Public Notice for Waiver of Aeronautical Land-Use Assurance Dayton-Wright Brothers Airport; Dayton, OH, 16903-16909 [2010-7079]

Download as PDF Federal Register / Vol. 75, No. 63 / Friday, April 2, 2010 / Notices • How timely is the airplane in alerting the crew of flight below the intended operating speed? How timely relative to stall warning? • Is alerting instantly recognizable, clear, and unambiguous to the flightcrew? • How are nuisance alerts minimized? • Does the alerting operate under all operating conditions, configurations, and phases of flight, including icing conditions? • Does the alerting operate during manual and autoflight? • After reviewing airworthiness, safety, cost, and other relevant factors, including recent certification and fleet experience, are there any additional considerations that should be taken into account? • Is coordination necessary with other harmonization working groups (e.g., Human Factors)? • If improvements are needed for low speed alerting in the existing fleet, should the FAA adopt a design approval holder (part 26) requirement to mandate development of design changes, or would an operational rule be sufficient? In responding, the working group should address the factors set forth in ‘‘FAA Policy Statement: Safety—A Shared Responsibility—New Direction for Addressing Airworthiness Issues for Transport Airplanes’’ (70 FR 40166, July 12, 2005). The ARAC working group should provide information that could lead to standards for low speed alerting that can be satisfied with practical design approaches. Schedule The required completion date is 9 months after the FAA publishes the task in the Federal Register. ARAC Acceptance of Task mstockstill on DSKH9S0YB1PROD with NOTICES ARAC accepted the task and assigned it to the existing Avionics Systems Harmonization Working Group in the Transport Airplane and Engine Issue Area. The working group serves as staff to ARAC and assists in the analysis of assigned tasks. ARAC must review and approve the working group’s recommendations. If ARAC accepts the working group’s recommendations, it will forward them to the FAA. Working Group Activity The Avionics Systems Harmonization Working Group must comply with the procedures adopted by ARAC. As part of the procedures, the working group must: 1. Recommend a work plan for completion of the task, including the VerDate Nov<24>2008 16:40 Apr 01, 2010 Jkt 220001 rationale supporting such a plan for consideration at the next meeting of the ARAC on Transport Airplane and Engine Issues held following publication of this notice. 2. Give a detailed conceptual presentation of the proposed recommendations prior to proceeding with the work stated in item 3 below. 3. Draft the appropriate documents and required analyses and/or any other related materials or documents. 4. Provide a status report at each meeting of the ARAC held to consider Transport Airplane and Engine Issues. Participation in the Working Group The Avionics Systems Harmonization Working Group is composed of technical experts having an interest in the assigned task. A working group member need not be a representative or a member of the full committee. If you have expertise in the subject matter and wish to become a member of the working group, write to the person listed under the caption FOR FURTHER INFORMATION CONTACT expressing that desire. Describe your interest in the task and state the expertise you would bring to the working group. We must receive all requests by May 3, 2010. The assistant chair, the assistant executive director, and the working group cochairs will review the requests and advise you whether or not your request is approved. If you are chosen for membership on the working group, you must represent your aviation community segment and actively participate in the working group by attending all meetings and providing written comments when requested to do so. You must devote the resources necessary to support the working group in meeting any assigned deadlines. You must keep your management chain and those you may represent advised of working group activities and decisions to ensure that the proposed technical solutions do not conflict with your sponsoring organization’s position when the subject being negotiated is presented to ARAC for approval. Once the working group has begun deliberations, members will not be added or substituted without the approval of the assistant chair, the assistant executive director, and the working group co-chairs. The Secretary of Transportation determined that the formation and use of the ARAC is necessary and in the public interest in connection with the performance of duties imposed on the FAA by law. Meetings of the ARAC are open to the public. Meetings of the Avionics Systems Harmonization Working Group PO 00000 Frm 00185 Fmt 4703 Sfmt 4703 16903 will not be open to the public, except to the extent individuals with an interest and expertise are selected to participate. The FAA will make no public announcement of working group meetings. Issued in Washington, DC, on March 29, 2010. Pamela Hamilton-Powell, Executive Director, Aviation Rulemaking Advisory Committee. [FR Doc. 2010–7402 Filed 4–1–10; 8:45 am] BILLING CODE 4910–13–P DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Public Notice for Waiver of Aeronautical Land-Use Assurance Dayton-Wright Brothers Airport; Dayton, OH AGENCY: Federal Aviation Administration, DOT. ACTION: Notice of intent of waiver with respect to land. SUMMARY: The Federal Aviation Administration (FAA) is considering a proposal to change a portion of the airport from aeronautical use to nonaeronautical use and to authorize the release of 10.829 acres of airport property for permanent public roadway use. The land consists of portions of 4 original airport acquired parcels. These parcels were acquired under grants 5– 39–0030–01, 5–39–0030–02, 5–39– 0030–03, 5–39–0030–04, 5–39–0030–05, and 3–39–0030–01. There are no impacts to the airport by allowing the City of Dayton to sell the property. The land is not needed for aeronautical use. Approval does not constitute a commitment by the FAA to financially assist in the sale of the subject airport property nor a determination of eligibility for grant-in-aid funding from the FAA. The disposition of proceeds from the sale of the airport property will be in accordance with FAA’s Policy and Procedures Concerning the Use of Airport Revenue, published in the Federal Register on February 16, 1999. In accordance with section 47107(h) of title 49, United States Code, this notice is required to be published in the Federal Register 30 days before modifying the land-use assurance that requires the property to be used for an aeronautical purpose. DATES: Comments must be received on or before May 3, 2010. ADDRESSES: Written comments on the Sponsor’s request must be delivered or mailed to: Irene R. Porter, Program Manager, Detroit Airports District E:\FR\FM\02APN1.SGM 02APN1 16904 Federal Register / Vol. 75, No. 63 / Friday, April 2, 2010 / Notices Office, 11677 South Wayne Road, Suite 107, Romulus, MI 48174. FOR FURTHER INFORMATION CONTACT: Irene R. Porter, Program Manager, Federal Aviation Administration, Great Lakes Region, Detroit Airports District Office, DET ADO–607, 11677 South Wayne Road, Suite 107, Romulus, Michigan 48174. Telephone Number (734–229–2915)/FAX Number (734– 229–2950). Documents reflecting this FAA action may be reviewed at this same location or at Dayton Wright Brothers Airport, Dayton, Ohio. SUPPLEMENTARY INFORMATION: mstockstill on DSKH9S0YB1PROD with NOTICES Parcel 6–SH1 Situated in the Township of Miami, County of Montgomery, State of Ohio and being a part of a 57.720 acre tract of land as conveyed to The City of Dayton, Ohio, and described in Deed M.F. 74–023D06 and lying in Section 10, Township 2, Range 5, M.Rs., and being a parcel of land lying on the Right side of the Centerline of Construction of Austin Boulevard, as shown on Plat Book 212, Pages 34 and 34A as surveyed by Burgess & Niple for the Montgomery County Engineer’s Office and being more particularly described as follows: Beginning for reference at a brass disk found in a highway monument box stamped ‘‘Montgomery County Engineer’s Dayton’’, located in the existing centerline of Right-of-Way of Austin Pike at the southeast corner of the Villages of Miami-South, Section Seven, as shown in Plat Book 192, Page 33. Said disk being located 15.31 left of Austin Boulevard Centerline of Construction Station 225+55.84; Thence the following seven (7) courses and distances along said existing centerline of Right-of-Way of Austin Pike: 1. S 83°01′58″ W, a distance of 670.76 feet and along the south line of said Villages of Miami-South, Section Seven, to an angle point being located 15.93 feet left of Austin Boulevard Centerline of Construction Station 218+85.08; 2. S 83°46′58″ W, a distance of 160.64 feet, and along said south line of the Villages of Miami-South, Section Seven, to an angle point at the common corner of said Villages of Miami-South, Section Seven, and the 68.065 acre tract of land conveyed to the Board of Trustees Miami Township, Montgomery County, Ohio in Deed M.F. 95–248D05. Said point being located 18.18 feet left of Austin Boulevard Centerline of Construction Station 217+24.46; 3. S 83°46′26″ W, a distance of 373.41 feet, and along the south line of said 68.065 acre tract, to an angle point being VerDate Nov<24>2008 16:40 Apr 01, 2010 Jkt 220001 located 21.45 feet left of Austin Boulevard Centerline of Construction Station 213+50.09; 4. S 83°49′00″ W, a distance of 722.77 feet, and along said south line of the 68.065 acre tract, to a point at the common corner of said 68.065 acre tract and the 23.744 acre tract of land conveyed to The City of Dayton, Ohio in Deed M.F. 83–011B03. Said point being located 76.02 feet right of Austin Boulevard Centerline of Construction Station 206+30.88; 5. Continue S 83°49′00″ W, a distance of 22.67 feet, and along the south line of said 23.744 acre tract, to a point at the northeast corner of the aforesaid Grantor’s 57.720 acre tract. Said point being located 78.95 feet right of Austin Boulevard Centerline of Construction Station 206+08.10; 6. S 89°17′39″ W, a distance of 673.03 feet, and along the south line of said 23.744 acre tract and north line said Grantor’s 57.720 acre tract, to a railroad spike found at the common corner of said 23.744 acre tract and the aforesaid 68.065 (Total) acre tract, said point being located 60.27 feet right of Austin Boulevard Centerline of Construction Station 199+26.65; 7. S 89°16′51″ W, a distance of 141.77 feet, and along the south line of said 68.065 (Total) acre tract and north line said Grantor’s 57.720 acre tract, to a point at the northeast corner of Parcel 126–WDV of proposed Right-of-Way to be acquired by ODOT Project MOT– 750.75, Phase Three, PID 77246, as shown upon the Right-of-Way plans thereof. Said point being located 46.21 feet right of Austin Boulevard Centerline of Construction Station 197+84.25; Thence the following three (3) courses and distances along said Parcel 126– WDV: 1. S 00°43′10″ E, a distance of 24.12 feet, to a point being located 70.18 feet right of Austin Boulevard Centerline of Construction Station 197+81.53; 2. S 55°11′45″ W, a distance of 72.45 feet, to a point being located 103.43 feet right of Austin Boulevard Centerline of Construction Station 197+16.18; 3. S 84°57′40″ W, a distance of 273.40 feet, to an iron pin set. Said iron pin being the point of true beginning and located 83.63 feet right of Austin Boulevard Centerline of Construction Station 194+38.94; Thence S 80°59′47″ W, a distance of 411.13 feet along the proposed south right-of-way across aforesaid Grantor’s 57.720 acre tract, to an iron pin set in the aforesaid south line of Parcel 126– WDV. Said iron pin being located 95.76 feet right of Austin Boulevard PO 00000 Frm 00186 Fmt 4703 Sfmt 4703 Centerline of Construction Station 190+41.43; Thence the following two (2) courses and distances along said south lines of Parcel 126–WDV: 1. N 76°48′01″ E, a distance of 200.25 feet, to a point. Said point being located 66.00 feet right of Austin Boulevard Centerline of Construction Station 192+31.49; 2. N 84°57′40″ E, a distance of 211.92 feet, to the point of true beginning. The above described area contains a total of 0.069 acres, within the Montgomery County Auditor’s Parcel Number K45 02602 0015, which includes 0.000 acres in the present road occupied. Parcel 6–SH2 Situated in the Township of Miami, County of Montgomery, State of Ohio and being a part of a 57.720 acre tract of land as conveyed to The City of Dayton, Ohio, and described in Deed M.F. 74–023D06 and lying in Section 10, Township 