Environmental Impact Statements; Notice of Availability, 18204-18205 [2010-8129]
Download as PDF
18204
Federal Register / Vol. 75, No. 68 / Friday, April 9, 2010 / Notices
srobinson on DSKHWCL6B1PROD with NOTICES
settlement agreement (Agreement) on
behalf of the City; District; Bureau of
Indian Affairs; National Park Service;
U.S. Fish and Wildlife Service; United
States Forest Service; Washington
Department of Fish and Wildlife;
Washington Department of Ecology;
Kalispel Tribe; the Lands Council;
American Whitewater; Selkirk
Conservation Alliance; the Town of
Cusick, Washington; Rick Larson; and
Al Six. The Agreement resolves among
the signatories all issues associated with
issuance of a new license for the
Boundary Project, including fish
passage, fish and wildlife habitat
enhancement, water quality, fish
supplementation, recreation, cultural
properties, and other matters. The
surrender of the District’s Sullivan
Creek Project includes the removal of
Mill Pond dam, related stream habitat
restoration, and construction of a cold
water release facility at Sullivan Lake
dam. The signatories request that the
Commission: (1) Accept and
incorporate, without material
modification, all of the proposed license
articles in Exhibit 1 of the Settlement in
the new project license for the Boundary
Project; and (2) insure an order
accepting the surrender of the District’s
license for the Sullivan Creek project
subject to the conditions contained in
Appendix B to the Agreement.
l. The A copy of the Settlement
Agreement is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://www.
ferc.gov, using the ‘‘e-Library’’ link.
Enter the docket number, excluding the
last three digits in the docket number
field, to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
Register online at https://
www.ferc.gov/esubscribenow.htm to be
notified via e-mail of new filings and
issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–8064 Filed 4–8–10; 8:45 am]
BILLING CODE 6717–01–P
VerDate Nov<24>2008
17:07 Apr 08, 2010
Jkt 220001
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8989–7]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly Receipt of Environmental
Impact Statements
Filed 03/29/2010 Through 04/02/2010
Pursuant to 40 CFR 1506.9.
Notice: In accordance with Section
309(a) of the Clean Air Act, EPA is
required to make its comments on EISs
issued by other Federal agencies public.
Historically, EPA has met this mandate
by publishing weekly notices of
availability of EPA comments, which
includes a brief summary of EPA’s
comment letters, in the Federal
Register. Since February 2008, EPA has
been including its comment letters on
EISs on its Web site at: https://
www.epa.gov/compliance/nepa/
eisdata.html. Including the entire EIS
comment letters on the Web site
satisfies the Section 309(a) requirement
to make EPA’s comments on EISs
available to the public. Accordingly,
after March 31, 2010, EPA will
discontinue the publication of this
notice of availability of EPA comments
in the Federal Register.
EIS No. 20100108, Draft EIS, BLM, AZ,
Sonoran Solar Energy Project,
Construction and Operation of a 3756megawatt (MW) Concentrated Solar
Thermal Power Plant and Ancillary
Facilities on 3,702 Acres, Right-ofWay Granting, Maricopa County, AZ,
Comment Period Ends: 05/24/2010,
Contact: Joe Incardine 801–524–3833.
EIS No. 20100109, Draft Supplement,
BR, UT, Narrows Project, Updated
Information, To Develop a
Supplemental Water Supply for
Agricultural and Municipal and
Industrial Water Use, Gooseberry
Creek, Sanpete County, UT, Comment
Period Ends: 05/24/2010, Contact:
Kerry Schwartz 801–379–1150.
EIS No. 20100110, Final EIS, BR, CA,
Los Vaqueros Reservoir Expansion
Project, To Develop Water Supplies
Environmental Water Management
that Supports Fish Protection, Habitat
Management, and other
Environmental Water Needs in the
Delta and Tributary River Systems,
San Francisco Bay Area, Contra Costa
County, CA, Wait Period Ends: 05/10/
2010, Contact: Louis Moore 916–978–
5106.
