Notice of Quarterly Report (October 1, 2009-December 31, 2009), 18889-18906 [2010-8314]
Download as PDF
Federal Register / Vol. 75, No. 70 / Tuesday, April 13, 2010 / Notices
person is physically fit to perform mine
rescue and recovery work.
• A record of the training received by
each mine rescue team member in the
use, care, and maintenance of the type
of breathing apparatus that will be used
by the mine rescue team must be made
and kept on file at the mine rescue
station for a period of one year. The
operator must provide the District
Manager information concerning the
schedule of upcoming training when
requested.
• Each mine must have a mine rescue
notification plan outlining the
procedures to be followed in notifying
the mine rescue teams when there is an
emergency that requires their services.
• Underground coal mine operators
must certify that each designated coal
mine rescue team meets the
requirements of 30 CFR part 49 subpart
B.
• Coal mine operators must make
arrangements for 24-hour emergency
medical assistance and transportation
for injured persons and to post this
information at appropriate places at the
mine, including the names, titles,
addresses, and telephone numbers of all
persons or services currently available
under those arrangements.
II. Desired Focus of Comments
MSHA is particularly interested in
comments that:
• Evaluate whether the proposed
collection of information is necessary
for the proper performance of the
functions of the agency, including
whether the information will have
practical utility;
• Evaluate the accuracy of the
agency’s estimate of the burden of the
proposed collection of information,
including the validity of the
methodology and assumptions used;
• Enhance the quality, utility, and
clarity of the information to be
collected; and
• Minimize the burden of the
collection of information on those who
are to respond, including through the
use of appropriate automated,
electronic, mechanical, or other
technological collection techniques or
other forms of information technology,
e.g., permitting electronic submissions
of responses.
A copy of the proposed information
collection request can be obtained by
contacting the employee listed in the
FOR FURTHER INFORMATION CONTACT
section of this notice, or viewed on the
Internet by ‘‘Rules & Reg’’, and then
selecting ‘‘FedReg.Docs’’.
On the next screen, select ‘‘Paperwork
Reduction Act Supporting Statement’’ to
view documents supporting the Federal
Register Notice.
III. Current Actions
This request for collection of
information contains notification and
recordkeeping provisions Mine Rescue
Teams and Arrangements for Emergency
Medical Assistance and Transportation
for Injured Persons at Coal Mines.
MSHA does not intend to publish the
results of this information collection
and is not seeking approval to not
display the expiration date or OMB
approval number for this collection of
information.
There are no certification exceptions
identified with this information
collection and the collection of this
information does not employ statistical
methods.
Type of Review: Renewal.
Agency: Mine Safety and Health
Administration.
Title: Mine Rescue Teams,
Arrangements for Emergency Medical
Assistance and Transportation for
Injured Persons; Agreements; Reporting
Requirements; Posting Requirements
and for Coal Mine Operators.
OMB Number: 1219–0144.
Frequency: On Occasion.
18889
Affected Public: Business or other forprofit.
Cost to Federal Government: 25,108.
Total Burden Respondents: 2,055.
Total Number of Responses: 24,767.
Total Burden Hours: 5,181.
Total Hour Burden Cost (operating/
maintaining): $863,397.
Comments submitted in response to
this notice will be summarized and/or
included in the request for Office of
Management and Budget approval of the
information collection request; they will
also become a matter of public record.
Dated: April 7, 2010.
Patricia W. Silvey,
Director, Office of Standards, Regulations and
Variances.
[FR Doc. 2010–8356 Filed 4–12–10; 8:45 am]
BILLING CODE 4510–43–P
MILLENNIUM CHALLENGE
CORPORATION
[MCC FR 10–04]
Notice of Quarterly Report (October 1,
2009—December 31, 2009)
AGENCY: Millennium Challenge
Corporation.
SUMMARY: The Millennium Challenge
Corporation (MCC) is reporting for the
quarter October 1, 2009 through
December 31, 2009, on assistance
provided under section 605 of the
Millennium Challenge Act of 2003 (22
U.S.C. 7701 et seq.), as amended (the
Act), and on transfers or allocations of
funds to other federal agencies under
section 619(b) of the Act. The following
report will be made available to the
public by publication in the Federal
Register and on the Internet Web site of
the MCC (https://www.mcc.gov) in
accordance with section 612(b) of the
Act.
ASSISTANCE PROVIDED UNDER SECTION 605
Projects
Obligated
Cumulative
disbursements
Objectives
Country: Madagascar
Year: 2010
Quarter 1
Entity to which the assistance is provided: MCA Madagascar
sroberts on DSKD5P82C1PROD with NOTICES
Land Tenure Project .........
VerDate Nov<24>2008
17:33 Apr 12, 2010
$30,123,098
Jkt 220001
Increase Land Titling and
Security.
PO 00000
Frm 00107
Fmt 4703
Total Obligation: $87,998,166
Total Quarterly Disbursement: $4,193,753
$29,667,721
Sfmt 4703
Measures
Area secured with land certificates or titles in the
Zones.
Proportion of the population informed about land
tenure reforms in the Zones.
Legal and regulatory reforms adopted.
Number of land documents inventoried in the Zones
and Antananarivo.
Number of land documents restored in the Zones
and Antananarivo.
Number of land documents digitized in the Zones
and Antananarivo.
E:\FR\FM\13APN1.SGM
13APN1
18890
Federal Register / Vol. 75, No. 70 / Tuesday, April 13, 2010 / Notices
ASSISTANCE PROVIDED UNDER SECTION 605—Continued
Projects
Obligated
Cumulative
disbursements
Objectives
Finance Project .................
25,937,781
Increase Competition in
the Financial Sector.
23,535,849
Agricultural Business Investment Project.
13,687,196
Improve Agricultural Projection Technologies
and Market Capacity in
Rural Areas.
13,582,621
Program Administration*
and Control, Monitoring
and Evaluation.
Pending subsequent
reports**.
18,250,091
..........................................
..........................................
Average time for Land Services Offices to issue a
duplicate copy of a title.
Average cost to a user to obtain a duplicate copy of
a title from the Land Services Offices.
Number of land certificates delivered in the Zones
during the period.
Number of new guichets fonciers operating in the
Zones.
The 256 Plan Local d’Occupation Foncier—Local
Plan of Land Occupation (PLOFs) are completed.
Volume of funds processed annually by the national
payment system.
The components necessary to implement the national payment system are operational: network
equipment and integrator, real time gross settlement system (RTGS), retail payment clearing system, telecommunication facilities.
Number of accountants and financial experts registered to become Certified Public Accountant
(CPA).
Percent of Micro-Finance Institution (MFI) loans recorded in the Central Bank database.
Number of farmers that adopt new technologies or
engage in higher value production.
Number of enterprises that adopt new technologies
or engage in higher value production.
Number of farmers receiving technical assistance.
Number of farmers employing technical assistance.
Number of businesses receiving technical assistance.
`
Number of Mnistere de l’Agriculture, de l’Elevage et
ˆ
de la Peche—Ministry of Agriculture, Livestock,
and Fishing (MAEP) agents trained in marketing
and investment promotion.
Zones identified and description of beneficiaries
within each zone submitted.
Number of people receiving information from Agricultural Business Center (ABCs) on business opportunities.
Zonal investment strategies for the Zones are developed.
Number of ABC clients who register as formal enterprises, cooperatives, or associations.
Number of marketing contracts of ABC clients.
17,583,512
........................
Measures
1,368,813
* Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment.
** These amounts represent disbursements made that will be allocated to individual projects in the subsequent quarter(s) and reported as such
in subsequent quarterly report(s)
Projects
Obligated
sroberts on DSKD5P82C1PROD with NOTICES
Country: Honduras
Entity to which the assistance is provided: MCA
Honduras
Total
Quarterly
Disbursement: $23,018,243
Rural Development Project
VerDate Nov<24>2008
17:33 Apr 12, 2010
69,907,000
Jkt 220001
Cumulative
disbursements
Objective
Year: 2010
Quarter 1
Increase the productivity
and business skills of
farmers who operate
small and medium-size
farms and their employees..
PO 00000
Frm 00108
Fmt 4703
Measures
Total Obligation: $205,000,000
45,706,605
Sfmt 4703
Number of program farmers harvesting high-value
horticulture crops.
Number of hectares harvesting high-value horticulture crops.
Number of business plans prepared by program
farmers with assistance from the implementing
entity.
E:\FR\FM\13APN1.SGM
13APN1
Federal Register / Vol. 75, No. 70 / Tuesday, April 13, 2010 / Notices
Projects
Obligated
Cumulative
disbursements
Objective
Transportation Project .......
119,005,876
Reduce transportation
costs between targeted
production centers and
national, regional and
global markets.
75,891,981
Program Administration*
and Control, Monitoring
and Evaluation.
Pending subsequent
reports**.
16,087,124
..........................................
..........................................
Objective
Projects
Country: Cape Verde
sroberts on DSKD5P82C1PROD with NOTICES
Total value of net sales.
Total number of recruited farmers receiving technical assistance.
Value of loans disbursed (disaggregated by trust
fund, leveraged from trust fund, and institutions
receiving technical assistance from ACDI–VOCA).
Number of loans disbursed (disaggregated by trust
fund, leveraged from trust fund, and institutions
receiving technical assistance from ACDI–VOCA).
Percentage of loan portfolio at risk (disaggregated
by trust fund and institutions receiving technical
assistance from ACDI–VOCA).
Funds lent from the trust fund to financial intermediaries through lines of credit.
Number of hectares under irrigation.
