Combined Notice of Filings #1, 17704-17706 [2010-7817]

Download as PDF WReier-Aviles on DSKGBLS3C1PROD with NOTICES 17704 Federal Register / Vol. 75, No. 66 / Wednesday, April 7, 2010 / Notices Applicants: New York Independent System Operator, Inc. Description: New York Independent System Operator, Inc submits proposed revisions to its Open Access Transmission Tariff and its Market Administration and Control Area Services Tariff to clarify certain meter data posting and customers review etc. Filed Date: 03/26/2010. Accession Number: 20100329–0202. Comment Date: 5 p.m. Eastern Time on Friday, April 16, 2010. Docket Numbers: ER10–942–000. Applicants: ISO New England Inc., New England Power Pool. Description: ISO New England Inc et al submit revisions to their Financial Assurance Policy and Billing Policy. Filed Date: 03/26/2010. Accession Number: 20100329–0207. Comment Date: 5 p.m. Eastern Time on Friday, April 16, 2010. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES10–31–000. Applicants: Midwest Independent Transmission System Operator, Inc. Description: Application of Midwest Independent Transmission System Operator, Inc. under Section 204 of the Federal Power Act to Issue Securities. Filed Date: 03/26/2010. Accession Number: 20100326–5122. Comment Date: 5 p.m. Eastern Time on Friday, April 16, 2010. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor VerDate Nov<24>2008 15:18 Apr 06, 2010 Jkt 220001 must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St. NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2010–7818 Filed 4–6–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 March 31, 2010. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER00–1372–006; ER07–496–003. Applicants: Alcoa Power Generating Inc.; Alcoa Power Marketing, LLC. Description: Amendment to Request for Exemption from the Triennial Market Power Update Reporting Requirements for Category 2 Sellers for the Northwest Region. Filed Date: 03/29/2010. Accession Number: 20100330–0030. Comment Date: 5 p.m. Eastern Time on Monday, April 19, 2010. Docket Numbers: ER04–1220–001. Applicants: Caprock Wind LLC. Description: Amendment to Caprock Wind LLC’s Request for Category 1 Seller Status. Filed Date: 03/30/2010. Accession Number: 20100330–5120. Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010. Docket Numbers: ER10–769–003. Applicants: Glenwood Energy Partners, LTD. PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 Description: Glenwood Energy Partners, LTD submits the Petition for Acceptance of Initial Rater Schedule, Waivers, and Blanket Authority. Filed Date: 03/30/2010. Accession Number: 20100331–0228. Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010. Docket Numbers: ER10–952–000. Applicants: Virginia Electric and Power Company. Description: Virginia Electric and Power Company submits notice of cancellation and a cancelled service agreement sheet terminating a Power Sales Agreement etc. Filed Date: 03/30/2010. Accession Number: 20100330–0244. Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010. Docket Numbers: ER10–953–000. Applicants: Midwest Independent Transmission System Operator, Inc. Description: Midwest Independent Transmission System Operator, Inc. proposed revisions to its Attachment LL, et al., of the Midwest ISO Access Transmission et al. Filed Date: 03/30/2010. Accession Number: 20100330–0246. Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010. Docket Numbers: ER10–954–000. Applicants: Midwest Independent Transmission System Operator, Inc. Description: Midwest Independent Transmission System Operator, Inc. et al., submits proposed revisions to the Congestion Management Process of the Joint Operating Agreement between the Midwest ISO et al. Filed Date: 03/30/2010. Accession Number: 20100330–0245. Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010. Docket Numbers: ER10–955–000. Applicants: Arizona Public Service Company. Description: Arizona Public Service Company submits an amendment to Exhibit B to the 1991 Operation Maintenance, and Replacement of Facilities Agreement with the Western Area Power Administration. Filed Date: 03/30/2010. Accession Number: 20100330–0248. Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010. Docket Numbers: ER10–956–000. Applicants: Vantage Wind Energy LLC. Description: Vantage Wind Energy LLC submits an application for authorization to make market-based wholesale sales of energy, capacity, and ancillary services under FERC Electric Tariff No. 1 and requests for related waivers etc. E:\FR\FM\07APN1.SGM 07APN1 WReier-Aviles on DSKGBLS3C1PROD with NOTICES Federal Register / Vol. 75, No. 66 / Wednesday, April 7, 2010 / Notices Filed Date: 03/30/2010. Accession Number: 20100331–0209. Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010. Docket Numbers: ER10–957–000. Applicants: Southwest Power Pool, Inc. Description: Southwest Power Pool, Inc. submits an executed Meter Agent Services Agreement with Energy Authority, Inc. et al. Filed Date: 03/30/2010. Accession Number: 20100331–0207. Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010. Docket Numbers: ER10–958–000. Applicants: Lockhart Power Company. Description: Lockhart Power Company request for revisions to FERC Electric Tariff, Original Volume No. 1 providing service to the City of Union, South Carolina. Filed Date: 03/30/2010. Accession Number: 20100331–0206. Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010. Docket Numbers: ER10–959–000. Applicants: Central Maine Power Company. Description: Central Maine Power Company submits an Amended Interconnection Agreement with Sparhawk Mill Associates, LLC. Filed Date: 03/30/2010. Accession Number: 20100331–0215. Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010. Docket Numbers: ER10–960–000. Applicants: Central Maine Power Company. Description: Central Maine Power Company submits an Amended Interconnection Agreement with Marsh Power LP. Filed Date: 03/30/2010. Accession Number: 20100331–0212. Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010. Docket Numbers: ER10–961–000. Applicants: Idaho Power Company. Description: Idaho Power Co. submits their Network Integration Service Agreement, Third Revised Service Agreement 159 to FERC Electric Tariff, First Revised Volume 6. Filed Date: 03/30/2010. Accession Number: 20100331–0214. Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010. Docket Numbers: ER10–962–000. Applicants: Union Electric Company. Description: Union Electric Company submits a proposed new Rate Schedule FERC No. 22 with supporting cost data. Filed Date: 03/31/2010. Accession Number: 20100331–0216. VerDate Nov<24>2008 15:18 Apr 06, 2010 Jkt 220001 Comment Date: 5 p.m. Eastern Time on Wednesday, April 21, 2010. Docket Numbers: ER10–963–000. Applicants: Tampa Electric Company. Description: Tampa Electric Company submits First Revised Sheet 3 to FERC Electric Tariff, Original Volume 7, to be effective 4/1/10. Filed Date: 03/31/2010. Accession Number: 20100331–0219. Comment Date: 5 p.m. Eastern Time on Wednesday, April 21, 2010. Docket Numbers: ER10–964–000. Applicants: Central Maine Power Company. Description: Central Maine Power Company submits an Amended Interconnection Agreement by and with Kennebec Water District. Filed Date: 03/30/2010. Accession Number: 20100331–0223. Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010. Docket Numbers: ER10–965–000. Applicants: PJM Interconnection, LLC. Description: PJM Interconnection, LLC submits a notice of cancellation of the executed Transmission Service Agreements. Filed Date: 03/31/2010. Accession Number: 20100331–0229. Comment Date: 5 p.m. Eastern Time on Wednesday, April 21, 2010. Docket Numbers: ER10–966–000. Applicants: California Independent System Operator Corporation. Description: The California Independent System Operator Corporation submits Third Revised Sheet 217 et al. to FERC Electric Tariff, Fourth Replacement Volume 1, to be effective 3/31/10. Filed Date: 03/31/2010. Accession Number: 20100331–0230. Comment Date: 5 p.m. Eastern Time on Wednesday, April 21, 2010. Docket Numbers: ER10–967–000. Applicants: Central Maine Power Company. Description: Central Maine Power Company submits petitions to terminate the Interconnection Agreement with Moosehead Energy, Inc. Filed Date: 03/31/2010. Accession Number: 20100331–0231. Comment Date: 5 p.m. Eastern Time on