Empire Pipeline, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Planned Tioga County Extension Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting, 19641-19643 [2010-8591]
Download as PDF
Federal Register / Vol. 75, No. 72 / Thursday, April 15, 2010 / Notices
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2010–8606 Filed 4–14–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF10–5–000]
mstockstill on DSKH9S0YB1PROD with NOTICES
Empire Pipeline, Inc.; Notice of Intent
To Prepare an Environmental
Assessment for the Planned Tioga
County Extension Project, Request for
Comments on Environmental Issues,
and Notice of Public Scoping Meeting
April 7, 2010.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Tioga County Extension Project,
involving construction and operation of
VerDate Nov<24>2008
15:43 Apr 14, 2010
Jkt 220001
facilities by Empire Pipeline, Inc.
(Empire) in Tioga County, Pennsylvania
and Steuben and Ontario Counties, New
York. This EA will be used by the
Commission in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
staff determine what issues need to be
evaluated in the EA. Please note that the
scoping period will close on May 7,
2010.
Comments may be submitted in
written form or verbally. Further details
on how to submit written comments are
provided in the Public Participation
section of this notice. In lieu of or in
addition to sending written comments,
we invite you to attend the public
scoping meetings scheduled as follows:
Date and time
Location
April 27, 2010, 7 p.m.
local time.
Radisson Hotel—Corning, 125 Denison
Parkway East, Corning, New York
14830. 607–962–
5000.
Hampton Inn, 7637
New York State
Rte 96, Victor, New
York 14564. 585–
924–4400.
April 28, 2010, 7 p.m.
local time.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives are
asked to notify their constituents of this
planned project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, you may be contacted by a
pipeline company representative about
the acquisition of an easement to
construct, operate, and maintain the
planned facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the project is
approved by the Commission, that
approval conveys with it the right of
eminent domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings in
accordance with State law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ is available for viewing on
the FERC Web site (https://
www.ferc.gov). This fact sheet addresses
a number of typically-asked questions,
including the use of eminent domain
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
19641
and how to participate in the
Commission’s proceedings.
Summary of the Planned Project
Empire plans to construct and operate
approximately 16 miles of 24-inchdiameter pipeline and replace
approximately 1.3 miles of existing 24inch-diameter pipeline. According to
Empire, its project would enable Empire
to provide firm transportation services
requested by producers connecting
extensive Marcellus Shale production
along the proposed pipeline corridor.
The Tioga County Extension Project
would provide about 350,000
dekatherms per day of capacity to
various market areas in New York, New
England, and eastern Canada along the
Millenium Pipeline, Tennessee Gas
Pipeline Company 200 Line,
TransCanada Pipeline, and Empire’s
existing systems.
The Tioga County Extension Project
would consist of the following facilities:
• Construction of 16 miles of 24-inchdiameter pipeline from Tioga County,
Pennsylvania to Steuben County, New
York;
• Replacement of 1.3 miles of existing
24-inch-diameter pipeline in Victor,
Ontario County, New York;
• Construction of a new interconnect
with Tennessee Gas Pipeline Company
in the Town of Canandaigua, Ontario
County, New York; and
• Miscellaneous modifications at
existing measurement and compressor
stations.
The general location of the project
facilities is shown in appendix 1.1
Land Requirements for Construction
Construction of the planned facilities
would disturb about 223 acres of land
for the aboveground facilities and the
pipeline. Following construction, about
113 acres would be maintained for
permanent operation of the project’s
facilities; the remaining acreage would
be restored and allowed to revert to
former uses. About 31 percent of the
planned pipeline route parallels an
existing pipeline right-of-way.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
1 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at https://
www.ferc.gov using the link called ‘‘eLibrary’’ or
from the Commission’s Public Reference Room, 888
First Street, NE., Washington, DC 20426, or call
(202) 502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
E:\FR\FM\15APN1.SGM
15APN1
mstockstill on DSKH9S0YB1PROD with NOTICES
19642
Federal Register / Vol. 75, No. 72 / Thursday, April 15, 2010 / Notices
Certificate of Public Convenience and
Necessity. NEPA also requires us 2 to
discover and address concerns the
public may have about proposals. This
process is referred to as scoping. The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. All comments
received will be considered during the
preparation of the EA.