Number of beneficial biological control agents developed for use by program farmers or other farmers
for pilot testing.
Number of improved coffee hybrids available for
cloning.
Number of farmers connected to the community irrigation system.
Number of certified deliverables across all agricultural public goods grant.
Freight shipment cost from Tegucigalpa to Puerto
Cortes.
Average annual daily traffic volume—CA–5.
International roughness index (IRI)—CA–5.
Kilometers of road upgraded—CA–5.
Percent of contracted road works disbursed—CA–5.
Average annual daily traffic volume—secondary
roads.
International roughness index (IRI)—secondary
roads.
Kilometers of road upgraded—secondary roads.
Percent of contracted road works disbursed—secondary roads.
Average annual daily traffic volume—rural roads.
Average speed—rural roads.
Kilometers of road upgraded—rural roads.
Percent of contracted road works disbursed—rural
roads.
Signed contracts for feasibility and/or design studies.
Percent of contracted studies disbursed.
Kilometers (km) of roads under design.
Signed contracts for roads works.
Kilometers (km) of roads under works contracts.
1,521,767
Obligated
Measures
9,027,708
........................
18891
Entity to which the assistance is provided: MCA
Cape Verde
Total
Quarterly
Disbursement: $8,048,329
Watershed and Agricultural
Support.
11,001,130
Year: 2010
Cumulative
disbursements
Quarter 1
Increase agricultural production in three targeted watershed areas
on three islands.
Measures
Total Obligation: $110,078,488
8,116,030
Productivity: Horticulture, Paul watershed.
Productivity: Horticulture, Faja watershed.
Productivity: Horticulture, Mosteiros watershed.
Number of farmers adopting drip irrigation.
Area irrigated with drip irrigation.
Percent of contracted irrigation works disbursed (cumulative).
Reservoirs constructed.
VerDate Nov<24>2008
17:33 Apr 12, 2010
Jkt 220001
PO 00000
Frm 00109
Fmt 4703
Sfmt 4703
E:\FR\FM\13APN1.SGM
13APN1
18892
Federal Register / Vol. 75, No. 70 / Tuesday, April 13, 2010 / Notices
Projects
Obligated
Infrastructure Improvement
83,160,208
Increase integration of the
internal market and reduce transportation
costs.
49,148,363
2,081,223
1,188,909
13,835,927
Spur private sector development on all islands
through increased investment in the priority
sectors and through financial sector reform.
..........................................
........................
..........................................
Obligated
Objective
Projects
Country: Nicaragua
Entity to which the assistance is provided: MCA
Nicaragua
Total
Quarterly
Disbursement: $12,093,689
Property Regularization
Project.
sroberts on DSKD5P82C1PROD with NOTICES
Transportation Project .......
VerDate Nov<24>2008
Measures
Number of farmers that have completed training in
at least 3 of 5 core agricultural disciplines.
Travel time ratio: percentage of beneficiary population further than 30 minutes from nearest market.
Kilometers of roads rehabilitated.
Percent of contracted Santiago Roads works disbursed (cumulative).
Percent of contracted Santo Antao Bridge works
disbursed (cumulative).
Kilometers (km) of roads under design.
Signed contracts for roads works.
Kilometers (km) of roads under works contracts.
Port of Praia: percent of contracted port works disbursed (cumulative).
Cargo village: percent of works completed.
Quay 2 improvements: percent of works completed.
Access road: percent of works completed.
Micro-Finance Institution (MFI) recovery rate, adjusted.
MFI portfolio at risk, adjusted.
Ratio of MFIs operationally self-sufficient.
1,471,195
Private Sector Development.
Program Administration*
and Control, Monitoring
and Evaluation.
Pending subsequent
reports**.
Cumulative
disbursements
Objective
17:33 Apr 12, 2010
Year: 2010
9,213,906
Cumulative
disbursements
Quarter 1
Total Obligation: $113,599,752
7,205,205
Increase Investment by
strengthening property
rights.
7,204,952
57,999,999
Reduce transportation
costs between Leon
and Chinandega and
national, regional and
global markets.
44,081,241
Jkt 220001
PO 00000
Frm 00110
Fmt 4703
Measures
Sfmt 4703
Automated database of registry and cadastre installed in the 10 municipalities of Leon.
Value of land, urban.
Value of land, rural.
Time to conduct a land transaction.
Number of additional parcels with a registered title,
urban.
Number of additional parcels with a registered title,
rural.
Number of protected areas demarcated.
Area covered by cadastral mapping.
Cost to conduct a land transaction.
Annual Average daily traffic volume: N1 Section R1.
Annual Average daily traffic volume: N1 Section R2.
Annual Average daily traffic volume: Port Sandino
(S13).
Annual Average daily traffic volume: Villanueva—
Guasaule Annual.
Average daily traffic volume: Somotillo-Cinco Pinos
(S1).
´
Annual average daily traffic volume: Leon-Poneloya˜
Las Penitas.
International Roughness Index: N–I Section R1.
International Roughness Index: N–I Section R2.
International Roughness Index: Port Sandino (S13).
International
roughness
index:
Villanueva—
Guasaule.
International roughness index: Somotillo-Cinco
Pinos.
´
International roughness index: Leon-Poneloya-Las
˜
Penitas.
Kilometers of NI upgraded: R1 and R2 and S13.
Kilometers of NI upgraded: Villanueva—Guasaule.
E:\FR\FM\13APN1.SGM
13APN1
Federal Register / Vol. 75, No. 70 / Tuesday, April 13, 2010 / Notices
Projects
Obligated
Cumulative
disbursements
Objective
Rural Development Project
32,897,500
Increase the value added
of farms and enterprises in the region.
22,401,745
Program Administration*,
Due Diligence, Monitoring and Evaluation.
Pending subsequent
reports**.
15,497,048
..........................................
..........................................
Objective
Projects
Country: Georgia
Entity to which the assistance is provided: MCA
Georgia
Total Quarterly
Disbursement:
$45,135,334
Regional Infrastructure Rehabilitation.
Regional Enterprise Development.
sroberts on DSKD5P82C1PROD with NOTICES
Kilometers of S1 road upgraded.
Kilometers of S9 road upgraded.
Kilometers of designed primary roads (including N–I/
Puerto Sandino and V–G).
Kilometers of designed secondary roads.
Number of beneficiaries with business plans prepared with assistance from the Rural Development Business Project.
Numbers of manzanas (1 Manzana = 1.7 hectares),
by sector, harvesting higher-value crops.
Number of manzanas of beneficiaries of the program that harvest higher-value crops with irrigation or commercial reforestation under Improvement of Water Supply Activities.
Number of beneficiaries implementing business
plans.
Average increase in income of beneficiaries due to
program.
3,759,039
Obligated
Measures
10,375,380
........................
18893
VerDate Nov<24>2008
17:33 Apr 12, 2010
Year: 2010
Cumulative
disbursements
Quarter 1
Total Obligation: $395,300,000
310,750,000
Key Regional Infrastructure Rehabilitated.
136,600,072
52,200,000
Enterprises in Regions
Developed.
38,387,329
Jkt 220001
PO 00000
Frm 00111
Fmt 4703
Measures
Sfmt 4703
Household savings from Infrastructure Rehabilitation
Activities.
Savings in vehicle operating costs (VOC).
International roughness index (IRI).
Annual average daily traffic (AADT).
Travel Time.
Kilometers of road paved.
Percent of contracted works disbursed.
Signed contracts for feasibility and/or design studies.
Percent of contracted studies disbursed.
Kilometers of roads under design.
Signed contracts for road works.
Kilometers of roads under works contracts.
Sites rehabilitated (phases I, II, III)—pipeline.
Construction works completed (phase II)—pipeline.
Savings in household expenditures for all subprojects.
Population Served by all subprojects.
Subprojects completed.
Value of project grant agreements signed.
Value of project works and goods contracts signed.
Subprojects with works initiated.
Jobs Created by Agribusiness Development Activity
(ADA) and by Georgia Regional Development
Fund (GRDF).
Household net income—ADA and GRDF.
Jobs created—ADA.
Firm income ADA.
Household net income—ADA.
Beneficiaries (direct and indirect)—ADA.
Grant agreements signed—ADA.
Increase in gross revenues of portfolio companies
(PC).
Increase in portfolio company employees.
Increase in wages paid to the portfolio company
employees.
Cumulative number of portfolio companies.
Funds disbursed to the portfolio companies.
E:\FR\FM\13APN1.SGM
13APN1
18894
Federal Register / Vol. 75, No. 70 / Tuesday, April 13, 2010 / Notices
Projects
Program Administration*,
Due Diligence, Monitoring and Evaluation.
Pending subsequent
reports**.
Obligated
Cumulative
disbursements
Objective
32,350,000
..........................................
16,093,973
........................
..........................................
Measures
0
November 2008, MCC and the Georgian government signed a Compact amendment making up to $100 million of additional funds available to
the Millennium Challenge Georgia Fund. These funds will be used to complete works in the Roads, Regional Infrastructure Development, and
Energy Rehabilitation Projects contemplated by the original Compact. The amendment was ratified by the Georgian parliament and entered
into force on January 30, 2009.
Projects
Obligated
Country: Vanuatu
Entity to which the assistance is provided: MCA
Vanuatu
Total
Quarterly
Disbursement: $6,590,285
Transportation Infrastructure Project.
Cumulative
disbursements
Objective
60,162,579
Year: 2010
Quarter 1
Facilitate transportation to
increase tourism and
business development.
Measures
Total Obligation: $65,690,000
42,223,234
Number of international tourists—Efate.
