Alta Wind I, LLC; Alta Wind II, LLC; Alta Wind III, LLC; Alta Wind IV, LLC; Alta Wind V, LLC; Alta Wind VI, LLC; Alta Wind VII, LLC; Alta Wind VIII, LLC; Alta Windpower Development, LLC; TGP Development Company, LLC; Notice of Petition for Declaratory Order, 23263 [2010-10218]
Download as PDF
Federal Register / Vol. 75, No. 84 / Monday, May 3, 2010 / Notices
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
EL09–43 ..........................................
EL09–61 ..........................................
EL09–78 ..........................................
EL10–55 ..........................................
ER05–1065 ......................................
ER07–682 ........................................
ER07–956 ........................................
ER08–767 ........................................
ER08–1056 ......................................
ER08–1057 ......................................
ER09–636 ........................................
ER09–833 ........................................
ER09–877 ........................................
ER09–882 ........................................
ER09–1214 ......................................
ER09–1224 ......................................
ER10–794 ........................................
ER10–879 ........................................
ER10–984 ........................................
These meetings are open to the
public.
For more information, contact Patrick
Clarey, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (317) 249–5937 or
patrick.clarey@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–10217 Filed 4–30–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL10–62–000]
Alta Wind I, LLC; Alta Wind II, LLC;
Alta Wind III, LLC; Alta Wind IV, LLC;
Alta Wind V, LLC; Alta Wind VI, LLC;
Alta Wind VII, LLC; Alta Wind VIII, LLC;
Alta Windpower Development, LLC;
TGP Development Company, LLC;
Notice of Petition for Declaratory Order
erowe on DSK5CLS3C1PROD with NOTICES
April 26, 2010.
Take notice that on April 23, 2010,
pursuant to section 207 of the Rules of
Practice and Procedures of the Federal
Energy Regulatory Commission
(Commission), 18 CFR 285.207 (2009),
Alta Wind I, LLC, Alta Wind II, LLC,
Alta Wind III, LLC, Alta Wind IV, LLC,
Alta Wind V, LLC, Alta Wind VI, LLC,
Alta Wind VII, LLC, Alta Wind VIII,
LLC, Alta Windpower Development,
LLC, and TGP Development Company,
LLC (Petitioners) filed jointly a petition
for declaratory order requesting the
Commission to confirm their firm
priority transmission rights to the
capacity of three 230 kV radial generator
tie-lines to interconnect Petitioners’ full
planned wind and solar generation
capacity to the integrated transmission
system.
VerDate Mar<15>2010
15:35 Apr 30, 2010
Jkt 220001
23263
Arkansas Public Service Commission v. Entergy Services, Inc.
Louisiana Public Service Commission v. Entergy Services, Inc.
South Mississippi Electric Power Association v. Entergy Services, Inc.
Louisiana Public Service Commission v. Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on May 24, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–10218 Filed 4–30–10; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OECA–2009–0415; FRL–9144–3;
EPA ICR Number 1072.09; OMB Control
Number 2060–0081]
Agency Information Collection
Activities; Submission to OMB for
Review and Approval; Comment
Request; NSPS for Lead Acid Battery
Manufacturing (Renewal)
AGENCY: Environmental Protection
Agency (EPA).
ACTION: Notice.
SUMMARY: In compliance with the
Paperwork Reduction Act (44 U.S.C.
3501 et seq.), this document announces
that an Information Collection Request
(ICR) has been forwarded to the Office
of Management and Budget (OMB) for
review and approval. This is a request
to renew an existing approved
collection. The ICR which is abstracted
below describes the nature of the
collection and the estimated burden and
cost.
DATES: Additional comments may be
submitted on or before June 2, 2010.
ADDRESSES: Submit your comments,
referencing docket ID number EPA–HQ–
OECA–2009–0415, to (1) EPA online
using https://www.regulations.gov (our
preferred method), or by e-mail to
docket.oeca@epa.gov, or by mail to: EPA
Docket Center (EPA/DC), Environmental
Protection Agency, Enforcement and
Compliance Docket and Information
Center, mail code 28221T, 1200
Pennsylvania Avenue, NW.,
Washington, DC 20460, and (2) OMB at:
Office of Information and Regulatory
Affairs, Office of Management and
Budget (OMB), Attention: Desk Officer
for EPA, 725 17th Street, NW.,
Washington, DC 20503.
FOR FURTHER INFORMATION CONTACT: John
Schaefer, Office of Air Quality Planning
E:\FR\FM\03MYN1.SGM
03MYN1
Agencies
[Federal Register Volume 75, Number 84 (Monday, May 3, 2010)]
[Notices]
[Page 23263]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-10218]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL10-62-000]
Alta Wind I, LLC; Alta Wind II, LLC; Alta Wind III, LLC; Alta
Wind IV, LLC; Alta Wind V, LLC; Alta Wind VI, LLC; Alta Wind VII, LLC;
Alta Wind VIII, LLC; Alta Windpower Development, LLC; TGP Development
Company, LLC; Notice of Petition for Declaratory Order
April 26, 2010.
Take notice that on April 23, 2010, pursuant to section 207 of the
Rules of Practice and Procedures of the Federal Energy Regulatory
Commission (Commission), 18 CFR 285.207 (2009), Alta Wind I, LLC, Alta
Wind II, LLC, Alta Wind III, LLC, Alta Wind IV, LLC, Alta Wind V, LLC,
Alta Wind VI, LLC, Alta Wind VII, LLC, Alta Wind VIII, LLC, Alta
Windpower Development, LLC, and TGP Development Company, LLC
(Petitioners) filed jointly a petition for declaratory order requesting
the Commission to confirm their firm priority transmission rights to
the capacity of three 230 kV radial generator tie-lines to interconnect
Petitioners' full planned wind and solar generation capacity to the
integrated transmission system.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on May 24, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-10218 Filed 4-30-10; 8:45 am]
BILLING CODE 6717-01-P