstockstill on DSKH9S0YB1PROD with NOTICES April 28, 2010. On February 26, 2010, City of Hamilton, Ohio (Hamilton) and American Municipal Power, Inc. (AMP) filed an application for a partial transfer of license of the Meldahl Hydroelectric Project No. 12677. The project would be located at the U.S. Army Corps of Engineers’ (Corps) Captain Anthony Meldahl Lock and Dam on the Ohio River, near the City of Augusta, Bracken County, Kentucky. Applicants seek Commission approval to transfer the license for the Meldahl Project from Hamilton to Hamilton and AMP. Applicants’ Contacts: City of Hamilton—Mr. Mark Brandenburger, City Manager, City of Hamilton, 345 High Street, Hamilton, OH 45011–6071 (513) 785–7000 e-mail: brandenb@ci.hamilton.oh.us. American Municipal Power, Inc.—Mr. Mark S. Gerken, P.E., President and CEO, American Municipal Power, Inc., 1111 Schrock Road, Suite 100, Columbus, OH 43229, phone (614) 540–0855, e-mail: mgerken@amppartners.org. FERC Contact: Patricia W. Gillis, (202) 502–8735. Deadline for filing comments and motions to intervene: 30 days from the issuance of this notice. Comments and motions to intervene may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii)(2009) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the eLibrary link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–12667–029) in the docket number field to access the document. For VerDate Mar<15>2010 16:53 May 05, 2010 Jkt 220001 [Docket No. PF10–7–000] Questar Pipeline Company; Notice of Intent to Prepare an Environmental Assessment for the Planned Mainline 104 Expansion Project and Request for Comments on Environmental Issues April 29, 2010. The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Mainline 104 Expansion Project, involving construction and operation of facilities by Questar Pipeline Company (Questar) in Uintah County, Utah. This EA will be used by the Commission in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the project. Your input will help the Commission staff determine what issues need to be evaluated in the EA. Please note that the scoping period will close on May 29, 2010. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives are asked to notify their constituents of this planned project and encourage them to comment on their areas of concern. A fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ is available for viewing on the FERC Web site (https:// www.ferc.gov). This fact sheet addresses a number of typically-asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. Summary of the Planned Project Questar plans to construct and operate about 23.3 miles of 24-inchdiameter pipeline in Uintah County, Utah. The Mainline 104 Expansion PO 00000 Frm 00074 Fmt 4703 Sfmt 4703 Project would loop 1 the western end of Questar’s existing Mainline 40 between its existing Green River Block Valve and its Fidlar Compressor Staiton. According to Questar, its project would allow existing shippers to amend the primary receipt-point capacity eastward to Fidlar. The Mainline 104 Expansion Project would consist of the following facilities: • 23.5 miles of 24-inch-diameter looping pipeline; • four mainline block valves; • two pig launchers/receivers; 2 • six taps; and • minor modifications at the existing Fidlar Compressor Station. The general location of the project facilities is shown in appendix 1.3 Land Requirements for Construction Construction of the planned facilities would disturb about 336 acres of land for the above ground facilities and the pipeline. Following construction, about 142 acres would be maintained for permanent operation of the project’s facilities; the remaining acreage would be restored and allowed to revert to former uses. About 70 percent of the planned pipeline route parallels existing pipeline, utility, or road rights-of-way. The EA Process The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from an action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires us 4 to discover and address concerns the public may have about proposals. This process is referred to as scoping. The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this notice, the Commission requests public comments on the scope of the issues to address in the EA. All comments received will be considered during the preparation of the EA. In the EA, we will discuss impacts that could occur as a result of the construction and operation of the 1 A pipeline loop is constructed parallel to an existing pipeline to increase capacity. 2 A ‘‘pig’’ is a tool that is inserted into and moves through the pipeline, and is used for cleaning the pipeline, internal inspections, or other purposes. 