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
EIS No. 20100111, Draft EIS, BLM, CA,
Ridgecrest Solar Power Project,
Construction and Operation of a
Concentrated Solar Powered Electric
Generating Facility, Application for a
Right-of-Way Grant, California Desert
Conservation Area Plan Amendment,
Kern County, CA, Comment Period
Ends: 07/08/2010, Contact: Janet
Eubanks 951–697–5376.
EIS No. 20100112, Final EIS, USFWS,
CA, Paiute Cutthroat Trout
Restoration Project, Eradication of
Non-Native Trout Species from 11
Stream Miles of Silver King Creek,
Alpine County, CA, Wait Period Ends:
05/10/2010, Contact: John Robles
916–414–6464.
EIS No. 20100113, Final EIS, FHWA, ID,
US–95 Garwood to Sagle (from MP–
438.4 to MP–469.75) Transportation
Improvements to Present and Future
Traffic Demand, Funding, NPDES
Permit and U.S. Army COE Section
404 Permit, Kootenai and Bonner
Counties, ID, Wait Period Ends: 05/
10/2010, Contact: Ross Blanchard
208–334–9180.
EIS No. 20100114, Draft EIS, USFS, SD,
Mystic Range Project Area, Propose to
Reauthorize Grazing of Domestic
Livestock on Eight Allotments, Black
Hills National Forest, Pennington and
Custer Counties, SD, Comment Period
Ends: 05/24/2010, Contact: Katie Van
Alstyne 606–343–1567.
EIS No. 20100115, Draft EIS, BLM, CA,
Genesis Solar Energy Project,
Application for a Right-of-Way Grant
to Construct, Operate and
Decommission a Solar Thermal
Facility on Public Lands, California
Desert Conservation Area Plan,
Riverside County, CA, Comment
Period Ends: 07/08/2010, Contact:
Allison Shaffer 760–833–7104.
EIS No. 20100116, Draft EIS, FHWA,
NC, Mid-Currituck Bridge Study,
Proposed Transportation
Improvements, Currituck and Dare
Counties, NC, Comment Period Ends:
06/07/2010, Contact: John F. Sullivan
919–856–4346.
EIS No. 20100117, Draft EIS, USFS, WV,
Fernow Experimental Forest Project,
To Continue Long-Term Research
Studies Involving Removal of Trees,
Prescribed Burning, Fertilization, and
Use of Herbicides and other
Management Activities to Control
Invasive Plant Species, Tucker
County, WV, Comment Period Ends:
05/25/2010, Contact: Mary Beth
Adams 304–478–2000 Ext 130.
EIS No. 20100118, Draft EIS, USACE,
KY, East Kentucky Power
Cooperative, Proposed Baseload
Power Plant, to Constructing and
Operating a 278 Megawatt Circulating
E:\FR\FM\09APN1.SGM
09APN1
Federal Register / Vol. 75, No. 68 / Friday, April 9, 2010 / Notices
Fluidized Bed Electric Generating
Unit (CFD), and Associated
Infrastructure at the Existing J.K.
Smith Power Station, Application for
U.S. Army COE Section 10 and 404
Permits, Clark County, KY, Comment
Period Ends: 05/24/2010, Contact:
Michael Hasty 502–315–6676.
The U.S. Department of Army, Corps
of Engineers has adopted the U.S.
Department of Energy’s FEIS #20020508
filed 12/06/2002. The Corps of
Engineers was not a Cooperating Agency
on the above FEIS. Under Section
1506.3(b) of the CEQ Regulations the
Adopting Agency shall treat the
statement as a draft and Recirculate it.
EIS No. 20100119, Final EIS, NPS, ND,
Theodore Roosevelt National Park,
Elk Management Plan,
Implementation, Billing and
McKenzie Counties, ND, Wait Period
Ends: 05/10/2010, Contact: Valerie
Naylor 701–623–4466.
