Notice of Actions Taken at March 18, 2010, Meeting, 23836-23837 [2010-10395]
Download as PDF
23836
Federal Register / Vol. 75, No. 85 / Tuesday, May 4, 2010 / Notices
applied research examining user needs
and the effects of new instruments on
our disability process and programs.
6. Measurement Considerations
In addition to the research needs
described in Recommendation 5, the
Panel recommended that we should
consider research related to appropriate
scales for inclusion in any new
instruments that we develop. The Panel
further stated that we should use scales
that are legally defensible for our needs
and focus on observable, discrete,
characteristics such as frequency and
duration.
7. Communication with Users, the
Public & the Scientific Community
The Panel recommended that we use
both traditional and emerging
government and private media outlets to
inform or solicit input from various
audiences about all activities regarding
the OIS development.
Dated: April 26, 2010.
Debra Tidwell-Peters,
Designated Federal Officer, Occupational
Information Development Advisory Panel.
[FR Doc. 2010–10297 Filed 5–3–10; 8:45 am]
BILLING CODE 4191–02–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Notice of Actions Taken at March 18,
2010, Meeting
mstockstill on DSKH9S0YB1PROD with NOTICES
AGENCY: Susquehanna River Basin
Commission.
ACTION: Notice of Commission actions.
SUMMARY: At its regular business
meeting on March 18, 2010, in State
College, Pennsylvania, the Commission
held a public hearing as part of its
regular business meeting. At the public
hearing, the Commission: (1) Approved
and tabled certain water resources
projects; (2) rescinded approval for a
water resources project; and (3)
approved settlements involving three
water resources projects. Details
concerning these and other matters
addressed at the public hearing and
business meeting are contained in the
Supplementary Information section of
this notice.
DATES: March 18, 2010.
ADDRESSES: Susquehanna River Basin
Commission, 1721 N. Front Street,
Harrisburg, PA 17102–2391.
FOR FURTHER INFORMATION CONTACT:
Richard A. Cairo, General Counsel,
telephone: (717) 238–0423, ext. 306; fax:
(717) 238–2436; e-mail: rcairo@srbc.net;
or Stephanie L. Richardson, Secretary to
VerDate Mar<15>2010
18:58 May 03, 2010
Jkt 220001
the Commission, telephone: (717) 238–
0423, ext. 304; fax: (717) 238–2436; email: srichardson@srbc.net. Regular
mail inquiries may be sent to the above
address.
SUPPLEMENTARY INFORMATION: In
addition to the public hearing and its
related action items identified below,
the following items were also presented
or acted on at the business meeting: (1)
A presentation by Pennsylvania
Department of Conservation and Natural
Resources Deputy Secretary for Parks &
Forestry James Grace on Marcellus
Shale natural gas leasing in
Pennsylvania state forests; (2) an update
on the implementation of the SRBC
Remote Water Quality Monitoring
Network; (3) a report on hydrologic
conditions in the Susquehanna Basin
with an emphasis on National Flood
Safety Week; (4) approval/ratification of
one grant related to the Susquehanna
Flood Forecast and Warning System,
and five contracts related to ArcGIS,
establishment of an SRBC satellite office
in Sayre, PA, consulting services for
instream flow studies, aquatic resource
surveys, and flood mapping; (5) ratified
the Executive Director’s retention of
outside counsel and other professional
services regarding the relicensing
proceedings for lower Susquehanna
River hydroelectric projects; and (6)
approved a revision of the FY–2011
Budget. The Commission also heard
counsel’s report on legal matters
affecting the Commission and
recognized retiring Chief Administrative
Officer Duane A. Friends for his 25
years of valuable service. The
Commission convened a public hearing
and took the following actions:
Public Hearing—Compliance Actions
The Commission approved a
settlement in lieu of civil penalties for
the following projects:
1. Chesapeake Energy Corporation—
Eastern Division. Pad ID: Ward (ABR–
20090519), Burlington Township, and
Sullivan 1 (ABR–20080715), Athens
Township, Bradford County, Pa.—
$20,000.