In the EA we will discuss impacts that
could occur as a result of the
construction and operation of the
planned project under these general
headings:
• Geology and soils;
• Land use;
• Water resources, fisheries, and
wetlands;
• Cultural resources;
• Vegetation and wildlife;
• Air quality and noise; and
• Endangered and threatened species.
We will also evaluate possible
alternatives to the planned project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
Although no formal application has
been filed, we have already initiated our
NEPA review under the Commission’s
pre-filing process. The purpose of the
pre-filing process is to encourage early
involvement of interested stakeholders
and to identify and resolve issues before
an application is filed with the FERC.
As part of our pre-filing review, we have
begun to contact some Federal and State
agencies to discuss their involvement in
the scoping process and the preparation
of the EA.
Our independent analysis of the
issues will be presented in the EA. The
EA will be placed in the public record
and, depending on the comments
received during the scoping process,
may be published and distributed to the
public. A comment period will be
allotted if the EA is published for
review. We will consider all comments
on the EA before we make our
recommendations to the Commission.
To ensure your comments are
considered, please carefully follow the
instructions in the Public Participation
section below.
With this notice, we are asking
agencies with jurisdiction and/or
special expertise with respect to
environmental issues to formally
cooperate with us in the preparation of
the EA. These agencies may choose to
2 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the environmental
staff of the Commission’s Office of Energy Projects.
VerDate Nov<24>2008
15:43 Apr 14, 2010
Jkt 220001
participate once they have evaluated the
proposal relative to their
responsibilities. Agencies that would
like to request cooperating agency status
should follow the instructions for filing
comments provided under the Public
Participation section of this notice.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send your comments so
that they will be received in
Washington, DC on or before May 7,
2010.
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
of comments and has expert eFiling staff
available to assist you at (202) 502–8258
or efiling@ferc.gov.
(1) You may file your comments
electronically by using the Quick
Comment feature, which is located at
https://www.ferc.gov under the link
called Documents and Filings. A Quick
Comment is an easy method for
interested persons to submit text-only
comments on a project;
(2) You may file your comments
electronically by using the ‘‘eFiling’’
feature that is listed under the
Documents and Filings link. eFiling
involves preparing your submission in
the same manner as you would if filing
on paper, and then saving the file on
your computer’s hard drive. You will
attach that file to your submission. New
eFiling users must first create an
account by clicking on the links called
Sign up or eRegister. You will be asked
to select the type of filing you are
making. A comment on a particular
project is considered a ‘‘Comment on a
Filing’’; or
(3) You may file a paper copy of your
comments at the following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Room 1A, Washington,
DC 20426.
Environmental Mailing List
The environmental mailing list
includes Federal, State, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the planned project.
If the EA is published for distribution,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(appendix 2).
Becoming an Intervenor
Once Empire files its application with
the Commission, you may want to
become an ‘‘intervenor’’, which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are included in the User’s
Guide under the ‘‘e-filing’’ link on the
Commission’s Web site. Please note that
you may not request intervenor status at
this time. You must wait until a formal
application for the project is filed with
the Commission.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (https://www.ferc.gov) using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number, excluding the last three
digits in the Docket Number field (i.e.,
PF10–5). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
E:\FR\FM\15APN1.SGM
15APN1
Federal Register / Vol. 75, No. 72 / Thursday, April 15, 2010 / Notices
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–8591 Filed 4–14–10; 8:45 am]
BILLING CODE 6717–01–P
888 First Street, NE., Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on April 26, 2010.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
[FR Doc. 2010–8589 Filed 4–14–10; 8:45 am]
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
Sagebrush, a California Partnership;
Notice of Filing
Federal Energy Regulatory
Commission
April 7, 2010.
mstockstill on DSKH9S0YB1PROD with NOTICES
[Docket No. EL10–23–002]
[Docket No. ER10–1031–000]
Take notice that on April 5, 2010,
Sagebrush, a California partnership
(Sagebrush) submits for filing a revised
open access transmission tariff (OATT)
to govern the terms of new
interconnection and transmission
service on Sagebrush’s existing
transmission line, pursuant to the
Commission’s February 4, 2010, Order
Accepting in Part and Rejecting in Part
Tariff Filing and Directing Compliance
Filing, 130 FERC ¶ 61,093 (2010).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
Crestwood Energy LP; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
VerDate Nov<24>2008
15:43 Apr 14, 2010
Jkt 220001
April 8, 2010.
