City of Tacoma, WA; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 20988-20989 [2010-9261]
Download as PDF
20988
Federal Register / Vol. 75, No. 77 / Thursday, April 22, 2010 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13667–000]
City of Sandpoint; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
srobinson on DSKHWCL6B1PROD with NOTICES
April 15, 2010.
On February 26, 2010, and revised
April 9, 2010, the City of Sandpoint
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act, proposing to study
the feasibility of the Little Sand Creek
Hydroelectric Project located on Little
Sand Creek in Bonner County, Idaho.
The existing dam is owned and operated
by the City of Sandpoint. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) An existing 50-footlong, 30-foot-high concrete gravity dam;
(2) a 0.15-acre reservoir; (3) an existing
2,500-foot-long 18-inch diameter steel
intake pipe running from the dam to the
water treatment plant will act as the
project’s penstock; (4) a powerhouse
next to the water treatment plant
containing a Pelton turbine and a 65kilowatt generator; and (5) appurtenant
facilities.
Applicant Contact: Matthew Mulder,
Assistant City Engineer, City of
Sandpoint, 1123 Lake Street, Sandpoint,
ID 83864; phone: (208) 263–3471.
FERC Contact: Joseph C. Adamson,
202–502–8085.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov/docs-filing/
ferconline.asp) under the ‘‘eFiling’’ link.
For a simpler method of submitting text
only comments, click on ‘‘Quick
Comment.’’ For assistance, please
contact FERC Online Support at
VerDate Nov<24>2008
18:25 Apr 21, 2010
Jkt 220001
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13667–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–9262 Filed 4–21–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1862–172]
City of Tacoma, WA; Notice of
Application for Amendment of License
and Soliciting Comments, Motions To
Intervene, and Protests
April 15, 2010.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Amendment of
License.
b. Project No.: 1862–172.
c. Date Filed: March 5, 2010, and
supplemented on March 30, 2010.
d. Applicant: City of Tacoma,
Washington.
e. Name of Project: Nisqually
Hydroelectric Project.
f. Location: The project is located on
the Nisqually River in Pierce, Thurston,
and Lewis Counties, Washington, partly
on lands of the Mount BakerSnoqualmie National Forest.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Patrick D.
McCarty, Generation Manager, Tacoma
Power, 3628 South 35th Street, Tacoma,
Washington 98409, telephone (253)
502–8336; or Marc Wicke, Tacoma
Power, 3628 South 35th Street, Tacoma,
Washington 98409, telephone (253)
502–8196.
i. FERC Contact: Linda Stewart,
telephone (202) 502–6680, and e-mail
address linda.stewart@ferc.gov.
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
j. Deadline for filing comments,
motions to intervene, and protests: May
17, 2010.
Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov) under the ‘‘efiling’’ link. The Commission strongly
encourages electronic filings.
All documents (original and eight
copies) filed by paper should be sent to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. Please include
the project number (P–1862–172) on any
comments or motions filed.
The Commission’s Rules of Practice
and Procedure require all interveners
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervener files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Request: The City of
Tacoma, Washington proposes to
modify Articles 405 (downramping
rates) and 409 (timing of planned spill
events) to allow for monthly spillway
gate testing at the LaGrande Dam from
November 1 to February 15. The
spillway gate testing is a
recommendation of the June 2008
Independent Consultant’s Part 12D
Safety Inspection Report for the project.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
E:\FR\FM\22APN1.SGM
22APN1
Federal Register / Vol. 75, No. 77 / Thursday, April 22, 2010 / Notices
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–9261 Filed 4–21–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings # 1
srobinson on DSKHWCL6B1PROD with NOTICES
April 14, 2010.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC10–60–000.
Applicants: New York State Electric &
Gas Corp., Noble Wethersfield
Windpark, LLC.
Description: Application of New York
State Electric & Gas Corporation and
Noble Wethersfield Windpark, LLC.
Filed Date: 04/14/2010.
Accession Number: 20100414–5114.
Comment Date: 5 p.m. Eastern Time
on Wednesday, May 5, 2010.
Take notice that the Commission
received the following electric rate
filings:
VerDate Nov<24>2008
18:25 Apr 21, 2010
Jkt 220001
Docket Numbers: ER10–226–003.
Applicants: Clean Currents, LLC.
Description: Clean Currents, LLC
Change in Status Amendment.
Filed Date: 04/14/2010.
Accession Number: 20100414–5035.
Comment Date: 5 p.m. Eastern Time
on Wednesday, May 5, 2010.
Docket Numbers: ER10–1043–000.
Applicants: ISO New England Inc.,
New England Power Pool.
Description: ISO New England Inc et
al. submits transmittal letter and tariff
sheets reflecting miscellaneous
revisions to the ISO Financial
Assurance Policy.
Filed Date: 04/13/2010.
Accession Number: 20100413–0217.
Comment Date: 5 p.m. Eastern Time
on Tuesday, May 4, 2010.
Docket Numbers: ER10–1044–000.
Applicants: Cleco Power LLC.
Description: Cleco Power LLC submits
amended versions of the Service
Agreement for Network Transmission
Services with Cleco Wholesale Energy
Service that previously was accepted for
filing etc.
Filed Date: 04/13/2010.
Accession Number: 20100413–0218.
Comment Date: 5 p.m. Eastern Time
on Tuesday, May 4, 2010.
Docket Numbers: ER10–1045–000.
Applicants: PJM Interconnection,
LLC.
Description: PJM Interconnection,
LLC submits an executed interim
interconnection service agreement with
Meadow Lake Wind Farm II LLC et al.
Filed Date: 04/13/2010.
Accession Number: 20100414–0204.
