Turnbull Hydro, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene and Protests, and Ready for Environmental Analysis; Soliciting Recommendations and Terms and Conditions for the Proposed Changes to the Transmission Line Routes, 16093-16094 [2010-7144]
Download as PDF
Federal Register / Vol. 75, No. 61 / Wednesday, March 31, 2010 / Notices
developments; one that is an existing,
licensed development (the Lower
Pacolet development) and a new
development (Upper Pacolet
development). The project would have
an annual generation of 8.092 gigawatthours. The proposed project would
consist of the facilities described below.
jlentini on DSKJ8SOYB1PROD with NOTICES
The Upper Pacolet development would
consist of: (1) An existing 315-foot-long by
18-foot-high concrete and rubble masonry
dam, with the addition of 3-foot-high
flashboards; (2) an existing 30-acre reservoir,
with a useable storage capacity of 90 acre-feet
at elevation 519.0 feet North American
Vertical Datum 1988 (NAVD 88); (3) new
vertical slide intake gates with rack and
pinion operators, sluice gates, and trashracks
having a 1-inch clear bar spacing with a trash
rake; (4) a new 24-foot-wide by 40-foot-long
concrete powerhouse that would contain a
vertical Kaplan turbine with an estimated
generating capacity of 1,100 kilowatts (kW);
(5) a tailrace with a 40-foot-long guide wall;
(6) a new 200-foot-long, 34 kilovolt (kV)
transmission line; (7) a proposed substation;
and (8) appurtenant facilities.
The Lower Pacolet development (all
existing facilities) would consist of: (1) A
347-foot-long by 24-foot-high concrete and
rubble masonry dam, with 4-foot-high
flashboards; (2) three sand gates; (3) an 11acre reservoir, with a useable storage capacity
of 44-acre feet at an elevation of 492.0 feet
NAVD 88 ; (4) an intake structure equipped
with trashracks having a 1.375-inch clear bar
spacing and a trash rake; (5) a 100-foot-long
by 10-foot-diameter penstock; (6) a 67-footlong by 32-foot-wide concrete powerhouse,
integral with the dam, containing two
vertical Leffel Type Z turbines, each
generating 400 kilowatts (kW); (7) a tailrace
with a 340-foot-long curved training wall; (8)
a 250-foot-long, 34.5-kV transmission line;
and (9) appurtenant facilities.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov. A copy is
also available for inspection and
reproduction at the address in item h
above.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, .214. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
VerDate Nov<24>2008
19:40 Mar 30, 2010
Jkt 220001
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE’’, ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND
CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’
(2) set forth in the heading the name of
the applicant and the project number of
the application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, recommendations, terms
and conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–7146 Filed 3–30–10; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
16093
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12597–021; Project No. 12598–
019]
Turnbull Hydro, LLC; Notice of
Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene and Protests, and Ready for
Environmental Analysis; Soliciting
Recommendations and Terms and
Conditions for the Proposed Changes
to the Transmission Line Routes
March 24, 2010.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Amendment
of License.
b. Project Nos.: 12597–021 and P–
12598–019.
c. Date Filed: February 17, 2010, and
supplemented March 17 and 23, 2010.
d. Applicant: Turnbull Hydro, LLC.
e. Name of Project: Lower and Upper
Turnbull Drop, respectively.
f. Location: The projects are located
on the Spring Valley Canal in Teton
County, Montana.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Ted
Sorenson, Turnbull Hydro, LLC, 5203
South 11th East, Idaho Falls, ID 83404,
(208) 522–8069.
i. FERC Contact: Any questions
regarding this notice should be directed
to Mr. Jeremy Jessup (202) 502–6779 or
Jeremy.Jessup@ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
recommendations, and preliminary
terms and conditions (terms and
conditions for transmission line routes
only), is 60 days from the issuance of
this notice; reply comments are due 105
days from the issuance date of this
notice. All documents may be filed
electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the ‘‘eFiling’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. For more information on how to
submit these types of filings, please go
to the Commissions Web site located at
https://ferc.gov.filing-comments.asp.
