Federal Register / Vol. 75, No. 65 / Tuesday, April 6, 2010 / Notices
the current containment Type A leak
rate test (integrated leak rate test or
ILRT) interval requirement of Title 10 of
the Code of Federal Regulations (10
CFR) Part 50, Appendix J, ‘‘Primary
Reactor Containment Leakage Testing
for Water-Cooled Power Reactors,’’
Option B, ‘‘Performance Based
Requirements,’’ from 10 years to 15
years. The amendment allows the next
ILRT to be performed no later than
October 25, 2014.
Date of issuance: March 17, 2010.
Effective date: As of its date of
issuance and shall be implemented
within 90 days from the date of
issuance.
Amendment No.: 195.
Facility Operating License No. NPF–
30: The amendment revised the
Operating License and Technical
Specifications.
Date of initial notice in Federal
Register: August 25, 2009 (74 FR 42931).
The supplemental letters dated
December 10, 2009, and January 19,
2010, provided additional information
that clarified the application, did not
expand the scope of the application as
originally noticed, and did not change
the staff’s original proposed no
significant hazards consideration
determination as published in the
Federal Register.
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated March 17, 2010.
No significant hazards consideration
comments received: No.
Dated at Rockville, Maryland, this 25th day
of March 2010.
For the Nuclear Regulatory Commission.
Joseph G. Giitter,
Director, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. 2010–7451 Filed 4–5–10; 8:45 am]
BILLING CODE 7590–01–P
Dated in Rockville, Maryland this 29th day
of March 2010.
For the Nuclear Regulatory Commission.
Bhalchandra K. Vaidya,
Project Manager Plant Licensing Branch 1–
1, Division of Operating Reactor Licensing,
Office of Nuclear Reactor Regulation.
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–387 and 50–388; NRC–
2010–0109]
sroberts on DSKD5P82C1PROD with NOTICES
incorrectly stated the number of
exemptions requested by the licensee
and the corresponding implementation
date. This action is necessary to correct
erroneous information.
FOR FURTHER INFORMATION CONTACT:
Bhalchandra K. Vaidya, NRR/DORL/PM,
Office of Nuclear Reactor Regulation,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone
(301) 415–3308, e-mail:
Bhalchandra.Vaidya@nrc.gov.
SUPPLEMENTARY INFORMATION:
(1) On page 13322, in the first
column, third complete paragraph, lines
twelve, thirteen, and fourteen, it reads,
‘‘October 29, 2010, for two requirements
and until July 31, 2011, for one other
requirement. The proposed action, an’’
and is corrected to read ‘‘October 29,
2010, for one requirement and until July
31, 2011, for two other requirements.
The proposed action, an.’’
(2) On page 13322, in the second
column, third complete paragraph, lines
two, three, and four, it reads, ‘‘until
October 29, 2010, for two requirements
and until July 31, 2011, for one other
requirement’’ and is corrected to read,
‘‘until October 29, 2010, for one
requirement and until July 31, 2011, for
two other requirements.’’
(3) On page 13322, in the third
column, second complete paragraph,
last line, it reads, ‘‘13926, 13967 (March
27, 2009)]’’ and is corrected to read,
‘‘13926 (March 27, 2009)].’’
(4) On page 13322, in the third
column, third complete paragraph, lines
nine, ten, and eleven, it reads, ‘‘October
29, 2010, for two requirements and until
July 31, 2011, for one other requirement,
would not have any’’ and is corrected to
read, ‘‘October 29, 2010, for one
requirement and until July 31, 2011, for
two other requirements, would not have
any’’.
PPL Susquehanna, LLC.;
Susquehanna Steam Electric Station,
Units 1 And 2; Correction to Federal
Register Notice for Environmental
Assessment and Finding of No
Significant Impact
Nuclear Regulatory
Commission.
ACTION: Notice of issuance; correction.
[FR Doc. 2010–7722 Filed 4–5–10; 8:45 am]
This document corrects a
notice appearing in the Federal Register
on March 19, 2010 (75 FR 13322), that
VerDate Nov<24>2008
18:15 Apr 05, 2010
Jkt 220001
Week of April 5, 2010
Tuesday, April 6, 2010
9 a.m.
Periodic Briefing on New Reactor
Issues—Design Certifications
(Public Meeting). (Contact: Amy
Snyder, 301–415–6822).
This meeting will be Webcast live at
the Web address—https://www.nrc.gov.
Thursday, April 8, 2010
9:30 a.m.