Number of international tourists—Santo.
Number of room nights occupied—Efate.
Number of room nights occupied—Santo.
Average annual daily traffic—Efate.
Average annual daily traffic—Santo.
Kilometers of road upgraded—Efate.
Kilometers of roads upgraded—Santo.
Signed contracts for feasibility and/or design studies.
Percent of contracted studies disbursed.
Kilometers (km) of roads under design.
Signed contracts for roads works.
Kilometers (km) of roads under works contracts.
Percent of contracted roads works disbursed.
Program Administration*,
Due Diligence, Monitoring and Evaluation.
Pending subsequent
reports**.
5,527,421
..........................................
2,835,051
........................
..........................................
104,691
Obligated
Objective
Projects
Country: Armenia
sroberts on DSKD5P82C1PROD with NOTICES
Entity to which the assistance is provided: MCA
Armenia
Total
Quarterly
Disbursement: $12,688,383
Irrigated Agriculture Project
(Agriculture and Water).
Rural Road Rehabilitation
Project.
Year: 2010
Cumulative
disbursements
Quarter 1
Measures
Total Obligation: $235,650,000
152,629,208
Increase agricultural productivity Improve and
Quality of Irrigation.
35,432,441
67,100,000
Better access to economic and social infrastructure.
7,870,944
Recovery of Water User Associations (WUA) operations and maintenance cost by water charges.
Primary canals rehabilitated.
Tertiary canals rehabilitated.
Percent of contracted irrigation works disbursed.
Value of signed contracts for irrigation works.
Number of farmers using better on-farm water management.
Number of farmers trained.
Number of agribusinesses assisted.
Value of agricultural loans to farmers/agribusinesses.
Average annual daily traffic.
International roughness index.
Kilometers of roads rehabilitated.
Percent of contracted roads works disbursed.
Signed contracts for roads works.
Percent of contracted studies disbursed.
Kilometers (km) of roads under design.
VerDate Nov<24>2008
17:33 Apr 12, 2010
Jkt 220001
PO 00000
Frm 00112
Fmt 4703
Sfmt 4703
E:\FR\FM\13APN1.SGM
13APN1
Federal Register / Vol. 75, No. 70 / Tuesday, April 13, 2010 / Notices
Projects
Obligated
Cumulative
disbursements
Objective
18895
Measures
Signed contracts for feasibility and/or design studies.
Kilometers (km) of roads under works contracts.
Program Administration*,
Due Diligence, Monitoring and Evaluation.
Pending subsequent
reports**.
15,920,792
..........................................
9,731,968
........................
..........................................
992,543
Obligated
Objective
Projects
Country: Benin
Entity to which the assistance is provided: MCA
Benin
Total Quarterly
Disbursement:
$17,276,237
Access to Financial Services.
Year: 2010
Cumulative
disbursements
Quarter 1
Total Obligation: $307,298,040
Expand Access to Financial Services.
3,337,246
Access to Justice ..............
34,270,000
Improved Ability of Justice
System to Enforce Contracts and Reconcile
Claims.
1,940,659
Access to Land .................
sroberts on DSKD5P82C1PROD with NOTICES
19,650,000
36,020,000
Strengthen property rights
and increase investment in rural and urban
land.
12,582,598
VerDate Nov<24>2008
17:33 Apr 12, 2010
Jkt 220001
PO 00000
Frm 00113
Fmt 4703
Measures
Sfmt 4703
Volume of credits granted by the Micro-Finance Institutions (MFI).
Volume of saving collected by the Micro-Finance Institutions.
Average portfolio at risk >90 days of microfinance
institutions at the national level.
Operational self-sufficiency of MFIs at the national
level.
Average time required by Cellule de Surveillance
`
´
´
des
Structures
Financieres
Decentralisees
(CSSFD) in treating MFI applications.
Number of institutions receiving grants through the
Facility.
Second call for proposal for grants launched.
Number of MFIs inspected by CSSFD.
Average time to enforce a contract.
Percent of firms reporting confidence in the judicial
system.
Number of cases processed at Arbitration Center
per year.
Number of Information, Education and Communication Campaign (IEC) sessions hosted by Chamber
of Commerce (CAMeC).
Passage of new legal codes.
Average time required for Tribunaux de premiere
instance- arbitration centers and courts of first instance (TPI) to reach a final decision on a case.
Average time required for Court of Appeals to reach
a final decision on a case.
Percent of cases resolved in TPI per year.
Percent of cases resolved in Court of Appeals per
year.
Number of Court inspections per year.
Number of Court employees trained.
Number of beneficiaries of legal aid services.
Complete construction on 9 new court houses.
Average time required to register a business
´ ´
(societe).
Average time required to register a business (sole
proprietorship).
Number of businesses accessing CAMEC service.
Business registration center (CFE) information and
outreach campaign executed throughout Benin.
Total value of investment in targeted urban land
parcels.
Total value of investment in targeted rural land parcels.
Average cost required to obtain a new land title
through on demand process.
Average cost required to convert occupancy permit
to land title through systematic process.
Percentage of respondents perceiving land security
in the Occupancy Permit (PH) into Land titles (TF)
or Rural Land Plan Foncier Rural (PFR) areas.
E:\FR\FM\13APN1.SGM
13APN1
18896
Federal Register / Vol. 75, No. 70 / Tuesday, April 13, 2010 / Notices
Projects
Obligated
Access to Markets ............
Program Administration*,
Due Diligence, Monitoring and Evaluation.
Pending subsequent
reports**.
169,447,000
Improve Access to Markets through Improvements to the Port of
Cotonou.
27,391,206
47,911,040
..........................................
........................
..........................................
Objective
Country: Ghana
Entity to which the assistance is provided: MCA
Ghana
Total Quarterly
Disbursement:
$33,331,317
Agriculture Project .............
sroberts on DSKD5P82C1PROD with NOTICES
Number of new land disputes reported by commune
heads.
Seven studies complete.
Land code texts adopted (laws, decrees and land
code).
Value ($) of equipment purchased.
Number of land certificates issued within MCABenin implementation.
Number of habitation permits converted to land titles.
Number of Continuously Operating Reference
(CORS) stations installed.
Number of public and private surveyors trained.
Number of communes with new cadastres.
Land market information system established.
Volume of merchandise traffic through the Port
Autonome de Cotonou.
Bulk ship carriers waiting times at the port.
Container ship waiting times at the port.
Port design-build contract awarded.
Port crime levels (number of thefts).
Internal port circulation time.
Average time to clear customs.
Execution rate of training plan.
Port meets—international port security standards
(ISPS).
Public consultation completed (3).
Environmental permits issued.
283,061
Obligated
Measures
20,768,780
Projects
Rural Development Project
VerDate Nov<24>2008
Cumulative
disbursements
Objective
17:33 Apr 12, 2010
227,899,382
89,361,539
Jkt 220001
Year: 2010
Cumulative
disbursements
Quarter 1
Enhance Profitability of
cultivation, services to
agriculture and product
handling in support of
the expansion of commercial agriculture
among groups of
smallholder farms.
Strengthen the rural institutions that provide
services complementary to, and supportive
of, agricultural and agriculture business development.
PO 00000
Frm 00114
Fmt 4703
Measures
Total Obligation: $547,009,000
60,896,888
12,640,404
Sfmt 4703
Number of farmers trained.
Number of agribusinesses assisted.
Number of hectares under production with MCC
support.
Value of agricultural loans to farmers/agribusinesses.
Value of signed contracts for feasibility and/or design studies (irrigation).
Percent of contracted (design/feasibility) studies
complete (irrigation).
Value of signed contracts for irrigation works (irrigation).
Percent of contracted irrigation works disbursed.
Percent of people aware of their land rights.
Total number of parcels surveyed in the Pilot Land
Registration Areas (PLRAs).
Volume of products passing through post-harvest
treatment.
Number of students enrolled in schools affected by
Education Facilities Sub-Activity.
Number of schools rehabilitated.
Number of basic school blocks constructed to Ministry of Education (MOE) construction standards.
E:\FR\FM\13APN1.SGM
13APN1
Federal Register / Vol. 75, No. 70 / Tuesday, April 13, 2010 / Notices
Projects
Obligated
Transportation ...................
Cumulative
disbursements
Objective
174,285,120
Reduce the transportation
costs affecting agriculture commerce at
sub-regional levels.
29,089,944
18897
Measures
Number of schools designed and due diligence
completed.
Distance to collect water.
Time to collect water.
Incidence of guinea worm.
Average number of days lost due to guinea worm.
Number of people affected by Water and Sanitation
Facilities Sub-Activity.
Number of stand-alone boreholes/wells/non-conventional water systems constructed/rehabilitated.
Number of small-town water systems constructed.
Number of pipe extension projects constructed.
Number of stand-alone boreholes/wells/non-conventional water systems identified and due diligence
performed for rehabilitation/construction.
Number of small-town water systems designed and
due diligence completed for construction.
Number of pipe extension projects designed and
due diligence completed for construction.
Number of agricultural processing plants in target
districts with electricity due to Rural Electrification
Sub-Activity.
Number of electricity projects identified and due diligence completed.
International roughness index.
Annualized average daily traffic.
Kilometers of road completed.
Percent of contracted road works disbursed.
Value of signed contracts for road works.
Kilometers of road designed.
Percent of contracted design/feasibility studies completed.
Value of signed contracts for feasibility and/or design studies.
Travel time for walk-on passengers.
Travel time for small vehicles.
Travel time for trucks.
Annual average daily traffic (vehicles).