Wednesday, April 21, 2010. Docket Numbers: ER10–968–000. Applicants: Cleco Power LLC. Description: Cleco Power LLC submits a Service Agreement for Network Integration Transmission. Filed Date: 03/31/2010. Accession Number: 20100331–0232. Comment Date: 5 p.m. Eastern Time on Wednesday, April 21, 2010. PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 17705 Take notice that the Commission received the following open access transmission tariff filings: Docket Numbers: OA09–16–001. Applicants: Northeast Utilities Service Company. Description: Northeast Utilities Service Company’s Order 890 compliance filing of its operational penalties report. Filed Date: 03/31/2010. Accession Number: 20100331–5157. Comment Date: 5 p.m. Eastern Time on Wednesday, April 21, 2010. Take notice that the Commission received the following public utility holding company filings: Docket Numbers: PH10–12–000. Applicants: Brookfield Asset Management Inc. Description: Brookfield Asset Management Inc., et al.’s Notice of Change in Facts. Filed Date: 03/30/2010. Accession Number: 20100330–5098. Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. E:\FR\FM\07APN1.SGM 07APN1 17706 Federal Register / Vol. 75, No. 66 / Wednesday, April 7, 2010 / Notices The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2010–7817 Filed 4–6–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10–53–000] FPL Energy Maine Hydro LLC, Complainant v. Great Lakes Hydro America LLC Rumford Falls Hydro LLC, Respondents; Notice of Complaint WReier-Aviles on DSKGBLS3C1PROD with NOTICES March 29, 2010. Take notice that on March 26, 2010, pursuant to section 206 of the Federal Energy Regulatory Commission’s (Commission) Rules and Practice and Procedure, 18 CFR 385.206 (2009) and sections 10(f) and 306 of the Federal Power Act, 16 U.S.C. 803 and 825(e), FPL Energy Maine Hydro LLC (Complainant) filed a formal complaint against Great Lakes Hydro America LLC and Rumford Falls Hydro LLC (Respondents) alleging that Respondents are violating Article 11 of Form L–3 (October, 1975) of their FERC hydro licenses by improperly obstructing Complainant’s efforts to allocate and recover costs associated with a remediation project designed to bring the Upper and Middle Dams into compliance with the Commission’s Part 12 safety regulations, 18 CFR part 12 (2009 (Renewal Project), in accordance with the Androscoggin Headwater Benefits Agreement approved by the Commission in 1992. Androscoggin Reservoir Company, 59 FERC 62,372 (1992). The Complainant certifies that copies of the complaint were served on the Respondents, all parties to the Androscoggin Headwater Benefits Agreement, and the Maine Pubic Utilities Commission. VerDate Nov<24>2008 15:18 Apr 06, 2010 Jkt 220001 Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on April 15, 2010. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2010–7819 Filed 4–6–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR10–11–000] Flint Hills Resources, LP, Complainant v. Mid-America Pipeline Company, LLC, Respondent; Notice of Complaint March 29, 2010. Take notice that on March 26, 2010, pursuant to Rule 206 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission (Commission), 18 CFR 385.206; the Commission’s Procedural Rules Applicable to Oil Pipeline Proceedings, PO 00000 Frm 00026 Fmt 4703 Sfmt 9990 18 CFR 343.2 and sections 2, 3, 13, and 15 of the Interstate Commerce Act, 49 U.S.C. App. 2, 3, 13, and 15 (1988), Flint Hills Resources, LP (Complainant) filed a complaint against Mid-America Pipeline Company, LLC (Respondent) challenging the Respondent’s rates for transporting butane, isobutane, natural gasoline, naphtha and refinery grade butane on the Respondent’s Northern interstate pipeline system as unjustly discriminatory in relation Respondent’s rates charged to propane shippers for substantially similar service. Complainant certifies that copies of the complaint were served on the contacts for the Respondent. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on April 15, 2010. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2010–7820 Filed 4–6–10; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\07APN1.SGM 07APN1