Briefing on Regional Programs—
Programs, Performance, and Future
Plans (Public Meeting). (Contact:
Richard Barkley, 610–337–5065).
This meeting will be Webcast live at
the Web address—https://www.nrc.gov.
Week of April 12, 2010—Tentative
Thursday, April 15, 2010
9:30 a.m.
Briefing on Resolution of Generic
Safety Issue (GSI)—191, Assessment
of Debris Accumulation on
Pressurized Water Reactor (PWR)
Sump Performance (Public
Meeting). (Contact: Michael Scott,
301–415–0565).
This meeting will be Webcast live at
the Web address—https://www.nrc.gov.
Week of April 19, 2010—Tentative
There are no meetings scheduled for
the week of April 19, 2010.
Week of April 26, 2010—Tentative
Thursday, April 29, 2010
9:30 a.m.
Briefing on the Fuel Cycle Oversight
Process Revisions (Public Meeting).
(Contact: Michael Raddatz, 301–
492–3108).
This meeting will be Webcast live at
the Web address—https://www.nrc.gov.
Week of May 3, 2010—Tentative
Tuesday, May 4, 2010
[NRC–2010–0002]
9:30 a.m.
Briefing on Human Capital and Equal
Employment Opportunity (Public
Meeting). (Contact: Kristin Davis,
301–415–2673).
This meeting will be Webcast live at
the Web address—https://www.nrc.gov.
Sunshine Federal Register Notice
Week of May 10, 2010—Tentative
AGENCY HOLDING THE MEETINGS: Nuclear
Regulatory Commission.
DATES: Weeks of April 5, 12, 19, 26, May
3, 10, 2010.
Tuesday, May 11, 2010
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
AGENCY:
SUMMARY:
PLACE: Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Public and Closed.
PO 00000
Frm 00085
Fmt 4703
Sfmt 4703
9:30 a.m.
Briefing on Federal State Materials
and Environmental Management
E:\FR\FM\06APN1.SGM
06APN1
Federal Register / Vol. 75, No. 65 / Tuesday, April 6, 2010 / Notices
Programs (FSME) Programs,
Performance, & Future Plans (Public
Meeting). (Contact: George Deegan,
301–415–7834).
Dated: April 1, 2010.
Richard J. Laufer,
Office of the Secretary.
[FR Doc. 2010–7864 Filed 4–2–10; 4:15 pm]
BILLING CODE 7590–01–P
Additional Information
sroberts on DSKD5P82C1PROD with NOTICES
This meeting will be Webcast live at
the Web address—https://www.nrc.gov.
*
*
*
*
*
*The schedule for Commission
meetings is subject to change on short
notice. To verify the status of meetings,
call (recording)—(301) 415–1292.
Contact person for more information:
Rochelle Bavol, (301) 415–1651.
*
*
*
*
*
AGENCY: Office of Personnel
Management.
ACTION: Notice.
By a vote of 3–0 on March 25, 2010,
the Commission determined pursuant to
U.S.C. 552b(e) and § 9.107(a) of the
Commission’s rules that Affirmation of:
a. Entergy Nuclear Generation Company
and Entergy Nuclear Operations, Inc.—
(Pilgrim Nuclear Power Station) Review
of LBP–07–13 (Ruling on Motion to
Dismiss SAMA Contention) b.
Tennessee Valley Authority (Watts Bar
Nuclear Plant, Unit 2), Notice of Appeal,
and Brief on Appeal of LBP–09–26 by
Sierra Club, Blue Ridge Environmental
Defense League, Tennessee
Environmental Council, and We the
People, Inc. (Dec. 3, 2009) be held on
March 26, 2010, with less than one
week notice to the public. Both items
were affirmed.
*
*
*
*
*
The NRC Commission Meeting
Schedule can be found on the Internet
at: https://www.nrc.gov/about-nrc/policymaking/schedule.html.
*
*
*
*
*
The NRC provides reasonable
accommodation to individuals with
disabilities where appropriate. If you
need a reasonable accommodation to
participate in these public meetings, or
need this meeting notice or the
transcript or other information from the
public meetings in another format (e.g.
braille, large print), please notify Angela
Bolduc, Chief, Employee/Labor
Relations and Work Life Branch, at 301–
492–2230, TDD: 301–415–2100, or by email at angela.bolduc@nrc.gov.
Determinations on requests for
reasonable accommodation will be
made on a case-by-case basis.
*
*
*
*
*
This notice is distributed
electronically to subscribers. If you no
longer wish to receive it, or would like
to be added to the distribution, please
contact the Office of the Secretary,
Washington, DC 20555 (301–415–1969),
or send an e-mail to
darlene.wright@nrc.gov.