2. Novus Operating, LLC. Pad ID:
Sylvester 1H and North Fork 1H,
Brookfield Township, Tioga County,
Pa.—$100,000.
3. Southwestern Energy Production
Company. Pad ID: Ferguson, Wyalusing
Township, Bradford County, Pa.—
$50,000.
Public Hearing—Projects Approved
1. Project Sponsor and Facility:
Carrizo Oil & Gas, Inc. (Mosquito
Creek—Hoffman), Karthaus Township,
Clearfield County, Pa. Surface water
withdrawal of up to 0.720 mgd.
PO 00000
Frm 00173
Fmt 4703
Sfmt 4703
2. Project Sponsor and Facility: EQT
Production Company (West Branch
Susquehanna River—Kuntz),
Greenwood Township, Clearfield
County, Pa. Surface water withdrawal of
up to 0.900 mgd.
3. Project Sponsor and Facility:
EXCO–North Coast Energy, Inc. (West
Branch Susquehanna River—Johnson),
Clinton Township, Lycoming County,
Pa. Surface water withdrawal of up to
0.999 mgd.
4. Project Sponsor and Facility:
Fortuna Energy Inc. (Fall Brook—
Bense), Troy Township, Bradford
County, Pa. Surface water withdrawal of
up to 1.000 mgd.
5. Project Sponsor and Facility:
Fortuna Energy Inc. (Unnamed
Tributary to North Branch Sugar
Creek—Besley), Columbia Township,
Bradford County, Pa. Surface water
withdrawal of up to 2.000 mgd.
6. Project Sponsor and Facility:
Fortuna Energy Inc. (South Branch
Sugar Creek—Shedden), Troy
Township, Bradford County, Pa. Surface
water withdrawal of up to 0.900 mgd.
7. Project Sponsor and Facility:
Fortuna Energy Inc. (Sugar Creek—
Hoffman), West Burlington Township,
Bradford County, Pa. Surface water
withdrawal modification increase from
0.250 mgd up to 2.000 mgd (Docket No.
20090327).
8. Project Sponsor: Graymont (PA),
Inc. Project Facility: Pleasant Gap
Facility, Spring Township, Centre
County, Pa. Groundwater withdrawal of
0.050 mgd (30-day average) from the
Plant Make-up Well.
9. Project Sponsor and Facility:
Harley-Davidson Motor Company
Operations, Inc., Springettsbury
Township, York County, Pa.
Modification to project features of the
withdrawal approval (Docket No.
19900715).
10. Project Sponsor and Facility:
Harley-Davidson Motor Company
Operations, Inc., Springettsbury
Township, York County, Pa.
Modification to add a groundwater
withdrawal of 0.585 mgd (30-day
average) from Well CW–20 to the
remediation system, without any
increase to total system withdrawal
quantity (Docket No. 19980901).
11. Project Sponsor and Facility:
Healthy Properties, Inc. (Sugar Creek—
owner), North Towanda Township,
Bradford County, Pa. Surface water
withdrawal of up to 0.450 mgd.
12. Project Sponsor and Facility:
Mountain Energy Services, Inc.
(Tunkhannock Creek—Deer Park
Lumber, Inc.), Tunkhannock Township,
Wyoming County, Pa. Surface water
withdrawal of up to 0.999 mgd.
E:\FR\FM\04MYN1.SGM
04MYN1
Federal Register / Vol. 75, No. 85 / Tuesday, May 4, 2010 / Notices
13. Project Sponsor and Facility:
Randy M. Wiernusz (Bowman Creek—
owner), Eaton Township, Wyoming
County, Pa. Surface water withdrawal of
up to 0.249 mgd.
14. Project Sponsor and Facility:
TerrAqua Resource Management (Tioga
River—Losey), Lawrenceville Borough,
Tioga County, Pa. Surface water
withdrawal of up to 0.375 mgd and
consumptive water use of up to 0.375
mgd.
15. Project Sponsor and Facility: XTO
Energy, Inc. (Lick Run—Dincher),
Shrewsbury Borough, Lycoming County,
Pa. Surface water withdrawal of up to
0.249 mgd.