2, Range 5, M.Rs., and being a parcel of land lying on the Right side of the Centerline of Construction, Austin Boulevard, as shown on Plat Book 212, Pages 34 and 34A as surveyed by Burgess & Niple for the Montgomery County Engineer’s Office and being more particularly described as follows: Beginning for reference at a brass disk found in a highway monument box stamped ‘‘Montgomery County Engineer’s Dayton’’, located in the existing centerline of Right-of-Way of Austin Pike at the southeast corner of the Villages of Miami-South, Section Seven, as shown in Plat Book 192, Page 33. Said disk being located 15.31 left of Austin Boulevard Centerline of Construction Station 225+55.84; Thence the following five (5) courses and distances along said existing centerline of Right-of-Way of Austin Pike: 1. S 83°01′58″ W, a distance of 670.76 feet, and along the south line of said Villages of Miami-South, Section Seven, to an angle point being located 15.93 feet left of Austin Boulevard Centerline of Construction Station 218+85.08; 2. S 83°46′58″ W, a distance of 160.64 feet, and along said south line of the Villages of Miami-South, Section Seven, to an angle point at the common corner of said Villages of Miami-South, Section Seven, and the 68.065 acre tract of land conveyed to the Board of Trustees Miami Township, Montgomery County, Ohio, by deed of record in Deed M.F. 95–248D05. Said point being located 18.18 feet left of Austin Boulevard Centerline of Construction Station 217+24.46; E:\FR\FM\02APN1.SGM 02APN1 mstockstill on DSKH9S0YB1PROD with NOTICES Federal Register / Vol. 75, No. 63 / Friday, April 2, 2010 / Notices 3. S 83°46′26″ W, a distance of 373.41 feet, and along the south line of said 68.065 acre tract, to an angle point being located 21.45 feet left of Austin Boulevard Centerline of Construction Station 213+50.09; 4. S 83°49′00″ W, a distance of 722.77 feet, and along said south line of the 68.065 acre tract, to a point at the common corner of said 68.065 acre tract and the 23.744 acre tract of land conveyed to The City of Dayton, Ohio by deed of record in Deed M.F. 83– 011B03. Said point being located 76.02 feet right of Austin Boulevard Centerline of Construction Station 206+30.88; 5. Continue S 83°49′00″ W, a distance of 22.67 feet, and along the south line of said 23.744 acre tract, to a point at the northeast corner of the aforesaid Grantor’s 57.720 acre tract. Said point being the point of true beginning and located 78.95 feet right of Austin Boulevard Centerline of Construction Station 206+08.10; Thence S 05°07′29″ W, a distance of 24.88 feet along the east line of said Grantor’s 57.720 acre tract, to an iron pin set in the existing southerly Rightof-Way line of Austin Pike. Said iron pin being located 103.76 feet right of Austin Boulevard Centerline of Construction Station 206+06.33; Thence S 89°17′39″ W, a distance of 670.50 feet along said existing southerly Right-of-Way line of Austin Pike, to an iron pin set. Said iron pin being located 84.93 feet right of Austin Boulevard Centerline of Construction Station 199+24.46; Thence S 85°14′06″ W, a distance of 159.75 feet, along the proposed south right-of-way across said Grantor’s 57.720 acre tract, to an iron pin set in the easterly line of Parcel 126–WDV, as delineated on ODOT Project MOT–75– 0.75, Phase Three, PID 77246, Right-ofWay plans. Said iron pin being located 80.00 feet right of Austin Boulevard Centerline of Construction Station 197+62.45; Thence the following two (2) courses and distances along the easterly lines of said Parcel 126–WDV: 1. N 55°11′45″ E, a distance of 21.23 feet, to an angle point. Said point being located 70.18 feet right of Austin Boulevard Centerline of Construction Station 197+81.53; 2. N 00°43′10″ W, a distance of 24.12 feet, to a point in the aforesaid existing centerline of Right-of-Way of Austin Pike and north line of Grantor’s 57.720 acre tract. Said point being located 46.21 feet right of Austin Boulevard Centerline of Construction Station 197+84.25; VerDate Nov<24>2008 16:40 Apr 01, 2010 Jkt 220001 Thence the following two (2) courses and distances along said existing centerline of Right-of-Way of Austin Pike and north line of Grantor’s 57.720 acre tract: 1. N 89°16′51″ E, a distance of 141.77 feet, to a railroad spike found. Said spike being located 60.27 feet right of Austin Boulevard Centerline of Construction Station 199+26.65; 2. N 89°17′39″ E, a distance of 673.03 feet, to the point of true beginning. The above described area contains a total of 0.481 acres within the Montgomery County Auditor’s Parcel Number K45 02602 0015, of which 0.461 acres are in the present road occupied. Parcel 6–SH3 Situated in the Township of Miami, County of Montgomery, State of Ohio and being a part of the 23.744 acre tract of land as conveyed to The City of Dayton, Ohio and described in Deed M.F. 83–011B03, and lying in Section 10, Township 2, Range 5, M.Rs., and being a parcel of land lying on the Left and Right sides of the Centerline of Construction, Austin Boulevard, as shown on Plat Book 212, Pages 34 and 34A as surveyed by Burgess & Niple for the Montgomery County Engineer’s Office and being more particularly described as follows: Beginning for reference at a brass disk found in a highway monument box stamped ‘‘Montgomery County Engineer’s Dayton’’, located in the existing centerline of Right-of-Way of Austin Pike at the southeast corner of the Villages of Miami-South Section Seven as shown in Plat Book 192, Page 33. Said disk being located 15.31 left of Austin Boulevard Centerline of Construction Station 225+55.84; Thence the following four (4) courses and distances along said existing centerline of Right-of-Way of Austin Pike: 1. S 83°01′58″ W, a distance of 670.76 feet, and along the south line of said Villages of Miami-South, Section Seven, to an angle point being located 15.93 feet left of Austin Boulevard Centerline of Construction Station 218+85.08; 2. S 83°46′58″ W, a distance of 160.64 feet, and along said south line of the Villages of Miami-South, Section Seven, to an angle point at the common corner of said Villages of Miami-South, Section Seven, and the 68.065 acre tract of land conveyed to the Board Of Trustees Miami Township, Montgomery County, Ohio, by deed of record in Deed M.F. 95–248D05. Said point being located 18.18 feet left of Austin Boulevard Centerline of Construction Station 217+24.46; PO 00000 Frm 00187 Fmt 4703 Sfmt 4703 16905 3. S 83°46′26″ W, a distance of 373.41 feet, and along the south line of said 68.065 acre tract, to an angle point being located 21.45 feet left of Austin Boulevard Centerline of Construction Station 213+50.09; 4. S 83°49′00″ W, a distance of 722.77 feet, and along said south line of the 68.065 acre tract, to a point at the common corner of said 68.065 acre tract and aforesaid Grantor’s 23.744 acre tract. Said point being the point of true beginning and located 76.02 feet right of Austin Boulevard Centerline of Construction Station 206+30.88; Thence continue S 83°49′00″ W, a distance of 22.67 feet, and along the south line of said Grantor’s 23.744 acre tract, to a point at the northeast corner of the 57.720 acre tract conveyed to THE CITY OF DAYTON, OHIO, and described in Deed M.F. 74–023D06. Said point being located 78.95 feet right of Austin Boulevard Centerline of Construction Station 206+08.10; Thence S 89°17′39″ W, a distance of 673.03 feet, and along the south line of said Grantor’s 23.744 acre tract and north line of said 57.720 acre tract to a railroad spike found at the common corner of said Grantor’s 23.744 acre tract and the aforesaid 68.065 (Total) acre tract conveyed to Board Of Trustees of Miami Township, Montgomery County, Ohio, said spike being located 60.27 feet right of Austin Boulevard Centerline of Construction Station 199+26.65; Thence N 14°46′48″ E, a distance of 160.12 feet, along the line common to said Grantor’s 23.744 acre tract and said 68.065 (Total) acre tract, to an iron pin set in the proposed north Right-of-Way. Said iron pin being located 90.00 feet left of Austin Boulevard Centerline of Construction Station 199+81.81; Thence the following three (3) courses and distances along the proposed north Right-of-way across said Grantor’s 23.744 acre tract: 1. Easterly along arc of said curve to the right (and non tangent to the previous course), having a radius of 5819.58 feet, a central angle of 04°10′55″, and a chord bearing N 86°56′32″ E, a chord distance of 424.67 feet, for an arc distance of 424.76 feet, to an iron pin set. Said iron pin being located 90.00 feet left of Austin Boulevard Centerline of Construction Station 204+00.00; 2. S 82°03′20″ E (and non tangent to the previous course), a distance of 102.54 feet, to an iron pin set. Said iron pin being located 75.00 feet left of Austin Boulevard Centerline of construction Station 205+00.00; 3. Easterly along arc of said curve to the right (and non tangent to the previous course), having a radius of E:\FR\FM\02APN1.SGM 02APN1 16906 Federal Register / Vol. 75, No. 63 / Friday, April 2, 2010 / Notices mstockstill on DSKH9S0YB1PROD with NOTICES 5804.58 feet, a central angle of 02°10′52″, and a chord bearing S 88°52′34″ E, a chord distance of 220.96 feet, for an arc distance of 220.97 feet, to an iron pin set in the line common to said Grantor’s 23.744 acre tract and the aforesaid 68.065 (Total) acre tract. Said iron pin being located 75.00 feet left of Austin Boulevard Centerline of Construction Station 207+18.12; Thence S 31°47′17″ W, a distance of 174.40 feet, along the line common to said Grantor’s 23.744 acre tract and aforesaid 68.065 (Total) acre tract, to the point of true beginning. The above described area contains a total of 2.685 acres, within the Montgomery County Auditor’s Parcel Number K45 02602 0058, which includes 0.398 acres in the present road occupied. Parcel 6–SH4 Situated in the Township of Miami, County of Montgomery, State of Ohio and being a part of the 16.700 acre tract of land as conveyed to The City of Dayton, Ohio and described in Deed M.F. 74–023D06 and lying in Section 10, Township 2, Range 5, M.Rs., and being a parcel of land lying on the Left and Right sides of the Centerline of Construction, Austin Boulevard, as shown on Plat Book 212, Pages 34 and 34A as surveyed by Burgess & Niple for the Montgomery County Engineer’s Office and being more particularly described as follows: Beginning for reference at a brass disk found in a highway monument box stamped ‘‘Montgomery County Engineer’s Dayton’’, located in the existing centerline of Right-of-Way of Austin Pike at the southeast corner of the Villages of Miami-South, Section Seven, as shown in Plat Book 192, Page 33. Said disk being located 15.31 left of Austin Boulevard Centerline of Construction Station 225+55.84; Thence the following three (3) courses and distances along said existing centerline of Right-of-way of Austin Pike: 1. S 83°01′58″ W, a distance of 670.76 feet, and along the south line of said Villages of Miami-South, Section Seven, to an angle point being located 15.93 feet left of Austin Boulevard Centerline of Construction Station 218+85.08; 2. S 83°46′58″ W, a distance of 160.64 feet, and along said south line of the Villages of Miami-South, Section Seven, to an angle point at the common corner of said Villages of Miami-South, Section Seven, and the 68.065 acre tract of land conveyed to the Board Of Trustees Miami Township, Montgomery County, Ohio, by deed of record in Deed M.F. 95–248D05. Said point being located VerDate Nov<24>2008 16:40 Apr 01, 2010 Jkt 220001 18.18 feet left of Austin Boulevard Centerline of Construction Station 217+24.46; 3. S 83°46′26″ W, a distance of 373.41 feet, and along the south line of said 68.065 acre tract, to an angle point at the common corner of the 54.423 acre tract conveyed to The City of Dayton, Ohio and described in Deed M.F. 86–547C10 and the aforesaid Grantor’s 16.700 acre tract. Said point being the TRUE POINT OF BEGINNING and located 21.45 feet left of Austin Boulevard Centerline of Construction Station 213+50.09; Thence S 05°08′40″ W, a distance of 103.51 feet, along the line common to said 54.423 acre tract and Grantor’s 16.700 acre tract, to an iron pin set. Said iron pin being located 80.69 feet right of Austin Boulevard Centerline of Construction Station 213+33.55; Thence the following two (2) courses and distances along the proposed south Right-of-Way across said Grantor’s 16.700 acre tract: 1. S 82°58′46″ W, a distance of 71.69 feet, to an iron pin set. Said iron pin being located 85.82 feet right of Austin Boulevard Centerline of Construction Station 212+65.03; 2. N 89°24′50″ W, a distance of 662.93 feet, to an iron pin set in the line common to said