VerDate Nov<24>2008
16:37 Apr 05, 2010
Jkt 220001
OFFICE OF PERSONNEL
MANAGEMENT
Submission for OMB Review; Request
for Comments On a Revised
Information Collection: (OMB Control
No. 3206–0140; Forms RI 20–7 and
RI 30–3)
17453
Washington, DC 20415–3500; and OPM
Desk Officer, Office of Information &
Regulatory Affairs, Office of
Management and Budget, New
Executive Office Building, 725 17th
Street, NW., Room 10235, Washington,
DC 20503.
FOR FURTHER INFORMATION CONTACT:
Cyrus S. Benson, Team Leader,
Publications Team, Retirement &
Benefits/Resource Management, U.S.
Office of Personnel Management, 1900 E
Street, NW., Room 4H28, Washington,
DC 20415, (202) 606–4808.
Office of Personnel Management
John Berry,
Director.
[FR Doc. 2010–7727 Filed 4–5–10; 8:45 am]
BILLING CODE 6325–38–P
In accordance with the
Paperwork Reduction Act of 1995 (Pub.
L. 104–13, May 22, 1995), this notice
announces that the Office of Personnel
Management (OPM) has submitted to
the Office of Management and Budget
(OMB) a request for review of a revised
information collection. This information
collection, ‘‘Representative Payee
Application’’ (OMB Control No. 3206–
0140; Form RI 20–7), is used by the
Civil Service Retirement System (CSRS)
and the Federal Employees Retirement
System (FERS) to collect information
from persons applying to be fiduciaries
for annuitants or survivor annuitants
who appear to be incapable of handling
their own funds or for minor children.
‘‘Information Necessary for a
Competency Determination’’ (OMB
Control No. 3206–0140; Form RI 30–3),
collects medical information regarding
the annuitant’s competency for OPM’s
use in evaluating the annuitant’s
condition.
We estimate 12,480 RI 20–7 forms are
completed annually. The form requires
approximately 30 minutes for
completion. The annual burden is 6,240
hours. Approximately 250 RI 30–3
forms will be completed annually. The
form requires approximately 1 hour for
completion. The annual burden is 250
hours. The total annual burden is 6,490.
For copies of this proposal, contact
Cyrus S. Benson on (202) 606–4808,
FAX (202) 606–0910 or via E-mail to
Cyrus.Benson@opm.gov. Please include
a mailing address with your request.
DATES: Comments on this proposal
should be received within 30 calendar
days from the date of this publication.
ADDRESSES: Send or deliver comments
to— James K. Freiert (Acting), Deputy
Associate Director, Retirement
Operations, Retirement and Benefits,
U.S. Office of Personnel Management,
1900 E Street, NW., Room 3305,
SUMMARY:
PO 00000
Frm 00086
Fmt 4703
Sfmt 4703
POSTAL SERVICE
International Product Change—Global
Reseller Expedited Package Contracts
Postal ServiceTM.
Notice.
AGENCY:
ACTION:
SUMMARY: The Postal Service gives
notice of filing a request with the Postal
Regulatory Commission to add Global
Reseller Expedited Package Contracts to
the Competitive Products List pursuant
to 39 U.S.C. 3642.
DATES: April 6, 2010.
FOR FURTHER INFORMATION CONTACT:
Margaret M. Falwell, 703–292–3576.
SUPPLEMENTARY INFORMATION: The
United States Postal Service® hereby
gives notice that it has filed with the
Postal Regulatory Commission a Request
of the United States Postal Service to
add Global Reseller Expedited Package
Contracts to the Competitive Products
List, and Notice of Filing (Under Seal)
of Contract and Enabling Governors’
Decision. Documents are available at
https://www.prc.gov, Docket Nos.
MC2010–21 and CP2010–36.
Neva R. Watson,
Attorney, Legislative.
[FR Doc. 2010–7762 Filed 4–5–10; 8:45 am]
BILLING CODE 7710–12–P
SMALL BUSINESS ADMINISTRATION
Interest Rates
The Small Business Administration
publishes an interest rate called the
optional ‘‘peg’’ rate (13 CFR 120.214) on
a quarterly basis. This rate is a weighted
average cost of money to the
government for maturities similar to the
average SBA direct loan. This rate may
E:\FR\FM\06APN1.SGM
06APN1
Agencies
[Federal Register Volume 75, Number 65 (Tuesday, April 6, 2010)]
[Notices]
[Pages 17452-17453]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-7864]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2010-0002]
Sunshine Federal Register Notice
Agency Holding the Meetings: Nuclear Regulatory Commission.
