Environmental Impacts Statements; Notice of Availability, 22778-22779 [2010-10156]

Download as PDF 22778 Federal Register / Vol. 75, No. 83 / Friday, April 30, 2010 / Notices Are there changes in the estimates from the last approval? To date, there are no changes in the number of hours in the total estimated respondent burden compared with that identified in the ICR currently approved by OMB. However, estimates may change based on comments received from the public. What is the next step in the process for this ICR? EPA will consider the comments received and amend the ICR as appropriate. The final ICR package will then be submitted to OMB for review and approval pursuant to 5 CFR 1320.12. At that time, EPA will issue another Federal Register notice pursuant to 5 CFR 1320.5(a)(1)(iv) to announce the submission of the ICR to OMB and the opportunity to submit additional comments to OMB. If you have any questions about this ICR or the approval process, please contact the technical person listed under FOR FURTHER INFORMATION CONTACT. Dated: April 23, 2010. Lori Stewart, Acting Director, Office of Transportation and Air Quality. [FR Doc. 2010–10175 Filed 4–29–10; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8990–1] wwoods2 on DSK1DXX6B1PROD with NOTICES_PART 1 Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–1399 or https://www.epa.gov/ compliance/nepa/ Weekly receipt of Environmental Impact Statements Filed 04/19/2010 Through 04/23/2010 Pursuant to 40 CFR 1506.9 Notice: In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA has met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA’s comment letters, in the Federal Register. Since February 2008, EPA has been including its comment letters on EISs on its Web site at: https:// www.epa.gov/compliance/nepa/ eisdata.html. Including the entire EIS comment letters on the Web site satisfies the Section 309(a) requirement to make EPA’s comments on EISs available to the public. Accordingly, VerDate Mar<15>2010 13:41 Apr 29, 2010 Jkt 220001 after March 31, 2010, EPA will discontinue the publication of this notice of availability of EPA comments in the Federal Register. EIS No. 20100146, Draft EIS, FHWA, CA, Tier 1—Hollister to Gilroy State Route 25 Widening and Route Adoption, Proposal Widen from TwoLane Conventional Highway to FourLane Expressway, and Route Adoption, San Benito and Santa Clara Counties, CA, Comment Period Ends: 06/14/2010, Contact: G. William Norris III 805–542–4711. EIS No. 20100147, Draft EIS, NPS, FL, PROGRAMMATIC—Coral Reef Restoration Plan, Implementation, Biscayne National Park, Homestead, FL, Comment Period Ends: 06/28/ 2010, Contact: Thomas Flanagan 303– 969–2691. EIS No. 20100148, Final EIS, USFS, CO, Gunnison Basin Federal Lands Travel Management Project, To Address Travel Management on Federal Lands within the Upper Gunnison Basin and North Fork Valley, Implementation, Gunnison, Delta, Hinsdale and Saguache Counties, CO, Wait Period Ends: 06/01/2010, Contact: Gary S. Shellhorn 970–874–6666. EIS No. 20100149, Draft EIS, NOAA, 00, American Lobster Fishery, Proposed Effort Control Measures, Interstate Fishery Management Plan, Implementation, Maine through North Carolina, Comment Period Ends: 06/ 28/2010, Contact: Patricia A. Kurkull 978–281–9300. EIS No. 20100150, Draft Supplement, USFS, CA, Tehachapi Renewable Transmission Project, New Information on Changed Conditions Caused by the Station Fire, Construct, Operate and Maintain New and Upgraded 500 kV and 220kV Transmission Lines and Substations, Special Use Authorization, Angeles National Forest, Los Angeles County, CA, Comment Period Ends: 06/14/ 2010, Contact: Justin Seastrand 626– 574–5278. EIS No. 20100151, Draft EIS, USFS, OR, Cobbler II Timber Sale and Fuels Reduction Project, Proposing Vegetation and Fuels Management to Improve Health and Vigor Upland Forest Stands and Reduce Hazardous and Ladder Fuels, Walla Walla Ranger District, Umatilla National Forest, Wallowa and Union Counties, OR, Comment Period Ends: 06/14/2010, Contact: Betsy Kaiser 509–572–6290. EIS No. 20100152, Final EIS, USFS, CA, Piute Fire Restoration Project, Proposes to Salvage Dead and Dying Trees, Treat Excess Fuels, and Plant Trees, Kern River Ranger District, PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 Sequoia National Forest, Kern County, CA, Wait Period Ends: 06/01/2010, Contact: Barbara Johnston 559–784– 