Grantor’s 16.700 acre tract and the 57.720 acre tract conveyed to The City of Dayton, Ohio, and described in Deed M.F. 74–023D06. Said iron pin being located 103.76 feet right of Austin Boulevard Centerline of Construction Station 206+06.33; Thence N 05°07′29″ E, a distance of 24.88 feet, along the line common to said Grantor’s 16.700 acre tract and said 57.720 acre tract, to a point in the aforesaid centerline of Austin Pike. Said point being located 78.95 feet right of Austin Boulevard Centerline of Construction Station 206+08.10; Thence N 83°49′00″ E, a distance of 745.44 feet, along said centerline of Austin Pike and north line of Grantor’s 16.700 acre tract, to the TRUE POINT OF BEGINNING. The above described area contains a total of 1.149 acres, within the Montgomery County Auditor’s Parcel Number K45 02602 0023, which includes 0.424 acres in the present road occupied. Parcel 6–SH5 Situated in the Township of Miami, County of Montgomery, State of Ohio and being a part of the 54.423 acre tract of land as conveyed to The City of Dayton, Ohio and described in Deed M.F. 86–547C10 and lying in Section 10, Township 2, Range 5, M.Rs., and being a parcel of land lying on the Left and Right sides of the Centerline of PO 00000 Frm 00188 Fmt 4703 Sfmt 4703 Construction, Austin Boulevard, as shown on Plat Book 212, Pages 34 and 34A as surveyed by Burgess & Niple for the Montgomery County Engineer’s Office and being more particularly described as follows: BEGINNING at a brass disk found in a highway monument box stamped ‘‘Montgomery County Engineer’s Dayton’’, located in the existing centerline of Right-of-Way of Austin Pike and north line of said Grantor’s 54.423 acre tract, at the southeast corner of the Villages of Miami-South, Section Seven, as shown in Plat Book 192, Page 33. Said disk being located 15.31 left of Austin Boulevard Centerline of Construction Station 225+55.84; Thence N 82°58′02″ E, a distance of 697.56 feet, along said existing centerline of Right-of-Way of Austin Pike and north line of Grantor’s 54.423 acre tract, to a PK Nail set at the common corner of said Grantor’s 54.423 acre tract and the 118.930 acre tract conveyed to The City of Dayton, Ohio and described in Deed M.F. 86–547C12. Said PK Nail being located 64.72 feet left of Austin Boulevard Centerline of Construction Station 232+44.54; Thence S 05°35′05″ W, a distance of 201.00 feet, along the line common to said Grantor’s 54.423 acre tract and said 118.930 acre tract to an iron pin set, said point being located 136.13 feet right of Austin Boulevard Centerline of Construction Station 232+36.87; Thence the following six (6) courses and distances along the proposed south Right-of-way across said Grantor’s 54.423 acre tract: 1. N 80°26′56″ W, a distance of 11.54 feet, to an iron pin set. Said iron pin being located 134.86 feet right of Austin Boulevard Centerline of Construction Station 232+24.83; 2. N 31°28′27″ W a distance of 42.22 feet, to an iron pin set. Said iron pin being located 100.00 feet right of Austin Boulevard Centerline of Construction Station 232+00.00; 3. N 74°27′32″ W, a distance of 50.56 feet, to an iron pin set. Said iron pin being located 88.25 feet right of Austin Boulevard Centerline of Construction Station 231+49.15; 4. N 85°46′45″ W, a distance of 145.19 feet, to an iron pin set, said iron pin being located 77.82 feet right of Austin Boulevard Centerline of Construction Station 230+00.00; 5. Westerly along arc of said curve to the left having a radius of 2786.97 feet, a central angle of 05°37′56″, and a chord bearing S 85°47′44″ W, a chord distance of 273.85 feet, for an arc distance of 273.96 feet, to an iron pin set at the point of tangency. Said iron pin being located 77.82 feet right of Austin E:\FR\FM\02APN1.SGM 02APN1 Federal Register / Vol. 75, No. 63 / Friday, April 2, 2010 / Notices Boulevard Centerline of Construction Station 227+18.39; 6. S 82°58′46″ W, a distance of 1389.12 feet, to an iron pin set in the line common to said Grantor’s 54.423 acre tract and the 16.700 acre tract conveyed to The City of Dayton, Ohio and described in Deed M.F. 74–023D06. Said iron pin being located 80.69 feet right of Austin Boulevard Centerline of Construction Station 213+33.55; Thence N 05°08′40″ E, a distance of 103.51 feet, along the line common to said Grantor’s 54.423 acre tract and said 16.700 acre tract, to a point in the aforesaid existing centerline of Right-ofway of Austin Pike at the common corner of said Grantor’s 54.423 acre tract and said 16.700 acre tract. Said point being located 21.45 feet left of Austin Boulevard Centerline of Construction Station 213+50.09; Thence the following three (3) courses and distances along said existing centerline of Right-of Way of Austin Pike and north line of said Grantor’s 54.423 acre tract: 1. N 83°46′26″ E, a distance of 373.41 feet, to a point at the southwest corner of aforesaid Villages of Miami South, Section Seven. Said point being located 18.18 feet left of Austin Boulevard Centerline of Construction Station 217+24.46; 2. N 83°46′58″ E, a distance of 160.64 feet, and along the south line of said Villages of Miami-South, Section Seven, to a point. Said point being located 15.93 feet left of Austin Boulevard Centerline of Construction Station 218+85.08; 3. N 83°01′58″ E, a distance of 670.76 feet, and along the south line of said Villages of Miami-South, Section Seven, to the POINT OF BEGINNING. The above described area contains a total of 4.388 acres, within the Montgomery County Auditor’s Parcel Number K45 02602 0059, which includes 1.357 acres in the present road occupied. mstockstill on DSKH9S0YB1PROD with NOTICES Parcel 6–SH6 Situated in the Township of Miami, County of Montgomery, State of Ohio and being a part of a 118.930 acre tract of land as conveyed to The City of Dayton, Ohio and described in Deed M.F. 86–547C12 and lying in Section 10, Township 2, Range 5, M.Rs., and being a parcel of land lying on the Left and Right sides of the centerline of right of way and construction Austin Boulevard, as shown on Plat Book 212, Pages 34 and 34A as surveyed by Burgess & Niple for the Montgomery County Engineer’s Office and being more particularly described as follows: VerDate Nov<24>2008 16:40 Apr 01, 2010 Jkt 220001 Beginning at a brass disk found in a highway monument box stamped ‘‘Montgomery County Engineer’s Dayton’’, located at the intersection of the existing centerline of Right-of-Way of Austin Pike, and the line common to Miami Township Section 10, Township 2, Range 5, and Washington Township Section 4, Township 2, Range 5 of the M.Rs. Said disk being the northeast corner of said Grantor’s 118.930 acre tract and located 85.17 feet left of Austin Boulevard Centerline of Construction Station 233+42.34; Thence S 05°35′01″ W, a distance of 230.30 feet, along said line common to Miami Township and Washington Township, and east line of Grantor’s 118.930 acre tract, to an iron pin set. Said iron pin being located 145.13 feet right of Austin Boulevard Centerline of Construction Station 233+41.81; Thence N 80°26′56″ W, a distance of 100.19 feet along the proposed south Right-of-Way across said Grantor’s 118.930 acre tract, to an iron pin set in the line common to said Grantor’s 118.930 acre tract, and the 54.423 acre tract conveyed to The City of Dayton, Ohio and described in Deed M.F. 86– 547C10. Said point being located 136.13 feet right of Austin Boulevard Centerline of Construction Station 232+36.87; Thence N 05°35′05″ E, a distance of 201.00 feet, along said line common to said Grantor’s 118.930 acre tract and said 54.423 acre tract, to a PK Nail Set in the aforesaid existing centerline of Right-of-way of Austin Pike, at the northwesterly corner of said Grantor’s 118.930 acre tract. Said PK nail being located 64.72 feet left of Austin Boulevard Centerline of Construction Station 232+44.54; Thence N 82°58′02″ E a distance of 102.42 feet along said existing centerline of Right-of-way of Austin Pike and northerly line of said Grantor’s 118.930 acre tract, to the true point of beginning. The above described area contains a total of 0.495 acres, within the Montgomery County Auditor’s Parcel Number K45 02602 0011, which includes 0.140 acres in the present road occupied. Parcel 6–SH7 Situated in the State of Ohio, County of Montgomery, Township of Miami, Section 10, Township 2, Range 5, M.Rs., and being a part of a 57.720 acre tract of land as conveyed to The City of Dayton, Ohio, and described in Deed M.F. 74–023D06 and being more particularly described as follows: Being a parcel lying on the right side of the Centerline of Construction of PO 00000 Frm 00189 Fmt 4703 Sfmt 4703 16907 Austin Boulevard as shown on Plat Book 212, Pages 34 and 34A of the Plat records of Montgomery County and being located within the following described points in the boundary thereof: Commencing at a brass disk found within a highway monument box stamped ‘‘Montgomery County Engineer’s Dayton’’ located on the existing centerline of Right-of-Way of Austin Pike at the southeast corner of the Villages of Miami-South, Section Seven, as shown on Plat Book 192, Page 33 of the Plat records of Montgomery County, said brass disk found being 15.31 feet left of Austin Boulevard Centerline of Construction station 225+55.84; Thence on the existing centerline of right of way of Austin Pike, South 83 degrees 01 minutes 58 seconds West, 670.76 feet to an angle point, said angle point being 15.93 feet left of Austin Boulevard Centerline of Construction station 218+85.08; Thence continuing on the existing centerline of right of way of Austin Pike, South 83 degrees 46 minutes 58 seconds West, 160.64 feet to an angle point, said angle point being 18.18 feet left of Austin Boulevard Centerline of Construction station 217+24.46; Thence continuing on the existing centerline of right of way of Austin Pike, South 83 degrees 46 minutes 26 seconds West, 373.41 feet to an angle point, said angle point being 21.45 feet left of Austin Boulevard Centerline of Construction station 213+50.09; Thence continuing on the existing centerline of right of way of Austin Pike, South 83 degrees 49 minutes 00 seconds West, 745.44 feet to an angle point, said angle point being 78.95 feet right of Austin Boulevard Centerline of Construction station 206+08.10. Said angle point also being the northeast corner of the aforesaid grantor’s 57.720 acre tract; Thence South 05 degrees 07 minutes 29 seconds West, 34.93 feet on the grantor’s east line to an iron pin set on the south line of an existing 10 foot DP&L easement as recorded in Deed MF 98–0489B07 & Deed MF 00–0735B01, said iron pin being 113.79 feet right of Austin Boulevard Centerline of Construction station 206+05.61 and also being the true point of beginning for the parcel of land herein described; Thence South 05 degrees 07 minutes 29 seconds West, 20.10 feet continuing on the grantor’s east line to an iron pin set on the proposed standard highway easement line, said iron pin being 133.84 feet right of Austin Boulevard Centerline of Construction station 206+04.16; E:\FR\FM\02APN1.SGM 02APN1 mstockstill on DSKH9S0YB1PROD with NOTICES 16908 Federal Register / Vol. 75, No. 63 / Friday, April 2, 2010 / Notices Thence South 89 degrees 17 minutes 39 seconds West, 666.38 feet on the proposed standard highway easement line to an iron pin set, said iron pin being 114.91 feet right of Austin Boulevard Centerline of Construction station 199+22.87; Thence South 85 degrees 14 minutes 06 seconds West, 150.64 feet continuing on the proposed standard highway easement line to an iron pin set, said iron pin being 110.33 feet right of Austin Boulevard Centerline of Construction station 197+69.28; Thence South 55 degrees 11 minutes 45 seconds West, 51.14 feet continuing on the proposed standard highway easement line to an iron pin set, said iron pin being 133.78 feet right of Austin Boulevard Centerline of Construction station 197+22.85; Thence South 84 degrees 57 minutes 40 seconds West, 280.33 feet continuing on the proposed standard highway easement line to an iron pin set, said iron pin being 113.59 feet right of Austin Boulevard Centerline of Construction station 194+37.08; Thence South 80 degrees 59 minutes 47 seconds West, 412.84 feet continuing on the proposed standard highway easement line to an iron pin set, said iron pin being 125.87 feet right of Austin Boulevard Centerline of Construction station 190+42.38; Thence North 88 degrees 30 minutes 19 seconds West, 497.87 feet continuing on the proposed standard highway easement line to an iron pin set, said iron pin being 122.42 feet right of Austin Boulevard Centerline of Construction station 185+51.78; Thence South 84 degrees 42 minutes 42 seconds West, 