Annual average daily traffic (passengers).
Landing stages rehabilitated.
Ferry terminal upgraded.
Rehabilitation of Akosombo Floating Dock completed.
Percent of contracted work disbursed landings and
terminals.
Value of signed contracts for works: ferry and floating dock.
Value of signed contracts for works: landings and
terminals.
Program Administration*,
Due Diligence, Monitoring and Evaluation.
Pending subsequent
reports**.
55,462,959
..........................................
19,243,257
........................
..........................................
1,327,602
Obligated
Objective
Projects
sroberts on DSKD5P82C1PROD with NOTICES
Country: El Salvador
Entity to which the assistance is provided: MCA
El
Salvador
Total
Quarterly
Disbursement: $16,870,583
Human Development
Project.
VerDate Nov<24>2008
17:33 Apr 12, 2010
94,963,736
Jkt 220001
Year: 2010
Cumulative
disbursements
Quarter 1
Increase human and
physical capital of residents of the Northern
Zone to take advantage
of employment and
business opportunities.
PO 00000
Frm 00115
Fmt 4703
Total Obligation: $460,940,000
11,720,541
Sfmt 4703
Measures
Employment rate of graduates of middle technical
schools.
Graduation rates of middle technical schools.
Middle technical schools remodeled and equipped.
E:\FR\FM\13APN1.SGM
13APN1
18898
Federal Register / Vol. 75, No. 70 / Tuesday, April 13, 2010 / Notices
Projects
Obligated
Productive Development
Project.
87,850,853
Connectivity Project ..........
Cumulative
disbursements
Objective
233,389,335
Increase production and
employment in the
Northern Zone.
20,015,147
Reduce travel cost and
time within the Northern
Zone, with the rest of
the country, and within
the region.
22,054,330
Measures
Scholarships granted to students of middle technical
schools.
Students of non-formal training.
Cost of water.
Time collecting water.
Households benefiting with water solutions built.
Potable water and basic sanitation systems with
construction contracts signed.
Cost of electricity.
Electricity consumption.
Households benefiting with a connection to the electricity network.
Household benefiting with the installation of isolated
solar systems.
Kilometers of new electrical lines with construction
contracts signed.
Population benefiting from strategic infrastructure.
Community Infrastructure Works with Construction
Contracts Signed.
Number of hectares under production with MCC
support.
Number of farmers trained.
Value of agricultural loans to farmers/agribusinesses.
Number of agribusinesses assisted.
Average annual daily traffic.
International roughness index.
Kilometers of roads rehabilitated.
Kilometers of roads under works contract.
Signed contracts for roads works.
Percent of contracted roads works disbursed.
Program Administration*
and Control, Monitoring
and Evaluation.
Pending Subsequent
Report**.
44,736,076
..........................................
12,356,366
........................
..........................................
0
Obligated
Objective
Projects
Country: Mali
sroberts on DSKD5P82C1PROD with NOTICES
Entity to which the assistance is provided: MCA
Mali
Total Quarterly
Disbursement:
$14,221,585
´
Bamako Senou Airport Improvement Project.
181,254,264
Year: 2010
Cumulative
disbursements
Quarter 1
Establish an independent
and secure link to the
regional and global
economy.
Measures
Total Obligation: $460,811,164
9,140,789
Total wage bill of tourism industry.
Freight volume.
Employment at airport.
Signature of design contract.
Average number of weekly flights (arrivals).
Passenger traffic (annual average).
Percent works complete.
Airside Infrastructure Design, and Airside Infrastructure Construction Supervision, (AIR A01) and
Landside Infrastructure Design (New Terminal &
Associated Works) and Landside Construction
Supervision is launched.
Time required for passenger processing at departures and arrivals.
Passenger satisfaction level.
Percent works complete.
Percent of airport management and maintenance
plan implemented.
Airport meets Federal Aviation Administration (FAA)
and International Civil Aviation Organization
(ICAO) security standards.
Technical assistance delivered to project.
VerDate Nov<24>2008
17:33 Apr 12, 2010
Jkt 220001
PO 00000
Frm 00116
Fmt 4703
Sfmt 4703
E:\FR\FM\13APN1.SGM
13APN1
Federal Register / Vol. 75, No. 70 / Tuesday, April 13, 2010 / Notices
Projects
Obligated
Objective
sroberts on DSKD5P82C1PROD with NOTICES
Alatona Irrigation Project ..
234,884,675
Industrial Park Project .......
2,643,432
Program Administration*
and Control, Monitoring
and Evaluation.
42,028,793
VerDate Nov<24>2008
17:33 Apr 12, 2010
Jkt 220001
Cumulative
disbursements
Increase the agricultural
production and productivity in the Alatona
zone of the ON.
32,430,172
Develop a platform for industrial activity to be located within the Airport
domain.
..........................................
2,637,472
PO 00000
Frm 00117
Fmt 4703
Measures
Number of agricultural jobs created in Alatona zone.
Main season rice yields.
International roughness index (IRI) on the NionoGoma Coura Route.
Average daily vehicle count.
Percentage works complete.
Total irrigated land in the Alatona zone.
Irrigation system efficiency on Alatona Canal during
the rainy season and the dry season.
Kilometers of road under design/feasibility study.
Value of signed contracts for road works.
Kilometers of road under works contract.
Percent of works completed on main system construction.
Percent of contracted irrigation works disbursed for
tranche 1.
Value of signed contracts for irrigation works.
Value of signed contracts for feasibility and/or design studies.
Percent of contracted (design/feasibility) studies disbursed.
Area planted by new settlers (wet season).
Titles registered in the land registration office of the
Alatona zone (for 5- or 10-hectare farms).
Total land payments made.
Total market gardens allocated in Alatona zones for
the populations affected by the project (PAPs).
Decree transferring legal control of the project impact area is passed.
Selection criteria for new settlers approved.
Contractor implementing the ‘‘Mapping of Agricultural and Communal Land Parcels’’ contract is
mobilized.
School enrollment rate.
Percent of Alatona population with access to drinking water.
Number of schools available in the Alatona.
Number of health centers available in the Alatona.
Number of concessions that have been compensated.
Resettlement census verified.
Adoption rate of improved agriculture techniques
among populations affected by the project
(PAPs).
Number of operational mixed cooperatives.
Area planted by PAPs (wet season rice).
Area planted with shallots during dry season.
Number of farmers completing literacy training.
Number of people completing the rice and shallot
production techniques module.
Number of farmers completing land titling training.
Water management system design and capacity
building strategy implemented.
Call for proposals for the applied research grants
launched.
Average portfolio at risk among Alatona microfinance institutions.
Average loan repayment rate of Alatona clients
(farmers organizations or individual farmers).
Amount of credit extended to Alatona farmers.
Number of farmers accessing grant assistance for
first loan from financial institutions.
Financial institution partners identified (report on assessment of the financial institutions in the Office
du Niger—Office of Niger zone (ON zone).
Occupancy level.
Average number of days required for operator to
connect to Industrial Park water and electricity
services.
16,370,427
Sfmt 4703
18899
E:\FR\FM\13APN1.SGM
13APN1
18900
Federal Register / Vol. 75, No. 70 / Tuesday, April 13, 2010 / Notices
Projects
Pending Subsequent
Report**.
Cumulative
disbursements
Obligated
Objective
........................
..........................................
Obligated
Objective
Projects
Country: Mongolia
Entity to which the assistance is provided: MCA
Mongolia
Total
Quarterly
Disbursement: $1,895,217
Property Rights Project .....
22,910,728
Rail Project ........................
188,378,000
Year: 2010
Measures
0
Cumulative
disbursements
Quarter 1
Measures
Total Obligation: $284,902,443
Increase security and
capitalization of land
assets held by lower-income Mongolians, and
increased peri-urban
herder productivity and
incomes.
824,383
Increase rail traffic and
shipping efficiency.
369,560
Vocational Education
Project.
25,492,856
Increase employment and
income among unemployed and underemployed Mongolians.
903,534
Health Project ...................
16,969,757
1,149,233
Program Administration*
and Control, Monitoring
and Evaluation.
Pending subsequent
reports**.
31,151,102
Increase the adoption of
behaviors that reduce
non-communicable diseases (NCDIs) among
target populations and
improved medical treatment and control of
NCDIs.
..........................................
........................
..........................................
Number of studies completed.
Legal and regulatory reforms adopted.
Number of landholders reached by public outreach
efforts.
Personnel Trained.
Number of Buildings rehabilitated/constructed.
Value of equipment purchased.
Rural hectares Mapped.
Urban Parcels Mapped.
Rural Hectares Formalized.
Urban parcels formalized.
Increase in gross domestic product due to rail improvements.
Freight turnover.
Mine traffic.
Percent of wagons leased by private firms.
Railway operating ratio.
Customer satisfaction.
Wagon time to destination.
Average locomotive availability.
Rate of employment.
Students completing newly designed long-term programs.
Percent of active teachers receiving certification
training.
Technical and vocational education and training
(TVET) legislation passed.
Diabetes and hypertension controlled.
Percentage of cancer cases diagnosed in early
stages.
Road and traffic safety activity finalized and key
interventions developed.
265,000
6,277,475
sroberts on DSKD5P82C1PROD with NOTICES
In late 2009, the MCC’s Board of Directors approved the allocation of a portion of the funds originally designated for the rail project to the expansion of the health, vocational education and property right projects from the rail project, and the remaining portion to the addition of a road
project.