Please include the project numbers
(P–12597–021 and P–12598–019) on any
comments, motions, recommendations,
E:\FR\FM\31MRN1.SGM
31MRN1
jlentini on DSKJ8SOYB1PROD with NOTICES
16094
Federal Register / Vol. 75, No. 61 / Wednesday, March 31, 2010 / Notices
or preliminary terms and conditions
filed.
k. Description of Request: At the
Lower Turnbull Drop Project, the
applicant proposes to (1) change the
hydraulic capacity from 600 cfs to 750
cfs; (2) change the authorized installed
capacity from 6,150 kW to 7,700 kW;
and (3) change from two turbines to a
single turbine. At the Upper Turnbull
Drop Project, the applicant proposes to
(1) change the hydraulic capacity from
600 cfs to 750 cfs; (2) change the
authorized installed capacity from 4,100
kW to 5,300 kW; and (3) change from
two turbines to a single turbine.
Additionally, at the Lower Turnbull
Drop Project, the applicant proposes to
(1) change the entire transmission line
to 69 kV and eliminate the remote
electrical substation and (2) change the
length and location of the 69 kV
transmission line. At the Upper
Turnbull Drop Project, the applicant
proposes to (1) change the entire
transmission line to 69 kV and eliminate
the remote electrical substation and (2)
change the length and location of the 69
kV transmission line. The filing of terms
and conditions (see section ‘‘o’’ below)
are only being requested by this notice
for the applicant’s proposal regarding
changes to the transmission line routes.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
VerDate Nov<24>2008
19:40 Mar 30, 2010
Jkt 220001
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the title ‘‘PROTEST’’,
‘‘MOTION TO INTERVENE’’,
‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ or ’’ TERMS
AND CONDITIONS’’ (transmission line
routes only); (2) set forth in the heading
the name of the applicant and the
project numbers of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene or
protests should relate to project works
which are the subject of the license
amendment. Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–7144 Filed 3–30–10; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10856–079]
Upper Peninsula Power Company;
North American Hydro Holdings, LLC;
Notice of Application for Transfer of
License, and Soliciting Comments and
Motions To Intervene
March 24, 2010.
On March 17, 2010, Upper Peninsula
Power Company (transferor) and North
American Hydro Holdings, LLC
(transferee) filed an application for
transfer of license of the AuTrain
Project, located on the Upper AuTrain
River in Alger County, Michigan.
Applicants seek Commission approval
to transfer the license for the AuTrain
Project from the transferor to the
transferee.
Applicant Contact: For transferor Mr.
Terry P. Jensky, Upper Peninsula Power
Company, 700 N Adams Street, Green
Bay, WI 54307, phone (920) 433–2900.
For the transferee Mr. Charles F. Alberg,
North American Hydro Holdings, LLC,
116 State Street, Neshkoro, WI 54960,
phone (920) 293–4628
FERC Contact: Robert Bell, (202) 502–
6062.
Deadline for filing comments and
motions to intervene: 30 days from the
issuance of this notice. Comments and
motions to intervene may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii)(2008) and the
instructions on the Commission’s
website under the ‘‘e-Filing’’ link. If
unable to be filed electronically,
documents may be paper-filed. To
paper-file, an original and eight copies
should be mailed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. For more
information on how to submit these
types of filings please go to the
Commission’s Web site located at https://
www.ferc.gov/filing-comments.asp.