198.53 feet continuing on the proposed standard highway easement line to an iron pin set, said iron pin being 145.87 feet right of Austin Boulevard Centerline of Construction station 183+54.64; Thence North 01 degrees 29 minutes 41 seconds East, 20.14 feet continuing on the proposed standard highway easement line to an iron pin set on the relocated 10 foot easement as recorded in Deed MF 98–0489B07 & Deed MF 00– 0735B01, said iron pin being 125.73 feet right of Austin Boulevard Centerline of Construction station 183+54.64; Thence North 84 degrees 42 minutes 42 seconds East, 197.34 feet on said relocated 10 foot easement to an iron pin set, said iron pin being 102.42 feet right of Austin Boulevard Centerline of Construction station 185+50.59; Thence South 88 degrees 30 minutes 19 seconds East, 497.21 feet continuing on said relocated 10 foot easement to an iron pin set, said iron pin being 105.80 feet right of Austin Boulevard VerDate Nov<24>2008 16:40 Apr 01, 2010 Jkt 220001 Centerline of Construction station 190+41.75; Thence North 80 degrees 59 minutes 47 seconds East, 411.70 feet continuing on said relocated 10 foot easement to an iron pin set, said iron pin being 93.62 feet right of Austin Boulevard Centerline of Construction station 194+38.32; Thence North 84 degrees 57 minutes 40 seconds East, 275.71 feet continuing on said relocated 10 foot easement to an iron pin set, said iron pin being 113.55 feet right of Austin Boulevard Centerline of Construction station 197+18.39; Thence North 55 degrees 11 minutes 45 seconds East, 51.19 feet continuing on said relocated 10 foot easement to an iron pin set, said iron pin being 90.11 feet right of Austin Boulevard Centerline of Construction station 197+64.72; Thence North 85 degrees 14 minutes 06 seconds East, 156.71 feet continuing on said relocated 10 foot easement to an iron pin set on the south line of an existing 10 foot DP&L easement as recorded in Deed MF 98–0489307 & Deed MF 00–0735301, said iron pin being 94.92 feet right of Austin Boulevard Centerline of Construction station 199+23.93; Thence North 89 degrees 17 minutes 39 seconds East, 669.13 feet on the south line of said existing 10 foot DP&L easement to the true point of beginning and containing 1.037 acres, of which 0.000 acres is PRO (Present Road Occupied), leaving a net take of 1.037 acres, more or less, subject to legal highways and other easements of record. Parcel 6–SH8 Situated in the State of Ohio, County of Montgomery, Township of Miami, Section 10, Township 2, Range 5, M.Rs., and being a part of a 16.700 acre tract of land as conveyed to The City of Dayton, Ohio, and described in Deed M.F. 74–023D06 and being more particularly described as follows: Being a parcel lying on the right side of the Centerline of Construction of Austin Boulevard as shown on Plat Book 212, Pages 34 and 34A of the Plat records of Montgomery County and being located within the following described points in the boundary thereof: Commencing at a brass disk found within a highway monument box stamped ‘‘Montgomery County Engineer’s Dayton’’ located on the existing centerline of Right-of-Way of Austin Pike at the southeast corner of the Villages of Miami-South, Section Seven, as shown on Plat Book 192, Page PO 00000 Frm 00190 Fmt 4703 Sfmt 4703 33 of the Plat records of Montgomery County, said brass disk found being 15.31 feet left of Austin Boulevard Centerline of Construction station 225+55.84; Thence on the existing centerline of right of way of Austin Pike, South 83 degrees 01 minutes 58 seconds West, 670.76 feet to an angle point, said angle point being 15.93 feet left of Austin Boulevard Centerline of Construction station 218+85.08; Thence continuing on the existing centerline of right of way of Austin Pike, South 83 degrees 46 minutes 58 seconds West, 160.64 feet to an angle point, said angle point being 18.18 feet left of Austin Boulevard Centerline of Construction station 217+24.46; Thence continuing on the existing centerline of right of way of Austin Pike, South 83 degrees 46 minutes 26 seconds West, 373.41 feet to an angle point, said angle point being 21.45 feet left of Austin Boulevard Centerline of Construction station 213+50.09; Thence South 05 degrees 08 minutes 40 seconds West, 113.74 feet on the grantor’s east line to an iron pin set on the relocated 10 foot easement as recorded in Deed MF 98–0489B07 & Deed MF 00–0735B01, said iron pin being 90.79 feet right of Austin Boulevard Centerline of Construction station 213+32.01 and also being the true point of beginning for the parcel of land herein described; Thence South 05 degrees 08 minutes 40 seconds West, 20.46 feet continuing on the grantor’s east line to an iron pin set on the proposed standard highway easement line, said iron pin being 111.00 feet right of Austin Boulevard Centerline of Construction station 213+28.97; Thence South 82 degrees 58 minutes 46 seconds West, 67.21 feet on the proposed standard highway easement line to an iron pin set, said iron pin being 115.88 feet right of Austin Boulevard Centerline of Construction station 212+65.69; Thence North 89 degrees 24 minutes 50 seconds West, 664.58 feet continuing on the proposed standard highway easement line to an iron pin set, said iron pin being 133.76 feet right of Austin Boulevard Centerline of Construction station 206+06.95; Thence South 89 degrees 17 minutes 39 seconds West, 2.73 feet continuing on the proposed standard highway easement line to an iron pin set on the grantor’s west line, said iron pin being 133.84 feet right of Austin Boulevard Centerline of Construction station 206+04.16; Thence North 05 degrees 07 minutes 29 seconds East, 20.10 feet on the E:\FR\FM\02APN1.SGM 02APN1 Federal Register / Vol. 75, No. 63 / Friday, April 2, 2010 / Notices mstockstill on DSKH9S0YB1PROD with NOTICES grantor’s west line to an iron pin set on the south line of an existing 10 foot DP&L easement as recorded in Deed MF 98–0489B07 & Deed MF 00–0735B01, said iron pin being 113.79 feet right of Austin Boulevard Centerline of Construction station 206+05.61; Thence North 89 degrees 17 minutes 39 seconds East, 0.91 feet on the south line of said existing 10 foot DP&L easement to an iron pin set on the relocated 10 foot easement as recorded in Deed MF 98–0489B07 & Deed MF 00– 0735B01, said iron pin being 113.76 feet right of Austin Boulevard Centerline of Construction station 206+06.53; Thence South 89 degrees 24 minutes 50 seconds East, 663.48 feet on said relocated 10 foot easement to an iron pin set, said iron pin being 95.84 feet right of Austin Boulevard Centerline of Construction station 212+65.25; Thence North 82 degrees 58 minutes 46 seconds East, 70.20 feet on said relocated 10 foot easement to the true point of beginning and containing 0.337 acres, of which 0.000 acres is PRO (Present Road Occupied), leaving a net take of 0.337 acres, more or less, subject to legal highways and other easements of record. Parcel 6–SH9 Situated in the State of Ohio, County of Montgomery, Township of Miami, Section 10, Township 2, Range 5, M.Rs., and being a part of a 54.423 acre tract of land as conveyed to The City of Dayton, Ohio, and described in Deed M.F. 86–547C10 and being more particularly described as follows: Being a parcel lying on the right side of the Centerline of Construction of Austin Boulevard as shown on Plat Book 212, Pages 34 and 34A of the Plat records of Montgomery County and being located within the following described points in the boundary thereof: Commencing at a brass disk found within a highway monument box stamped ‘‘Montgomery County Engineer’s Dayton’’ located on the existing centerline of Right-of-Way of Austin Pike at the southeast corner of the Villages of Miami-South, Section Seven, as shown on Plat Book 192, Page 33 of the Plat records of Montgomery County, said brass disk found being 15.31 feet left of Austin Boulevard Centerline of Construction station 225+55.84; Thence on the existing centerline of right of way of Austin Pike, South 83 degrees 01 minutes 58 seconds West, 670.76 feet to an angle point, said angle point being 15.93 feet left of Austin Boulevard Centerline of Construction station 218+85.08; VerDate Nov<24>2008 16:40 Apr 01, 2010 Jkt 220001 Thence continuing on the existing centerline of right of way of Austin Pike, South 83 degrees 46 minutes 58 seconds West, 160.64 feet to an angle point, said angle point being 18.18 feet left of Austin Boulevard Centerline of Construction station 217+24.46; Thence South 06 degrees 58 minutes 02 seconds East, 96.00 feet on a line to an iron pin set on the proposed right of way line of Parcel 6–SH5 to be acquired by ODOT Project MOTCR 166–6.00, PID 78696, as shown on the Right-of-Way plans thereof, said iron pin being 77.82 feet right of Austin Boulevard Centerline of Construction station 217+24.37 and also being the true point of beginning for the parcel of land herein described; Thence South 06 degrees 58 minutes 02 seconds East, 30.00 feet on the proposed standard highway easement line to an iron pin set, said iron pin being 107.82 feet right of Austin Boulevard Centerline of Construction station 217+24.34; Thence South 82 degrees 58 minutes 46 seconds West, 401.54 feet on the proposed standard highway easement line to an iron pin set on the grantor’s west line, said iron pin being 111.00 feet right of Austin Boulevard Centerline of Construction station 213+28.97; Thence North 05 degrees 08 minutes 40 seconds East, 20.46 feet on the grantor’s west line to an iron pin set on the relocated 10 foot easement as recorded in Deed MF 98–0489B07 & Deed MF 00–0735B01, said iron pin being 90.79 feet right of Austin Boulevard Centerline of Construction station 213+32.01; Thence North 82 degrees 58 minutes 46 seconds East, 377.24 feet on said relocated 10 foot easement to an iron pin set on the proposed standard highway easement line, said iron pin being 87.82 feet right of Austin Boulevard Centerline of Construction station 217+04.36; Thence North 06 degrees 58 minutes 02 seconds West, 10.00 feet on the proposed standard highway easement line to an iron pin set on said Parcel 6– SH5, said iron pin being 77.82 feet right of Austin Boulevard Centerline of Construction station 217+04.37; Thence North 82. degrees 58 minutes 46 seconds East, 20.00 feet on the proposed right of way line of said Parcel 6–SH5 to the true point of beginning and containing 0.188 acres, of which 0.000 acres is PRO (Present Road Occupied), leaving a net take of 0.188 acres, more or less, subject to legal highways and other easements of record. Issued in Romulus, Michigan, on March 5, 2010. PO 00000 Frm 00191 Fmt 4703 Sfmt 4703 16909 Original signed by: Joe Hebert, Acting Manager, Detroit Airports District Office, FAA, Great Lakes Region. [FR Doc. 2010–7079 Filed 4–1–10; 8:45 am] BILLING CODE 4910–13–M DEPARTMENT OF THE TREASURY Office of Foreign Assets Control Designation of One Individual Pursuant to Executive Order 13224 AGENCY: Office of Foreign Assets Control, Treasury. ACTION: Notice. SUMMARY: The Treasury Department’s Office of Foreign Assets Control (‘‘OFAC’’) is publishing the names of one newly-designated individual whose property and interests in property are blocked pursuant to Executive Order 13224 of September 23, 2001, ‘‘Blocking Property and Prohibiting Transactions With Persons Who Commit, Threaten To Commit, or Support Terrorism.’’ DATES: The designation by the Director of OFAC of the individual identified in this notice, pursuant to Executive Order 13224, is effective on March 25, 2010. FOR FURTHER INFORMATION CONTACT: Assistant Director, Compliance Outreach & Implementation, Office of Foreign Assets Control, Department of the Treasury, Washington, DC 20220, tel.: 202/622–2490. SUPPLEMENTARY INFORMATION: Electronic and Facsimile Availability This document and additional information concerning OFAC are available from OFAC’s Web site (https://www.treas.gov/ofac) or via facsimile through a 24-hour fax-ondemand service, tel.: 202/622–0077. Background On September 23, 2001, the President issued Executive Order 13224 (the ‘‘Order’’) pursuant to the International Emergency Economic Powers Act, 50 U.S.C. 1701–1706, and the United Nations Participation Act of 1945, 22 U.S.C. 287c. In the Order, the President declared a national emergency to address grave acts of terrorism and threats of terrorism committed by foreign terrorists, including the September 11, 2001, terrorist attacks in New York, Pennsylvania, and at the Pentagon. The Order imposes economic sanctions on persons who have committed, pose a significant risk of committing, or support acts of terrorism. The President identified in the Annex to the Order, as amended by Executive E:\FR\FM\02APN1.SGM 02APN1