VerDate Nov<24>2008
17:33 Apr 12, 2010
Jkt 220001
PO 00000
Frm 00118
Fmt 4703
Sfmt 4703
E:\FR\FM\13APN1.SGM
13APN1
Federal Register / Vol. 75, No. 70 / Tuesday, April 13, 2010 / Notices
Projects
Obligated
Country: Mozambique
Entity to which the assistance is provided: MCA
Mozambique
Total
Quarterly
Disbursement: $4,542,157
Water and Sanitation
Project.
Road Rehabilitation Project
sroberts on DSKD5P82C1PROD with NOTICES
Land Tenure Services
Project.
VerDate Nov<24>2008
17:33 Apr 12, 2010
Cumulative
disbursements
Objective
Year: 2010
Quarter 1
203,585,393
Increase access to reliable and quality water
and sanitation facilities.
176,307,480
Increase access to productive resources and
markets.
39,068,307
Establish efficient, secure
land access for households and investors.
Jkt 220001
PO 00000
Frm 00119
Fmt 4703
Measures
Total Obligation: $506,924,053
2,041,490
715,163
2,182,331
Sfmt 4703
18901
Time to get to non-private water source.
Percent of urban population with improved water
sources.
Percent of urban population with improved sanitation facilities.
Number of private household water connections in
urban areas.
Number of private household sanitation connections
in urban areas.
Number of standpipes in urban areas.
Final detailed design for 5 towns submitted.
Final detailed design for 3 cities submitted.
Percent of rural population with access to improved
water sources.
Number of rural water points constructed.
Final design report 1 (400 WP) submitted.
Final design report II (200 Water points) submitted.
Implementing agreement signed with the Administration for Water and Sanitation (AIAS) Infrastructure.
Change in international roughness index (IRI).
Average annual daily traffic volume.
Kilometers of road rehabilitated.
Kilometers of road under design.
´
Percent of Namialo—Rio Lurio Road—Metoro feasibility, design, and supervision contract disbursed.
Percent of Rio LigonhalNampula feasibility, design, and supervision contract disbursed.
Percent of ChimuaralNicoadala feasibility, design,
and supervision contract disbursed.
Kilometers of roads under works contract.
´
Percent of Namialo—Rio Lurio Road construction
contract disbursed.
´
Percent of Rio Lurio—Metoro Road construction
contract disbursed.
Percent of Rio Ligonha—Nampula Road construction contract disbursed.
Percent of ChimuaralNicoadala Road construction
contract disbursed.
Feasibility/Environmental and Social Assessment
studies, design, supervision, and construction
´
contract (ESA) for NamialolRio Lurio-Metoro
Road segment signed.
Feasibility/ESA contract for Rio LigonhalNampula
Road segment signed.
Feasibility/ESA contract for Chimuara—Nicoadala
Road signed.
Time to get land usage rights direito de uso e
aproveitamento da terra (state-granted land right)
(DUAT).
Cost to get land usage rights DUAT.
Total number of officials and residents reached with
land strategy and policy awareness and outreach
messages.
Land strategy approved.
Number of buildings rehabilitated or built.
Total value of procured equipment and materials.
Number of people trained.
Rural hectares mapped in Site Specific Activity.
Rural hectares mapped in Community Land Fund
Initiative.
Urban parcels mapped.
Rural hectares formalized through Site Specific Activity.
Rural hectares formalized through Community Land
Fund Initiative.
E:\FR\FM\13APN1.SGM
13APN1
18902
Federal Register / Vol. 75, No. 70 / Tuesday, April 13, 2010 / Notices
Projects
Obligated
Cumulative
disbursements
Objective
Farmer Income Support
Project.
18,400,117
Improve coconut productivity and diversification
into cash crop.
1,267,243
Program Administration*
and Control, Monitoring
and Evaluation.
Pending Subsequent
Report**.
69,562,756
..........................................
..........................................
806,906
Obligated
Objective
Projects
Country: Lesotho
Entity to which the assistance is provided: MCA
Lesotho
Total Quarterly
Disbursement:
$3,674,696
Water Project ....................
Health Project ...................
sroberts on DSKD5P82C1PROD with NOTICES
Urban parcels formalized.
Number of communities delimited.
Number of households having land formalized.
Income from coconuts and coconut products.
Survival rate of coconut seedling.
Number of diseased or dead palm trees cleared.
Number of coconut seedlings planted.
Hectares under production.
Number of farmers trained in pest and disease control.
Number of farmers trained in crop diversification
technologies.
Contract for project implementation signed.
9,116,105
........................
Measures
164,027,999
122,398,000
Year: 2010
Cumulative
disbursements
Quarter 1
Improve the water supply
for industrial and domestic needs, and enhance rural livelihoods
through improved watershed management.
Increase access to life-extending ART and essential health services
by providing a sustainable delivery platform..
Measures
Total Obligation: $362,514,382
5,470,756
3,194,630
School days lost due to water borne diseases.
Diarrhea notification at health centers.
Time saved due to access to water source.
Rural household (HH) provided with access to improved water supply.
Rural HH provided with access to improved ventilated latrines.
Rural water points constructed.
Number of new latrines built.
Urban HH with access to potable water supply.
Number of enterprises connected to water network.
Households connected to improved water network.
Cubic meters of treated water from metolong dam
delivered through a conveyance system to Water
and Sewerage Authority (WASA).
Value of water treatment contract works award.
Value of conveyance system contract work award.
Species population.
Livestock grazing per area.
Area put under conservation.
People with HIV still alive 12 months after initiation
of treatment.
TB notification (per 100,000 pop.).
Proportion of blood units collected annually.
Deliveries conducted in the health centers.
Immunization coverage rate.
Number of Health Centers (H/C) constructed and
fully equipped.
Value of contract works for health center construction.
Percentage of contract works for health center construction disbursed.
Percentage of contract works for Botshalo Complex
disbursed.
Percentage of contract works for Out-Patient Department (OPD) Centers disbursed.
Percentage of HSS Contract disbursed.
Proportion of People Living With AIDS(PLWA) receiving Antiretroviral treatment (ARV) (by age and
sex).
Referred tests from central laboratory per year by
types (number).
VerDate Nov<24>2008
17:33 Apr 12, 2010
Jkt 220001
PO 00000
Frm 00120
Fmt 4703
Sfmt 4703
E:\FR\FM\13APN1.SGM
13APN1
Federal Register / Vol. 75, No. 70 / Tuesday, April 13, 2010 / Notices
Projects
Obligated
Private Sector Development Project.
Cumulative
disbursements
Objective
36,470,318
Stimulate investment by
improving access to
credit, reducing transaction costs and increasing the participation of women in the
economy.
1,961,646
18903
Measures
Average time (days) required to enforce a contract.
Pending commercial cases.
Cases filed at the commercial court.
Value of commercial cases.
Judicial staff trained.
Administrative and clerical staff trained.
Awareness campaigns.
Portfolio of loans.
Loan processing time.
Bank accounts.
Paper-based payments.
Electronic payments.
Value of contract services signed.
Debit/smart cards issued.
Mortgage bonds registered.
Value of registered mortgage bonds.
New land disputes brought to the Land Tribunal and
Courts of Law.
Time to complete a land transaction.
Time to complete transfer of land rights.
Land transactions recorded.
Land parcels formalized.
Number of land administration personnel trained.
Land Act adopted.
People trained on gender equality and economic
rights.
ID cards issued.
Population registered in the national database.
Program Administration*
and Control, Monitoring
and Evaluation.
Pending Subsequent
Report**.
39,654,682
..........................................
10,222,540
........................
..........................................
¥23,881
Obligated
Objective
Projects
Country: Morocco
Year: 2010
Cumulative
disbursements
Quarter 1
Total Obligation: $697,500,000
300,898,445
Reduce volatility of agricultural production and
increase volume of fruit
agricultural production.
9,663,592
Small Scale Fisheries .......
sroberts on DSKD5P82C1PROD with NOTICES
Entity to which the assistance is provided: MCA
Lesotho
Total Quarterly
Disbursement:
$12,789,002
Fruit Tree Productivity .......
116,168,027
Improve quality of fish
moving through domestic channels and assure
the sustainable use of
fishing resources.
1,155,138
Artisan and Fez Medina ....
VerDate Nov<24>2008
17:33 Apr 12, 2010
111,873,858
Jkt 220001
Increase value added to
tourism and artisan
sectors.
PO 00000
Frm 00121
Fmt 4703
Measures
384,852
Sfmt 4703
Total annual volume of production of dates and olives.
Cropped area covered by olive trees.
Survival rate of newly planted olive trees after 2
years project-supported establishment period.
Yield of rehabilitated olive trees.
Cropped area covered by date trees.
Yield of rehabilitated date palms.
State of fish stock.
Domestic fish consumption level.
Fisherman net revenue.
Average fisherman sales price at Points de
´
´
´
Debarquement Amenages (PDA).
Volume sold at wholesale markets.
Fish sale price.
Average sales price.
Volume of sales among mobile fish vendors.
Average revenue of potters receiving Artisan Production Activity.
Employment and wages among project graduates.
Tourist arrivals.
Artisan profits (artisans engaged in product finishing
and points of sale).
E:\FR\FM\13APN1.SGM
13APN1
18904
Federal Register / Vol. 75, No. 70 / Tuesday, April 13, 2010 / Notices
Projects
Obligated
Cumulative
disbursements
Objective
Financial Services .............
46,200,000
12,937,907
88,511,670
Increase supply and decrease costs of financial services available
to microenterprises.
Improved survival rate of
new SMEs and INDHfunded income generating activities; increased revenue for
new SMEs and INDHfunded income generating activities.
