Environmental Impact Statements; Notice of Availability, 18204-18205 [2010-8129]

Download as PDF 18204 Federal Register / Vol. 75, No. 68 / Friday, April 9, 2010 / Notices srobinson on DSKHWCL6B1PROD with NOTICES settlement agreement (Agreement) on behalf of the City; District; Bureau of Indian Affairs; National Park Service; U.S. Fish and Wildlife Service; United States Forest Service; Washington Department of Fish and Wildlife; Washington Department of Ecology; Kalispel Tribe; the Lands Council; American Whitewater; Selkirk Conservation Alliance; the Town of Cusick, Washington; Rick Larson; and Al Six. The Agreement resolves among the signatories all issues associated with issuance of a new license for the Boundary Project, including fish passage, fish and wildlife habitat enhancement, water quality, fish supplementation, recreation, cultural properties, and other matters. The surrender of the District’s Sullivan Creek Project includes the removal of Mill Pond dam, related stream habitat restoration, and construction of a cold water release facility at Sullivan Lake dam. The signatories request that the Commission: (1) Accept and incorporate, without material modification, all of the proposed license articles in Exhibit 1 of the Settlement in the new project license for the Boundary Project; and (2) insure an order accepting the surrender of the District’s license for the Sullivan Creek project subject to the conditions contained in Appendix B to the Agreement. l. The A copy of the Settlement Agreement is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www. ferc.gov, using the ‘‘e-Library’’ link. Enter the docket number, excluding the last three digits in the docket number field, to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. Register online at https:// www.ferc.gov/esubscribenow.htm to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–8064 Filed 4–8–10; 8:45 am] BILLING CODE 6717–01–P VerDate Nov<24>2008 17:07 Apr 08, 2010 Jkt 220001 ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8989–7] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–1399 or https://www.epa.gov/ compliance/nepa/. Weekly Receipt of Environmental Impact Statements Filed 03/29/2010 Through 04/02/2010 Pursuant to 40 CFR 1506.9. Notice: In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA has met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA’s comment letters, in the Federal Register. Since February 2008, EPA has been including its comment letters on EISs on its Web site at: https:// www.epa.gov/compliance/nepa/ eisdata.html. Including the entire EIS comment letters on the Web site satisfies the Section 309(a) requirement to make EPA’s comments on EISs available to the public. Accordingly, after March 31, 2010, EPA will discontinue the publication of this notice of availability of EPA comments in the Federal Register. EIS No. 20100108, Draft EIS, BLM, AZ, Sonoran Solar Energy Project, Construction and Operation of a 3756megawatt (MW) Concentrated Solar Thermal Power Plant and Ancillary Facilities on 3,702 Acres, Right-ofWay Granting, Maricopa County, AZ, Comment Period Ends: 05/24/2010, Contact: Joe Incardine 801–524–3833. EIS No. 20100109, Draft Supplement, BR, UT, Narrows Project, Updated Information, To Develop a Supplemental Water Supply for Agricultural and Municipal and Industrial Water Use, Gooseberry Creek, Sanpete County, UT, Comment Period Ends: 05/24/2010, Contact: Kerry Schwartz 801–379–1150. EIS No. 20100110, Final EIS, BR, CA, Los Vaqueros Reservoir Expansion Project, To Develop Water Supplies Environmental Water Management that Supports Fish Protection, Habitat Management, and other Environmental Water Needs in the Delta and Tributary River Systems, San Francisco Bay Area, Contra Costa County, CA, Wait Period Ends: 05/10/ 2010, Contact: Louis Moore 916–978– 5106. PO 00000 Frm 00061 Fmt 4703 Sfmt 4703 EIS No. 20100111, Draft EIS, BLM, CA, Ridgecrest Solar Power Project, Construction and Operation of a Concentrated Solar Powered Electric Generating Facility, Application for a Right-of-Way Grant, California Desert Conservation Area Plan Amendment, Kern County, CA, Comment Period Ends: 07/08/2010, Contact: Janet Eubanks 951–697–5376. EIS No. 20100112, Final