Download as PDF 17452 Federal Register / Vol. 75, No. 65 / Tuesday, April 6, 2010 / Notices the current containment Type A leak rate test (integrated leak rate test or ILRT) interval requirement of Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix J, ‘‘Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors,’’ Option B, ‘‘Performance Based Requirements,’’ from 10 years to 15 years. The amendment allows the next ILRT to be performed no later than October 25, 2014. Date of issuance: March 17, 2010. Effective date: As of its date of issuance and shall be implemented within 90 days from the date of issuance. Amendment No.: 195. Facility Operating License No. NPF– 30: The amendment revised the Operating License and Technical Specifications. Date of initial notice in Federal Register: August 25, 2009 (74 FR 42931). The supplemental letters dated December 10, 2009, and January 19, 2010, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staff’s original proposed no significant hazards consideration determination as published in the Federal Register. The Commission’s related evaluation of the amendment is contained in a Safety Evaluation dated March 17, 2010. No significant hazards consideration comments received: No. Dated at Rockville, Maryland, this 25th day of March 2010. For the Nuclear Regulatory Commission. Joseph G. Giitter, Director, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. 2010–7451 Filed 4–5–10; 8:45 am] BILLING CODE 7590–01–P Dated in Rockville, Maryland this 29th day of March 2010. For the Nuclear Regulatory Commission. Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1– 1, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. NUCLEAR REGULATORY COMMISSION [Docket Nos. 50–387 and 50–388; NRC– 2010–0109] sroberts on DSKD5P82C1PROD with NOTICES incorrectly stated the number of exemptions requested by the licensee and the corresponding implementation date. This action is necessary to correct erroneous information. FOR FURTHER INFORMATION CONTACT: Bhalchandra K. Vaidya, NRR/DORL/PM, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone (301) 415–3308, e-mail: Bhalchandra.Vaidya@nrc.gov. SUPPLEMENTARY INFORMATION: (1) On page 13322, in the first column, third complete paragraph, lines twelve, thirteen, and fourteen, it reads, ‘‘October 29, 2010, for two requirements and until July 31, 2011, for one other requirement. The proposed action, an’’ and is corrected to read ‘‘October 29, 2010, for one requirement and until July 31, 2011, for two other requirements. The proposed action, an.’’ (2) On page 13322, in the second column, third complete paragraph, lines two, three, and four, it reads, ‘‘until October 29, 2010, for two requirements and until July 31, 2011, for one other requirement’’ and is corrected to read, ‘‘until October 29, 2010, for one requirement and until July 31, 2011, for two other requirements.’’ (3) On page 13322, in the third column, second complete paragraph, last line, it reads, ‘‘13926, 13967 (March 27, 2009)]’’ and is corrected to read, ‘‘13926 (March 27, 2009)].’’ (4) On page 13322, in the third column, third complete paragraph, lines nine, ten, and eleven, it reads, ‘‘October 29, 2010, for two requirements and until July 31, 2011, for one other requirement, would not have any’’ and is corrected to read, ‘‘October 29, 2010, for one requirement and until July 31, 2011, for two other requirements, would not have any’’. PPL Susquehanna, LLC.; Susquehanna Steam Electric Station, Units 1 And 2; Correction to Federal Register Notice for Environmental Assessment and Finding of No Significant Impact Nuclear Regulatory Commission. ACTION: Notice of issuance; correction. [FR Doc. 2010–7722 Filed 4–5–10; 8:45 am] This document corrects a notice appearing in the Federal Register on March 19, 2010 (75 FR 13322), that VerDate Nov<24>2008 18:15 Apr 05, 2010 Jkt 220001 Week of April 5, 2010 Tuesday, April 6, 2010 9 a.m. Periodic Briefing on New Reactor Issues—Design Certifications (Public Meeting). (Contact: Amy Snyder, 301–415–6822). This meeting will be Webcast live at the Web address—https://www.nrc.gov. Thursday, April 8, 2010 9:30 a.m. Briefing on Regional Programs— Programs, Performance, and Future Plans (Public Meeting). (Contact: Richard Barkley, 610–337–5065). This meeting will be Webcast live at the Web address—https://www.nrc.gov. Week of April 12, 2010—Tentative Thursday, April 15, 2010 9:30 a.m. Briefing on Resolution of Generic Safety Issue (GSI)—191, Assessment of Debris Accumulation on Pressurized Water Reactor (PWR) Sump Performance (Public Meeting). (Contact: Michael Scott, 301–415–0565). This meeting will be Webcast live at the Web address—https://www.nrc.gov. Week of April 19, 2010—Tentative There are no meetings scheduled for the week of April 19, 2010. Week of April 26, 2010—Tentative Thursday, April 29, 2010 9:30 a.m. Briefing on the Fuel Cycle Oversight Process Revisions (Public Meeting). (Contact: Michael Raddatz, 301– 492–3108). This meeting will be Webcast live at the Web address—https://www.nrc.gov. Week of May 3, 2010—Tentative Tuesday, May 4, 2010 [NRC–2010–0002] 9:30 a.m. Briefing on Human Capital and Equal Employment Opportunity (Public Meeting). (Contact: Kristin Davis, 301–415–2673). This meeting will be Webcast live at the Web address—https://www.nrc.gov. Sunshine Federal Register Notice Week of May 10, 2010—Tentative AGENCY HOLDING THE MEETINGS: Nuclear Regulatory Commission. DATES: Weeks of April 5, 12, 19, 26, May 3, 10, 2010. Tuesday, May 11, 2010 BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION AGENCY: SUMMARY: PLACE: Commissioners’ Conference Room, 11555 Rockville Pike, Rockville, Maryland. STATUS: Public and Closed. PO 00000 Frm 00085 Fmt 4703 Sfmt 4703 9:30 a.m. Briefing on Federal State Materials and Environmental Management E:\FR\FM\06APN1.SGM 06APN1 Federal Register / Vol. 75, No. 65 / Tuesday, April 6, 2010 / Notices Programs (FSME) Programs, Performance, & Future Plans (Public Meeting). (Contact: George Deegan, 301–415–7834). Dated: April 1, 2010. Richard J. Laufer, Office of the Secretary. [FR Doc. 2010–7864 Filed 4–2–10; 4:15 pm] BILLING CODE 7590–01–P Additional Information sroberts on DSKD5P82C1PROD with NOTICES This meeting will be Webcast live at the Web address—https://www.nrc.gov. * * * * * *The schedule for Commission meetings is subject to change on short notice. To verify the status of meetings, call (recording)—(301) 415–1292. Contact person for more information: Rochelle Bavol, (301) 415–1651. * * * * * AGENCY: Office of Personnel Management. ACTION: Notice. By a vote of 3–0 on March 25, 2010, the Commission determined pursuant to U.S.C. 552b(e) and § 9.107(a) of the Commission’s rules that Affirmation of: a. Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.— (Pilgrim Nuclear Power Station) Review of LBP–07–13 (Ruling on Motion to Dismiss SAMA Contention) b. Tennessee Valley Authority (Watts Bar Nuclear Plant, Unit 2), Notice of Appeal, and Brief on Appeal of LBP–09–26 by Sierra Club, Blue Ridge Environmental Defense League, Tennessee Environmental Council, and We the People, Inc. (Dec. 3, 2009) be held on March 26, 2010, with less than one week notice to the public. Both items were affirmed. * * * * * The NRC Commission Meeting Schedule can be found on the Internet at: https://www.nrc.gov/about-nrc/policymaking/schedule.html. * * * * * The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in these public meetings, or need this meeting notice or the transcript or other information from the public meetings in another format (e.g. braille, large print), please notify Angela Bolduc, Chief, Employee/Labor Relations and Work Life Branch, at 301– 492–2230, TDD: 301–415–2100, or by email at angela.bolduc@nrc.gov. