Alta Wind I, LLC; Alta Wind II, LLC; Alta Wind III, LLC; Alta Wind IV, LLC; Alta Wind V, LLC; Alta Wind VI, LLC; Alta Wind VII, LLC; Alta Wind VIII, LLC; Alta Windpower Development, LLC; TGP Development Company, LLC; Notice of Petition for Declaratory Order, 23263 [2010-10218]

Download as PDF Federal Register / Vol. 75, No. 84 / Monday, May 3, 2010 / Notices Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. EL09–43 .......................................... EL09–61 .......................................... EL09–78 .......................................... EL10–55 .......................................... ER05–1065 ...................................... ER07–682 ........................................ ER07–956 ........................................ ER08–767 ........................................ ER08–1056 ...................................... ER08–1057 ...................................... ER09–636 ........................................ ER09–833 ........................................ ER09–877 ........................................ ER09–882 ........................................ ER09–1214 ...................................... ER09–1224 ...................................... ER10–794 ........................................ ER10–879 ........................................ ER10–984 ........................................ These meetings are open to the public. For more information, contact Patrick Clarey, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (317) 249–5937 or patrick.clarey@ferc.gov. Kimberly D. Bose, Secretary. [FR Doc. 2010–10217 Filed 4–30–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10–62–000] Alta Wind I, LLC; Alta Wind II, LLC; Alta Wind III, LLC; Alta Wind IV, LLC; Alta Wind V, LLC; Alta Wind VI, LLC; Alta Wind VII, LLC; Alta Wind VIII, LLC; Alta Windpower Development, LLC; TGP Development Company, LLC; Notice of Petition for Declaratory Order erowe on DSK5CLS3C1PROD with NOTICES April 26, 2010. Take notice that on April 23, 2010, pursuant to section 207 of the Rules of Practice and Procedures of the Federal Energy Regulatory Commission (Commission), 18 CFR 285.207 (2009), Alta Wind I, LLC, Alta Wind II, LLC, Alta Wind III, LLC, Alta Wind IV, LLC, Alta Wind V, LLC, Alta Wind VI, LLC, Alta Wind VII, LLC, Alta Wind VIII, LLC, Alta Windpower Development, LLC, and TGP Development Company, LLC (Petitioners) filed jointly a petition for declaratory order requesting the Commission to confirm their firm priority transmission rights to the capacity of three 230 kV radial generator tie-lines to interconnect Petitioners’ full planned wind and solar generation capacity to the integrated transmission system. VerDate Mar<15>2010 15:35 Apr 30, 2010 Jkt 220001 23263 Arkansas Public Service Commission v. Entergy Services, Inc. Louisiana Public Service Commission v. Entergy Services, Inc. South Mississippi Electric Power Association v. Entergy Services, Inc. Louisiana Public Service Commission v. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on May 24, 2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–10218 Filed 4–30–10; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OECA–2009–0415; FRL–9144–3; EPA ICR Number 1072.09; OMB Control Number 2060–0081] Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment Request; NSPS for Lead Acid Battery Manufacturing (Renewal) AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.), this document announces that an Information Collection Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval. This is a request to renew an existing approved collection. The ICR which is abstracted below describes the nature of the collection and the estimated burden and cost. DATES: Additional comments may be submitted on or before June 2, 2010. ADDRESSES: Submit your comments, referencing docket ID number EPA–HQ– OECA–2009–0415, to (1) EPA online using https://www.regulations.gov (our preferred method), or by e-mail to docket.oeca@epa.gov, or by mail to: EPA Docket Center (EPA/DC), Environmental Protection Agency, Enforcement and Compliance Docket and Information Center, mail code 28221T, 1200 Pennsylvania Avenue, NW., Washington, DC 20460, and (2) OMB at: Office of Information and Regulatory Affairs, Office of Management and Budget (OMB), Attention: Desk Officer for EPA, 725 17th Street, NW., Washington, DC 20503. FOR FURTHER INFORMATION CONTACT: John Schaefer, Office of Air Quality Planning E:\FR\FM\03MYN1.SGM 03MYN1

Agencies

[Federal Register Volume 75, Number 84 (Monday, May 3, 2010)]
[Notices]
[Page 23263]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-10218]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL10-62-000]


Alta Wind I, LLC; Alta Wind II, LLC; Alta Wind III, LLC; Alta 
Wind IV, LLC; Alta Wind V, LLC; Alta Wind VI, LLC; Alta Wind VII, LLC; 
Alta Wind VIII, LLC; Alta Windpower Development, LLC; TGP Development 
Company, LLC; Notice of Petition for Declaratory Order

April 26, 2010.
    Take notice that on April 23, 2010, pursuant to section 207 of the 
Rules of Practice and Procedures of the Federal Energy Regulatory 
Commission (Commission), 18 CFR 285.207 (2009), Alta Wind I, LLC, Alta 
Wind II, LLC, Alta Wind III, LLC, Alta Wind IV, LLC, Alta Wind V, LLC, 
Alta Wind VI, LLC, Alta Wind VII, LLC, Alta Wind VIII, LLC, Alta 
Windpower Development, LLC, and TGP Development Company, LLC 
(Petitioners) filed jointly a petition for declaratory order requesting 
the Commission to confirm their firm priority transmission rights to 
the capacity of three 230 kV radial generator tie-lines to interconnect 
Petitioners' full planned wind and solar generation capacity to the 
integrated transmission system.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on May 24, 2010.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-10218 Filed 4-30-10; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.