EIS No. 20100120, Final EIS, USFS, CO,
Rio de los Pinos Vegetation
Management Project, Proposes to
Salvage Engelmann Spruce Trees that
have been killed by, or are Infested
with, Spruce Beetle, Conejos Peak
Ranger District, Rio Grande National
Forest, Conejos, Rio Grande and
Archuleta Counties, CO, Wait Period
Ends: 05/10/2010, Contact: Kevin
Duda 719–274–8971.
Dated: April 6, 2010.
Ken Mittelholtz,
Deputy Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 2010–8129 Filed 4–8–10; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9135–8]
Total Coliform Rule Revisions—Notice
of Stakeholder Meeting
srobinson on DSKHWCL6B1PROD with NOTICES
AGENCY: Environmental Protection
Agency (EPA).
ACTION: Notice.
SUMMARY: The Environmental Protection
Agency (EPA) is developing proposed
revisions to the 1989 Total Coliform
Rule (TCR). The Total Coliform Rule/
Distribution System Advisory
Committee established an Agreement in
Principle, which provides the Agency
with recommendations for revising the
TCR. One of the recommendations of
the Committee is that EPA conduct
stakeholder outreach as the Agency
develops the proposed revisions. Today,
EPA is giving notice of a public meeting
in which the Agency will provide
VerDate Nov<24>2008
17:07 Apr 08, 2010
Jkt 220001
updates on the proposed Revised Total
Coliform Rule (RTCR) and the
Distribution Systems Research and
Information Collection Partnership;
opportunities for stakeholders to
provide feedback on assessment and
corrective action guidance related to the
proposed rule; and opportunities for
stakeholders to provide feedback on
options for the process of reviewing the
methods approved to analyze drinking
water samples to determine the
presence of total coliforms and E. coli.
Other topics to be discussed in the
meeting include a review of EPA’s
commitments to stakeholder outreach
and involvement pertaining to the
proposed RTCR and the plan and
tentative schedule for revising other
guidance documents.
DATES: The public meeting will be held
on Tuesday, May 11, 2010 (9:30 a.m. to
5 p.m., Eastern Daylight Savings Time
(EDST)) and Wednesday, May 12, 2010
(8:30 a.m. to 12:30 p.m., EDST).
Attendees and those planning to
participate via teleconference should
register for the meeting by calling Kate
Zimmer of RESOLVE at (202) 965–
6387or by e-mail to kzimmer@resolv.org
no later than May 4, 2010.
ADDRESSES: The meeting will be held at
the EPA East Building, 1201
Constitution Avenue, NW., Washington,
DC 20460. On May 11, 2010, the
meeting will be in room 1117(A) of the
East Building. On May 12, 2010, the
meeting will be in room 1153 of the East
Building.
FOR FURTHER INFORMATION CONTACT:
Teleconferencing will be available for
individuals unable to attend the meeting
in person. For general inquiries about
this meeting and teleconference
information, contact Kate Zimmer of
RESOLVE at (202) 965–6387 or by email kzimmer@resolv.org. For technical
information, contact Sean Conley
(conley.sean@epa.gov, (202) 564–1781,
Standards and Risk Management
Division, Office of Ground Water and
Drinking Water (MC 4607M),
Environmental Protection Agency, 1200
Pennsylvania Avenue, NW.,
Washington, DC 20460; fax number:
(202) 564–3767). For more information
on the Committee’s recommendations
please visit, https://www.epa.gov/
safewater/sdwa/
regs_under_development.html.
Special
Accommodations: For information on
access or accommodations for
individuals with disabilities, please
contact Cesar Cordero at (202) 564–5275
or by e-mail at cordero.cesar@epa.gov.
Please allow at least 10 days prior to the
SUPPLEMENTARY INFORMATION:
PO 00000
Frm 00062
Fmt 4703
Sfmt 4703
18205
meeting to give EPA time to process
your request.
Dated: April 5, 2010.
Cynthia C. Dougherty,
Director, Office of Ground Water and Drinking
Water.
[FR Doc. 2010–8126 Filed 4–8–10; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–ORD–2009–0645; FRL–9135–9]
Notice of Peer Review Meeting for the
External Peer Review Drafts of Two
Documents on Using Probabilistic
Methods To Enhance the Role of Risk
Analysis in Decision-Making
AGENCY: Environmental Protection
Agency (EPA).