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. * * * * * This notice is distributed electronically to subscribers. If you no longer wish to receive it, or would like to be added to the distribution, please contact the Office of the Secretary, Washington, DC 20555 (301–415–1969), or send an e-mail to darlene.wright@nrc.gov. VerDate Nov<24>2008 16:37 Apr 05, 2010 Jkt 220001 OFFICE OF PERSONNEL MANAGEMENT Submission for OMB Review; Request for Comments On a Revised Information Collection: (OMB Control No. 3206–0140; Forms RI 20–7 and RI 30–3) 17453 Washington, DC 20415–3500; and OPM Desk Officer, Office of Information & Regulatory Affairs, Office of Management and Budget, New Executive Office Building, 725 17th Street, NW., Room 10235, Washington, DC 20503. FOR FURTHER INFORMATION CONTACT: Cyrus S. Benson, Team Leader, Publications Team, Retirement & Benefits/Resource Management, U.S. Office of Personnel Management, 1900 E Street, NW., Room 4H28, Washington, DC 20415, (202) 606–4808. Office of Personnel Management John Berry, Director. [FR Doc. 2010–7727 Filed 4–5–10; 8:45 am] BILLING CODE 6325–38–P In accordance with the Paperwork Reduction Act of 1995 (Pub. L. 104–13, May 22, 1995), this notice announces that the Office of Personnel Management (OPM) has submitted to the Office of Management and Budget (OMB) a request for review of a revised information collection. This information collection, ‘‘Representative Payee Application’’ (OMB Control No. 3206– 0140; Form RI 20–7), is used by the Civil Service Retirement System (CSRS) and the Federal Employees Retirement System (FERS) to collect information from persons applying to be fiduciaries for annuitants or survivor annuitants who appear to be incapable of handling their own funds or for minor children. ‘‘Information Necessary for a Competency Determination’’ (OMB Control No. 3206–0140; Form RI 30–3), collects medical information regarding the annuitant’s competency for OPM’s use in evaluating the annuitant’s condition. We estimate 12,480 RI 20–7 forms are completed annually. The form requires approximately 30 minutes for completion. The annual burden is 6,240 hours. Approximately 250 RI 30–3 forms will be completed annually. The form requires approximately 1 hour for completion. The annual burden is 250 hours. The total annual burden is 6,490. For copies of this proposal, contact Cyrus S. Benson on (202) 606–4808, FAX (202) 606–0910 or via E-mail to Cyrus.Benson@opm.gov. Please include a mailing address with your request. DATES: Comments on this proposal should be received within 30 calendar days from the date of this publication. ADDRESSES: Send or deliver comments to— James K. Freiert (Acting), Deputy Associate Director, Retirement Operations, Retirement and Benefits, U.S. Office of Personnel Management, 1900 E Street, NW., Room 3305, SUMMARY: PO 00000 Frm 00086 Fmt 4703 Sfmt 4703 POSTAL SERVICE International Product Change—Global Reseller Expedited Package Contracts Postal ServiceTM. Notice. AGENCY: ACTION: SUMMARY: The Postal Service gives notice of filing a request with the Postal Regulatory Commission to add Global Reseller Expedited Package Contracts to the Competitive Products List pursuant to 39 U.S.C. 3642. DATES: April 6, 2010. FOR FURTHER INFORMATION CONTACT: Margaret M. Falwell, 703–292–3576. SUPPLEMENTARY INFORMATION: The United States Postal Service® hereby gives notice that it has filed with the Postal Regulatory Commission a Request of the United States Postal Service to add Global Reseller Expedited Package Contracts to the Competitive Products List, and Notice of Filing (Under Seal) of Contract and Enabling Governors’ Decision. Documents are available at https://www.prc.gov, Docket Nos. MC2010–21 and CP2010–36. Neva R. Watson, Attorney, Legislative. [FR Doc. 2010–7762 Filed 4–5–10; 8:45 am] BILLING CODE 7710–12–P SMALL BUSINESS ADMINISTRATION Interest Rates The Small Business Administration publishes an interest rate called the optional ‘‘peg’’ rate (13 CFR 120.214) on a quarterly basis. This rate is a weighted average cost of money to the government for maturities similar to the average SBA direct loan. This rate may E:\FR\FM\06APN1.SGM 06APN1