16. Project Sponsor and Facility: XTO
Energy, Inc. (Little Muncy Creek—
Temple), Moreland Township,
Lycoming County, Pa. Surface water
withdrawal of up to 0.249 mgd.
mstockstill on DSKH9S0YB1PROD with NOTICES
Public Hearing—Projects Tabled
1. Project Sponsor: Chester County
Solid Waste Authority. Project Facility:
Lanchester Landfill, Salisbury and
Caernarvon Townships, Lancaster
County, Pa. Application for
groundwater withdrawal of 0.190 mgd
(30-day average) from two wells and
three collection sumps.
2. Project Sponsor: Chester County
Solid Waste Authority. Project Facility:
Lanchester Landfill, Salisbury and
Caernarvon Townships, Lancaster
County, Pa. Application for
consumptive water use of up to 0.075
mgd.
3. Project Sponsor: Chester County
Solid Waste Authority. Project Facility:
Lanchester Landfill, Salisbury and
Caernarvon Townships, Lancaster
County, Pa. Application for an existing
into-basin diversion of up to 0.050 mgd
from the Delaware River Basin.
4. Project Sponsor and Facility:
Sunnyside Ethanol, LLC (West Branch
Susquehanna River—1—owner),
Curwensville Borough, Clearfield
County, Pa. Application for surface
water withdrawal of up to 1.270 mgd.
5. Project Sponsor and Facility:
Sunnyside Ethanol, LLC (West Branch
Susquehanna River—2—owner),
Curwensville Borough, Clearfield
County, Pa. Application for surface
water withdrawal of up to 0.710 mgd.
6. Project Sponsor and Facility:
Sunnyside Ethanol, LLC, Curwensville
Borough, Clearfield County, Pa.
Application for consumptive water use
of up to 1.980 mgd.
7. Project Sponsor and Facility:
Walker Township Water Association,
Walker Township, Centre County, Pa.
Modification to increase the total
groundwater system withdrawal limit
VerDate Mar<15>2010
18:58 May 03, 2010
Jkt 220001
(30-day average) from 0.523 mgd to
0.962 mgd (Docket No. 20070905).
Public Hearing—Rescission of Project
Approval
1. Project Sponsor and Facility:
Chesapeake Appalachia, LLC
(Susquehanna River) (Docket No.
20080907), Oakland Township,
Susquehanna County, Pa.
Authority: Pub. L. 91–575, 84 Stat. 1509
et seq., 18 CFR parts 806, 807, and 808.
Dated: April 20, 2010.
Thomas W. Beauduy,
Deputy Director.
[FR Doc. 2010–10395 Filed 5–3–10; 8:45 am]
BILLING CODE 7040–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Notice of Projects Approved for
Consumptive Uses of Water
AGENCY: Susquehanna River Basin
Commission.
ACTION:
Notice of approved projects.
SUMMARY: This notice lists the projects
approved by rule by the Susquehanna
River Basin Commission during the
period set forth in DATES.
DATES: February 1, 2010, through March
31, 2010.
Susquehanna River Basin
Commission, 1721 North Front Street,
Harrisburg, PA 17102–2391.
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
Richard A. Cairo, General Counsel,
telephone: (717) 238–0423, ext. 306; fax:
(717) 238–2436;
e-mail: rcairo@srbc.net or Stephanie L.
Richardson, Secretary to the
Commission, telephone: (717) 238–
0423, ext. 304; fax: (717) 238–2436; email: srichardson@srbc.net. Regular
mail inquiries may be sent to the above
address.
This
notice lists the projects, described
below, receiving approval for the
consumptive use of water pursuant to
the Commission’s approval by rule
process set forth in 18 CFR 806.22(e)
and 18 CFR 806.22(f) for the time period
specified above:
SUPPLEMENTARY INFORMATION:
Approvals By Rule Issued Under 18 CFR
§ 806.22(e):
1. Allegheny Energy Supply
Company, LLC, Hunlock Creek Unit 4,
ABR–20100316, Hunlock Township,
Luzerne County, Pa.; Approval Date:
March 9, 2010.