..........................................
Enterprise Support ............
33,850,000
Program Administration*
and Control, Monitoring
and Evaluation.
Pending Subsequent
Report**.
........................
..........................................
Objective
Projects
Country: Tanzania
Year: 2010
1.352,603
9,320,527
Cumulative
disbursements
Quarter 1
Increase value added to
businesses.
2,952,318
Transport Sector ...............
sroberts on DSKD5P82C1PROD with NOTICES
206,471,000
372,776,000
Increase cash crop revenue and aggregate
visitor spending.
3,034,852
17:33 Apr 12, 2010
Jkt 220001
PO 00000
Frm 00122
Fmt 4703
Measures
Total Obligation: $698,136,000
Entity to which the assistance is provided: MCA
Tanzania
Total
Quarterly
Disbursement: $3,161,608
Energy Sector ...................
VerDate Nov<24>2008
Employment created.
Small and Medium Enterprises (SME) value added.
Gross loan portfolio outstanding of microcredit associations.
Portfolio at risk >30 days ratio.
Operating expense ratio.
Average annual sales of participating businesses.
Survival rate of participating businesses.
173,509
Obligated
Measures
Sfmt 4703
New power customers.
Energy generation—Kigoma.
Transmission capacity.
Percentage disbursed for design and supervision
contract Consulting Engineer (CE) year 1 budgeted.
International roughness index (Tunduma, Tanga,
Nantumbo, Peramiho).
Average annual daily traffic (Tunduma, Tanga,
Nantumbo, Peramiho).
Kilometers upgraded/completed (Tunduma, Tanga,
Nantumbo, Peramiho).
Percent disbursed on construction works (Tunduma,
Tanga, Nantumbo, Peramiho).
Signed contracts for construction works (Tunduma,
Tanga, Nantumbo, Peramiho).
Percent disbursed for feasibility and/or design studies (Tunduma, Tanga, Nantumbo, Peramiho).
Signed contracts for feasibility and/or design studies
(Tunduma, Tanga, Nantumbo, Peramiho).
Kilometers of roads under design (Tunduma, Tanga,
Nantumbo, Peramiho).
International roughness index (Zanzibar Rural
Roads).
Average annual daily traffic (Zanzibar Rural Roads).
Kilometers upgraded/completed (Zanzibar Rural
Roads).
Percent disbursed on construction works (Zanzibar
Rural Roads).
Signed contracts for construction works (Zanzibar
Rural Roads).
Percent disbursed for feasibility and/or design studies (Zanzibar Rural Roads).
Signed contracts for feasibility and/or design studies
(Zanzibar Rural Roads).
Kilometers of roads under design (Zanzibar Rural
Roads).
Passenger arrivals.
Percentage of upgrade complete (airport).
Percent disbursed on construction works (airport).
Signed contracts for construction works (airport).
E:\FR\FM\13APN1.SGM
13APN1
Federal Register / Vol. 75, No. 70 / Tuesday, April 13, 2010 / Notices
Projects
Obligated
Water Sector Project .........
Cumulative
disbursements
Objective
66,335,000
Increase investment in
human and physical
capital and to reduce
the prevalence of
water-related disease.
1,095,219
18905
Measures
Prevalence of diarrhea (Dar es Salaam).
Prevalence of diarrhea (Morogoro).
Prevalence of cholera (Dar es Salaam).
Prevalence of cholera (Morogoro).
Volume of individual water consumption (Dar es Salaam).
Volume of individual water consumption (Morogoro).
Number of households using improved source for
drinking water (Dar es Salaam).
Number of households using improved source for
drinking water (Morogoro).
Number of businesses using improved water source
(Dar es Salaam).
Number of businesses using improved water source
(Morogoro).
Volume of water produced (Lower Ruvu).
Volume of water produced (Morogoro).
Volume of non-revenue water (Dar es Salaam).
Operations and maintenance cost recovery ratio
(Dar es Salaam).
Operations and maintenance cost recovery ratio
(Morogoro).
Percent disbursed on construction works.
Signed contracts for construction works.
Program Administration*
and Control, Monitoring
and Evaluation.
Pending Subsequent
Report**.
52,554,000
..........................................
3,788,306
........................
..........................................
206,197
Obligated
Objective
Projects
Country: Burkina Faso
Entity to which the assistance is provided: MCA
Burkina Faso
Total
Quarterly
Disbursement: $2,397,440
Roads Project ...................
194,130,681
Year: 2010
Cumulative
disbursements
Quarter 1
Bright 2 Schools Project ...
26,829,669
Program Administration*
and Control, Monitoring
and Evaluation.
Pending Subsequent
Report**.
56,138,546
Enhance access to markets through investments in the road network.
Increase investment in
land and rural productivity through improved
land tenure security
and land management.
Expand the productive
use of land in order to
increase the volume
and value of agricultural
production in project
zones.
Increase primary school
completion rates.
..........................................
........................
..........................................
59,934,614
Agriculture Development
Project.
sroberts on DSKD5P82C1PROD with NOTICES
Rural Land Governance
Project.
141,910,059
VerDate Nov<24>2008
17:33 Apr 12, 2010
Jkt 220001
PO 00000
Frm 00123
Fmt 4703
Measures
Total Obligation: $478,943,569
14,871
To Be Determined (TBD).
465,530
TBD.
17,851
TBD.
26,829,669
TBD.
6,824,723
65,145
Sfmt 4703
E:\FR\FM\13APN1.SGM
13APN1
18906
Federal Register / Vol. 75, No. 70 / Tuesday, April 13, 2010 / Notices
Projects
Obligated
Cumulative
disbursements
Objective
Country: Namibia
Entity to which the assistance is provided: MCA
Namibia
Total
Quarterly
Disbursement: $2,455,717
Education Project ..............
144,976,559
Tourism Project .................
66,959,291
Agriculture Project .............
46,965,320
Program Administration*
and Control, Monitoring
and Evaluation.
Pending Subsequent
Report**.
Year: 2010
Quarter 1
Measures
Total Obligation: $304,477,817
45,576,647
Improve the education
sector’s effectiveness,
efficiency and quality.
Increase incomes and
create employment opportunities by improving
the marketing, management and infrastructure
of Etosha National Park.
Sustainably improve the
economic performance
and profitability of the
livestock sector and increase the volume of
the indigenous natural
products for export.
..........................................
338,267
4,045,476
........................
..........................................
To Be Determined (TBD).
0
78,360
TBD.
32,554
TBD.
* Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment.
** These amounts represent disbursements made that will be allocated to individual projects in the subsequent quarter(s) and reported as such
in subsequent quarterly report(s)
619(b) Transfer or Allocation of Funds
U.S. Agency to which Funds were Transferred
or Allocated
Amount
Description of program or project
None
$0
None
Dated: April 6, 2010.
Charles Cooper,
Vice President, Congressional and Public
Affairs, Millennium Challenge Corporation.
[FR Doc. 2010–8314 Filed 4–12–10; 8:45 am]
BILLING CODE 9211–03–P
NATIONAL FOUNDATION ON THE
ARTS AND THE HUMANITIES
sroberts on DSKD5P82C1PROD with NOTICES
AGENCY: The National Endowment for
the Humanities.
ACTION: Notice of Meetings.
SUMMARY: Pursuant to the provisions of
the Federal Advisory Committee Act
(Pub. L. 92–463, as amended), notice is
hereby given that the following
meetings of Humanities Panels will be
held at the Old Post Office, 1100
Pennsylvania Avenue, NW.,
Washington, DC 20506.
FOR FURTHER INFORMATION CONTACT:
Michael P. McDonald, Advisory
Committee Management Officer,
17:33 Apr 12, 2010
Jkt 220001
The
proposed meetings are for the purpose
of panel review, discussion, evaluation
and recommendation on applications
for financial assistance under the
National Foundation on the Arts and the
Humanities Act of 1965, as amended,
including discussion of information
given in confidence to the agency by the
grant applicants. Because the proposed
meetings will consider information that
is likely to disclose trade secrets and
commercial or financial information
obtained from a person and privileged
or confidential and/or information of a
personal nature the disclosure of which
would constitute a clearly unwarranted
invasion of personal privacy, pursuant
to authority granted me by the
SUPPLEMENTARY INFORMATION:
Meetings of Humanities Panel
VerDate Nov<24>2008
National Endowment for the
Humanities, Washington, DC 20506;
telephone (202) 606–8322. Hearingimpaired individuals are advised that
information on this matter may be
obtained by contacting the
Endowment’s TDD terminal on (202)
606–8282.
PO 00000
Frm 00124
Fmt 4703
Sfmt 4703
Chairman’s Delegation of Authority to
Close Advisory Committee meetings,
dated July 19, 1993, I have determined
that these meetings will be closed to the
public pursuant to subsections (c)(4),
and (6) of section 552b of Title 5, United
States Code.
1. Date: May 3, 2010.
Time: 8:30 a.m. to 5 p.m.
Room: 315.
Program: This meeting will review
applications for Landmarks of American
History and Culture, submitted to the
Division of Education Programs at the
March 2, 2010 deadline.
2. Date: May 4, 2010.
Time: 8:30 a.m. to 5 p.m.
Room: 315.
Program: This meeting will review
applications for Landmarks of American
History and Culture, submitted to the
Division of Education Programs at the
March 2, 2010 deadline.
3. Date: May 5, 2010.
Time: 8:30 a.m. to 5 p.m.
Room: 315.