Agencies

[Federal Register Volume 75, Number 63 (Friday, April 2, 2010)]
[Notices]
[Pages 16903-16909]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-7079]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration


Public Notice for Waiver of Aeronautical Land-Use Assurance 
Dayton-Wright Brothers Airport; Dayton, OH

AGENCY: Federal Aviation Administration, DOT.

ACTION: Notice of intent of waiver with respect to land.

-----------------------------------------------------------------------

SUMMARY: The Federal Aviation Administration (FAA) is considering a 
proposal to change a portion of the airport from aeronautical use to 
non-aeronautical use and to authorize the release of 10.829 acres of 
airport property for permanent public roadway use. The land consists of 
portions of 4 original airport acquired parcels. These parcels were 
acquired under grants 5-39-0030-01, 5-39-0030-02, 5-39-0030-03, 5-39-
0030-04, 5-39-0030-05, and 3-39-0030-01. There are no impacts to the 
airport by allowing the City of Dayton to sell the property. The land 
is not needed for aeronautical use. Approval does not constitute a 
commitment by the FAA to financially assist in the sale of the subject 
airport property nor a determination of eligibility for grant-in-aid 
funding from the FAA. The disposition of proceeds from the sale of the 
airport property will be in accordance with FAA's Policy and Procedures 
Concerning the Use of Airport Revenue, published in the Federal 
Register on February 16, 1999. In accordance with section 47107(h) of 
title 49, United States Code, this notice is required to be published 
in the Federal Register 30 days before modifying the land-use assurance 
that requires the property to be used for an aeronautical purpose.

DATES: Comments must be received on or before May 3, 2010.

ADDRESSES: Written comments on the Sponsor's request must be delivered 
or mailed to: Irene R. Porter, Program Manager, Detroit Airports 
District

[[Page 16904]]

Office, 11677 South Wayne Road, Suite 107, Romulus, MI 48174.

FOR FURTHER INFORMATION CONTACT: Irene R. Porter, Program Manager, 
Federal Aviation Administration, Great Lakes Region, Detroit Airports 
District Office, DET ADO-607, 11677 South Wayne Road, Suite 107, 
Romulus, Michigan 48174. Telephone Number (734-229-2915)/FAX Number 
(734-229-2950).
    Documents reflecting this FAA action may be reviewed at this same 
location or at Dayton Wright Brothers Airport, Dayton, Ohio.

SUPPLEMENTARY INFORMATION: 

Parcel 6-SH1

    Situated in the Township of Miami, County of Montgomery, State of 
Ohio and being a part of a 57.720 acre tract of land as conveyed to The 
City of Dayton, Ohio, and described in Deed M.F. 74-023D06 and lying in 
Section 10, Township 2, Range 5, M.Rs., and being a parcel of land 
lying on the Right side of the Centerline of Construction of Austin 
Boulevard, as shown on Plat Book 212, Pages 34 and 34A as surveyed by 
Burgess & Niple for the Montgomery County Engineer's Office and being 
more particularly described as follows:
    Beginning for reference at a brass disk found in a highway monument 
box stamped ``Montgomery County Engineer's Dayton'', located in the 
existing centerline of Right-of-Way of Austin Pike at the southeast 
corner of the Villages of Miami-South, Section Seven, as shown in Plat 
Book 192, Page 33. Said disk being located 15.31 left of Austin 
Boulevard Centerline of Construction Station 225+55.84;
    Thence the following seven (7) courses and distances along said 
existing centerline of Right-of-Way of Austin Pike:
    1. S 83[deg]01[min]58[sec] W, a distance of 670.76 feet and along 
the south line of said Villages of Miami-South, Section Seven, to an 
angle point being located 15.93 feet left of Austin Boulevard 
Centerline of Construction Station 218+85.08;
    2. S 83[deg]46[min]58[sec] W, a distance of 160.64 feet, and along 
said south line of the Villages of Miami-South, Section Seven, to an 
angle point at the common corner of said Villages of Miami-South, 
Section Seven, and the 68.065 acre tract of land conveyed to the Board 
of Trustees Miami Township, Montgomery County, Ohio in Deed M.F. 95-
248D05. Said point being located 18.18 feet left of Austin Boulevard 
Centerline of Construction Station 217+24.46;
    3. S 83[deg]46[min]26[sec] W, a distance of 373.41 feet, and along 
the south line of said 68.065 acre tract, to an angle point being 
located 21.45 feet left of Austin Boulevard Centerline of Construction 
Station 213+50.09;
    4. S 83[deg]49[min]00[sec] W, a distance of 722.77 feet, and along 
said south line of the 68.065 acre tract, to a point at the common 
corner of said 68.065 acre tract and the 23.744 acre tract of land 
conveyed to The City of Dayton, Ohio in Deed M.F. 83-011B03. Said point 
being located 76.02 feet right of Austin Boulevard Centerline of 
Construction Station 206+30.88;
    5. Continue S 83[deg]49[min]00[sec] W, a distance of 22.67 feet, 
and along the south line of said 23.744 acre tract, to a point at the 
northeast corner of the aforesaid Grantor's 57.720 acre tract. Said 
point being located 78.95 feet right of Austin Boulevard Centerline of 
Construction Station 206+08.10;
    6. S 89[deg]17[min]39[sec] W, a distance of 673.03 feet, and along 
the south line of said 23.744 acre tract and north line said Grantor's 
57.720 acre tract, to a railroad spike found at the common corner of 
said 23.744 acre tract and the aforesaid 68.065 (Total) acre tract, 
said point being located 60.27 feet right of Austin Boulevard 
Centerline of Construction Station 199+26.65;
    7. S 89[deg]16[min]51[sec] W, a distance of 141.77 feet, and along 
the south line of said 68.065 (Total) acre tract and north line said 
Grantor's 57.720 acre tract, to a point at the northeast corner of 
Parcel 126-WDV of proposed Right-of-Way to be acquired by ODOT Project 
MOT-750.75, Phase Three, PID 77246, as shown upon the Right-of-Way 
plans thereof. Said point being located 46.21 feet right of Austin 
Boulevard Centerline of Construction Station 197+84.25;
    Thence the following three (3) courses and distances along said 
Parcel 126-WDV:
    1. S 00[deg]43[min]10[sec] E, a distance of 24.12 feet, to a point 
being located 70.18 feet right of Austin Boulevard Centerline of 
Construction Station 197+81.53;
    2. S 55[deg]11[min]45[sec] W, a distance of 72.45 feet, to a point 
being located 103.43 feet right of Austin Boulevard Centerline of 
Construction Station 197+16.18;
    3. S 84[deg]57[min]40[sec] W, a distance of 273.40 feet, to an iron 
pin set. Said iron pin being the point of true beginning and located 
83.63 feet right of Austin Boulevard Centerline of Construction Station 
194+38.94;
    Thence S 80[deg]59[min]47[sec] W, a distance of 411.13 feet along 
the proposed south right-of-way across aforesaid Grantor's 57.720 acre 
tract, to an iron pin set in the aforesaid south line of Parcel 126-
WDV. Said iron pin being located 95.76 feet right of Austin Boulevard 
Centerline of Construction Station 190+41.43;
    Thence the following two (2) courses and distances along said south 
lines of Parcel 126-WDV:
    1. N 76[deg]48[min]01[sec] E, a distance of 200.25 feet, to a 
point. Said point being located 66.00 feet right of Austin Boulevard 
Centerline of Construction Station 192+31.49;
    2. N 84[deg]57[min]40[sec] E, a distance of 211.92 feet, to the 
point of true beginning.
    The above described area contains a total of 0.069 acres, within 
the Montgomery County Auditor's Parcel Number K45 02602 0015, which 
includes 0.000 acres in the present road occupied.

Parcel 6-SH2

    Situated in the Township of Miami, County of Montgomery, State of 
Ohio and being a part of a 57.720 acre tract of land as conveyed to The 
City of Dayton, Ohio, and described in Deed M.F. 74-023D06 and lying in 
Section 10, Township 2, Range 5, M.Rs., and being a parcel of land 
lying on the Right side of the Centerline of Construction, Austin 
Boulevard, as shown on Plat Book 212, Pages 34 and 34A as surveyed by 
Burgess & Niple for the Montgomery County Engineer's Office and being 
more particularly described as follows:
    Beginning for reference at a brass disk found in a highway monument 
box stamped ``Montgomery County Engineer's Dayton'', located in the 
existing centerline of Right-of-Way of Austin Pike at the southeast 
corner of the Villages of Miami-South, Section Seven, as shown in Plat 
Book 192, Page 33. Said disk being located 15.31 left of Austin 
Boulevard Centerline of Construction Station 225+55.84;
    Thence the following five (5) courses and distances along said 
existing centerline of Right-of-Way of Austin Pike:
    1. S 83[deg]01[min]58[sec] W, a distance of 670.76 feet, and along 
the south line of said Villages of Miami-South, Section Seven, to an 
angle point being located 15.93 feet left of Austin Boulevard 
Centerline of Construction Station 218+85.08;
    2. S 83[deg]46[min]58[sec] W, a distance of 160.64 feet, and along 
said south line of the Villages of Miami-South, Section Seven, to an 
angle point at the common corner of said Villages of Miami-South, 
Section Seven, and the 68.065 acre tract of land conveyed to the Board 
of Trustees Miami Township, Montgomery County, Ohio, by deed of record 
in Deed M.F. 95-248D05. Said point being located 18.18 feet left of 
Austin Boulevard Centerline of Construction Station 217+24.46;

[[Page 16905]]