This is a supplemental notice in the
above-referenced proceeding of
Crestwood Energy LP’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is April 28,
2010.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
19643
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–8583 Filed 4–14–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER10–1029–000]
West Oaks Energy LP; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
April 8, 2010.
This is a supplemental notice in the
above-referenced proceeding of West
Oaks Energy LP’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
E:\FR\FM\15APN1.SGM
15APN1
Agencies
[Federal Register Volume 75, Number 72 (Thursday, April 15, 2010)]
[Notices]
[Pages 19641-19643]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-8591]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PF10-5-000]
Empire Pipeline, Inc.; Notice of Intent To Prepare an
Environmental Assessment for the Planned Tioga County Extension
Project, Request for Comments on Environmental Issues, and Notice of
Public Scoping Meeting
April 7, 2010.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Tioga County Extension
Project, involving construction and operation of facilities by Empire
Pipeline, Inc. (Empire) in Tioga County, Pennsylvania and Steuben and
Ontario Counties, New York. This EA will be used by the Commission in
its decision-making process to determine whether the project is in the
public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help the Commission staff
determine what issues need to be evaluated in the EA. Please note that
the scoping period will close on May 7, 2010.
Comments may be submitted in written form or verbally. Further
details on how to submit written comments are provided in the Public
Participation section of this notice. In lieu of or in addition to
sending written comments, we invite you to attend the public scoping
meetings scheduled as follows:
------------------------------------------------------------------------
Date and time Location
------------------------------------------------------------------------
April 27, 2010, 7 p.m. local time......... Radisson Hotel--Corning, 125
Denison Parkway East,
Corning, New York 14830.
607-962-5000.
April 28, 2010, 7 p.m. local time......... Hampton Inn, 7637 New York
State Rte 96, Victor, New
York 14564. 585-924-4400.
------------------------------------------------------------------------
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives are asked to notify their constituents of this planned
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, you may be contacted
by a pipeline company representative about the acquisition of an
easement to construct, operate, and maintain the planned facilities.
The company would seek to negotiate a mutually acceptable agreement.
However, if the project is approved by the Commission, that approval
conveys with it the right of eminent domain. Therefore, if easement
negotiations fail to produce an agreement, the pipeline company could
initiate condemnation proceedings in accordance with State law.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' is available for
viewing on the FERC Web site (https://www.ferc.gov). This fact sheet
addresses a number of typically-asked questions, including the use of
eminent domain and how to participate in the Commission's proceedings.
Summary of the Planned Project
Empire plans to construct and operate approximately 16 miles of 24-
inch-diameter pipeline and replace approximately 1.3 miles of existing
24-inch-diameter pipeline. According to Empire, its project would
enable Empire to provide firm transportation services requested by
producers connecting extensive Marcellus Shale production along the
proposed pipeline corridor. The Tioga County Extension Project would
provide about 350,000 dekatherms per day of capacity to various market
areas in New York, New England, and eastern Canada along the Millenium
Pipeline, Tennessee Gas Pipeline Company 200 Line, TransCanada
Pipeline, and Empire's existing systems.
The Tioga County Extension Project would consist of the following
facilities:
Construction of 16 miles of 24-inch-diameter pipeline from
Tioga County, Pennsylvania to Steuben County, New York;
Replacement of 1.3 miles of existing 24-inch-diameter
pipeline in Victor, Ontario County, New York;
Construction of a new interconnect with Tennessee Gas
Pipeline Company in the Town of Canandaigua, Ontario County, New York;
and
Miscellaneous modifications at existing measurement and
compressor stations.
The general location of the project facilities is shown in appendix
1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of appendices were sent to
all those receiving this notice in the mail and are available at
https://www.ferc.gov using the link called ``eLibrary'' or from the
Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426, or call (202) 502-8371. For instructions on
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the planned facilities would disturb about 223
acres of land for the aboveground facilities and the pipeline.
Following construction, about 113 acres would be maintained for
permanent operation of the project's facilities; the remaining acreage
would be restored and allowed to revert to former uses. About 31
percent of the planned pipeline route parallels an existing pipeline
right-of-way.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
[[Page 19642]]
Certificate of Public Convenience and Necessity. NEPA also requires us
\2\ to discover and address concerns the public may have about
proposals. This process is referred to as scoping. The main goal of the
scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of the issues to address in the EA. All comments
received will be considered during the preparation of the EA.