EIS, USFWS, CA, Paiute Cutthroat Trout Restoration Project, Eradication of Non-Native Trout Species from 11 Stream Miles of Silver King Creek, Alpine County, CA, Wait Period Ends: 05/10/2010, Contact: John Robles 916–414–6464. EIS No. 20100113, Final EIS, FHWA, ID, US–95 Garwood to Sagle (from MP– 438.4 to MP–469.75) Transportation Improvements to Present and Future Traffic Demand, Funding, NPDES Permit and U.S. Army COE Section 404 Permit, Kootenai and Bonner Counties, ID, Wait Period Ends: 05/ 10/2010, Contact: Ross Blanchard 208–334–9180. EIS No. 20100114, Draft EIS, USFS, SD, Mystic Range Project Area, Propose to Reauthorize Grazing of Domestic Livestock on Eight Allotments, Black Hills National Forest, Pennington and Custer Counties, SD, Comment Period Ends: 05/24/2010, Contact: Katie Van Alstyne 606–343–1567. EIS No. 20100115, Draft EIS, BLM, CA, Genesis Solar Energy Project, Application for a Right-of-Way Grant to Construct, Operate and Decommission a Solar Thermal Facility on Public Lands, California Desert Conservation Area Plan, Riverside County, CA, Comment Period Ends: 07/08/2010, Contact: Allison Shaffer 760–833–7104. EIS No. 20100116, Draft EIS, FHWA, NC, Mid-Currituck Bridge Study, Proposed Transportation Improvements, Currituck and Dare Counties, NC, Comment Period Ends: 06/07/2010, Contact: John F. Sullivan 919–856–4346. EIS No. 20100117, Draft EIS, USFS, WV, Fernow Experimental Forest Project, To Continue Long-Term Research Studies Involving Removal of Trees, Prescribed Burning, Fertilization, and Use of Herbicides and other Management Activities to Control Invasive Plant Species, Tucker County, WV, Comment Period Ends: 05/25/2010, Contact: Mary Beth Adams 304–478–2000 Ext 130. EIS No. 20100118, Draft EIS, USACE, KY, East Kentucky Power Cooperative, Proposed Baseload Power Plant, to Constructing and Operating a 278 Megawatt Circulating E:\FR\FM\09APN1.SGM 09APN1 Federal Register / Vol. 75, No. 68 / Friday, April 9, 2010 / Notices Fluidized Bed Electric Generating Unit (CFD), and Associated Infrastructure at the Existing J.K. Smith Power Station, Application for U.S. Army COE Section 10 and 404 Permits, Clark County, KY, Comment Period Ends: 05/24/2010, Contact: Michael Hasty 502–315–6676. The U.S. Department of Army, Corps of Engineers has adopted the U.S. Department of Energy’s FEIS #20020508 filed 12/06/2002. The Corps of Engineers was not a Cooperating Agency on the above FEIS. Under Section 1506.3(b) of the CEQ Regulations the Adopting Agency shall treat the statement as a draft and Recirculate it. EIS No. 20100119, Final EIS, NPS, ND, Theodore Roosevelt National Park, Elk Management Plan, Implementation, Billing and McKenzie Counties, ND, Wait Period Ends: 05/10/2010, Contact: Valerie Naylor 701–623–4466. EIS No. 20100120, Final EIS, USFS, CO, Rio de los Pinos Vegetation Management Project, Proposes to Salvage Engelmann Spruce Trees that have been killed by, or are Infested with, Spruce Beetle, Conejos Peak Ranger District, Rio Grande National Forest, Conejos, Rio Grande and Archuleta Counties, CO, Wait Period Ends: 05/10/2010, Contact: Kevin Duda 719–274–8971. Dated: April 6, 2010. Ken Mittelholtz, Deputy Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2010–8129 Filed 4–8–10; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [FRL–9135–8] Total Coliform Rule Revisions—Notice of Stakeholder Meeting srobinson on DSKHWCL6B1PROD with NOTICES AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: The Environmental Protection Agency (EPA) is developing proposed revisions to the 1989 Total Coliform Rule (TCR). The Total Coliform Rule/ Distribution System Advisory Committee established an Agreement in Principle, which provides the Agency with recommendations for revising the TCR. One of the recommendations of the Committee is that EPA conduct stakeholder outreach as the Agency develops the proposed revisions. Today, EPA is giving notice of a public meeting in which the Agency will provide VerDate Nov<24>2008 17:07 Apr 08, 2010 Jkt 220001 updates on the proposed Revised Total Coliform Rule (RTCR) and the Distribution Systems Research and Information Collection Partnership; opportunities for stakeholders to provide feedback on assessment and corrective