Turnbull Hydro, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene and Protests, and Ready for Environmental Analysis; Soliciting Recommendations and Terms and Conditions for the Proposed Changes to the Transmission Line Routes, 16093-16094 [2010-7144]

Download as PDF Federal Register / Vol. 75, No. 61 / Wednesday, March 31, 2010 / Notices developments; one that is an existing, licensed development (the Lower Pacolet development) and a new development (Upper Pacolet development). The project would have an annual generation of 8.092 gigawatthours. The proposed project would consist of the facilities described below. jlentini on DSKJ8SOYB1PROD with NOTICES The Upper Pacolet development would consist of: (1) An existing 315-foot-long by 18-foot-high concrete and rubble masonry dam, with the addition of 3-foot-high flashboards; (2) an existing 30-acre reservoir, with a useable storage capacity of 90 acre-feet at elevation 519.0 feet North American Vertical Datum 1988 (NAVD 88); (3) new vertical slide intake gates with rack and pinion operators, sluice gates, and trashracks having a 1-inch clear bar spacing with a trash rake; (4) a new 24-foot-wide by 40-foot-long concrete powerhouse that would contain a vertical Kaplan turbine with an estimated generating capacity of 1,100 kilowatts (kW); (5) a tailrace with a 40-foot-long guide wall; (6) a new 200-foot-long, 34 kilovolt (kV) transmission line; (7) a proposed substation; and (8) appurtenant facilities. The Lower Pacolet development (all existing facilities) would consist of: (1) A 347-foot-long by 24-foot-high concrete and rubble masonry dam, with 4-foot-high flashboards; (2) three sand gates; (3) an 11acre reservoir, with a useable storage capacity of 44-acre feet at an elevation of 492.0 feet NAVD 88 ; (4) an intake structure equipped with trashracks having a 1.375-inch clear bar spacing and a trash rake; (5) a 100-foot-long by 10-foot-diameter penstock; (6) a 67-footlong by 32-foot-wide concrete powerhouse, integral with the dam, containing two vertical Leffel Type Z turbines, each generating 400 kilowatts (kW); (7) a tailrace with a 340-foot-long curved training wall; (8) a 250-foot-long, 34.5-kV transmission line; and (9) appurtenant facilities. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov. A copy is also available for inspection and reproduction at the address in item h above. n. Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received VerDate Nov<24>2008 19:40 Mar 30, 2010 Jkt 220001 on or before the specified comment date for the particular application. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. o. A license applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. Kimberly D. Bose, Secretary. [FR Doc. 2010–7146 Filed 3–30–10; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 16093 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12597–021; Project No. 12598– 019] Turnbull Hydro, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene and Protests, and Ready for Environmental Analysis; Soliciting Recommendations and Terms and Conditions for the Proposed Changes to the Transmission Line Routes March 24, 2010. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Amendment of License. b. Project Nos.: 12597–021 and P– 12598–019. c. Date Filed: February 17, 2010, and supplemented March 17 and 23, 2010. d. Applicant: Turnbull Hydro, LLC. e. Name of Project: Lower and Upper Turnbull Drop, respectively. f. Location: The projects are located on the Spring Valley Canal in Teton County, Montana. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r. h. Applicant Contact: Mr. Ted Sorenson, Turnbull Hydro, LLC, 5203 South 11th East, Idaho Falls, ID 83404, (208) 522–8069. i. FERC Contact: Any questions regarding this notice should be directed to Mr. Jeremy Jessup (202) 502–6779 or Jeremy.Jessup@ferc.gov. j. Deadline for filing motions to intervene and protests, comments, recommendations, and preliminary terms and conditions (terms and conditions for transmission line routes only), is 60 days from the issuance of this notice; reply comments are due 105 days from the issuance date of this notice. All documents may be filed electronically via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘eFiling’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings, please go to the Commissions Web site located at https://ferc.gov.filing-comments.asp. Please include the project numbers (P–12597–021 and P–12598–019) on any comments, motions, recommendations, E:\FR\FM\31MRN1.SGM 31MRN1 jlentini on DSKJ8SOYB1PROD with NOTICES 16094 Federal Register / Vol. 75, No. 61 / Wednesday, March 31, 2010 / Notices or preliminary terms and conditions filed. k. Description of Request: At the Lower Turnbull Drop Project, the applicant proposes to (1) change the hydraulic capacity from 600 cfs to 750 cfs; (2) change the authorized installed capacity from 6,150 kW to 7,700 kW; and (3) change from two turbines to a single turbine. At the Upper Turnbull Drop Project, the applicant proposes to (1) change the hydraulic capacity from 600 cfs to 750 cfs; (2) change the authorized installed capacity from 4,100 kW to 5,300 kW; and (3) change from two turbines to a single turbine. Additionally, at the Lower Turnbull Drop Project, the applicant proposes to (1) change the entire transmission line to 69 kV and eliminate the remote electrical substation and (2) change the length and location of the 69 kV transmission line. At the Upper Turnbull Drop Project, the applicant proposes to (1) change the entire transmission line to 69 kV and eliminate the remote electrical substation and (2) change the length and location of the 69 kV transmission line. The filing of terms and conditions (see section ‘‘o’’ below) are only being requested by this notice for the applicant’s proposal regarding changes to the transmission line routes. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but VerDate Nov<24>2008 19:40 Mar 30, 2010 Jkt 220001 only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the title ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ or ’’ TERMS AND CONDITIONS’’ (transmission line routes only); (2) set forth in the heading the name of the applicant and the project numbers of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene or protests should relate to project works which are the subject of the license amendment. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–7144 Filed 3–30–10; 8:45 am] BILLING CODE 6717–01–P PO 00000 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 10856–079] Upper Peninsula Power Company; North American Hydro Holdings, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene March 24, 2010. On March 17, 2010, Upper Peninsula Power Company (transferor) and North American Hydro Holdings, LLC (transferee) filed an application for transfer of license of the AuTrain Project, located on the Upper AuTrain River in Alger County, Michigan. Applicants seek Commission approval to transfer the license for the AuTrain Project from the transferor to the transferee. Applicant Contact: For transferor Mr. Terry P. Jensky, Upper Peninsula Power Company, 700 N Adams Street, Green Bay, WI 54307, phone (920) 433–2900. For the transferee Mr. Charles F. Alberg, North American Hydro Holdings, LLC, 116 State Street, Neshkoro, WI 54960, phone (920) 293–4628 FERC Contact: Robert Bell, (202) 502– 6062. Deadline for filing comments and motions to intervene: 30 days from the issuance of this notice. Comments and motions to intervene may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii)(2008) and the instructions on the Commission’s website under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https:// www.ferc.gov/filing-comments.asp. More information about this project can be viewed or printed on the eLibrary link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–10856–079) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. 2010–7141 Filed 3–30–10; 8:45 am] BILLING CODE 6717–01–P Frm 00029 Fmt 4703 Sfmt 9990 E:\FR\FM\31MRN1.SGM 31MRN1