PO 00000
Frm 00174
Fmt 4703
Sfmt 4703
23837
Approvals By Rule Issued Under 18 CFR
806.22(f):
1. Southwestern Energy Company,
Pad ID: Ferguson; ABR–20100201,
Herrick Township, Bradford County,
Pa.; Approval Date: February 1, 2010.
2. Chief Oil & Gas, LLC, Pad ID: Bacon
Drilling Pad #1; ABR–20100202,
Burlington Township, Bradford County,
Pa.; Approval Date: February 2, 2010.
3. XTO Energy Incorporated, Pad ID:
TLT, ABR–20100203, Jordan Township,
Lycoming County, Pa.; Approval Date:
February 2, 2010.
4. Alta Operating Company, LLC, Pad
ID: Blye Pad Site, ABR–20100204,
Middletown Township, Susquehanna
County, Pa.; Approval Date: February 8,
2010.
5. Chief Oil & Gas, LLC, Pad ID:
Kensinger 3H Drilling Pad #1, ABR–
20100205, Penn Township, Lycoming
County, Pa.; Approval Date: February 9,
2010.
6. Chesapeake Appalachia, LLC, Pad
ID: Yengo, ABR–20100206, Cherry
Township, Sullivan County, Pa.;
Approval Date: February 9, 2010.
7. Anadarko E&P Company, LP, Pad
ID: Texas Blockhouse F&G Pad B, ABR–
20100207, Pine Township, Lycoming
County, Pa.; Approval Date: February 9,
2010.
8. Seneca Resources Corporation; Pad
ID: Wilcox Pad F, ABR–20090505.1,
Covington Township, Tioga County, Pa.;
Approval Date: February 9, 2010.
9. Seneca Resources Corporation, Pad
ID: DCNR 595 Pad D, ABR–20090827.1,
Bloss Township, Tioga County, Pa.;
Approval Date: February 9, 2010,
including a partial waiver of 18 CFR
806.15.
10. East Resources, Inc., Pad ID:
Ackley 806, ABR–20100208, Clymer
Township, Tioga County, Pa.; Approval
Date: February 11, 2010.
11. XTO Energy, Incorporated, Pad ID:
Kepner 8503H, ABR–20100209,
Shrewsbury Township, Lycoming
County, Pa.; Approval Date: February
11, 2010.
12. Chesapeake Appalachia, LLC, Pad
ID: Dan Ellis, ABR–20100210, Monroe
Township, Bradford Township, Pa.;
Approval Date: February 11, 2010.
13. XTO Energy, Incorporated, Pad ID:
Hazlak 8504, ABR–20100211,
Shrewsbury Township, Lycoming
County, Pa.; Approval Date: February
12, 2010.
14. Fortuna Energy, Inc., Pad ID:
Putnam 01 077, ABR–20100212,
Armenia Township, Bradford County,
Pa.; Approval Date: February 12, 2010.
15. Fortuna Energy, Inc., Pad ID: Lutz
01 015, ABR–20100213, Troy Township,
Bradford County, Pa.; Approval Date:
February 12, 2010.
E:\FR\FM\04MYN1.SGM
04MYN1
Agencies
[Federal Register Volume 75, Number 85 (Tuesday, May 4, 2010)]
[Notices]
[Pages 23836-23837]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-10395]
=======================================================================
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Notice of Actions Taken at March 18, 2010, Meeting
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice of Commission actions.
-----------------------------------------------------------------------
SUMMARY: At its regular business meeting on March 18, 2010, in State
College, Pennsylvania, the Commission held a public hearing as part of
its regular business meeting. At the public hearing, the Commission:
(1) Approved and tabled certain water resources projects; (2) rescinded
approval for a water resources project; and (3) approved settlements
involving three water resources projects. Details concerning these and
other matters addressed at the public hearing and business meeting are
contained in the Supplementary Information section of this notice.
DATES: March 18, 2010.
ADDRESSES: Susquehanna River Basin Commission, 1721 N. Front Street,
Harrisburg, PA 17102-2391.