    3. S 83[deg]46[min]26[sec] W, a distance of 373.41 feet, and along 
the south line of said 68.065 acre tract, to an angle point being 
located 21.45 feet left of Austin Boulevard Centerline of Construction 
Station 213+50.09;
    4. S 83[deg]49[min]00[sec] W, a distance of 722.77 feet, and along 
said south line of the 68.065 acre tract, to a point at the common 
corner of said 68.065 acre tract and the 23.744 acre tract of land 
conveyed to The City of Dayton, Ohio by deed of record in Deed M.F. 83-
011B03. Said point being located 76.02 feet right of Austin Boulevard 
Centerline of Construction Station 206+30.88;
    5. Continue S 83[deg]49[min]00[sec] W, a distance of 22.67 feet, 
and along the south line of said 23.744 acre tract, to a point at the 
northeast corner of the aforesaid Grantor's 57.720 acre tract. Said 
point being the point of true beginning and located 78.95 feet right of 
Austin Boulevard Centerline of Construction Station 206+08.10;
    Thence S 05[deg]07[min]29[sec] W, a distance of 24.88 feet along 
the east line of said Grantor's 57.720 acre tract, to an iron pin set 
in the existing southerly Right-of-Way line of Austin Pike. Said iron 
pin being located 103.76 feet right of Austin Boulevard Centerline of 
Construction Station 206+06.33;
    Thence S 89[deg]17[min]39[sec] W, a distance of 670.50 feet along 
said existing southerly Right-of-Way line of Austin Pike, to an iron 
pin set. Said iron pin being located 84.93 feet right of Austin 
Boulevard Centerline of Construction Station 199+24.46;
    Thence S 85[deg]14[min]06[sec] W, a distance of 159.75 feet, along 
the proposed south right-of-way across said Grantor's 57.720 acre 
tract, to an iron pin set in the easterly line of Parcel 126-WDV, as 
delineated on ODOT Project MOT-75-0.75, Phase Three, PID 77246, Right-
of-Way plans. Said iron pin being located 80.00 feet right of Austin 
Boulevard Centerline of Construction Station 197+62.45;
    Thence the following two (2) courses and distances along the 
easterly lines of said Parcel 126-WDV:
    1. N 55[deg]11[min]45[sec] E, a distance of 21.23 feet, to an angle 
point. Said point being located 70.18 feet right of Austin Boulevard 
Centerline of Construction Station 197+81.53;
    2. N 00[deg]43[min]10[sec] W, a distance of 24.12 feet, to a point 
in the aforesaid existing centerline of Right-of-Way of Austin Pike and 
north line of Grantor's 57.720 acre tract. Said point being located 
46.21 feet right of Austin Boulevard Centerline of Construction Station 
197+84.25;
    Thence the following two (2) courses and distances along said 
existing centerline of Right-of-Way of Austin Pike and north line of 
Grantor's 57.720 acre tract:
    1. N 89[deg]16[min]51[sec] E, a distance of 141.77 feet, to a 
railroad spike found. Said spike being located 60.27 feet right of 
Austin Boulevard Centerline of Construction Station 199+26.65;
    2. N 89[deg]17[min]39[sec] E, a distance of 673.03 feet, to the 
point of true beginning.
    The above described area contains a total of 0.481 acres within the 
Montgomery County Auditor's Parcel Number K45 02602 0015, of which 
0.461 acres are in the present road occupied.

Parcel 6-SH3

    Situated in the Township of Miami, County of Montgomery, State of 
Ohio and being a part of the 23.744 acre tract of land as conveyed to 
The City of Dayton, Ohio and described in Deed M.F. 83-011B03, and 
lying in Section 10, Township 2, Range 5, M.Rs., and being a parcel of 
land lying on the Left and Right sides of the Centerline of 
Construction, Austin Boulevard, as shown on Plat Book 212, Pages 34 and 
34A as surveyed by Burgess & Niple for the Montgomery County Engineer's 
Office and being more particularly described as follows:
    Beginning for reference at a brass disk found in a highway monument 
box stamped ``Montgomery County Engineer's Dayton'', located in the 
existing centerline of Right-of-Way of Austin Pike at the southeast 
corner of the Villages of Miami-South Section Seven as shown in Plat 
Book 192, Page 33. Said disk being located 15.31 left of Austin 
Boulevard Centerline of Construction Station 225+55.84;
    Thence the following four (4) courses and distances along said 
existing centerline of Right-of-Way of Austin Pike:
    1. S 83[deg]01'58'' W, a distance of 670.76 feet, and along the 
south line of said Villages of Miami-South, Section Seven, to an angle 
point being located 15.93 feet left of Austin Boulevard Centerline of 
Construction Station 218+85.08;
    2. S 83[deg]46'58'' W, a distance of 160.64 feet, and along said 
south line of the Villages of Miami-South, Section Seven, to an angle 
point at the common corner of said Villages of Miami-South, Section 
Seven, and the 68.065 acre tract of land conveyed to the Board Of 
Trustees Miami Township, Montgomery County, Ohio, by deed of record in 
Deed M.F. 95-248D05. Said point being located 18.18 feet left of Austin 
Boulevard Centerline of Construction Station 217+24.46;
    3. S 83[deg]46'26'' W, a distance of 373.41 feet, and along the 
south line of said 68.065 acre tract, to an angle point being located 
21.45 feet left of Austin Boulevard Centerline of Construction Station 
213+50.09;
    4. S 83[deg]49'00'' W, a distance of 722.77 feet, and along said 
south line of the 68.065 acre tract, to a point at the common corner of 
said 68.065 acre tract and aforesaid Grantor's 23.744 acre tract. Said 
point being the point of true beginning and located 76.02 feet right of 
Austin Boulevard Centerline of Construction Station 206+30.88;
    Thence continue S 83[deg]49'00'' W, a distance of 22.67 feet, and 
along the south line of said Grantor's 23.744 acre tract, to a point at 
the northeast corner of the 57.720 acre tract conveyed to THE CITY OF 
DAYTON, OHIO, and described in Deed M.F. 74-023D06. Said point being 
located 78.95 feet right of Austin Boulevard Centerline of Construction 
Station 206+08.10;
    Thence S 89[deg]17'39'' W, a distance of 673.03 feet, and along the 
south line of said Grantor's 23.744 acre tract and north line of said 
57.720 acre tract to a railroad spike found at the common corner of 
said Grantor's 23.744 acre tract and the aforesaid 68.065 (Total) acre 
tract conveyed to Board Of Trustees of Miami Township, Montgomery 
County, Ohio, said spike being located 60.27 feet right of Austin 
Boulevard Centerline of Construction Station 199+26.65;
    Thence N 14[deg]46'48'' E, a distance of 160.12 feet, along the 
line common to said Grantor's 23.744 acre tract and said 68.065 (Total) 
acre tract, to an iron pin set in the proposed north Right-of-Way. Said 
iron pin being located 90.00 feet left of Austin Boulevard Centerline 
of Construction Station 199+81.81;
    Thence the following three (3) courses and distances along the 
proposed north Right-of-way across said Grantor's 23.744 acre tract:
    1. Easterly along arc of said curve to the right (and non tangent 
to the previous course), having a radius of 5819.58 feet, a central 
angle of 04[deg]10'55'', and a chord bearing N 86[deg]56'32'' E, a 
chord distance of 424.67 feet, for an arc distance of 424.76 feet, to 
an iron pin set. Said iron pin being located 90.00 feet left of Austin 
Boulevard Centerline of Construction Station 204+00.00;
    2. S 82[deg]03'20'' E (and non tangent to the previous course), a 
distance of 102.54 feet, to an iron pin set. Said iron pin being 
located 75.00 feet left of Austin Boulevard Centerline of construction 
Station 205+00.00;
    3. Easterly along arc of said curve to the right (and non tangent 
to the previous course), having a radius of

[[Page 16906]]

5804.58 feet, a central angle of 02[deg]10'52'', and a chord bearing S 
88[deg]52'34'' E, a chord distance of 220.96 feet, for an arc distance 
of 220.97 feet, to an iron pin set in the line common to said Grantor's 
23.744 acre tract and the aforesaid 68.065 (Total) acre tract. Said 
iron pin being located 75.00 feet left of Austin Boulevard Centerline 
of Construction Station 207+18.12;
    Thence S 31[deg]47'17'' W, a distance of 174.40 feet, along the 
line common to said Grantor's 23.744 acre tract and aforesaid 68.065 
(Total) acre tract, to the point of true beginning.
    The above described area contains a total of 2.685 acres, within 
the Montgomery County Auditor's Parcel Number K45 02602 0058, which 
includes 0.398 acres in the present road occupied.

Parcel 6-SH4

    Situated in the Township of Miami, County of Montgomery, State of 
Ohio and being a part of the 16.700 acre tract of land as conveyed to 
The City of Dayton, Ohio and described in Deed M.F. 74-023D06 and lying 
in Section 10, Township 2, Range 5, M.Rs., and being a parcel of land 
lying on the Left and Right sides of the Centerline of Construction, 
Austin Boulevard, as shown on Plat Book 212, Pages 34 and 34A as 
surveyed by Burgess & Niple for the Montgomery County Engineer's Office 
and being more particularly described as follows:
    Beginning for reference at a brass disk found in a highway monument 
box stamped ``Montgomery County Engineer's Dayton'', located in the 
existing centerline of Right-of-Way of Austin Pike at the southeast 
corner of the Villages of Miami-South, Section Seven, as shown in Plat 
Book 192, Page 33. Said disk being located 15.31 left of Austin 
Boulevard Centerline of Construction Station 225+55.84;
    Thence the following three (3) courses and distances along said 
existing centerline of Right-of-way of Austin Pike:
    1. S 83[deg]01'58'' W, a distance of 670.76 feet, and along the 
south line of said Villages of Miami-South, Section Seven, to an angle 
point being located 15.93 feet left of Austin Boulevard Centerline of 
Construction Station 218+85.08;
    2. S 83[deg]46'58'' W, a distance of 160.64 feet, and along said 
south line of the Villages of Miami-South, Section Seven, to an angle 
point at the common corner of said Villages of Miami-South, Section 
Seven, and the 68.065 acre tract of land conveyed to the Board Of 
Trustees Miami Township, Montgomery County, Ohio, by deed of record in 
Deed M.F. 95-248D05. Said point being located 18.18 feet left of Austin 
Boulevard Centerline of Construction Station 217+24.46;
    3. S 83[deg]46'26'' W, a distance of 373.41 feet, and along the 
south line of said 68.065 acre tract, to an angle point at the common 
corner of the 54.423 acre tract conveyed to The City of Dayton, Ohio 
and described in Deed M.F. 86-547C10 and the aforesaid Grantor's 16.700 
acre tract. Said point being the TRUE POINT OF BEGINNING and located 
21.45 feet left of Austin Boulevard Centerline of Construction Station 
213+50.09;
    Thence S 05[deg]08'40'' W, a distance of 103.51 feet, along the 
line common to said 54.423 acre tract and Grantor's 16.700 acre tract, 
to an iron pin set. Said iron pin being located 80.69 feet right of 
Austin Boulevard Centerline of Construction Station 213+33.55;
    Thence the following two (2) courses and distances along the 
proposed south Right-of-Way across said Grantor's 16.700 acre tract:
    1. S 82[deg]58'46'' W, a distance of 71.69 feet, to an iron pin 
set. Said iron pin being located 85.82 feet right of Austin Boulevard 
Centerline of Construction Station 212+65.03;
    2. N 89[deg]24'50'' W, a distance of 662.93 feet, to an iron pin 
set in the line common to said Grantor's 16.700 acre tract and the 
57.720 acre tract conveyed to The City of Dayton, Ohio, and described 
in Deed M.F. 74-023D06. Said iron pin being located 103.76 feet right 
of Austin Boulevard Centerline of Construction Station 206+06.33;
    Thence N 05[deg]07'29'' E, a distance of 24.88 feet, along the line 
common to said Grantor's 16.700 acre tract and said 57.720 acre tract, 
to a point in the aforesaid centerline of Austin Pike. Said point being 
located 78.95 feet right of Austin Boulevard Centerline of Construction 
Station 206+08.10;
    Thence N 83[deg]49'00'' E, a distance of 745.44 feet, along said 
centerline of Austin Pike and north line of Grantor's 16.700 acre 
tract, to the TRUE POINT OF BEGINNING.
    The above described area contains a total of 1.149 acres, within 
the Montgomery County Auditor's Parcel Number K45 02602 0023, which 
includes 0.424 acres in the present road occupied.