Agencies

[Federal Register Volume 75, Number 66 (Wednesday, April 7, 2010)]
[Notices]
[Pages 17704-17706]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-7817]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings 1

March 31, 2010.
    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER00-1372-006; ER07-496-003.
    Applicants: Alcoa Power Generating Inc.; Alcoa Power Marketing, 
LLC.
    Description: Amendment to Request for Exemption from the Triennial 
Market Power Update Reporting Requirements for Category 2 Sellers for 
the Northwest Region.
    Filed Date: 03/29/2010.
    Accession Number: 20100330-0030.
    Comment Date: 5 p.m. Eastern Time on Monday, April 19, 2010.

    Docket Numbers: ER04-1220-001.
    Applicants: Caprock Wind LLC.
    Description: Amendment to Caprock Wind LLC's Request for Category 1 
Seller Status.
    Filed Date: 03/30/2010.
    Accession Number: 20100330-5120.
    Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010.

    Docket Numbers: ER10-769-003.
    Applicants: Glenwood Energy Partners, LTD.
    Description: Glenwood Energy Partners, LTD submits the Petition for 
Acceptance of Initial Rater Schedule, Waivers, and Blanket Authority.
    Filed Date: 03/30/2010.
    Accession Number: 20100331-0228.
    Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010.

    Docket Numbers: ER10-952-000.
    Applicants: Virginia Electric and Power Company.
    Description: Virginia Electric and Power Company submits notice of 
cancellation and a cancelled service agreement sheet terminating a 
Power Sales Agreement etc.
    Filed Date: 03/30/2010.
    Accession Number: 20100330-0244.
    Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010.

    Docket Numbers: ER10-953-000.
    Applicants: Midwest Independent Transmission System Operator, Inc.
    Description: Midwest Independent Transmission System Operator, Inc. 
proposed revisions to its Attachment LL, et al., of the Midwest ISO 
Access Transmission et al.
    Filed Date: 03/30/2010.
    Accession Number: 20100330-0246.
    Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010.

    Docket Numbers: ER10-954-000.
    Applicants: Midwest Independent Transmission System Operator, Inc.
    Description: Midwest Independent Transmission System Operator, Inc. 
et al., submits proposed revisions to the Congestion Management Process 
of the Joint Operating Agreement between the Midwest ISO et al.
    Filed Date: 03/30/2010.
    Accession Number: 20100330-0245.
    Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010.

    Docket Numbers: ER10-955-000.
    Applicants: Arizona Public Service Company.
    Description: Arizona Public Service Company submits an amendment to 
Exhibit B to the 1991 Operation Maintenance, and Replacement of 
Facilities Agreement with the Western Area Power Administration.
    Filed Date: 03/30/2010.
    Accession Number: 20100330-0248.
    Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010.

    Docket Numbers: ER10-956-000.
    Applicants: Vantage Wind Energy LLC.
    Description: Vantage Wind Energy LLC submits an application for 
authorization to make market-based wholesale sales of energy, capacity, 
and ancillary services under FERC Electric Tariff No. 1 and requests 
for related waivers etc.

[[Page 17705]]

    Filed Date: 03/30/2010.
    Accession Number: 20100331-0209.
    Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010.

    Docket Numbers: ER10-957-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Southwest Power Pool, Inc. submits an executed Meter 
Agent Services Agreement with Energy Authority, Inc. et al.
    Filed Date: 03/30/2010.
    Accession Number: 20100331-0207.
    Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010.

    Docket Numbers: ER10-958-000.
    Applicants: Lockhart Power Company.
    Description: Lockhart Power Company request for revisions to FERC 
Electric Tariff, Original Volume No. 1 providing service to the City of 
Union, South Carolina.
    Filed Date: 03/30/2010.
    Accession Number: 20100331-0206.
    Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010.

    Docket Numbers: ER10-959-000.
    Applicants: Central Maine Power Company.
    Description: Central Maine Power Company submits an Amended 
Interconnection Agreement with Sparhawk Mill Associates, LLC.
    Filed Date: 03/30/2010.
    Accession Number: 20100331-0215.
    Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010.

    Docket Numbers: ER10-960-000.
    Applicants: Central Maine Power Company.
    Description: Central Maine Power Company submits an Amended 
Interconnection Agreement with Marsh Power LP.
    Filed Date: 03/30/2010.
    Accession Number: 20100331-0212.
    Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010.

    Docket Numbers: ER10-961-000.
    Applicants: Idaho Power Company.
    Description: Idaho Power Co. submits their Network Integration 
Service Agreement, Third Revised Service Agreement 159 to FERC Electric 
Tariff, First Revised Volume 6.
    Filed Date: 03/30/2010.
    Accession Number: 20100331-0214.
    Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010.

    Docket Numbers: ER10-962-000.
    Applicants: Union Electric Company.
    Description: Union Electric Company submits a proposed new Rate 
Schedule FERC No. 22 with supporting cost data.
    Filed Date: 03/31/2010.
    Accession Number: 20100331-0216.
    Comment Date: 5 p.m. Eastern Time on Wednesday, April 21, 2010.