1500 Ext. 1220. EIS No. 20100153, Final EIS, BR, CA, Millerton Lake Resource Management Plan (RMP) and General Plan, Implementation, Fresno and Madera Counties, CA, Wait Period Ends: 06/ 01/2010, Contact: Jack Collins 559– 349–4544. EIS No. 20100154, Draft EIS, BLM, NV, Genesis Project, Proposes Expansion of Existing Mine Pits and Development of the Bluestar Ridge Open Pit Mine, Newmont Mining Corporation, Eureka County, NV, Comment Period Ends: 06/14/2010, Contact: Kirk Laird 775–753–0272. EIS No. 20100155, Final EIS, USFS, OR, Canyon Fuels and Vegetation Management Project, Proposed Fuels and Vegetation Treatment to Reduce the Risk of Stand Loss Due to Overly Dense Stand Conditions, Lookout Mountain Ranger District, Ochoco National Forest, Crook County, OR, Wait Period Ends: 06/01/2010, Contact: Marcy Anderson 541–416– 6463. EIS No. 20100156, Final EIS, USCG, 00, USCG Pacific Operations: Districts 11 Area, California and Districts 13 Area, Oregon and Washington, Improve the Protection and Conservation of Marine Protected Species and Marine Protected Areas, CA, OR and WA, Wait Period Ends: 06/01/2010, Contact: Jeff R. Bray 202–372–3752. Amended Notices EIS No. 20100133, Final EIS, FHWA, 00, TIER 1—FEIS Trans-Texas Corridor— 35 (TTC–35) System, Improvement to International, Interstate and Intrastate Movement of Goods and People, Oklahoma-Mexico/Gulf Coast Element, Wait Period Ends: 05/25/ 2010, Contact: Brett Jackson 512–536– 5946 Revision to FR Notice Published 04/26/2010: Correction to Wait Period End from 05/24/2010 to 05/25/2010. EIS No. 20100134, Final EIS, FHWA, TN, US 127/TN 28 Improvements, from 1–40 at Crossville to TN 62 at Clarkrange, Funding, US Army COE Section 10 and 404 Permits, Cumberland and Fentress Counties, TN, Wait Period Ends: 05/25/2010, Contact: Pamela M. Kordenbrock 615– 781–5770, Revision to FR Notice Published 04/26/2010: Correction to Wait, Period End from 05/24/2010 to 05/25/2010. EIS No. 20100135, Final EIS, BLM, NV, Round Mountain Expansion Project, Proposed to Construct and Operate and Expand the Existing Open-Pit Gold Mining and Processing E:\FR\FM\30APN1.SGM 30APN1 wwoods2 on DSK1DXX6B1PROD with NOTICES_PART 1 Federal Register / Vol. 75, No. 83 / Friday, April 30, 2010 / Notices Operations, north of the town of Tonopah in Nye County, NV, Wait Period Ends: 05/25/2010, Contact: Christopher Worthington 775–635– 4000 Revision to FR Notice Published 04/26/2010: Correction to Wait Period End from 05/24/2010 to 05/25/2010. EIS No. 20100136, Final EIS, USFS, 00, Nebraska National Forests and Grassland Travel Management Project, Proposes to Designate Routes and Areas Open to Motorized Travel, Buffalo Gap National Grassland, Oglala National Grassland, Samuel R. McKelvie National Forest, and the Pine Ridge and Bessey Units of the Nebraska National Forest, Fall River, Custer, Pennington, Jackson Counties; SD and Sioux, Dawes, Cherry, Thomas and Blaine Counties, NE, Wait Period Ends: 05/25/2010, Contact: Mike McNeill 308–432–0336, Revision to FR Notice Published 04/ 26/2010: Correction to Wait, Period End from 05/24/2010 to 05/25/2010. EIS No. 20100137, Draft EIS, USFS, ID, Robo Elk Project, Proposes Watershed Improvement, Timber Harvest, Fuel Treatments, and Recreation Activities, Palouse Ranger District, Clearwater National Forest, Clearwater County, ID, Comment Period Ends: 06/09/ 2010, Contact: George Harbaugh 208– 935–4260, Revision to FR Notice Published 04/26/2010: Correction to Comment Period End from 06/07/ 2010 to 06/09/2010. EIS No. 20100138, Final EIS, BR, CA, Lake Casitas Resource Management Plan (RMP), Implementation, Cities of Los Angeles and Ventura, Western Ventura County, CA, Wait Period Ends: 05/25/2010, Contact: Jack Collins 559–349–4544, Revision to FR Notice Published 04/26/2010: Correction to Wait, Period End from 05/24/2010 to 05/25/2010. EIS No. 20100139, Draft EIS, USFS, CA, Kelsey Peak Timber Sale and Fuelbreak Project, Proposing to Harvest Commercial Timber and Create Fuelbreak, Upper Mad River Watershed, Mad River Ranger District, Six Rivers National Forest, Trinity County, CA, Comment Period Ends: 06/09/2010, Contact: Keith Menasco 928–774–0594, Revision to FR Notice Published 04/26/2010: Correction to Comment Period End from 06/07/ 2010 to 06/09/2010. EIS No. 20100140, Final EIS, FSA, 00, WITHDRAWN—PROGRAMMATIC— Biomass Crop Assistance Program (BCAP), To Establish and