---------------------------------------------------------------------------
\2\ ``We'', ``us'', and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA we will discuss impacts that could occur as a result of
the construction and operation of the planned project under these
general headings:
Geology and soils;
Land use;
Water resources, fisheries, and wetlands;
Cultural resources;
Vegetation and wildlife;
Air quality and noise; and
Endangered and threatened species.
We will also evaluate possible alternatives to the planned project
or portions of the project, and make recommendations on how to lessen
or avoid impacts on the various resource areas.
Although no formal application has been filed, we have already
initiated our NEPA review under the Commission's pre-filing process.
The purpose of the pre-filing process is to encourage early involvement
of interested stakeholders and to identify and resolve issues before an
application is filed with the FERC. As part of our pre-filing review,
we have begun to contact some Federal and State agencies to discuss
their involvement in the scoping process and the preparation of the EA.
Our independent analysis of the issues will be presented in the EA.
The EA will be placed in the public record and, depending on the
comments received during the scoping process, may be published and
distributed to the public. A comment period will be allotted if the EA
is published for review. We will consider all comments on the EA before
we make our recommendations to the Commission. To ensure your comments
are considered, please carefully follow the instructions in the Public
Participation section below.
With this notice, we are asking agencies with jurisdiction and/or
special expertise with respect to environmental issues to formally
cooperate with us in the preparation of the EA. These agencies may
choose to participate once they have evaluated the proposal relative to
their responsibilities. Agencies that would like to request cooperating
agency status should follow the instructions for filing comments
provided under the Public Participation section of this notice.
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. Your comments should focus on
the potential environmental effects, reasonable alternatives, and
measures to avoid or lessen environmental impacts. The more specific
your comments, the more useful they will be. To ensure that your
comments are timely and properly recorded, please send your comments so
that they will be received in Washington, DC on or before May 7, 2010.
For your convenience, there are three methods you can use to submit
your comments to the Commission. The Commission encourages electronic
filing of comments and has expert eFiling staff available to assist you
at (202) 502-8258 or efiling@ferc.gov.
(1) You may file your comments electronically by using the Quick
Comment feature, which is located at https://www.ferc.gov under the link
called Documents and Filings. A Quick Comment is an easy method for
interested persons to submit text-only comments on a project;
(2) You may file your comments electronically by using the
``eFiling'' feature that is listed under the Documents and Filings
link. eFiling involves preparing your submission in the same manner as
you would if filing on paper, and then saving the file on your
computer's hard drive. You will attach that file to your submission.
New eFiling users must first create an account by clicking on the links
called Sign up or eRegister. You will be asked to select the type of
filing you are making. A comment on a particular project is considered
a ``Comment on a Filing''; or
(3) You may file a paper copy of your comments at the following
address: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Room 1A, Washington, DC 20426.
Environmental Mailing List
The environmental mailing list includes Federal, State, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. We will update the environmental mailing list
as the analysis proceeds to ensure that we send the information related
to this environmental review to all individuals, organizations, and
government entities interested in and/or potentially affected by the
planned project.
If the EA is published for distribution, copies will be sent to the
environmental mailing list for public review and comment. If you would
prefer to receive a paper copy of the document instead of the CD
version or would like to remove your name from the mailing list, please
return the attached Information Request (appendix 2).
Becoming an Intervenor
Once Empire files its application with the Commission, you may want
to become an ``intervenor'', which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Instructions for becoming an intervenor are
included in the User's Guide under the ``e-filing'' link on the
Commission's Web site. Please note that you may not request intervenor
status at this time. You must wait until a formal application for the
project is filed with the Commission.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site (https://www.ferc.gov) using the eLibrary link. Click on
the eLibrary link, click on ``General Search'' and enter the docket
number, excluding the last three digits in the Docket Number field
(i.e., PF10-5). Be sure you have selected an appropriate date range.
For assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which
[[Page 19643]]
allows you to keep track of all formal issuances and submittals in
specific dockets. This can reduce the amount of time you spend
researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at https://www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-8591 Filed 4-14-10; 8:45 am]
BILLING CODE 6717-01-P