    Docket Numbers: ER10-963-000.
    Applicants: Tampa Electric Company.
    Description: Tampa Electric Company submits First Revised Sheet 3 
to FERC Electric Tariff, Original Volume 7, to be effective 4/1/10.
    Filed Date: 03/31/2010.
    Accession Number: 20100331-0219.
    Comment Date: 5 p.m. Eastern Time on Wednesday, April 21, 2010.

    Docket Numbers: ER10-964-000.
    Applicants: Central Maine Power Company.
    Description: Central Maine Power Company submits an Amended 
Interconnection Agreement by and with Kennebec Water District.
    Filed Date: 03/30/2010.
    Accession Number: 20100331-0223.
    Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010.

    Docket Numbers: ER10-965-000.
    Applicants: PJM Interconnection, LLC.
    Description: PJM Interconnection, LLC submits a notice of 
cancellation of the executed Transmission Service Agreements.
    Filed Date: 03/31/2010.
    Accession Number: 20100331-0229.
    Comment Date: 5 p.m. Eastern Time on Wednesday, April 21, 2010.

    Docket Numbers: ER10-966-000.
    Applicants: California Independent System Operator Corporation.
    Description: The California Independent System Operator Corporation 
submits Third Revised Sheet 217 et al. to FERC Electric Tariff, Fourth 
Replacement Volume 1, to be effective 3/31/10.
    Filed Date: 03/31/2010.
    Accession Number: 20100331-0230.
    Comment Date: 5 p.m. Eastern Time on Wednesday, April 21, 2010.

    Docket Numbers: ER10-967-000.
    Applicants: Central Maine Power Company.
    Description: Central Maine Power Company submits petitions to 
terminate the Interconnection Agreement with Moosehead Energy, Inc.
    Filed Date: 03/31/2010.
    Accession Number: 20100331-0231.
    Comment Date: 5 p.m. Eastern Time on Wednesday, April 21, 2010.

    Docket Numbers: ER10-968-000.
    Applicants: Cleco Power LLC.
    Description: Cleco Power LLC submits a Service Agreement for 
Network Integration Transmission.
    Filed Date: 03/31/2010.
    Accession Number: 20100331-0232.
    Comment Date: 5 p.m. Eastern Time on Wednesday, April 21, 2010.

    Take notice that the Commission received the following open access 
transmission tariff filings:

    Docket Numbers: OA09-16-001.
    Applicants: Northeast Utilities Service Company.
    Description: Northeast Utilities Service Company's Order 890 
compliance filing of its operational penalties report.
    Filed Date: 03/31/2010.
    Accession Number: 20100331-5157.
    Comment Date: 5 p.m. Eastern Time on Wednesday, April 21, 2010.

    Take notice that the Commission received the following public 
utility holding company filings:

    Docket Numbers: PH10-12-000.
    Applicants: Brookfield Asset Management Inc.
    Description: Brookfield Asset Management Inc., et al.'s Notice of 
Change in Facts.
    Filed Date: 03/30/2010.
    Accession Number: 20100330-5098.
    Comment Date: 5 p.m. Eastern Time on Tuesday, April 20, 2010.

    Any person desiring to intervene or to protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Rules of Practice and Procedure (18 CFR 385.211 and 
385.214) on or before 5 p.m. Eastern time on the specified comment 
date. It is not necessary to separately intervene again in a subdocket 
related to a compliance filing if you have previously intervened in the 
same docket. Protests will be considered by the Commission in 
determining the appropriate action to be taken, but will not serve to 
make protestants parties to the proceeding. Anyone filing a motion to 
intervene or protest must serve a copy of that document on the 
Applicant. In reference to filings initiating a new proceeding, 
interventions or protests submitted on or before the comment deadline 
need not be served on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
14 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First St., NE., Washington, DC 20426.

[[Page 17706]]

    The filings in the above proceedings are accessible in the 
Commission's eLibrary system by clicking on the appropriate link in the 
above list. They are also available for review in the Commission's 
Public Reference Room in Washington, DC. There is an eSubscription link 
on the Web site that enables subscribers to receive e-mail notification 
when a document is added to a subscribed docket(s). For assistance with 
any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov or 
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2010-7817 Filed 4-6-10; 8:45 am]