action guidance related to the proposed rule; and opportunities for stakeholders to provide feedback on options for the process of reviewing the methods approved to analyze drinking water samples to determine the presence of total coliforms and E. coli. Other topics to be discussed in the meeting include a review of EPA’s commitments to stakeholder outreach and involvement pertaining to the proposed RTCR and the plan and tentative schedule for revising other guidance documents. DATES: The public meeting will be held on Tuesday, May 11, 2010 (9:30 a.m. to 5 p.m., Eastern Daylight Savings Time (EDST)) and Wednesday, May 12, 2010 (8:30 a.m. to 12:30 p.m., EDST). Attendees and those planning to participate via teleconference should register for the meeting by calling Kate Zimmer of RESOLVE at (202) 965– 6387or by e-mail to kzimmer@resolv.org no later than May 4, 2010. ADDRESSES: The meeting will be held at the EPA East Building, 1201 Constitution Avenue, NW., Washington, DC 20460. On May 11, 2010, the meeting will be in room 1117(A) of the East Building. On May 12, 2010, the meeting will be in room 1153 of the East Building. FOR FURTHER INFORMATION CONTACT: Teleconferencing will be available for individuals unable to attend the meeting in person. For general inquiries about this meeting and teleconference information, contact Kate Zimmer of RESOLVE at (202) 965–6387 or by email kzimmer@resolv.org. For technical information, contact Sean Conley (conley.sean@epa.gov, (202) 564–1781, Standards and Risk Management Division, Office of Ground Water and Drinking Water (MC 4607M), Environmental Protection Agency, 1200 Pennsylvania Avenue, NW., Washington, DC 20460; fax number: (202) 564–3767). For more information on the Committee’s recommendations please visit, https://www.epa.gov/ safewater/sdwa/ regs_under_development.html. Special Accommodations: For information on access or accommodations for individuals with disabilities, please contact Cesar Cordero at (202) 564–5275 or by e-mail at cordero.cesar@epa.gov. Please allow at least 10 days prior to the SUPPLEMENTARY INFORMATION: PO 00000 Frm 00062 Fmt 4703 Sfmt 4703 18205 meeting to give EPA time to process your request. Dated: April 5, 2010. Cynthia C. Dougherty, Director, Office of Ground Water and Drinking Water. [FR Doc. 2010–8126 Filed 4–8–10; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–ORD–2009–0645; FRL–9135–9] Notice of Peer Review Meeting for the External Peer Review Drafts of Two Documents on Using Probabilistic Methods To Enhance the Role of Risk Analysis in Decision-Making AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of Peer Review Meeting with Opportunity for Public Comment. SUMMARY: EPA is announcing that Eastern Research Group, Inc. (ERG), an EPA contractor for external scientific peer review, will convene an independent panel of experts and organize and conduct an external peer review meeting to review two draft documents entitled, ‘‘Using Probabilistic Methods to Enhance the Role of Risk Analysis in Decision-Making, with Case Study Examples’’ and a ‘‘Managers’ Summary’’ of the same document. The draft documents were prepared by the Agency’s Risk Assessment Forum. The peer review meeting is scheduled to take place on May 6, 2010. On August 18, 2009, EPA announced a 15-day public comment period for the draft documents (74 FR 41695), and on September 17, 2009 extended the comment period to 60 days (74 FR 47794), thus closing the public comment period on October 16, 2009. The public comment period and the external peer review are separate processes that provide opportunities for all interested parties to comment on the document. In addition to the opportunity provided for public comments through the EPA docket by the closing date of October 16, 2009, the public can provide comments for the external peer reviewers’ consideration through the public meeting scheduled for May 6, 2010. EPA is releasing this draft document solely for the purpose of predissemination peer review under applicable information quality guidelines. This document has not been formally disseminated by EPA. It does not represent and should not be construed to represent any Agency policy or determination. E:\FR\FM\09APN1.SGM 09APN1