3 The appendices referenced in this notice are not being printed in the Federal Register. Copies of appendices were sent to all those receiving this notice in the mail and are available at https:// www.ferc.gov using the link called ‘‘eLibrary’’ or from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426, or call (202) 502–8371. For instructions on connecting to eLibrary, refer to the last page of this notice. 4 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the environmental staff of the Commission’s Office of Energy Projects. E:\FR\FM\06MYN1.SGM 06MYN1 mstockstill on DSKH9S0YB1PROD with NOTICES Federal Register / Vol. 75, No. 87 / Thursday, May 6, 2010 / Notices planned project under these general headings: • Geology and soils; • land use; • water resources, fisheries, and wetlands; • cultural resources; • vegetation and wildlife; • air quality and noise; • endangered and threatened species; and • public safety. We will also evaluate possible alternatives to the planned project or portions of the project, and make recommendations on how to lessen or avoid impacts on the various resource areas. Although no formal application has been filed, we have already initiated our NEPA review under the Commission’s pre-filing process. The purpose of the pre-filing process is to encourage early involvement of interested stakeholders and to identify and resolve issues before an application is filed with the FERC. As part of our pre-filing review, we have begun to contact some federal and state agencies to discuss their involvement in the scoping process and the preparation of the EA. Our independent analysis of the issues will be presented in the EA. The EA will be placed in the public record and, depending on the comments received during the scoping process, may be published and distributed to the public. A comment period will be allotted if the EA is published for review. We will consider all comments on the EA before we make our recommendations to the Commission. To ensure your comments are considered, please carefully follow the instructions in the Public Participation section beginning on page 4. With this notice, we are asking agencies with jurisdiction and/or special expertise with respect to environmental issues to formally cooperate with us in the preparation of the EA. These agencies may choose to participate once they have evaluated the proposal relative to their responsibilities. Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. Currently, the U.S. Department of Interior’s Bureau of Indian Affairs, Bureau of Land Management (BLM), and U.S. Fish and Wildlife Service have expressed their intention to participate as cooperating agencies in the preparation of the EA to satisfy their NEPA responsibilities related to this project. VerDate Mar<15>2010 16:53 May 05, 2010 Jkt 220001 Consultations Under Section 106 of the National Historic Preservation Act In accordance with the Advisory Council on Historic Preservation’s implementing regulations, we are using this notice to solicit the views of the public on the project’s potential effects on historic properties.5 We will document our findings on the impacts on cultural resources and summarize the status of consultations under section 106 of the National Historic Preservation Act in our EA. Currently Identified Environmental Issues We have already identified several issues that we think deserve attention based on a preliminary review of the planned facilities and the environmental information provided by Questar. This preliminary list of issues may be changed based on your comments and our analysis. • Approach and crossing of the Green River; • Crossing the Uintah and Ouray Reservation; and • Crossing state and federal lands. Public Participation You can make a difference by providing us with your specific comments or concerns about the project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that your comments are timely and properly recorded, please send your comments so that they will be received in Washington, DC on or before May 29, 2010. For your convenience, there are three methods you can use to submit your comments to the Commission. In all instances, please reference the project docket number PF10–7–000 with your submission. The Commission encourages electronic filing of comments and has expert eFiling staff available to assist you at (202) 502–8258 or efiling@ferc.gov. (1) You may file your comments electronically by using the Quick Comment feature, which is located at https://www.ferc.gov under the link called ‘‘Documents and Filings’’. A Quick Comment is an easy method for 5 The Advisory Council on Historic Preservation’s regulations are at Title 36 of the Code of