Administer the Program Areas Program Component of BCAP as mandated in Title IX of the 2008 Farm Bill in the United States, Wait Period Ends: 05/ 25/2010, Contact: Matthew T. Ponish VerDate Mar<15>2010 13:41 Apr 29, 2010 Jkt 220001 202–720–6853, Revision to FR Notice Published 04/26/2010: Officially Withdrawn by the preparing agency by letter dated 04/26/2010. EIS No. 20100141, Final EIS, BLM, UT, Mona to Oquirrh Transmission Corridor Project and Draft Pony Express Resource Management Plan Amendment, Construction, Operation, Maintenance and Decommissioning a Double-Circuit 500/345 Kilovolt (Kv) Transmission Line, Right-of-Way Grant, Rocky Mountain Power, Juab, Salt Lake, Tooele and Utah Counties, UT, Wait Period Ends: 05/25/2010, Contact: Mike Nelson 801–977–4300, Revision to FR Notice Published 04/ 26/2010: Correction to Wait, Period End from 05/24/2010 to 05/25/2010. EIS No. 20100142, Draft EIS, USFS, UT, Kitty Hawk Administrative Site Master Development Plan, Implementation, Cedar City Ranger District, Dixie National Forest, Cedar City, Iron County, UT, Comment Period Ends: 06/09/2010, Contact: Georgina Lampman 435–865–3794, Revision to FR Notice Published 04/ 26/2010: Correction to Comment Period End from 06/07/2010 to 06/09/ 2010. EIS No. 20100143, Final EIS, FHWA, NC, NC–24 Transportation Improvements, from west of I–95 to I– 40, Funding, US Army COE 4040 Permit, Cumberland, Sampson, and Duplin Counties, NC, Wait Period Ends: 05/25/2010, Contact: John F. Sullivan 919–865–4346, Revision to FR Notice Published 04/26/2010: Correction to Wait, Period End from 05/24/2010 to 05/25/2010. EIS No. 20100144, Draft EIS, NRC, SC, Virgil C. Summer Nuclear Station Units 2 and 3, Application for Combined License to Construct and Operate a New Nuclear Reactors, Fairfield County, SC, Comment Period Ends: 07/09/2010, Contact: Patricia Vokoun 301–415–3470, Revision to FR Notice Published 04/26/2010: Correction to Comment Period End from 07/06/2010 to 07/09/2010. EIS No. 20100145, Draft EIS, NRC, MD, Calvert Cliffs Nuclear Power Plant Unit 3, Application for Combined License for Construct and Operate a New Nuclear Unit, NUREG 1936, Calvert County, MD, Comment Period Ends: 07/09/2010, Contact: Laura Quinn 301–415–2220, Revision to FR Notice Published 04/26/2010: Correction to Comment Period End from 07/06/2010 to 07/09/2010. PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 22779 Dated: April 27, 2010. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2010–10156 Filed 4–29–10; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2010–0383; FRL–8823–8] FIFRA Scientific Advisory Panel; Notice of Public Meeting AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: There will be a 3–day meeting of the Federal Insecticide, Fungicide, and Rodenticide Act Scientific Advisory Panel (FIFRA SAP) to consider and review a set of scientific issues related to review of SHEDsMultimedia version 4, Peer consult on PBPK Modeling, and a SHEDS-PBPK Permethrin study. DATES: The meeting will be held on July 20-22, 2010, from 9 a.m. to approximately 5:30 p.m. Comments. The Agency encourages that written comments be submitted by July 8, 2010 and requests for oral comments be submitted by July 15, 2010. However, written comments and requests to make oral comments may be submitted until the date of the meeting, but anyone submitting written comments after July 8, 2010 should contact the Designated Federal Official (DFO) listed under FOR FURTHER INFORMATION CONTACT. For additional instructions, see Unit I.C. of the SUPPLEMENTARY INFORMATION. Nominations. Nominations of candidates to serve as ad hoc members of FIFRA SAP for this meeting should be provided on or before May 14, 2010. Webcasting. This meeting may be webcast. Please refer to the FIFRA SAP’s website, https://www.epa.gov/scipoly/ SAP/ for information on how to access the webcast. Please note that the webcast is a supplementary public process provided only for convenience. If difficulties arise resulting in webcasting outages, the meeting will continue as planned. Special accommodations. For information on access or services for individuals with disabilities, and to request accommodation of a disability, please contact the DFO listed under FOR FURTHER INFORMATION CONTACT at least 10 days prior to the meeting to give EPA as much time as possible to process your request. E:\FR\FM\30APN1.SGM 30APN1