Program: This meeting will review
applications for Landmarks of American
E:\FR\FM\13APN1.SGM
13APN1
Agencies
[Federal Register Volume 75, Number 70 (Tuesday, April 13, 2010)]
[Notices]
[Pages 18889-18906]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-8314]
=======================================================================
-----------------------------------------------------------------------
MILLENNIUM CHALLENGE CORPORATION
[MCC FR 10-04]
Notice of Quarterly Report (October 1, 2009--December 31, 2009)
AGENCY: Millennium Challenge Corporation.
SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for
the quarter October 1, 2009 through December 31, 2009, on assistance
provided under section 605 of the Millennium Challenge Act of 2003 (22
U.S.C. 7701 et seq.), as amended (the Act), and on transfers or
allocations of funds to other federal agencies under section 619(b) of
the Act. The following report will be made available to the public by
publication in the Federal Register and on the Internet Web site of the
MCC (https://www.mcc.gov) in accordance with section 612(b) of the Act.
Assistance Provided Under Section 605
----------------------------------------------------------------------------------------------------------------
Cumulative
Projects Obligated Objectives disbursements Measures
----------------------------------------------------------------------------------------------------------------
Country: Madagascar Year: 2010 Quarter 1 Total Obligation: $87,998,166
----------------------------------------------------------------------------------------------------------------
Entity to which the assistance is provided: MCA Madagascar Total Quarterly Disbursement: $4,193,753
----------------------------------------------------------------------------------------------------------------
Land Tenure Project.............. $30,123,098 Increase Land $29,667,721 Area secured with land
Titling and certificates or titles
Security. in the Zones.
Proportion of the
population informed
about land tenure
reforms in the Zones.
Legal and regulatory
reforms adopted.
.............. .............. Number of land documents
inventoried in the
Zones and Antananarivo.
.............. .............. Number of land documents
restored in the Zones
and Antananarivo.
.............. .............. Number of land documents
digitized in the Zones
and Antananarivo.
[[Page 18890]]
.............. .............. Average time for Land
Services Offices to
issue a duplicate copy
of a title.
.............. .............. Average cost to a user
to obtain a duplicate
copy of a title from
the Land Services
Offices.
.............. .............. Number of land
certificates delivered
in the Zones during the
period.
.............. .............. Number of new guichets
fonciers operating in
the Zones.
.............. .............. The 256 Plan Local
d'Occupation Foncier--
Local Plan of Land
Occupation (PLOFs) are
completed.
Finance Project.................. 25,937,781 Increase 23,535,849 Volume of funds
Competition in the processed annually by
Financial Sector. the national payment
system.
The components necessary
to implement the
national payment system
are operational:
network equipment and
integrator, real time
gross settlement system
(RTGS), retail payment
clearing system,
telecommunication
facilities.
.............. .............. Number of accountants
and financial experts
registered to become
Certified Public
Accountant (CPA).
.............. .............. Percent of Micro-Finance
Institution (MFI) loans
recorded in the Central
Bank database.
Agricultural Business Investment 13,687,196 Improve 13,582,621 Number of farmers that
Project. Agricultural adopt new technologies
Projection or engage in higher
Technologies and value production.
Market Capacity in Number of enterprises
Rural Areas. that adopt new
technologies or engage
in higher value
production.
Number of farmers
receiving technical
assistance.
.............. .............. Number of farmers
employing technical
assistance.
.............. .............. Number of businesses
receiving technical
assistance.
.............. .............. Number of
Mnist[egrave]re de
l'Agriculture, de
l'Elevage et de la
P[ecirc]che--Ministry
of Agriculture,
Livestock, and Fishing
(MAEP) agents trained
in marketing and
investment promotion.
.............. .............. Zones identified and
description of
beneficiaries within
each zone submitted.
.............. .............. Number of people
receiving information
from Agricultural
Business Center (ABCs)
on business
opportunities.
.............. .............. Zonal investment
strategies for the
Zones are developed.
.............. .............. Number of ABC clients
who register as formal
enterprises,
cooperatives, or
associations.
.............. .............. Number of marketing
contracts of ABC
clients.
Program Administration* and 18,250,091 ................... 17,583,512
Control, Monitoring and
Evaluation.
Pending subsequent reports**..... .............. ................... 1,368,813
----------------------------------------------------------------------------------------------------------------
* Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment.
** These amounts represent disbursements made that will be allocated to individual projects in the subsequent
quarter(s) and reported as such in subsequent quarterly report(s)
----------------------------------------------------------------------------------------------------------------
Cumulative
Projects Obligated Objective disbursements Measures
----------------------------------------------------------------------------------------------------------------
Country: Honduras Year: 2010 Quarter 1 Total Obligation: $205,000,000
----------------------------------------------------------------------------------------------------------------
Entity to which the assistance is
provided: MCA Honduras Total
Quarterly Disbursement:
$23,018,243
Rural Development Project........ 69,907,000 Increase the 45,706,605 Number of program
productivity and farmers harvesting high-
business skills of value horticulture
farmers who crops.
operate small and Number of hectares
medium-size farms harvesting high-value
and their horticulture crops.
employees.. Number of business plans
prepared by program
farmers with assistance
from the implementing
entity.
[[Page 18891]]
.............. .............. Total value of net
sales.
.............. .............. Total number of
recruited farmers
receiving technical
assistance.
.............. .............. Value of loans disbursed
(disaggregated by trust
fund, leveraged from
trust fund, and
institutions receiving
technical assistance
from ACDI-VOCA).
.............. .............. Number of loans
disbursed
(disaggregated by trust
fund, leveraged from
trust fund, and
institutions receiving
technical assistance
from ACDI-VOCA).
.............. .............. Percentage of loan
portfolio at risk
(disaggregated by trust
fund and institutions
receiving technical
assistance from ACDI-
VOCA).
.............. .............. Funds lent from the
trust fund to financial
intermediaries through
lines of credit.
.............. .............. Number of hectares under
irrigation.
.............. .............. Number of beneficial
biological control
agents developed for
use by program farmers
or other farmers for
pilot testing.
.............. .............. Number of improved
coffee hybrids
available for cloning.
.............. .............. Number of farmers
connected to the
community irrigation
system.
.............. .............. Number of certified
deliverables across all
agricultural public
goods grant.
Transportation Project........... 119,005,876 Reduce 75,891,981 Freight shipment cost
transportation from Tegucigalpa to
costs between Puerto Cortes.
targeted Average annual daily
production centers traffic volume--CA-5.
and national, International roughness
regional and index (IRI)--CA-5.
global markets. Kilometers of road
upgraded--CA-5.
.............. .............. Percent of contracted
road works disbursed--
CA-5.
.............. .............. Average annual daily
traffic volume--
secondary roads.
.............. .............. International roughness
index (IRI)--secondary
roads.
.............. .............. Kilometers of road
upgraded--secondary
roads.
.............. .............. Percent of contracted
road works disbursed--
secondary roads.
.............. .............. Average annual daily
traffic volume--rural
roads.
.............. .............. Average speed--rural
roads.
.............. .............. Kilometers of road
upgraded--rural roads.
.............. .............. Percent of contracted
road works disbursed--
rural roads.
.............. .............. Signed contracts for
feasibility and/or
design studies.
.............. .............. Percent of contracted
studies disbursed.
.............. .............. Kilometers (km) of roads
under design.
.............. .............. Signed contracts for
roads works.
.............. .............. Kilometers (km) of roads
under works contracts.
Program Administration* and 16,087,124 ................... 9,027,708
Control, Monitoring and
Evaluation.
Pending subsequent reports**..... .............. ................... 1,521,767
----------------------------------------------------------------------------------------------------------------
Cumulative
Projects Obligated Objective disbursements Measures
----------------------------------------------------------------------------------------------------------------
Country: Cape Verde Year: 2010 Quarter 1 Total Obligation: $110,078,488
----------------------------------------------------------------------------------------------------------------
Entity to which the assistance is
provided: MCA Cape Verde Total
Quarterly Disbursement:
$8,048,329
Watershed and Agricultural 11,001,130 Increase 8,116,030 Productivity:
Support. agricultural Horticulture, Paul
production in watershed.
three targeted Productivity:
watershed areas on Horticulture, Faja
three islands. watershed.
Productivity:
Horticulture, Mosteiros
watershed.
.............. .............. Number of farmers
adopting drip
irrigation.
.............. .............. Area irrigated with drip
irrigation.
.............. .............. Percent of contracted
irrigation works
disbursed (cumulative).
.............. .............. Reservoirs constructed.
[[Page 18892]]
.............. .............. Number of farmers that
have completed training
in at least 3 of 5 core
agricultural
disciplines.
Infrastructure Improvement....... 83,160,208 Increase 49,148,363 Travel time ratio:
integration of the percentage of
internal market beneficiary population
and reduce further than 30 minutes
transportation from nearest market.
costs. Kilometers of roads
rehabilitated.
Percent of contracted
Santiago Roads works
disbursed (cumulative).
.............. .............. Percent of contracted
Santo Antao Bridge
works disbursed
(cumulative).
.............. .............. Kilometers (km) of roads
under design.
.............. .............. Signed contracts for
roads works.
.............. .............. Kilometers (km) of roads
under works contracts.
.............. .............. Port of Praia: percent
of contracted port
works disbursed
(cumulative).
.............. .............. Cargo village: percent
of works completed.
.............. .............. Quay 2 improvements:
percent of works
completed.
.............. .............. Access road: percent of
works completed.
Private Sector Development....... 2,081,223 Spur private sector 1,188,909 Micro-Finance
development on all Institution (MFI)
islands through recovery rate,
increased adjusted.
investment in the MFI portfolio at risk,
priority sectors adjusted.
and through Ratio of MFIs
financial sector operationally self-
reform. sufficient.