Federal Regulations, Part 800. Historic properties are defined in those regulations as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register for Historic Places. PO 00000 Frm 00075 Fmt 4703 Sfmt 4703 24939 interested persons to submit text-only comments on a project; (2) You may file your comments electronically by using the ‘‘eFiling’’ feature that is listed under the ‘‘Documents and Filings’’ link. eFiling involves preparing your submission in the same manner as you would if filing on paper, and then saving the file on your computer’s hard drive. You will attach that file to your submission. New eFiling users must first create an account by clicking on the links called ‘‘Sign up’’ or ‘‘eRegister’’. You will be asked to select the type of filing you are making. A comment on a particular project is considered a ‘‘Comment on a Filing’’; or (3) You may file a paper copy of your comments at the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1A, Washington, DC 20426. Environmental Mailing List The environmental mailing list includes federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; and local libraries and newspapers. This list includes all affected landowners (as defined in the Commission’s regulations) who are potential right-ofway grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project. We will update the environmental mailing list as the analysis proceeds to ensure that we send the information related to this environmental review to all individuals, organizations, and government entities interested in and/or potentially affected by the planned project. If the EA is published for distribution, copies will be sent to the environmental mailing list for public review and comment. If you would prefer to receive a paper copy of the document instead of the CD version or would like to remove your name from the mailing list, please return the attached Information Request (appendix 2). Becoming an Intervenor Once Questar files its application with the Commission, you may want to become an ‘‘intervenor’’ which is an official party to the Commission’s proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the Commission’s final ruling. E:\FR\FM\06MYN1.SGM 06MYN1 24940 Federal Register / Vol. 75, No. 87 / Thursday, May 6, 2010 / Notices An intervenor formally participates in the proceeding by filing a request to intervene. Instructions for becoming an intervenor are included in the User’s Guide under the ‘‘e-filing’’ link on the Commission’s Web site. Please note that the Commission will not accept requests for intervenor status at this time. You must wait until a formal application for the project is filed with the Commission. Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC Web site (https://www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number, excluding the last three digits in the Docket Number field (i.e., PF10–7). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https://www.ferc.gov/ esubscribenow.htm. Finally, public meetings or site visits will be posted on the Commission’s calendar located at https://www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Kimberly D. Bose, Secretary. [FR Doc. 2010–10641 Filed 5–5–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Kimberly D. Bose, Secretary. [Docket No. PR10–16–000] mstockstill on DSKH9S0YB1PROD with NOTICES the interruptible transportation services provided under section 311(a)(2) of the Natural Gas Policy Act of 1978 (NGPA). Any person desiring to participate in this rate proceeding must file a motion to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern time on Friday, May 7, 2010. [FR Doc. 2010–10642 Filed 5–5–10; 8:45 am] BILLING CODE 6717–01–P Acacia Natural Gas Corporation; Notice of Baseline Filing April 29, 2010. 16:53 May 05, 2010 Jkt 220001 PO 00000 Federal Energy Regulatory Commission [Docket No. EL05–15–010] Entergy Services, Inc.; Notice of Filing April 29, 2010. Take notice that on April 28, 2010, Entergy Services, Inc. filed a compliance refund report, pursuant to the Federal Energy Regulatory Commission’s, Order Conditionally Accepting Refund Report and Ordering Further Funds, issued on January 8, 2010, Arkansas Electric Cooperative Corp. v. Entergy Arkansas, Inc. 130 FERC ¶ 61,020 (2010). Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on May 19, 2010. Kimberly D. Bose, Secretary. Take notice that on April 27, 2010, Acacia Natural Gas Corporation (Acacia) submitted its baseline filing of its Statement of Operating Conditions for VerDate Mar<15>2010 DEPARTMENT OF ENERGY [FR Doc. 2010–10637 Filed 5–5–10; 8:45 am] BILLING CODE 6717–01–P Frm 00076 Fmt 4703 Sfmt 9990 E:\FR\FM\06MYN1.SGM 06MYN1