Comment Date: 5 p.m. Eastern Time
on Tuesday, May 4, 2010.
Docket Numbers: ER10–1046–000.
Applicants: Consolidated Edison
Company of New York, Inc.
Description: Consolidated Edison
Company of New York, Inc submits an
amendment to Con Edison’s Delivery
Service Rate Schedule 96 et al.
Filed Date: 04/13/2010.
Accession Number: 20100414–0205.
Comment Date: 5 p.m. Eastern Time
on Tuesday, May 4, 2010.
Docket Numbers: ER10–1047–000.
Applicants: Pacific Gas and Electric
Company.
Description: Pacific Gas and Electric
Company submits two executed
agreements, Wholesale Distribution
Tariff Service Agreement & a Generator
Interconnection Agreement with
Monterey Regional Waste Management
District.
Filed Date: 04/14/2010.
Accession Number: 20100414–0217.
Comment Date: 5 p.m. Eastern Time
on Wednesday, May 5, 2010.
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
20989
Docket Numbers: ER10–1048–000.
Applicants: Commonwealth Edison
Company.
Description: Commonwealth Edison
Company submits tariff filing per 35.12:
Baseline Tariff to be effective 4/14/2010.
Filed Date: 04/14/2010.
Accession Number: 20100414–5054.
Comment Date: 5 p.m. Eastern Time
on Wednesday, May 5, 2010.
Docket Numbers: ER10–1049–000.
Applicants: Pacific Gas and Electric
Company.
Description: Pacific Gas and Electric
Company submits a Notice of
Termination of the Etiwanda Exchange
Agreement with California Department
of Water Resources.
Filed Date: 04/14/2010.
Accession Number: 20100414–0218.
Comment Date: 5 p.m. Eastern Time
on Wednesday, May 5, 2010.
Docket Numbers: ER10–1050–000.
Applicants: Pacific Gas and Electric
Company.
Description: Pacific Gas and Electric
Company submits a revised Appendix B
to the Coordinated Operations and
Interconnection Agreement with
Atlantic Power Corp et al., effective
June 14, 2010.
Filed Date: 04/14/2010.
Accession Number: 20100414–0219.
Comment Date: 5 p.m. Eastern Time
on Wednesday, May 5, 2010.
Docket Numbers: ER10–1051–000.
Applicants: Pacific Gas and Electric
Company.
Description: Pacific Gas and Electric
Company submits a Notice of
Cancellation of Rate Schedule FERC
219, the Generator Special Facilities
Agreement with San Joaquin Cogen LLP
etc., to become effective 6/14/10.
Filed Date: 04/14/2010.
Accession Number: 20100414–0220.
Comment Date: 5 p.m. Eastern Time
on Wednesday, May 5, 2010.
Take notice that the Commission
received the following open access
transmission tariff filings:
Docket Numbers: OA07–39–006;
OA08–71–006.
Applicants: Xcel Energy Services Inc.
Description: PSCo’s Annual Report of
Penalty Assessments and Distributions
in Accordance with Order Nos. 890 and
890–A.
Filed Date: 04/14/2010.
Accession Number: 20100414–5079.
Comment Date: 5 p.m. Eastern Time
on Wednesday, May 5, 2010.
Docket Numbers: OA08–52–008.
Applicants: New York Independent
System Operator, Inc.
Description: New York Independent
System Operator, Inc et al. submits
E:\FR\FM\22APN1.SGM
22APN1
Agencies
[Federal Register Volume 75, Number 77 (Thursday, April 22, 2010)]
[Notices]
[Pages 20988-20989]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-9261]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1862-172]
City of Tacoma, WA; Notice of Application for Amendment of
License and Soliciting Comments, Motions To Intervene, and Protests
April 15, 2010.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Amendment of License.
b. Project No.: 1862-172.
c. Date Filed: March 5, 2010, and supplemented on March 30, 2010.
d. Applicant: City of Tacoma, Washington.
e. Name of Project: Nisqually Hydroelectric Project.
f. Location: The project is located on the Nisqually River in
Pierce, Thurston, and Lewis Counties, Washington, partly on lands of
the Mount Baker-Snoqualmie National Forest.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Patrick D. McCarty, Generation Manager,
Tacoma Power, 3628 South 35th Street, Tacoma, Washington 98409,
telephone (253) 502-8336; or Marc Wicke, Tacoma Power, 3628 South 35th
Street, Tacoma, Washington 98409, telephone (253) 502-8196.
i. FERC Contact: Linda Stewart, telephone (202) 502-6680, and e-
mail address linda.stewart@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests: May 17, 2010.
Comments, protests, and interventions may be filed electronically
via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site (https://www.ferc.gov)
under the ``e-filing'' link. The Commission strongly encourages
electronic filings.
All documents (original and eight copies) filed by paper should be
sent to: Secretary, Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. Please include the project number
(P-1862-172) on any comments or motions filed.
The Commission's Rules of Practice and Procedure require all
interveners filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervener files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency. A copy
of any motion to intervene must also be served upon each representative
of the Applicant specified in the particular application.
k. Description of Request: The City of Tacoma, Washington proposes
to modify Articles 405 (downramping rates) and 409 (timing of planned
spill events) to allow for monthly spillway gate testing at the
LaGrande Dam from November 1 to February 15. The spillway gate testing
is a recommendation of the June 2008 Independent Consultant's Part 12D
Safety Inspection Report for the project.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via e-mail of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
[[Page 20989]]
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Any filings must bear in all capital letters the title
``COMMENTS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as applicable,
and the Project Number of the particular application to which the
filing refers.
p. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-9261 Filed 4-21-10; 8:45 am]
BILLING CODE 6717-01-P