Oregon Wave Energy Partners I, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 21289 [2010-9411]
Download as PDF
Federal Register / Vol. 75, No. 78 / Friday, April 23, 2010 / Notices
Comment Date: May 7, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–9412 Filed 4–22–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12749–002]
Oregon Wave Energy Partners I, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
WReier-Aviles on DSKGBLS3C1PROD with NOTICES
April 16, 2010.
On March 2, 2010, Oregon Wave
Energy Partners I, LLC filed an
application for a subsequent
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the Coos Bay
OPT Wave Park Project. The requested
project boundary comprises
approximately 7.36 square miles of
coastal waters, located between 2.5 and
3.0 miles off the coast near Coos Bay,
Oregon.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist
of: (1) 200 PowerBuoys having a total
installed capacity of 100 megawatts; (2)
an approximately 2.5-mile-long, subsea
transmission cable; (3) an approximately
200-yard-long transmission line
connecting to an existing substation;
and (4) appurtenant facilities. The
project would have an estimated average
annual generation of 276,000 megawatthours.
Applicant Contact: Mr. Charles F.
Dunleavy, Oregon Wave Energy Partners
I, LLC, 1590 Reed Road, Pennington, NJ
08534.
FERC Contact: Jim Hastreiter, (503)
552–2760, or via e-mail at
james.hastreiter@ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
VerDate Nov<24>2008
15:23 Apr 22, 2010
Jkt 220001
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov/docs-filing/
ferconline.asp) under the ‘‘eFiling’’ link.
For a simpler method of submitting text
only comments, click on ‘‘Quick
Comment.’’ For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–12749–002) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–9411 Filed 4–22–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
April 12, 2010.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC10–49–000.
Applicants: GWF Energy LLC.
Description: Supplemental
Information Supporting Section 203
Application for Authorization for
Disposition of Jurisdictional Facilities
and Request for Privileged Treatment of
GWF Energy LLC.
Filed Date: 04/07/2010.
Accession Number: 20100407–5076.
Comment Date: 5 p.m. Eastern Time
on Thursday, April 22, 2010.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER97–324–018;
ER97–3834–024.
Applicants: The Detroit Edison
Company.
Description: The Detroit Edison Co et
al. submits a compliance filing,
Attachment A.
PO 00000
Frm 00070
Fmt 4703
Sfmt 4703
21289
Filed Date: 04/09/2010.
Accession Number: 20100409–0211.
Comment Date: 5 p.m. Eastern Time
on Friday, April 30, 2010.
Docket Numbers: ER02–862–013.
Applicants: Entergy Power Ventures,
L.P.
Description: Entergy Power Ventures,
LP submits an amendment to their
application requesting Category 1 Seller
designation, etc.
Filed Date: 04/09/2010.
Accession Number: 20100412–0203.
Comment Date: 5 p.m. Eastern Time
on Friday, April 30, 2010.
Docket Numbers: ER07–312–006.
Applicants: Dogwood Energy LLC.
Description: Supplemental Filing to
Market Power Update of Dogwood
Energy LLC.
Filed Date: 04/09/2010
Accession Number: 20100409–5126.
Comment Date: 5 p.m. Eastern Time
on Friday, April 30, 2010.
Docket Numbers: ER10–468–002.
Applicants: Google Energy LLC.
Description: Google Energy LLC
submits substitute FERC Electric Tariff,
Volume No. 1.
Filed Date: 04/06/2010.
Accession Number: 20100406–0208.
Comment Date: 5 p.m. Eastern Time
on Tuesday, April 27, 2010.
Docket Numbers: ER10–715–003.
Applicants: Llano Estacodo Wind,
LLC.
Description: Llano Estacado Wind,
LLC submits an amendment to their
updated market power analysis to
support the continued allowance of
market-based rates.
Filed Date: 04/09/2010.
Accession Number: 20100412–0202.
Comment Date: 5 p.m. Eastern Time
on Friday, April 30, 2010.
Docket Numbers: ER10–820–001.
Applicants: The Detroit Edison
Company.
Description: Detroit Edison Company
submits a First Revised Sheet 1 to its
FERC Electric Tariff, Original Volume
2—Notice of Cancellation.
Filed Date: 04/09/2010.
Accession Number: 20100409–0216.
Comment Date: 5 p.m. Eastern Time
on Friday, April 30, 2010.
Docket Numbers: ER10–881–001
Applicants: Reliable Power, LLC.
Description: Reliable Power, LLC
submits an Amendment to Application
for Market-Based Rate Authority.
Filed Date: 04/09/2010.
Accession Number: 20100409–0208.
Comment Date: 5 p.m. Eastern Time
on Friday, April 30, 2010.
Docket Numbers: ER10–1036–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
E:\FR\FM\23APN1.SGM
23APN1
Agencies
[Federal Register Volume 75, Number 78 (Friday, April 23, 2010)]
[Notices]
[Page 21289]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-9411]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12749-002]
Oregon Wave Energy Partners I, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
April 16, 2010.
On March 2, 2010, Oregon Wave Energy Partners I, LLC filed an
application for a subsequent preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing to study the feasibility of
the Coos Bay OPT Wave Park Project. The requested project boundary
comprises approximately 7.36 square miles of coastal waters, located
between 2.5 and 3.0 miles off the coast near Coos Bay, Oregon.
The sole purpose of a preliminary permit, if issued, is to grant
the permit holder priority to file a license application during the
permit term. A preliminary permit does not authorize the permit holder
to perform any land-disturbing activities or otherwise enter upon lands
or waters owned by others without the owners' express permission.
The proposed project would consist of: (1) 200 PowerBuoys having a
total installed capacity of 100 megawatts; (2) an approximately 2.5-
mile-long, subsea transmission cable; (3) an approximately 200-yard-
long transmission line connecting to an existing substation; and (4)
appurtenant facilities. The project would have an estimated average
annual generation of 276,000 megawatt-hours.
Applicant Contact: Mr. Charles F. Dunleavy, Oregon Wave Energy
Partners I, LLC, 1590 Reed Road, Pennington, NJ 08534.
FERC Contact: Jim Hastreiter, (503) 552-2760, or via e-mail at
james.hastreiter@ferc.gov.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site (https://www.ferc.gov/docs-filing/ferconline.asp) under the
``eFiling'' link. For a simpler method of submitting text only
comments, click on ``Quick Comment.'' For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov; call toll-free at
(866) 208-3676; or, for TTY, contact (202) 502-8659. Although the
Commission strongly encourages electronic filing, documents may also be
paper-filed. To paper-file, mail an original and eight copies to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-12749-002) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-9411 Filed 4-22-10; 8:45 am]
BILLING CODE 6717-01-P