Agencies

[Federal Register Volume 75, Number 68 (Friday, April 9, 2010)]
[Notices]
[Pages 18204-18205]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-8129]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8989-7]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.

Weekly Receipt of Environmental Impact Statements
Filed 03/29/2010 Through 04/02/2010
Pursuant to 40 CFR 1506.9.

    Notice: In accordance with Section 309(a) of the Clean Air Act, EPA 
is required to make its comments on EISs issued by other Federal 
agencies public. Historically, EPA has met this mandate by publishing 
weekly notices of availability of EPA comments, which includes a brief 
summary of EPA's comment letters, in the Federal Register. Since 
February 2008, EPA has been including its comment letters on EISs on 
its Web site at: https://www.epa.gov/compliance/nepa/eisdata.html. 
Including the entire EIS comment letters on the Web site satisfies the 
Section 309(a) requirement to make EPA's comments on EISs available to 
the public. Accordingly, after March 31, 2010, EPA will discontinue the 
publication of this notice of availability of EPA comments in the 
Federal Register.

EIS No. 20100108, Draft EIS, BLM, AZ, Sonoran Solar Energy Project, 
Construction and Operation of a 3756-megawatt (MW) Concentrated Solar 
Thermal Power Plant and Ancillary Facilities on 3,702 Acres, Right-of-
Way Granting, Maricopa County, AZ, Comment Period Ends: 05/24/2010, 
Contact: Joe Incardine 801-524-3833.
EIS No. 20100109, Draft Supplement, BR, UT, Narrows Project, Updated 
Information, To Develop a Supplemental Water Supply for Agricultural 
and Municipal and Industrial Water Use, Gooseberry Creek, Sanpete 
County, UT, Comment Period Ends: 05/24/2010, Contact: Kerry Schwartz 
801-379-1150.
EIS No. 20100110, Final EIS, BR, CA, Los Vaqueros Reservoir Expansion 
Project, To Develop Water Supplies Environmental Water Management that 
Supports Fish Protection, Habitat Management, and other Environmental 
Water Needs in the Delta and Tributary River Systems, San Francisco Bay 
Area, Contra Costa County, CA, Wait Period Ends: 05/10/2010, Contact: 
Louis Moore 916-978-5106.
EIS No. 20100111, Draft EIS, BLM, CA, Ridgecrest Solar Power Project, 
Construction and Operation of a Concentrated Solar Powered Electric 
Generating Facility, Application for a Right-of-Way Grant, California 
Desert Conservation Area Plan Amendment, Kern County, CA, Comment 
Period Ends: 07/08/2010, Contact: Janet Eubanks 951-697-5376.
EIS No. 20100112, Final EIS, USFWS, CA, Paiute Cutthroat Trout 
Restoration Project, Eradication of Non-Native Trout Species from 11 
Stream Miles of Silver King Creek, Alpine County, CA, Wait Period Ends: 
05/10/2010, Contact: John Robles 916-414-6464.
EIS No. 20100113, Final EIS, FHWA, ID, US-95 Garwood to Sagle (from MP-
438.4 to MP-469.75) Transportation Improvements to Present and Future 
Traffic Demand, Funding, NPDES Permit and U.S. Army COE Section 404 
Permit, Kootenai and Bonner Counties, ID, Wait Period Ends: 05/10/2010, 
Contact: Ross Blanchard 208-334-9180.
EIS No. 20100114, Draft EIS, USFS, SD, Mystic Range Project Area, 
Propose to Reauthorize Grazing of Domestic Livestock on Eight 
Allotments, Black Hills National Forest, Pennington and Custer 
Counties, SD, Comment Period Ends: 05/24/2010, Contact: Katie Van 
Alstyne 606-343-1567.
EIS No. 20100115, Draft EIS, BLM, CA, Genesis Solar Energy Project, 
Application for a Right-of-Way Grant to Construct, Operate and 
Decommission a Solar Thermal Facility on Public Lands, California 
Desert Conservation Area Plan, Riverside County, CA, Comment Period 
Ends: 07/08/2010, Contact: Allison Shaffer 760-833-7104.
EIS No. 20100116, Draft EIS, FHWA, NC, Mid-Currituck Bridge Study, 
Proposed Transportation Improvements, Currituck and Dare Counties, NC, 
Comment Period Ends: 06/07/2010, Contact: John F. Sullivan 919-856-
4346.
EIS No. 20100117, Draft EIS, USFS, WV, Fernow Experimental Forest 
Project, To Continue Long-Term Research Studies Involving Removal of 
Trees, Prescribed Burning, Fertilization, and Use of Herbicides and 
other Management Activities to Control Invasive Plant Species, Tucker 
County, WV, Comment Period Ends: 05/25/2010, Contact: Mary Beth Adams 
304-478-2000 Ext 130.
EIS No. 20100118, Draft EIS, USACE, KY, East Kentucky Power 
Cooperative, Proposed Baseload Power Plant, to Constructing and 
Operating a 278 Megawatt Circulating

[[Page 18205]]

Fluidized Bed Electric Generating Unit (CFD), and Associated 
Infrastructure at the Existing J.K. Smith Power Station, Application 
for U.S. Army COE Section 10 and 404 Permits, Clark County, KY, Comment 
Period Ends: 05/24/2010, Contact: Michael Hasty 502-315-6676.
    The U.S. Department of Army, Corps of Engineers has adopted the 
U.S. Department of Energy's FEIS 20020508 filed 12/06/2002. 
The Corps of Engineers was not a Cooperating Agency on the above FEIS. 
Under Section 1506.3(b) of the CEQ Regulations the Adopting Agency 
shall treat the statement as a draft and Recirculate it.
EIS No. 20100119, Final EIS, NPS, ND, Theodore Roosevelt National Park, 
Elk Management Plan, Implementation, Billing and McKenzie Counties, ND, 
Wait Period Ends: 05/10/2010, Contact: Valerie Naylor 701-623-4466.
EIS No. 20100120, Final EIS, USFS, CO, Rio de los Pinos Vegetation 
Management Project, Proposes to Salvage Engelmann Spruce Trees that 
have been killed by, or are Infested with, Spruce Beetle, Conejos Peak 
Ranger District, Rio Grande National Forest, Conejos, Rio Grande and 
Archuleta Counties, CO, Wait Period Ends: 05/10/2010, Contact: Kevin 
Duda 719-274-8971.

    Dated: April 6, 2010.
Ken Mittelholtz,
Deputy Director, NEPA Compliance Division, Office of Federal 
Activities.
[FR Doc. 2010-8129 Filed 4-8-10; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.