FOR FURTHER INFORMATION CONTACT: Richard A. Cairo, General Counsel,
telephone: (717) 238-0423, ext. 306; fax: (717) 238-2436; e-mail:
rcairo@srbc.net; or Stephanie L. Richardson, Secretary to the
Commission, telephone: (717) 238-0423, ext. 304; fax: (717) 238-2436;
e-mail: srichardson@srbc.net. Regular mail inquiries may be sent to the
above address.
SUPPLEMENTARY INFORMATION: In addition to the public hearing and its
related action items identified below, the following items were also
presented or acted on at the business meeting: (1) A presentation by
Pennsylvania Department of Conservation and Natural Resources Deputy
Secretary for Parks & Forestry James Grace on Marcellus Shale natural
gas leasing in Pennsylvania state forests; (2) an update on the
implementation of the SRBC Remote Water Quality Monitoring Network; (3)
a report on hydrologic conditions in the Susquehanna Basin with an
emphasis on National Flood Safety Week; (4) approval/ratification of
one grant related to the Susquehanna Flood Forecast and Warning System,
and five contracts related to ArcGIS, establishment of an SRBC
satellite office in Sayre, PA, consulting services for instream flow
studies, aquatic resource surveys, and flood mapping; (5) ratified the
Executive Director's retention of outside counsel and other
professional services regarding the relicensing proceedings for lower
Susquehanna River hydroelectric projects; and (6) approved a revision
of the FY-2011 Budget. The Commission also heard counsel's report on
legal matters affecting the Commission and recognized retiring Chief
Administrative Officer Duane A. Friends for his 25 years of valuable
service. The Commission convened a public hearing and took the
following actions:
Public Hearing--Compliance Actions
The Commission approved a settlement in lieu of civil penalties for
the following projects:
1. Chesapeake Energy Corporation--Eastern Division. Pad ID: Ward
(ABR-20090519), Burlington Township, and Sullivan 1 (ABR-20080715),
Athens Township, Bradford County, Pa.--$20,000.
2. Novus Operating, LLC. Pad ID: Sylvester 1H and North Fork 1H,
Brookfield Township, Tioga County, Pa.--$100,000.
3. Southwestern Energy Production Company. Pad ID: Ferguson,
Wyalusing Township, Bradford County, Pa.--$50,000.
Public Hearing--Projects Approved
1. Project Sponsor and Facility: Carrizo Oil & Gas, Inc. (Mosquito
Creek--Hoffman), Karthaus Township, Clearfield County, Pa. Surface
water withdrawal of up to 0.720 mgd.
2. Project Sponsor and Facility: EQT Production Company (West
Branch Susquehanna River--Kuntz), Greenwood Township, Clearfield
County, Pa. Surface water withdrawal of up to 0.900 mgd.
3. Project Sponsor and Facility: EXCO-North Coast Energy, Inc.
(West Branch Susquehanna River--Johnson), Clinton Township, Lycoming
County, Pa. Surface water withdrawal of up to 0.999 mgd.
4. Project Sponsor and Facility: Fortuna Energy Inc. (Fall Brook--
Bense), Troy Township, Bradford County, Pa. Surface water withdrawal of
up to 1.000 mgd.
5. Project Sponsor and Facility: Fortuna Energy Inc. (Unnamed
Tributary to North Branch Sugar Creek--Besley), Columbia Township,
Bradford County, Pa. Surface water withdrawal of up to 2.000 mgd.
6. Project Sponsor and Facility: Fortuna Energy Inc. (South Branch
Sugar Creek--Shedden), Troy Township, Bradford County, Pa. Surface
water withdrawal of up to 0.900 mgd.
7. Project Sponsor and Facility: Fortuna Energy Inc. (Sugar Creek--
Hoffman), West Burlington Township, Bradford County, Pa. Surface water
withdrawal modification increase from 0.250 mgd up to 2.000 mgd (Docket
No. 20090327).
8. Project Sponsor: Graymont (PA), Inc. Project Facility: Pleasant
Gap Facility, Spring Township, Centre County, Pa. Groundwater
withdrawal of 0.050 mgd (30-day average) from the Plant Make-up Well.