Program Administration* and 13,835,927 ................... 9,213,906
Control, Monitoring and
Evaluation.
Pending subsequent reports**..... .............. ................... 1,471,195
----------------------------------------------------------------------------------------------------------------
Cumulative
Projects Obligated Objective disbursements Measures
----------------------------------------------------------------------------------------------------------------
Country: Nicaragua Year: 2010 Quarter 1 Total Obligation: $113,599,752
----------------------------------------------------------------------------------------------------------------
Entity to which the assistance is
provided: MCA Nicaragua Total
Quarterly Disbursement:
$12,093,689
Property Regularization Project.. 7,205,205 Increase Investment 7,204,952 Automated database of
by strengthening registry and cadastre
property rights. installed in the 10
municipalities of Leon.
Value of land, urban.
Value of land, rural.
.............. .............. Time to conduct a land
transaction.
.............. .............. Number of additional
parcels with a
registered title,
urban.
.............. .............. Number of additional
parcels with a
registered title,
rural.
.............. .............. Number of protected
areas demarcated.
.............. .............. Area covered by
cadastral mapping.
.............. .............. Cost to conduct a land
transaction.
Transportation Project........... 57,999,999 Reduce 44,081,241 Annual Average daily
transportation traffic volume: N1
costs between Leon Section R1.
and Chinandega and Annual Average daily
national, regional traffic volume: N1
and global markets. Section R2.
Annual Average daily
traffic volume: Port
Sandino (S13).
Annual Average daily
traffic volume:
Villanueva--Guasaule
Annual.
.............. .............. Average daily traffic
volume: Somotillo-Cinco
Pinos (S1).
.............. .............. Annual average daily
traffic volume:
Le[oacute]n-Poneloya-
Las Pe[ntilde]itas.
.............. .............. International Roughness
Index: N-I Section R1.
.............. .............. International Roughness
Index: N-I Section R2.
.............. .............. International Roughness
Index: Port Sandino
(S13).
.............. .............. International roughness
index: Villanueva--
Guasaule.
.............. .............. International roughness
index: Somotillo-Cinco
Pinos.
.............. .............. International roughness
index: Le[oacute]n-
Poneloya-Las
Pe[ntilde]itas.
.............. .............. Kilometers of NI
upgraded: R1 and R2 and
S13.
.............. .............. Kilometers of NI
upgraded: Villanueva--
Guasaule.
[[Page 18893]]
.............. .............. Kilometers of S1 road
upgraded.
.............. .............. Kilometers of S9 road
upgraded.
.............. .............. Kilometers of designed
primary roads
(including N-I/Puerto
Sandino and V-G).
.............. .............. Kilometers of designed
secondary roads.
Rural Development Project........ 32,897,500 Increase the value 22,401,745 Number of beneficiaries
added of farms and with business plans
enterprises in the prepared with
region. assistance from the
Rural Development
Business Project.
Numbers of manzanas (1
Manzana = 1.7
hectares), by sector,
harvesting higher-value
crops.
.............. .............. Number of manzanas of
beneficiaries of the
program that harvest
higher-value crops with
irrigation or
commercial
reforestation under
Improvement of Water
Supply Activities.
.............. .............. Number of beneficiaries
implementing business
plans.
.............. .............. Average increase in
income of beneficiaries
due to program.
Program Administration*, Due 15,497,048 ................... 10,375,380
Diligence, Monitoring and
Evaluation.
Pending subsequent reports**..... .............. ................... 3,759,039
----------------------------------------------------------------------------------------------------------------
Cumulative
Projects Obligated Objective disbursements Measures
----------------------------------------------------------------------------------------------------------------
Country: Georgia Year: 2010 Quarter 1 Total Obligation: $395,300,000
----------------------------------------------------------------------------------------------------------------
Entity to which the assistance is
provided: MCA Georgia Total
Quarterly Disbursement:
$45,135,334
Regional Infrastructure 310,750,000 Key Regional 136,600,072 Household savings from
Rehabilitation. Infrastructure Infrastructure
Rehabilitated. Rehabilitation
Activities.
Savings in vehicle
operating costs (VOC).
.............. .............. International roughness
index (IRI).
.............. .............. Annual average daily
traffic (AADT).
.............. .............. Travel Time.
.............. .............. Kilometers of road
paved.
.............. .............. Percent of contracted
works disbursed.
.............. .............. Signed contracts for
feasibility and/or
design studies.
.............. .............. Percent of contracted
studies disbursed.
.............. .............. Kilometers of roads
under design.
.............. .............. Signed contracts for
road works.
.............. .............. Kilometers of roads
under works contracts.
.............. .............. Sites rehabilitated
(phases I, II, III)--
pipeline.
.............. .............. Construction works
completed (phase II)--
pipeline.
.............. .............. Savings in household
expenditures for all
subprojects.
.............. .............. Population Served by all
subprojects.
.............. .............. Subprojects completed.
.............. .............. Value of project grant
agreements signed.
.............. .............. Value of project works
and goods contracts
signed.
.............. .............. Subprojects with works
initiated.
Regional Enterprise Development.. 52,200,000 Enterprises in 38,387,329 Jobs Created by
Regions Developed. Agribusiness
Development Activity
(ADA) and by Georgia
Regional Development
Fund (GRDF).
Household net income--
ADA and GRDF.
.............. .............. Jobs created--ADA.
.............. .............. Firm income ADA.
.............. .............. Household net income--
ADA.
.............. .............. Beneficiaries (direct
and indirect)--ADA.
.............. .............. Grant agreements signed--
ADA.
.............. .............. Increase in gross
revenues of portfolio
companies (PC).
.............. .............. Increase in portfolio
company employees.
.............. .............. Increase in wages paid
to the portfolio
company employees.
.............. .............. Cumulative number of
portfolio companies.
.............. .............. Funds disbursed to the
portfolio companies.
[[Page 18894]]
Program Administration*, Due 32,350,000 ................... 16,093,973
Diligence, Monitoring and
Evaluation.
Pending subsequent reports**..... .............. ................... 0
----------------------------------------------------------------------------------------------------------------
November 2008, MCC and the Georgian government signed a Compact amendment making up to $100 million of
additional funds available to the Millennium Challenge Georgia Fund. These funds will be used to complete works
in the Roads, Regional Infrastructure Development, and Energy Rehabilitation Projects contemplated by the
original Compact. The amendment was ratified by the Georgian parliament and entered into force on January 30,
2009.
----------------------------------------------------------------------------------------------------------------
Cumulative
Projects Obligated Objective disbursements Measures
----------------------------------------------------------------------------------------------------------------
Country: Vanuatu Year: 2010 Quarter 1 Total Obligation: $65,690,000
----------------------------------------------------------------------------------------------------------------
Entity to which the assistance is
provided: MCA Vanuatu Total
Quarterly Disbursement:
$6,590,285
Transportation Infrastructure 60,162,579 Facilitate 42,223,234 Number of international
Project. transportation to tourists--Efate.
increase tourism Number of international
and business tourists--Santo.
development.
.............. .............. Number of room nights
occupied--Efate.
.............. .............. Number of room nights
occupied--Santo.
.............. .............. Average annual daily
traffic--Efate.
.............. .............. Average annual daily
traffic--Santo.
.............. .............. Kilometers of road
upgraded--Efate.
.............. .............. Kilometers of roads
upgraded--Santo.
.............. .............. Signed contracts for
feasibility and/or
design studies.
.............. .............. Percent of contracted
studies disbursed.
.............. .............. Kilometers (km) of roads
under design.
.............. .............. Signed contracts for
roads works.
.............. .............. Kilometers (km) of roads
under works contracts.
.............. .............. Percent of contracted
roads works disbursed.
Program Administration*, Due 5,527,421 ................... 2,835,051
Diligence, Monitoring and
Evaluation.
Pending subsequent reports**..... .............. ................... 104,691
----------------------------------------------------------------------------------------------------------------
Cumulative
Projects Obligated Objective disbursements Measures
----------------------------------------------------------------------------------------------------------------
Country: Armenia Year: 2010 Quarter 1 Total Obligation: $235,650,000
----------------------------------------------------------------------------------------------------------------
Entity to which the assistance is
provided: MCA Armenia Total
Quarterly Disbursement:
$12,688,383
Irrigated Agriculture Project 152,629,208 Increase 35,432,441 Recovery of Water User
(Agriculture and Water). agricultural Associations (WUA)
productivity operations and
Improve and maintenance cost by
Quality of water charges.
Irrigation. Primary canals
rehabilitated.
.............. .............. Tertiary canals
rehabilitated.
.............. .............. Percent of contracted
irrigation works
disbursed.
.............. .............. Value of signed
contracts for
irrigation works.
.............. .............. Number of farmers using
better on-farm water
management.
.............. .............. Number of farmers
trained.
.............. .............. Number of agribusinesses
assisted.
.............. .............. Value of agricultural
loans to farmers/
agribusinesses.
Rural Road Rehabilitation Project 67,100,000 Better access to 7,870,944 Average annual daily
economic and traffic.
social International roughness
infrastructure. index.
.............. .............. Kilometers of roads
rehabilitated.
.............. .............. Percent of contracted
roads works disbursed.
.............. .............. Signed contracts for
roads works.
.............. .............. Percent of contracted
studies disbursed.
.............. .............. Kilometers (km) of roads
under design.
[[Page 18895]]
.............. .............. Signed contracts for
feasibility a