More information about this project can
be viewed or printed on the eLibrary
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–10856–079)
in the docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–7141 Filed 3–30–10; 8:45 am]
BILLING CODE 6717–01–P
Frm 00029
Fmt 4703
Sfmt 9990
E:\FR\FM\31MRN1.SGM
31MRN1
Agencies
[Federal Register Volume 75, Number 61 (Wednesday, March 31, 2010)]
[Notices]
[Pages 16093-16094]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-7144]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12597-021; Project No. 12598-019]
Turnbull Hydro, LLC; Notice of Application Accepted for Filing,
Soliciting Comments, Motions To Intervene and Protests, and Ready for
Environmental Analysis; Soliciting Recommendations and Terms and
Conditions for the Proposed Changes to the Transmission Line Routes
March 24, 2010.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Amendment of License.
b. Project Nos.: 12597-021 and P-12598-019.
c. Date Filed: February 17, 2010, and supplemented March 17 and 23,
2010.
d. Applicant: Turnbull Hydro, LLC.
e. Name of Project: Lower and Upper Turnbull Drop, respectively.
f. Location: The projects are located on the Spring Valley Canal in
Teton County, Montana.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Ted Sorenson, Turnbull Hydro, LLC, 5203
South 11th East, Idaho Falls, ID 83404, (208) 522-8069.
i. FERC Contact: Any questions regarding this notice should be
directed to Mr. Jeremy Jessup (202) 502-6779 or Jeremy.Jessup@ferc.gov.
j. Deadline for filing motions to intervene and protests, comments,
recommendations, and preliminary terms and conditions (terms and
conditions for transmission line routes only), is 60 days from the
issuance of this notice; reply comments are due 105 days from the
issuance date of this notice. All documents may be filed electronically
via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions
on the Commission's Web site at https://www.ferc.gov under the ``e-
Filing'' link. If unable to be filed electronically, documents may be
paper-filed. To paper-file, an original and eight copies should be
mailed to: Secretary, Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For more information on how to
submit these types of filings, please go to the Commissions Web site
located at https://ferc.gov.filing-comments.asp.
Please include the project numbers (P-12597-021 and P-12598-019) on
any comments, motions, recommendations,
[[Page 16094]]
or preliminary terms and conditions filed.
k. Description of Request: At the Lower Turnbull Drop Project, the
applicant proposes to (1) change the hydraulic capacity from 600 cfs to
750 cfs; (2) change the authorized installed capacity from 6,150 kW to
7,700 kW; and (3) change from two turbines to a single turbine. At the
Upper Turnbull Drop Project, the applicant proposes to (1) change the
hydraulic capacity from 600 cfs to 750 cfs; (2) change the authorized
installed capacity from 4,100 kW to 5,300 kW; and (3) change from two
turbines to a single turbine.
Additionally, at the Lower Turnbull Drop Project, the applicant
proposes to (1) change the entire transmission line to 69 kV and
eliminate the remote electrical substation and (2) change the length
and location of the 69 kV transmission line. At the Upper Turnbull Drop
Project, the applicant proposes to (1) change the entire transmission
line to 69 kV and eliminate the remote electrical substation and (2)
change the length and location of the 69 kV transmission line. The
filing of terms and conditions (see section ``o'' below) are only being
requested by this notice for the applicant's proposal regarding changes
to the transmission line routes.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via e-mail of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the title ``PROTEST'', ``MOTION TO
INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' or
'' TERMS AND CONDITIONS'' (transmission line routes only); (2) set
forth in the heading the name of the applicant and the project numbers
of the application to which the filing responds; (3) furnish the name,
address, and telephone number of the person protesting or intervening;
and (4) otherwise comply with the requirements of 18 CFR 385.2001
through 385.2005. All comments, motions to intervene or protests must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All comments, motions to intervene or
protests should relate to project works which are the subject of the
license amendment. Agencies may obtain copies of the application
directly from the applicant. A copy of any protest or motion to
intervene must be served upon each representative of the applicant
specified in the particular application. If an intervener files
comments or documents with the Commission relating to the merits of an
issue that may affect the responsibilities of a particular resource
agency, they must also serve a copy of the document on that resource
agency. A copy of all other filings in reference to this application
must be accompanied by proof of service on all persons listed in the
service list prepared by the Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and 385.2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-7144 Filed 3-30-10; 8:45 am]