Agencies

[Federal Register Volume 75, Number 87 (Thursday, May 6, 2010)]
[Notices]
[Pages 24938-24940]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-10641]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. PF10-7-000]


Questar Pipeline Company; Notice of Intent to Prepare an 
Environmental Assessment for the Planned Mainline 104 Expansion Project 
and Request for Comments on Environmental Issues

April 29, 2010.
    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Mainline 104 Expansion 
Project, involving construction and operation of facilities by Questar 
Pipeline Company (Questar) in Uintah County, Utah. This EA will be used 
by the Commission in its decision-making process to determine whether 
the project is in the public convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. Your input will help the Commission staff 
determine what issues need to be evaluated in the EA. Please note that 
the scoping period will close on May 29, 2010.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives are asked to notify their constituents of this planned 
project and encourage them to comment on their areas of concern.
    A fact sheet prepared by the FERC entitled ``An Interstate Natural 
Gas Facility On My Land? What Do I Need To Know?'' is available for 
viewing on the FERC Web site (https://www.ferc.gov). This fact sheet 
addresses a number of typically-asked questions, including the use of 
eminent domain and how to participate in the Commission's proceedings.

Summary of the Planned Project

    Questar plans to construct and operate about 23.3 miles of 24-inch-
diameter pipeline in Uintah County, Utah. The Mainline 104 Expansion 
Project would loop \1\ the western end of Questar's existing Mainline 
40 between its existing Green River Block Valve and its Fidlar 
Compressor Staiton. According to Questar, its project would allow 
existing shippers to amend the primary receipt-point capacity eastward 
to Fidlar.
---------------------------------------------------------------------------

    \1\ A pipeline loop is constructed parallel to an existing 
pipeline to increase capacity.
---------------------------------------------------------------------------

    The Mainline 104 Expansion Project would consist of the following 
facilities:
     23.5 miles of 24-inch-diameter looping pipeline;
     four mainline block valves;
     two pig launchers/receivers; \2\
---------------------------------------------------------------------------

    \2\ A ``pig'' is a tool that is inserted into and moves through 
the pipeline, and is used for cleaning the pipeline, internal 
inspections, or other purposes.
---------------------------------------------------------------------------

     six taps; and
     minor modifications at the existing Fidlar Compressor 
Station.
    The general location of the project facilities is shown in appendix 
1.\3\
---------------------------------------------------------------------------

    \3\ The appendices referenced in this notice are not being 
printed in the Federal Register. Copies of appendices were sent to 
all those receiving this notice in the mail and are available at 
https://www.ferc.gov using the link called ``eLibrary'' or from the 
Commission's Public Reference Room, 888 First Street, NE., 
Washington, DC 20426, or call (202) 502-8371. For instructions on 
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the planned facilities would disturb about 336 
acres of land for the above ground facilities and the pipeline. 
Following construction, about 142 acres would be maintained for 
permanent operation of the project's facilities; the remaining acreage 
would be restored and allowed to revert to former uses. About 70 
percent of the planned pipeline route parallels existing pipeline, 
utility, or road rights-of-way.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\4\ to discover and address concerns the public may have about 
proposals. This process is referred to as scoping. The main goal of the 
scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. All comments 
received will be considered during the preparation of the EA.
---------------------------------------------------------------------------

    \4\ ``We'', ``us'', and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA, we will discuss impacts that could occur as a result of 
the construction and operation of the

[[Page 24939]]

planned project under these general headings:
     Geology and soils;
     land use;
     water resources, fisheries, and wetlands;
     cultural resources;
     vegetation and wildlife;
     air quality and noise;
     endangered and threatened species; and
     public safety.
    We will also evaluate possible alternatives to the planned project 
or portions of the project, and make recommendations on how to lessen 
or avoid impacts on the various resource areas.
    Although no formal application has been filed, we have already 
initiated our NEPA review under the Commission's pre-filing process. 
The purpose of the pre-filing process is to encourage early involvement 
of interested stakeholders and to identify and resolve issues before an 
application is filed with the FERC. As part of our pre-filing review, 
we have begun to contact some federal and state agencies to discuss 
their involvement in the scoping process and the preparation of the EA.
    Our independent analysis of the issues will be presented in the EA. 
The EA will be placed in the public record and, depending on the 
comments received during the scoping process, may be published and 
distributed to the public. A comment period will be allotted if the EA 
is published for review. We will consider all comments on the EA before 
we make our recommendations to the Commission. To ensure your comments 
are considered, please carefully follow the instructions in the Public 
Participation section beginning on page 4.
    With this notice, we are asking agencies with jurisdiction and/or 
special expertise with respect to environmental issues to formally 
cooperate with us in the preparation of the EA. These agencies may 
choose to participate once they have evaluated the proposal relative to 
their responsibilities. Agencies that would like to request cooperating 
agency status should follow the instructions for filing comments 
provided under the Public Participation section of this notice. 
Currently, the U.S. Department of Interior's Bureau of Indian Affairs, 
Bureau of Land Management (BLM), and U.S. Fish and Wildlife Service 
have expressed their intention to participate as cooperating agencies 
in the preparation of the EA to satisfy their NEPA responsibilities 
related to this project.