ACTION: Notice of Peer Review Meeting
with Opportunity for Public Comment.
SUMMARY: EPA is announcing that
Eastern Research Group, Inc. (ERG), an
EPA contractor for external scientific
peer review, will convene an
independent panel of experts and
organize and conduct an external peer
review meeting to review two draft
documents entitled, ‘‘Using Probabilistic
Methods to Enhance the Role of Risk
Analysis in Decision-Making, with Case
Study Examples’’ and a ‘‘Managers’
Summary’’ of the same document. The
draft documents were prepared by the
Agency’s Risk Assessment Forum. The
peer review meeting is scheduled to
take place on May 6, 2010. On August
18, 2009, EPA announced a 15-day
public comment period for the draft
documents (74 FR 41695), and on
September 17, 2009 extended the
comment period to 60 days (74 FR
47794), thus closing the public
comment period on October 16, 2009.
The public comment period and the
external peer review are separate
processes that provide opportunities for
all interested parties to comment on the
document. In addition to the
opportunity provided for public
comments through the EPA docket by
the closing date of October 16, 2009, the
public can provide comments for the
external peer reviewers’ consideration
through the public meeting scheduled
for May 6, 2010.
EPA is releasing this draft document
solely for the purpose of predissemination peer review under
applicable information quality
guidelines. This document has not been
formally disseminated by EPA. It does
not represent and should not be
construed to represent any Agency
policy or determination.
E:\FR\FM\09APN1.SGM
09APN1
Agencies
[Federal Register Volume 75, Number 68 (Friday, April 9, 2010)]
[Notices]
[Pages 18204-18205]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-8129]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8989-7]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly Receipt of Environmental Impact Statements
Filed 03/29/2010 Through 04/02/2010
Pursuant to 40 CFR 1506.9.
Notice: In accordance with Section 309(a) of the Clean Air Act, EPA
is required to make its comments on EISs issued by other Federal
agencies public. Historically, EPA has met this mandate by publishing
weekly notices of availability of EPA comments, which includes a brief
summary of EPA's comment letters, in the Federal Register. Since
February 2008, EPA has been including its comment letters on EISs on
its Web site at: https://www.epa.gov/compliance/nepa/eisdata.html.
Including the entire EIS comment letters on the Web site satisfies the
Section 309(a) requirement to make EPA's comments on EISs available to
the public. Accordingly, after March 31, 2010, EPA will discontinue the
publication of this notice of availability of EPA comments in the
Federal Register.
EIS No. 20100108, Draft EIS, BLM, AZ, Sonoran Solar Energy Project,
Construction and Operation of a 3756-megawatt (MW) Concentrated Solar
Thermal Power Plant and Ancillary Facilities on 3,702 Acres, Right-of-
Way Granting, Maricopa County, AZ, Comment Period Ends: 05/24/2010,
Contact: Joe Incardine 801-524-3833.
EIS No. 20100109, Draft Supplement, BR, UT, Narrows Project, Updated
Information, To Develop a Supplemental Water Supply for Agricultural
and Municipal and Industrial Water Use, Gooseberry Creek, Sanpete
County, UT, Comment Period Ends: 05/24/2010, Contact: Kerry Schwartz
801-379-1150.
EIS No. 20100110, Final EIS, BR, CA, Los Vaqueros Reservoir Expansion
Project, To Develop Water Supplies Environmental Water Management that
Supports Fish Protection, Habitat Management, and other Environmental
Water Needs in the Delta and Tributary River Systems, San Francisco Bay
Area, Contra Costa County, CA, Wait Period Ends: 05/10/2010, Contact:
Louis Moore 916-978-5106.
EIS No. 20100111, Draft EIS, BLM, CA, Ridgecrest Solar Power Project,
Construction and Operation of a Concentrated Solar Powered Electric
Generating Facility, Application for a Right-of-Way Grant, California
Desert Conservation Area Plan Amendment, Kern County, CA, Comment
Period Ends: 07/08/2010, Contact: Janet Eubanks 951-697-5376.