Parcel 6-SH5

    Situated in the Township of Miami, County of Montgomery, State of 
Ohio and being a part of the 54.423 acre tract of land as conveyed to 
The City of Dayton, Ohio and described in Deed M.F. 86-547C10 and lying 
in Section 10, Township 2, Range 5, M.Rs., and being a parcel of land 
lying on the Left and Right sides of the Centerline of Construction, 
Austin Boulevard, as shown on Plat Book 212, Pages 34 and 34A as 
surveyed by Burgess & Niple for the Montgomery County Engineer's Office 
and being more particularly described as follows:
    BEGINNING at a brass disk found in a highway monument box stamped 
``Montgomery County Engineer's Dayton'', located in the existing 
centerline of Right-of-Way of Austin Pike and north line of said 
Grantor's 54.423 acre tract, at the southeast corner of the Villages of 
Miami-South, Section Seven, as shown in Plat Book 192, Page 33. Said 
disk being located 15.31 left of Austin Boulevard Centerline of 
Construction Station 225+55.84;
    Thence N 82[deg]58'02'' E, a distance of 697.56 feet, along said 
existing centerline of Right-of-Way of Austin Pike and north line of 
Grantor's 54.423 acre tract, to a PK Nail set at the common corner of 
said Grantor's 54.423 acre tract and the 118.930 acre tract conveyed to 
The City of Dayton, Ohio and described in Deed M.F. 86-547C12. Said PK 
Nail being located 64.72 feet left of Austin Boulevard Centerline of 
Construction Station 232+44.54;
    Thence S 05[deg]35'05'' W, a distance of 201.00 feet, along the 
line common to said Grantor's 54.423 acre tract and said 118.930 acre 
tract to an iron pin set, said point being located 136.13 feet right of 
Austin Boulevard Centerline of Construction Station 232+36.87;
    Thence the following six (6) courses and distances along the 
proposed south Right-of-way across said Grantor's 54.423 acre tract:
    1. N 80[deg]26'56'' W, a distance of 11.54 feet, to an iron pin 
set. Said iron pin being located 134.86 feet right of Austin Boulevard 
Centerline of Construction Station 232+24.83;
    2. N 31[deg]28'27'' W a distance of 42.22 feet, to an iron pin set. 
Said iron pin being located 100.00 feet right of Austin Boulevard 
Centerline of Construction Station 232+00.00;
    3. N 74[deg]27'32'' W, a distance of 50.56 feet, to an iron pin 
set. Said iron pin being located 88.25 feet right of Austin Boulevard 
Centerline of Construction Station 231+49.15;
    4. N 85[deg]46'45'' W, a distance of 145.19 feet, to an iron pin 
set, said iron pin being located 77.82 feet right of Austin Boulevard 
Centerline of Construction Station 230+00.00;
    5. Westerly along arc of said curve to the left having a radius of 
2786.97 feet, a central angle of 05[deg]37'56'', and a chord bearing S 
85[deg]47'44'' W, a chord distance of 273.85 feet, for an arc distance 
of 273.96 feet, to an iron pin set at the point of tangency. Said iron 
pin being located 77.82 feet right of Austin

[[Page 16907]]

Boulevard Centerline of Construction Station 227+18.39;
    6. S 82[deg]58'46'' W, a distance of 1389.12 feet, to an iron pin 
set in the line common to said Grantor's 54.423 acre tract and the 
16.700 acre tract conveyed to The City of Dayton, Ohio and described in 
Deed M.F. 74-023D06. Said iron pin being located 80.69 feet right of 
Austin Boulevard Centerline of Construction Station 213+33.55;
    Thence N 05[deg]08'40'' E, a distance of 103.51 feet, along the 
line common to said Grantor's 54.423 acre tract and said 16.700 acre 
tract, to a point in the aforesaid existing centerline of Right-of-way 
of Austin Pike at the common corner of said Grantor's 54.423 acre tract 
and said 16.700 acre tract. Said point being located 21.45 feet left of 
Austin Boulevard Centerline of Construction Station 213+50.09;
    Thence the following three (3) courses and distances along said 
existing centerline of Right-of Way of Austin Pike and north line of 
said Grantor's 54.423 acre tract:
    1. N 83[deg]46'26'' E, a distance of 373.41 feet, to a point at the 
southwest corner of aforesaid Villages of Miami South, Section Seven. 
Said point being located 18.18 feet left of Austin Boulevard Centerline 
of Construction Station 217+24.46;
    2. N 83[deg]46'58'' E, a distance of 160.64 feet, and along the 
south line of said Villages of Miami-South, Section Seven, to a point. 
Said point being located 15.93 feet left of Austin Boulevard Centerline 
of Construction Station 218+85.08;
    3. N 83[deg]01'58'' E, a distance of 670.76 feet, and along the 
south line of said Villages of Miami-South, Section Seven, to the POINT 
OF BEGINNING.
    The above described area contains a total of 4.388 acres, within 
the Montgomery County Auditor's Parcel Number K45 02602 0059, which 
includes 1.357 acres in the present road occupied.

Parcel 6-SH6

    Situated in the Township of Miami, County of Montgomery, State of 
Ohio and being a part of a 118.930 acre tract of land as conveyed to 
The City of Dayton, Ohio and described in Deed M.F. 86-547C12 and lying 
in Section 10, Township 2, Range 5, M.Rs., and being a parcel of land 
lying on the Left and Right sides of the centerline of right of way and 
construction Austin Boulevard, as shown on Plat Book 212, Pages 34 and 
34A as surveyed by Burgess & Niple for the Montgomery County Engineer's 
Office and being more particularly described as follows:
    Beginning at a brass disk found in a highway monument box stamped 
``Montgomery County Engineer's Dayton'', located at the intersection of 
the existing centerline of Right-of-Way of Austin Pike, and the line 
common to Miami Township Section 10, Township 2, Range 5, and 
Washington Township Section 4, Township 2, Range 5 of the M.Rs. Said 
disk being the northeast corner of said Grantor's 118.930 acre tract 
and located 85.17 feet left of Austin Boulevard Centerline of 
Construction Station 233+42.34;
    Thence S 05[deg]35'01'' W, a distance of 230.30 feet, along said 
line common to Miami Township and Washington Township, and east line of 
Grantor's 118.930 acre tract, to an iron pin set. Said iron pin being 
located 145.13 feet right of Austin Boulevard Centerline of 
Construction Station 233+41.81;
    Thence N 80[deg]26'56'' W, a distance of 100.19 feet along the 
proposed south Right-of-Way across said Grantor's 118.930 acre tract, 
to an iron pin set in the line common to said Grantor's 118.930 acre 
tract, and the 54.423 acre tract conveyed to The City of Dayton, Ohio 
and described in Deed M.F. 86-547C10. Said point being located 136.13 
feet right of Austin Boulevard Centerline of Construction Station 
232+36.87;
    Thence N 05[deg]35'05'' E, a distance of 201.00 feet, along said 
line common to said Grantor's 118.930 acre tract and said 54.423 acre 
tract, to a PK Nail Set in the aforesaid existing centerline of Right-
of-way of Austin Pike, at the northwesterly corner of said Grantor's 
118.930 acre tract. Said PK nail being located 64.72 feet left of 
Austin Boulevard Centerline of Construction Station 232+44.54;
    Thence N 82[deg]58'02'' E a distance of 102.42 feet along said 
existing centerline of Right-of-way of Austin Pike and northerly line 
of said Grantor's 118.930 acre tract, to the true point of beginning.
    The above described area contains a total of 0.495 acres, within 
the Montgomery County Auditor's Parcel Number K45 02602 0011, which 
includes 0.140 acres in the present road occupied.

Parcel 6-SH7

    Situated in the State of Ohio, County of Montgomery, Township of 
Miami, Section 10, Township 2, Range 5, M.Rs., and being a part of a 
57.720 acre tract of land as conveyed to The City of Dayton, Ohio, and 
described in Deed M.F. 74-023D06 and being more particularly described 
as follows:
    Being a parcel lying on the right side of the Centerline of 
Construction of Austin Boulevard as shown on Plat Book 212, Pages 34 
and 34A of the Plat records of Montgomery County and being located 
within the following described points in the boundary thereof:
    Commencing at a brass disk found within a highway monument box 
stamped ``Montgomery County Engineer's Dayton'' located on the existing 
centerline of Right-of-Way of Austin Pike at the southeast corner of 
the Villages of Miami-South, Section Seven, as shown on Plat Book 192, 
Page 33 of the Plat records of Montgomery County, said brass disk found 
being 15.31 feet left of Austin Boulevard Centerline of Construction 
station 225+55.84;
    Thence on the existing centerline of right of way of Austin Pike, 
South 83 degrees 01 minutes 58 seconds West, 670.76 feet to an angle 
point, said angle point being 15.93 feet left of Austin Boulevard 
Centerline of Construction station 218+85.08;
    Thence continuing on the existing centerline of right of way of 
Austin Pike, South 83 degrees 46 minutes 58 seconds West, 160.64 feet 
to an angle point, said angle point being 18.18 feet left of Austin 
Boulevard Centerline of Construction station 217+24.46;
    Thence continuing on the existing centerline of right of way of 
Austin Pike, South 83 degrees 46 minutes 26 seconds West, 373.41 feet 
to an angle point, said angle point being 21.45 feet left of Austin 
Boulevard Centerline of Construction station 213+50.09;
    Thence continuing on the existing centerline of right of way of 
Austin Pike, South 83 degrees 49 minutes 00 seconds West, 745.44 feet 
to an angle point, said angle point being 78.95 feet right of Austin 
Boulevard Centerline of Construction station 206+08.10. Said angle 
point also being the northeast corner of the aforesaid grantor's 57.720 
acre tract;
    Thence South 05 degrees 07 minutes 29 seconds West, 34.93 feet on 
the grantor's east line to an iron pin set on the south line of an 
existing 10 foot DP&L easement as recorded in Deed MF 98-0489B07 & Deed 
MF 00-0735B01, said iron pin being 113.79 feet right of Austin 
Boulevard Centerline of Construction station 206+05.61 and also being 
the true point of beginning for the parcel of land herein described;
    Thence South 05 degrees 07 minutes 29 seconds West, 20.10 feet 
continuing on the grantor's east line to an iron pin set on the 
proposed standard highway easement line, said iron pin being 133.84 
feet right of Austin Boulevard Centerline of Construction station 
206+04.16;

[[Page 16908]]