Agencies

[Federal Register Volume 75, Number 65 (Tuesday, April 6, 2010)]
[Notices]
[Pages 17452-17453]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-7864]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2010-0002]


Sunshine Federal Register Notice

Agency Holding the Meetings: Nuclear Regulatory Commission.

Dates: Weeks of April 5, 12, 19, 26, May 3, 10, 2010.

Place: Commissioners' Conference Room, 11555 Rockville Pike, Rockville, 
Maryland.

Status: Public and Closed.

Week of April 5, 2010

Tuesday, April 6, 2010

9 a.m.
    Periodic Briefing on New Reactor Issues--Design Certifications 
(Public Meeting). (Contact: Amy Snyder, 301-415-6822).

    This meeting will be Webcast live at the Web address--https://www.nrc.gov.

Thursday, April 8, 2010

    9:30 a.m.
    Briefing on Regional Programs--Programs, Performance, and Future 
Plans (Public Meeting). (Contact: Richard Barkley, 610-337-5065).

    This meeting will be Webcast live at the Web address--https://www.nrc.gov.

Week of April 12, 2010--Tentative

Thursday, April 15, 2010

9:30 a.m.
    Briefing on Resolution of Generic Safety Issue (GSI)--191, 
Assessment of Debris Accumulation on Pressurized Water Reactor (PWR) 
Sump Performance (Public Meeting). (Contact: Michael Scott, 301-415-
0565).

    This meeting will be Webcast live at the Web address--https://www.nrc.gov.

Week of April 19, 2010--Tentative

    There are no meetings scheduled for the week of April 19, 2010.

Week of April 26, 2010--Tentative

Thursday, April 29, 2010

9:30 a.m.
    Briefing on the Fuel Cycle Oversight Process Revisions (Public 
Meeting). (Contact: Michael Raddatz, 301-492-3108).

    This meeting will be Webcast live at the Web address--https://www.nrc.gov.

Week of May 3, 2010--Tentative

Tuesday, May 4, 2010

9:30 a.m.
    Briefing on Human Capital and Equal Employment Opportunity (Public 
Meeting). (Contact: Kristin Davis, 301-415-2673).

    This meeting will be Webcast live at the Web address--https://www.nrc.gov.

Week of May 10, 2010--Tentative

Tuesday, May 11, 2010

9:30 a.m.
    Briefing on Federal State Materials and Environmental Management

[[Page 17453]]

Programs (FSME) Programs, Performance, & Future Plans (Public Meeting). 
(Contact: George Deegan, 301-415-7834).

    This meeting will be Webcast live at the Web address--https://www.nrc.gov.
* * * * *
    *The schedule for Commission meetings is subject to change on short 
notice. To verify the status of meetings, call (recording)--(301) 415-
1292. Contact person for more information: Rochelle Bavol, (301) 415-
1651.
* * * * *

Additional Information

    By a vote of 3-0 on March 25, 2010, the Commission determined 
pursuant to U.S.C. 552b(e) and Sec.  9.107(a) of the Commission's rules 
that Affirmation of: a. Entergy Nuclear Generation Company and Entergy 
Nuclear Operations, Inc.--(Pilgrim Nuclear Power Station) Review of 
LBP-07-13 (Ruling on Motion to Dismiss SAMA Contention) b. Tennessee 
Valley Authority (Watts Bar Nuclear Plant, Unit 2), Notice of Appeal, 
and Brief on Appeal of LBP-09-26 by Sierra Club, Blue Ridge 
Environmental Defense League, Tennessee Environmental Council, and We 
the People, Inc. (Dec. 3, 2009) be held on March 26, 2010, with less 
than one week notice to the public. Both items were affirmed.
* * * * *
    The NRC Commission Meeting Schedule can be found on the Internet 
at: https://www.nrc.gov/about-nrc/policy-making/schedule.html.
* * * * *
    The NRC provides reasonable accommodation to individuals with 
disabilities where appropriate. If you need a reasonable accommodation 
to participate in these public meetings, or need this meeting notice or 
the transcript or other information from the public meetings in another 
format (e.g. braille, large print), please notify Angela Bolduc, Chief, 
Employee/Labor Relations and Work Life Branch, at 301-492-2230, TDD: 
301-415-2100, or by e-mail at angela.bolduc@nrc.gov. Determinations on 
requests for reasonable accommodation will be made on a case-by-case 
basis.
* * * * *
    This notice is distributed electronically to subscribers. If you no 
longer wish to receive it, or would like to be added to the 
distribution, please contact the Office of the Secretary, Washington, 
DC 20555 (301-415-1969), or send an e-mail to darlene.wright@nrc.gov.

    Dated: April 1, 2010.
Richard J. Laufer,
Office of the Secretary.
[FR Doc. 2010-7864 Filed 4-2-10; 4:15 pm]
BILLING CODE 7590-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.