EIS No. 20100112, Final EIS, USFWS, CA, Paiute Cutthroat Trout
Restoration Project, Eradication of Non-Native Trout Species from 11
Stream Miles of Silver King Creek, Alpine County, CA, Wait Period Ends:
05/10/2010, Contact: John Robles 916-414-6464.
EIS No. 20100113, Final EIS, FHWA, ID, US-95 Garwood to Sagle (from MP-
438.4 to MP-469.75) Transportation Improvements to Present and Future
Traffic Demand, Funding, NPDES Permit and U.S. Army COE Section 404
Permit, Kootenai and Bonner Counties, ID, Wait Period Ends: 05/10/2010,
Contact: Ross Blanchard 208-334-9180.
EIS No. 20100114, Draft EIS, USFS, SD, Mystic Range Project Area,
Propose to Reauthorize Grazing of Domestic Livestock on Eight
Allotments, Black Hills National Forest, Pennington and Custer
Counties, SD, Comment Period Ends: 05/24/2010, Contact: Katie Van
Alstyne 606-343-1567.
EIS No. 20100115, Draft EIS, BLM, CA, Genesis Solar Energy Project,
Application for a Right-of-Way Grant to Construct, Operate and
Decommission a Solar Thermal Facility on Public Lands, California
Desert Conservation Area Plan, Riverside County, CA, Comment Period
Ends: 07/08/2010, Contact: Allison Shaffer 760-833-7104.
EIS No. 20100116, Draft EIS, FHWA, NC, Mid-Currituck Bridge Study,
Proposed Transportation Improvements, Currituck and Dare Counties, NC,
Comment Period Ends: 06/07/2010, Contact: John F. Sullivan 919-856-
4346.
EIS No. 20100117, Draft EIS, USFS, WV, Fernow Experimental Forest
Project, To Continue Long-Term Research Studies Involving Removal of
Trees, Prescribed Burning, Fertilization, and Use of Herbicides and
other Management Activities to Control Invasive Plant Species, Tucker
County, WV, Comment Period Ends: 05/25/2010, Contact: Mary Beth Adams
304-478-2000 Ext 130.
EIS No. 20100118, Draft EIS, USACE, KY, East Kentucky Power
Cooperative, Proposed Baseload Power Plant, to Constructing and
Operating a 278 Megawatt Circulating
[[Page 18205]]
Fluidized Bed Electric Generating Unit (CFD), and Associated
Infrastructure at the Existing J.K. Smith Power Station, Application
for U.S. Army COE Section 10 and 404 Permits, Clark County, KY, Comment
Period Ends: 05/24/2010, Contact: Michael Hasty 502-315-6676.
The U.S. Department of Army, Corps of Engineers has adopted the
U.S. Department of Energy's FEIS 20020508 filed 12/06/2002.
The Corps of Engineers was not a Cooperating Agency on the above FEIS.
Under Section 1506.3(b) of the CEQ Regulations the Adopting Agency
shall treat the statement as a draft and Recirculate it.
EIS No. 20100119, Final EIS, NPS, ND, Theodore Roosevelt National Park,
Elk Management Plan, Implementation, Billing and McKenzie Counties, ND,
Wait Period Ends: 05/10/2010, Contact: Valerie Naylor 701-623-4466.
EIS No. 20100120, Final EIS, USFS, CO, Rio de los Pinos Vegetation
Management Project, Proposes to Salvage Engelmann Spruce Trees that
have been killed by, or are Infested with, Spruce Beetle, Conejos Peak
Ranger District, Rio Grande National Forest, Conejos, Rio Grande and
Archuleta Counties, CO, Wait Period Ends: 05/10/2010, Contact: Kevin
Duda 719-274-8971.
Dated: April 6, 2010.
Ken Mittelholtz,
Deputy Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 2010-8129 Filed 4-8-10; 8:45 am]
BILLING CODE 6560-50-P