Agencies

[Federal Register Volume 75, Number 61 (Wednesday, March 31, 2010)]
[Notices]
[Pages 16093-16094]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-7144]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12597-021; Project No. 12598-019]


Turnbull Hydro, LLC; Notice of Application Accepted for Filing, 
Soliciting Comments, Motions To Intervene and Protests, and Ready for 
Environmental Analysis; Soliciting Recommendations and Terms and 
Conditions for the Proposed Changes to the Transmission Line Routes

March 24, 2010.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Amendment of License.
    b. Project Nos.: 12597-021 and P-12598-019.
    c. Date Filed: February 17, 2010, and supplemented March 17 and 23, 
2010.
    d. Applicant: Turnbull Hydro, LLC.
    e. Name of Project: Lower and Upper Turnbull Drop, respectively.
    f. Location: The projects are located on the Spring Valley Canal in 
Teton County, Montana.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Mr. Ted Sorenson, Turnbull Hydro, LLC, 5203 
South 11th East, Idaho Falls, ID 83404, (208) 522-8069.
    i. FERC Contact: Any questions regarding this notice should be 
directed to Mr. Jeremy Jessup (202) 502-6779 or Jeremy.Jessup@ferc.gov.
    j. Deadline for filing motions to intervene and protests, comments, 
recommendations, and preliminary terms and conditions (terms and 
conditions for transmission line routes only), is 60 days from the 
issuance of this notice; reply comments are due 105 days from the 
issuance date of this notice. All documents may be filed electronically 
via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions 
on the Commission's Web site at https://www.ferc.gov under the ``e-
Filing'' link. If unable to be filed electronically, documents may be 
paper-filed. To paper-file, an original and eight copies should be 
mailed to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426. For more information on how to 
submit these types of filings, please go to the Commissions Web site 
located at https://ferc.gov.filing-comments.asp.
    Please include the project numbers (P-12597-021 and P-12598-019) on 
any comments, motions, recommendations,

[[Page 16094]]

or preliminary terms and conditions filed.
    k. Description of Request: At the Lower Turnbull Drop Project, the 
applicant proposes to (1) change the hydraulic capacity from 600 cfs to 
750 cfs; (2) change the authorized installed capacity from 6,150 kW to 
7,700 kW; and (3) change from two turbines to a single turbine. At the 
Upper Turnbull Drop Project, the applicant proposes to (1) change the 
hydraulic capacity from 600 cfs to 750 cfs; (2) change the authorized 
installed capacity from 4,100 kW to 5,300 kW; and (3) change from two 
turbines to a single turbine.
    Additionally, at the Lower Turnbull Drop Project, the applicant 
proposes to (1) change the entire transmission line to 69 kV and 
eliminate the remote electrical substation and (2) change the length 
and location of the 69 kV transmission line. At the Upper Turnbull Drop 
Project, the applicant proposes to (1) change the entire transmission 
line to 69 kV and eliminate the remote electrical substation and (2) 
change the length and location of the 69 kV transmission line. The 
filing of terms and conditions (see section ``o'' below) are only being 
requested by this notice for the applicant's proposal regarding changes 
to the transmission line routes.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street, NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via e-mail of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the title ``PROTEST'', ``MOTION TO 
INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' or 
'' TERMS AND CONDITIONS'' (transmission line routes only); (2) set 
forth in the heading the name of the applicant and the project numbers 
of the application to which the filing responds; (3) furnish the name, 
address, and telephone number of the person protesting or intervening; 
and (4) otherwise comply with the requirements of 18 CFR 385.2001 
through 385.2005. All comments, motions to intervene or protests must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). All comments, motions to intervene or 
protests should relate to project works which are the subject of the 
license amendment. Agencies may obtain copies of the application 
directly from the applicant. A copy of any protest or motion to 
intervene must be served upon each representative of the applicant 
specified in the particular application. If an intervener files 
comments or documents with the Commission relating to the merits of an 
issue that may affect the responsibilities of a particular resource 
agency, they must also serve a copy of the document on that resource 
agency. A copy of all other filings in reference to this application 
must be accompanied by proof of service on all persons listed in the 
service list prepared by the Commission in this proceeding, in 
accordance with 18 CFR 4.34(b) and 385.2010.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-7144 Filed 3-30-10; 8:45 am]
BILLING CODE 6717-01-P