Agencies

[Federal Register Volume 75, Number 83 (Friday, April 30, 2010)]
[Notices]
[Pages 22778-22779]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-10156]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8990-1]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/

Weekly receipt of Environmental Impact Statements
Filed 04/19/2010 Through 04/23/2010 Pursuant to 40 CFR 1506.9

    Notice: In accordance with Section 309(a) of the Clean Air Act, EPA 
is required to make its comments on EISs issued by other Federal 
agencies public. Historically, EPA has met this mandate by publishing 
weekly notices of availability of EPA comments, which includes a brief 
summary of EPA's comment letters, in the Federal Register. Since 
February 2008, EPA has been including its comment letters on EISs on 
its Web site at: https://www.epa.gov/compliance/nepa/eisdata.html. 
Including the entire EIS comment letters on the Web site satisfies the 
Section 309(a) requirement to make EPA's comments on EISs available to 
the public. Accordingly, after March 31, 2010, EPA will discontinue the 
publication of this notice of availability of EPA comments in the 
Federal Register.

EIS No. 20100146, Draft EIS, FHWA, CA, Tier 1--Hollister to Gilroy 
State Route 25 Widening and Route Adoption, Proposal Widen from Two-
Lane Conventional Highway to Four-Lane Expressway, and Route Adoption, 
San Benito and Santa Clara Counties, CA, Comment Period Ends: 06/14/
2010, Contact: G. William Norris III 805-542-4711.
EIS No. 20100147, Draft EIS, NPS, FL, PROGRAMMATIC--Coral Reef 
Restoration Plan, Implementation, Biscayne National Park, Homestead, 
FL, Comment Period Ends: 06/28/2010, Contact: Thomas Flanagan 303-969-
2691.
EIS No. 20100148, Final EIS, USFS, CO, Gunnison Basin Federal Lands 
Travel Management Project, To Address Travel Management on Federal 
Lands within the Upper Gunnison Basin and North Fork Valley, 
Implementation, Gunnison, Delta, Hinsdale and Saguache Counties, CO, 
Wait Period Ends: 06/01/2010, Contact: Gary S. Shellhorn 970-874-6666.
EIS No. 20100149, Draft EIS, NOAA, 00, American Lobster Fishery, 
Proposed Effort Control Measures, Interstate Fishery Management Plan, 
Implementation, Maine through North Carolina, Comment Period Ends: 06/
28/2010, Contact: Patricia A. Kurkull 978-281-9300.
EIS No. 20100150, Draft Supplement, USFS, CA, Tehachapi Renewable 
Transmission Project, New Information on Changed Conditions Caused by 
the Station Fire, Construct, Operate and Maintain New and Upgraded 500 
kV and 220kV Transmission Lines and Substations, Special Use 
Authorization, Angeles National Forest, Los Angeles County, CA, Comment 
Period Ends: 06/14/2010, Contact: Justin Seastrand 626-574-5278.
EIS No. 20100151, Draft EIS, USFS, OR, Cobbler II Timber Sale and Fuels 
Reduction Project, Proposing Vegetation and Fuels Management to Improve 
Health and Vigor Upland Forest Stands and Reduce Hazardous and Ladder 
Fuels, Walla Walla Ranger District, Umatilla National Forest, Wallowa 
and Union Counties, OR, Comment Period Ends: 06/14/2010, Contact: Betsy 
Kaiser 509-572-6290.
EIS No. 20100152, Final EIS, USFS, CA, Piute Fire Restoration Project, 
Proposes to Salvage Dead and Dying Trees, Treat Excess Fuels, and Plant 
Trees, Kern River Ranger District, Sequoia National Forest, Kern 
County, CA, Wait Period Ends: 06/01/2010, Contact: Barbara Johnston 
559-784-1500 Ext. 1220.
EIS No. 20100153, Final EIS, BR, CA, Millerton Lake Resource Management 
Plan (RMP) and General Plan, Implementation, Fresno and Madera 
Counties, CA, Wait Period Ends: 06/01/2010, Contact: Jack Collins 559-
349-4544.
EIS No. 20100154, Draft EIS, BLM, NV, Genesis Project, Proposes 
Expansion of Existing Mine Pits and Development of the Bluestar Ridge 
Open Pit Mine, Newmont Mining Corporation, Eureka County, NV, Comment 
Period Ends: 06/14/2010, Contact: Kirk Laird 775-753-0272.
EIS No. 20100155, Final EIS, USFS, OR, Canyon Fuels and Vegetation 
Management Project, Proposed Fuels and Vegetation Treatment to Reduce 
the Risk of Stand Loss Due to Overly Dense Stand Conditions, Lookout 
Mountain Ranger District, Ochoco National Forest, Crook County, OR, 
Wait Period Ends: 06/01/2010, Contact: Marcy Anderson 541-416-6463.
EIS No. 20100156, Final EIS, USCG, 00, USCG Pacific Operations: 
Districts 11 Area, California and Districts 13 Area, Oregon and 
Washington, Improve the Protection and Conservation of Marine Protected 
Species and Marine Protected Areas, CA, OR and WA, Wait Period Ends: 
06/01/2010, Contact: Jeff R. Bray 202-372-3752.