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations, we are using this notice to solicit the views 
of the public on the project's potential effects on historic 
properties.\5\ We will document our findings on the impacts on cultural 
resources and summarize the status of consultations under section 106 
of the National Historic Preservation Act in our EA.
---------------------------------------------------------------------------

    \5\ The Advisory Council on Historic Preservation's regulations 
are at Title 36 of the Code of Federal Regulations, Part 800. 
Historic properties are defined in those regulations as any 
prehistoric or historic district, site, building, structure, or 
object included in or eligible for inclusion in the National 
Register for Historic Places.
---------------------------------------------------------------------------

Currently Identified Environmental Issues

    We have already identified several issues that we think deserve 
attention based on a preliminary review of the planned facilities and 
the environmental information provided by Questar. This preliminary 
list of issues may be changed based on your comments and our analysis.
     Approach and crossing of the Green River;
     Crossing the Uintah and Ouray Reservation; and
     Crossing state and federal lands.

Public Participation

    You can make a difference by providing us with your specific 
comments or concerns about the project. Your comments should focus on 
the potential environmental effects, reasonable alternatives, and 
measures to avoid or lessen environmental impacts. The more specific 
your comments, the more useful they will be. To ensure that your 
comments are timely and properly recorded, please send your comments so 
that they will be received in Washington, DC on or before May 29, 2010.
    For your convenience, there are three methods you can use to submit 
your comments to the Commission. In all instances, please reference the 
project docket number PF10-7-000 with your submission. The Commission 
encourages electronic filing of comments and has expert eFiling staff 
available to assist you at (202) 502-8258 or efiling@ferc.gov.
    (1) You may file your comments electronically by using the Quick 
Comment feature, which is located at https://www.ferc.gov under the link 
called ``Documents and Filings''. A Quick Comment is an easy method for 
interested persons to submit text-only comments on a project;
    (2) You may file your comments electronically by using the 
``eFiling'' feature that is listed under the ``Documents and Filings'' 
link. eFiling involves preparing your submission in the same manner as 
you would if filing on paper, and then saving the file on your 
computer's hard drive. You will attach that file to your submission. 
New eFiling users must first create an account by clicking on the links 
called ``Sign up'' or ``eRegister''. You will be asked to select the 
type of filing you are making. A comment on a particular project is 
considered a ``Comment on a Filing''; or
    (3) You may file a paper copy of your comments at the following 
address: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street, NE., Room 1A, Washington, DC 20426.

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; and 
local libraries and newspapers. This list includes all affected 
landowners (as defined in the Commission's regulations) who are 
potential right-of-way grantors, whose property may be used temporarily 
for project purposes, or who own homes within certain distances of 
aboveground facilities, and anyone who submits comments on the project. 
We will update the environmental mailing list as the analysis proceeds 
to ensure that we send the information related to this environmental 
review to all individuals, organizations, and government entities 
interested in and/or potentially affected by the planned project.
    If the EA is published for distribution, copies will be sent to the 
environmental mailing list for public review and comment. If you would 
prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix 2).

Becoming an Intervenor

    Once Questar files its application with the Commission, you may 
want to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling.

[[Page 24940]]

An intervenor formally participates in the proceeding by filing a 
request to intervene. Instructions for becoming an intervenor are 
included in the User's Guide under the ``e-filing'' link on the 
Commission's Web site. Please note that the Commission will not accept 
requests for intervenor status at this time. You must wait until a 
formal application for the project is filed with the Commission.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site (https://www.ferc.gov) using the eLibrary link. Click on 
the eLibrary link, click on ``General Search'' and enter the docket 
number, excluding the last three digits in the Docket Number field 
(i.e., PF10-7). Be sure you have selected an appropriate date range. 
For assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at https://www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-10641 Filed 5-5-10; 8:45 am]
BILLING CODE 6717-01-P