Dates: Weeks of April 5, 12, 19, 26, May 3, 10, 2010.
Place: Commissioners' Conference Room, 11555 Rockville Pike, Rockville,
Maryland.
Status: Public and Closed.
Week of April 5, 2010
Tuesday, April 6, 2010
9 a.m.
Periodic Briefing on New Reactor Issues--Design Certifications
(Public Meeting). (Contact: Amy Snyder, 301-415-6822).
This meeting will be Webcast live at the Web address--https://www.nrc.gov.
Thursday, April 8, 2010
9:30 a.m.
Briefing on Regional Programs--Programs, Performance, and Future
Plans (Public Meeting). (Contact: Richard Barkley, 610-337-5065).
This meeting will be Webcast live at the Web address--https://www.nrc.gov.
Week of April 12, 2010--Tentative
Thursday, April 15, 2010
9:30 a.m.
Briefing on Resolution of Generic Safety Issue (GSI)--191,
Assessment of Debris Accumulation on Pressurized Water Reactor (PWR)
Sump Performance (Public Meeting). (Contact: Michael Scott, 301-415-
0565).
This meeting will be Webcast live at the Web address--https://www.nrc.gov.
Week of April 19, 2010--Tentative
There are no meetings scheduled for the week of April 19, 2010.
Week of April 26, 2010--Tentative
Thursday, April 29, 2010
9:30 a.m.
Briefing on the Fuel Cycle Oversight Process Revisions (Public
Meeting). (Contact: Michael Raddatz, 301-492-3108).
This meeting will be Webcast live at the Web address--https://www.nrc.gov.
Week of May 3, 2010--Tentative
Tuesday, May 4, 2010
9:30 a.m.
Briefing on Human Capital and Equal Employment Opportunity (Public
Meeting). (Contact: Kristin Davis, 301-415-2673).
This meeting will be Webcast live at the Web address--https://www.nrc.gov.
Week of May 10, 2010--Tentative
Tuesday, May 11, 2010
9:30 a.m.
Briefing on Federal State Materials and Environmental Management
[[Page 17453]]
Programs (FSME) Programs, Performance, & Future Plans (Public Meeting).
(Contact: George Deegan, 301-415-7834).
This meeting will be Webcast live at the Web address--https://www.nrc.gov.
* * * * *
*The schedule for Commission meetings is subject to change on short
notice. To verify the status of meetings, call (recording)--(301) 415-
1292. Contact person for more information: Rochelle Bavol, (301) 415-
1651.
* * * * *
Additional Information
By a vote of 3-0 on March 25, 2010, the Commission determined
pursuant to U.S.C. 552b(e) and Sec. 9.107(a) of the Commission's rules
that Affirmation of: a. Entergy Nuclear Generation Company and Entergy
Nuclear Operations, Inc.--(Pilgrim Nuclear Power Station) Review of
LBP-07-13 (Ruling on Motion to Dismiss SAMA Contention) b. Tennessee
Valley Authority (Watts Bar Nuclear Plant, Unit 2), Notice of Appeal,
and Brief on Appeal of LBP-09-26 by Sierra Club, Blue Ridge
Environmental Defense League, Tennessee Environmental Council, and We
the People, Inc. (Dec. 3, 2009) be held on March 26, 2010, with less
than one week notice to the public. Both items were affirmed.
* * * * *
The NRC Commission Meeting Schedule can be found on the Internet
at: https://www.nrc.gov/about-nrc/policy-making/schedule.html.
* * * * *
The NRC provides reasonable accommodation to individuals with
disabilities where appropriate. If you need a reasonable accommodation
to participate in these public meetings, or need this meeting notice or
the transcript or other information from the public meetings in another
format (e.g. braille, large print), please notify Angela Bolduc, Chief,
Employee/Labor Relations and Work Life Branch, at 301-492-2230, TDD:
301-415-2100, or by e-mail at angela.bolduc@nrc.gov. Determinations on
requests for reasonable accommodation will be made on a case-by-case
basis.
* * * * *
This notice is distributed electronically to subscribers. If you no
longer wish to receive it, or would like to be added to the
distribution, please contact the Office of the Secretary, Washington,
DC 20555 (301-415-1969), or send an e-mail to darlene.wright@nrc.gov.
Dated: April 1, 2010.
Richard J. Laufer,
Office of the Secretary.
[FR Doc. 2010-7864 Filed 4-2-10; 4:15 pm]