Amended Notices

EIS No. 20100133, Final EIS, FHWA, 00, TIER 1--FEIS Trans-Texas 
Corridor--35 (TTC-35) System, Improvement to International, Interstate 
and Intrastate Movement of Goods and People, Oklahoma-Mexico/Gulf Coast 
Element, Wait Period Ends: 05/25/2010, Contact: Brett Jackson 512-536-
5946 Revision to FR Notice Published 04/26/2010: Correction to Wait 
Period End from 05/24/2010 to 05/25/2010.
EIS No. 20100134, Final EIS, FHWA, TN, US 127/TN 28 Improvements, from 
1-40 at Crossville to TN 62 at Clarkrange, Funding, US Army COE Section 
10 and 404 Permits, Cumberland and Fentress Counties, TN, Wait Period 
Ends: 05/25/2010, Contact: Pamela M. Kordenbrock 615-781-5770, Revision 
to FR Notice Published 04/26/2010: Correction to Wait, Period End from 
05/24/2010 to 05/25/2010.
EIS No. 20100135, Final EIS, BLM, NV, Round Mountain Expansion Project, 
Proposed to Construct and Operate and Expand the Existing Open-Pit Gold 
Mining and Processing

[[Page 22779]]

Operations, north of the town of Tonopah in Nye County, NV, Wait Period 
Ends: 05/25/2010, Contact: Christopher Worthington 775-635-4000 
Revision to FR Notice Published 04/26/2010: Correction to Wait Period 
End from 05/24/2010 to 05/25/2010.
EIS No. 20100136, Final EIS, USFS, 00, Nebraska National Forests and 
Grassland Travel Management Project, Proposes to Designate Routes and 
Areas Open to Motorized Travel, Buffalo Gap National Grassland, Oglala 
National Grassland, Samuel R. McKelvie National Forest, and the Pine 
Ridge and Bessey Units of the Nebraska National Forest, Fall River, 
Custer, Pennington, Jackson Counties; SD and Sioux, Dawes, Cherry, 
Thomas and Blaine Counties, NE, Wait Period Ends: 05/25/2010, Contact: 
Mike McNeill 308-432-0336, Revision to FR Notice Published 04/26/2010: 
Correction to Wait, Period End from 05/24/2010 to 05/25/2010.
EIS No. 20100137, Draft EIS, USFS, ID, Robo Elk Project, Proposes 
Watershed Improvement, Timber Harvest, Fuel Treatments, and Recreation 
Activities, Palouse Ranger District, Clearwater National Forest, 
Clearwater County, ID, Comment Period Ends: 06/09/2010, Contact: George 
Harbaugh 208-935-4260, Revision to FR Notice Published 04/26/2010: 
Correction to Comment Period End from 06/07/2010 to 06/09/2010.
EIS No. 20100138, Final EIS, BR, CA, Lake Casitas Resource Management 
Plan (RMP), Implementation, Cities of Los Angeles and Ventura, Western 
Ventura County, CA, Wait Period Ends: 05/25/2010, Contact: Jack Collins 
559-349-4544, Revision to FR Notice Published 04/26/2010: Correction to 
Wait, Period End from 05/24/2010 to 05/25/2010.
EIS No. 20100139, Draft EIS, USFS, CA, Kelsey Peak Timber Sale and 
Fuelbreak Project, Proposing to Harvest Commercial Timber and Create 
Fuelbreak, Upper Mad River Watershed, Mad River Ranger District, Six 