9. Project Sponsor and Facility: Harley-Davidson Motor Company
Operations, Inc., Springettsbury Township, York County, Pa.
Modification to project features of the withdrawal approval (Docket No.
19900715).
10. Project Sponsor and Facility: Harley-Davidson Motor Company
Operations, Inc., Springettsbury Township, York County, Pa.
Modification to add a groundwater withdrawal of 0.585 mgd (30-day
average) from Well CW-20 to the remediation system, without any
increase to total system withdrawal quantity (Docket No. 19980901).
11. Project Sponsor and Facility: Healthy Properties, Inc. (Sugar
Creek--owner), North Towanda Township, Bradford County, Pa. Surface
water withdrawal of up to 0.450 mgd.
12. Project Sponsor and Facility: Mountain Energy Services, Inc.
(Tunkhannock Creek--Deer Park Lumber, Inc.), Tunkhannock Township,
Wyoming County, Pa. Surface water withdrawal of up to 0.999 mgd.
[[Page 23837]]
13. Project Sponsor and Facility: Randy M. Wiernusz (Bowman Creek--
owner), Eaton Township, Wyoming County, Pa. Surface water withdrawal of
up to 0.249 mgd.
14. Project Sponsor and Facility: TerrAqua Resource Management
(Tioga River--Losey), Lawrenceville Borough, Tioga County, Pa. Surface
water withdrawal of up to 0.375 mgd and consumptive water use of up to
0.375 mgd.
15. Project Sponsor and Facility: XTO Energy, Inc. (Lick Run--
Dincher), Shrewsbury Borough, Lycoming County, Pa. Surface water
withdrawal of up to 0.249 mgd.
16. Project Sponsor and Facility: XTO Energy, Inc. (Little Muncy
Creek--Temple), Moreland Township, Lycoming County, Pa. Surface water
withdrawal of up to 0.249 mgd.
Public Hearing--Projects Tabled
1. Project Sponsor: Chester County Solid Waste Authority. Project
Facility: Lanchester Landfill, Salisbury and Caernarvon Townships,
Lancaster County, Pa. Application for groundwater withdrawal of 0.190
mgd (30-day average) from two wells and three collection sumps.
2. Project Sponsor: Chester County Solid Waste Authority. Project
Facility: Lanchester Landfill, Salisbury and Caernarvon Townships,
Lancaster County, Pa. Application for consumptive water use of up to
0.075 mgd.
3. Project Sponsor: Chester County Solid Waste Authority. Project
Facility: Lanchester Landfill, Salisbury and Caernarvon Townships,
Lancaster County, Pa. Application for an existing into-basin diversion
of up to 0.050 mgd from the Delaware River Basin.
4. Project Sponsor and Facility: Sunnyside Ethanol, LLC (West
Branch Susquehanna River--1--owner), Curwensville Borough, Clearfield
County, Pa. Application for surface water withdrawal of up to 1.270
mgd.
5. Project Sponsor and Facility: Sunnyside Ethanol, LLC (West
Branch Susquehanna River--2--owner), Curwensville Borough, Clearfield
County, Pa. Application for surface water withdrawal of up to 0.710
mgd.
6. Project Sponsor and Facility: Sunnyside Ethanol, LLC,
Curwensville Borough, Clearfield County, Pa. Application for
consumptive water use of up to 1.980 mgd.
7. Project Sponsor and Facility: Walker Township Water Association,
Walker Township, Centre County, Pa. Modification to increase the total
groundwater system withdrawal limit (30-day average) from 0.523 mgd to
0.962 mgd (Docket No. 20070905).
Public Hearing--Rescission of Project Approval
1. Project Sponsor and Facility: Chesapeake Appalachia, LLC
(Susquehanna River) (Docket No. 20080907), Oakland Township,
Susquehanna County, Pa.
Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts
806, 807, and 808.
Dated: April 20, 2010.
Thomas W. Beauduy,
Deputy Director.
[FR Doc. 2010-10395 Filed 5-3-10; 8:45 am]
BILLING CODE 7040-01-P