    Thence South 89 degrees 17 minutes 39 seconds West, 666.38 feet on 
the proposed standard highway easement line to an iron pin set, said 
iron pin being 114.91 feet right of Austin Boulevard Centerline of 
Construction station 199+22.87;
    Thence South 85 degrees 14 minutes 06 seconds West, 150.64 feet 
continuing on the proposed standard highway easement line to an iron 
pin set, said iron pin being 110.33 feet right of Austin Boulevard 
Centerline of Construction station 197+69.28;
    Thence South 55 degrees 11 minutes 45 seconds West, 51.14 feet 
continuing on the proposed standard highway easement line to an iron 
pin set, said iron pin being 133.78 feet right of Austin Boulevard 
Centerline of Construction station 197+22.85;
    Thence South 84 degrees 57 minutes 40 seconds West, 280.33 feet 
continuing on the proposed standard highway easement line to an iron 
pin set, said iron pin being 113.59 feet right of Austin Boulevard 
Centerline of Construction station 194+37.08;
    Thence South 80 degrees 59 minutes 47 seconds West, 412.84 feet 
continuing on the proposed standard highway easement line to an iron 
pin set, said iron pin being 125.87 feet right of Austin Boulevard 
Centerline of Construction station 190+42.38;
    Thence North 88 degrees 30 minutes 19 seconds West, 497.87 feet 
continuing on the proposed standard highway easement line to an iron 
pin set, said iron pin being 122.42 feet right of Austin Boulevard 
Centerline of Construction station 185+51.78;
    Thence South 84 degrees 42 minutes 42 seconds West, 198.53 feet 
continuing on the proposed standard highway easement line to an iron 
pin set, said iron pin being 145.87 feet right of Austin Boulevard 
Centerline of Construction station 183+54.64;
    Thence North 01 degrees 29 minutes 41 seconds East, 20.14 feet 
continuing on the proposed standard highway easement line to an iron 
pin set on the relocated 10 foot easement as recorded in Deed MF 98-
0489B07 & Deed MF 00-0735B01, said iron pin being 125.73 feet right of 
Austin Boulevard Centerline of Construction station 183+54.64;
    Thence North 84 degrees 42 minutes 42 seconds East, 197.34 feet on 
said relocated 10 foot easement to an iron pin set, said iron pin being 
102.42 feet right of Austin Boulevard Centerline of Construction 
station 185+50.59;
    Thence South 88 degrees 30 minutes 19 seconds East, 497.21 feet 
continuing on said relocated 10 foot easement to an iron pin set, said 
iron pin being 105.80 feet right of Austin Boulevard Centerline of 
Construction station 190+41.75;
    Thence North 80 degrees 59 minutes 47 seconds East, 411.70 feet 
continuing on said relocated 10 foot easement to an iron pin set, said 
iron pin being 93.62 feet right of Austin Boulevard Centerline of 
Construction station 194+38.32;
    Thence North 84 degrees 57 minutes 40 seconds East, 275.71 feet 
continuing on said relocated 10 foot easement to an iron pin set, said 
iron pin being 113.55 feet right of Austin Boulevard Centerline of 
Construction station 197+18.39;
    Thence North 55 degrees 11 minutes 45 seconds East, 51.19 feet 
continuing on said relocated 10 foot easement to an iron pin set, said 
iron pin being 90.11 feet right of Austin Boulevard Centerline of 
Construction station 197+64.72;
    Thence North 85 degrees 14 minutes 06 seconds East, 156.71 feet 
continuing on said relocated 10 foot easement to an iron pin set on the 
south line of an existing 10 foot DP&L easement as recorded in Deed MF 
98-0489307 & Deed MF 00-0735301, said iron pin being 94.92 feet right 
of Austin Boulevard Centerline of Construction station 199+23.93;
    Thence North 89 degrees 17 minutes 39 seconds East, 669.13 feet on 
the south line of said existing 10 foot DP&L easement to the true point 
of beginning and containing 1.037 acres, of which 0.000 acres is PRO 
(Present Road Occupied), leaving a net take of 1.037 acres, more or 
less, subject to legal highways and other easements of record.

Parcel 6-SH8

    Situated in the State of Ohio, County of Montgomery, Township of 
Miami, Section 10, Township 2, Range 5, M.Rs., and being a part of a 
16.700 acre tract of land as conveyed to The City of Dayton, Ohio, and 
described in Deed M.F. 74-023D06 and being more particularly described 
as follows:
    Being a parcel lying on the right side of the Centerline of 
Construction of Austin Boulevard as shown on Plat Book 212, Pages 34 
and 34A of the Plat records of Montgomery County and being located 
within the following described points in the boundary thereof:
    Commencing at a brass disk found within a highway monument box 
stamped ``Montgomery County Engineer's Dayton'' located on the existing 
centerline of Right-of-Way of Austin Pike at the southeast corner of 
the Villages of Miami-South, Section Seven, as shown on Plat Book 192, 
Page 33 of the Plat records of Montgomery County, said brass disk found 
being 15.31 feet left of Austin Boulevard Centerline of Construction 
station 225+55.84;
    Thence on the existing centerline of right of way of Austin Pike, 
South 83 degrees 01 minutes 58 seconds West, 670.76 feet to an angle 
point, said angle point being 15.93 feet left of Austin Boulevard 
Centerline of Construction station 218+85.08;
    Thence continuing on the existing centerline of right of way of 
Austin Pike, South 83 degrees 46 minutes 58 seconds West, 160.64 feet 
to an angle point, said angle point being 18.18 feet left of Austin 
Boulevard Centerline of Construction station 217+24.46;
    Thence continuing on the existing centerline of right of way of 
Austin Pike, South 83 degrees 46 minutes 26 seconds West, 373.41 feet 
to an angle point, said angle point being 21.45 feet left of Austin 
Boulevard Centerline of Construction station 213+50.09;
    Thence South 05 degrees 08 minutes 40 seconds West, 113.74 feet on 
the grantor's east line to an iron pin set on the relocated 10 foot 
easement as recorded in Deed MF 98-0489B07 & Deed MF 00-0735B01, said 
iron pin being 90.79 feet right of Austin Boulevard Centerline of 
Construction station 213+32.01 and also being the true point of 
beginning for the parcel of land herein described;
    Thence South 05 degrees 08 minutes 40 seconds West, 20.46 feet 
continuing on the grantor's east line to an iron pin set on the 
proposed standard highway easement line, said iron pin being 111.00 
feet right of Austin Boulevard Centerline of Construction station 
213+28.97;
    Thence South 82 degrees 58 minutes 46 seconds West, 67.21 feet on 
the proposed standard highway easement line to an iron pin set, said 
iron pin being 115.88 feet right of Austin Boulevard Centerline of 
Construction station 212+65.69;
    Thence North 89 degrees 24 minutes 50 seconds West, 664.58 feet 
continuing on the proposed standard highway easement line to an iron 
pin set, said iron pin being 133.76 feet right of Austin Boulevard 
Centerline of Construction station 206+06.95;
    Thence South 89 degrees 17 minutes 39 seconds West, 2.73 feet 
continuing on the proposed standard highway easement line to an iron 
pin set on the grantor's west line, said iron pin being 133.84 feet 
right of Austin Boulevard Centerline of Construction station 206+04.16;
    Thence North 05 degrees 07 minutes 29 seconds East, 20.10 feet on 
the

[[Page 16909]]

grantor's west line to an iron pin set on the south line of an existing 
10 foot DP&L easement as recorded in Deed MF 98-0489B07 & Deed MF 00-
0735B01, said iron pin being 113.79 feet right of Austin Boulevard 
Centerline of Construction station 206+05.61;
    Thence North 89 degrees 17 minutes 39 seconds East, 0.91 feet on 
the south line of said existing 10 foot DP&L easement to an iron pin 
set on the relocated 10 foot easement as recorded in Deed MF 98-0489B07 
& Deed MF 00-0735B01, said iron pin being 113.76 feet right of Austin 
Boulevard Centerline of Construction station 206+06.53;
    Thence South 89 degrees 24 minutes 50 seconds East, 663.48 feet on 
said relocated 10 foot easement to an iron pin set, said iron pin being 
95.84 feet right of Austin Boulevard Centerline of Construction station 
212+65.25;
    Thence North 82 degrees 58 minutes 46 seconds East, 70.20 feet on 
said relocated 10 foot easement to the true point of beginning and 
containing 0.337 acres, of which 0.000 acres is PRO (Present Road 
Occupied), leaving a net take of 0.337 acres, more or less, subject to 
legal highways and other easements of record.

Parcel 6-SH9

    Situated in the State of Ohio, County of Montgomery, Township of 
Miami, Section 10, Township 2, Range 5, M.Rs., and being a part of a 
54.423 acre tract of land as conveyed to The City of Dayton, Ohio, and 
described in Deed M.F. 86-547C10 and being more particularly described 
as follows:
    Being a parcel lying on the right side of the Centerline of 
Construction of Austin Boulevard as shown on Plat Book 212, Pages 34 
and 34A of the Plat records of Montgomery County and being located 
within the following described points in the boundary thereof:
    Commencing at a brass disk found within a highway monument box 
stamped ``Montgomery County Engineer's Dayton'' located on the existing 
centerline of Right-of-Way of Austin Pike at the southeast corner of 
the Villages of Miami-South, Section Seven, as shown on Plat Book 192, 
Page 33 of the Plat records of Montgomery County, said brass disk found 
being 15.31 feet left of Austin Boulevard Centerline of Construction 
station 225+55.84;
    Thence on the existing centerline of right of way of Austin Pike, 
South 83 degrees 01 minutes 58 seconds West, 670.76 feet to an angle 
point, said angle point being 15.93 feet left of Austin Boulevard 
Centerline of Construction station 218+85.08;
    Thence continuing on the existing centerline of right of way of 
Austin Pike, South 83 degrees 46 minutes 58 seconds West, 160.64 feet 
to an angle point, said angle point being 18.18 feet left of Austin 
Boulevard Centerline of Construction station 217+24.46;
    Thence South 06 degrees 58 minutes 02 seconds East, 96.00 feet on a 
line to an iron pin set on the proposed right of way line of Parcel 6-
SH5 to be acquired by ODOT Project MOTCR 166-6.00, PID 78696, as shown 
on the Right-of-Way plans thereof, said iron pin being 77.82 feet right 
of Austin Boulevard Centerline of Construction station 217+24.37 and 
also being the true point of beginning for the parcel of land herein 
described;
    Thence South 06 degrees 58 minutes 02 seconds East, 30.00 feet on 
the proposed standard highway easement line to an iron pin set, said 
iron pin being 107.82 feet right of Austin Boulevard Centerline of 
Construction station 217+24.34;
    Thence South 82 degrees 58 minutes 46 seconds West, 401.54 feet on 
the proposed standard highway easement line to an iron pin set on the 
grantor's west line, said iron pin being 111.00 feet right of Austin 
Boulevard Centerline of Construction station 213+28.97;
    Thence North 05 degrees 08 minutes 40 seconds East, 20.46 feet on 
the grantor's west line to an iron pin set on the relocated 10 foot 
easement as recorded in Deed MF 98-0489B07 & Deed MF 00-0735B01, said 
iron pin being 90.79 feet right of Austin Boulevard Centerline of 
Construction station 213+32.01;
    Thence North 82 degrees 58 minutes 46 seconds East, 377.24 feet on 
said relocated 10 foot easement to an iron pin set on the proposed 
standard highway easement line, said iron pin being 87.82 feet right of 
Austin Boulevard Centerline of Construction station 217+04.36;
    Thence North 06 degrees 58 minutes 02 seconds West, 10.00 feet on 
the proposed standard highway easement line to an iron pin set on said 
Parcel 6-SH5, said iron pin being 77.82 feet right of Austin Boulevard 
Centerline of Construction station 217+04.37;
    Thence North 82. degrees 58 minutes 46 seconds East, 20.00 feet on 
the proposed right of way line of said Parcel 6-SH5 to the true point 
of beginning and containing 0.188 acres, of which 0.000 acres is PRO 
(Present Road Occupied), leaving a net take of 0.188 acres, more or 
less, subject to legal highways and other easements of record.

    Issued in Romulus, Michigan, on March 5, 2010.
    Original signed by:
Joe Hebert,
Acting Manager, Detroit Airports District Office, FAA, Great Lakes 
Region.
[FR Doc. 2010-7079 Filed 4-1-10; 8:45 am]