Rivers National Forest, Trinity County, CA, Comment Period Ends: 06/09/
2010, Contact: Keith Menasco 928-774-0594, Revision to FR Notice 
Published 04/26/2010: Correction to Comment Period End from 06/07/2010 
to 06/09/2010.
EIS No. 20100140, Final EIS, FSA, 00, WITHDRAWN--PROGRAMMATIC--Biomass 
Crop Assistance Program (BCAP), To Establish and Administer the Program 
Areas Program Component of BCAP as mandated in Title IX of the 2008 
Farm Bill in the United States, Wait Period Ends: 05/25/2010, Contact: 
Matthew T. Ponish 202-720-6853, Revision to FR Notice Published 04/26/
2010: Officially Withdrawn by the preparing agency by letter dated 04/
26/2010.
EIS No. 20100141, Final EIS, BLM, UT, Mona to Oquirrh Transmission 
Corridor Project and Draft Pony Express Resource Management Plan 
Amendment, Construction, Operation, Maintenance and Decommissioning a 
Double-Circuit 500/345 Kilovolt (Kv) Transmission Line, Right-of-Way 
Grant, Rocky Mountain Power, Juab, Salt Lake, Tooele and Utah Counties, 
UT, Wait Period Ends: 05/25/2010, Contact: Mike Nelson 801-977-4300, 
Revision to FR Notice Published 04/26/2010: Correction to Wait, Period 
End from 05/24/2010 to 05/25/2010.
EIS No. 20100142, Draft EIS, USFS, UT, Kitty Hawk Administrative Site 
Master Development Plan, Implementation, Cedar City Ranger District, 
Dixie National Forest, Cedar City, Iron County, UT, Comment Period 
Ends: 06/09/2010, Contact: Georgina Lampman 435-865-3794, Revision to 
FR Notice Published 04/26/2010: Correction to Comment Period End from 
06/07/2010 to 06/09/2010.
EIS No. 20100143, Final EIS, FHWA, NC, NC-24 Transportation 
Improvements, from west of I-95 to I-40, Funding, US Army COE 4040 
Permit, Cumberland, Sampson, and Duplin Counties, NC, Wait Period Ends: 
05/25/2010, Contact: John F. Sullivan 919-865-4346, Revision to FR 
Notice Published 04/26/2010: Correction to Wait, Period End from 05/24/
2010 to 05/25/2010.
EIS No. 20100144, Draft EIS, NRC, SC, Virgil C. Summer Nuclear Station 
Units 2 and 3, Application for Combined License to Construct and 
Operate a New Nuclear Reactors, Fairfield County, SC, Comment Period 
Ends: 07/09/2010, Contact: Patricia Vokoun 301-415-3470, Revision to FR 
Notice Published 04/26/2010: Correction to Comment Period End from 07/
06/2010 to 07/09/2010.
EIS No. 20100145, Draft EIS, NRC, MD, Calvert Cliffs Nuclear Power 
Plant Unit 3, Application for Combined License for Construct and 
Operate a New Nuclear Unit, NUREG 1936, Calvert County, MD, Comment 
Period Ends: 07/09/2010, Contact: Laura Quinn 301-415-2220, Revision to 
FR Notice Published 04/26/2010: Correction to Comment Period End from 
07/06/2010 to 07/09/2010.

    Dated: April 27, 2010.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2010-10156 Filed 4-29-10; 8:45 am]
BILLING CODE 6560-50-P