City of Keene, NH; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions, 15701-15702 [2010-6983]
Download as PDF
Federal Register / Vol. 75, No. 60 / Tuesday, March 30, 2010 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1951–169]
Georgia Power Company; Notice of
Application for Amendment of License
and Soliciting Comments, Motions To
Intervene, and Protests
jlentini on DSKJ8SOYB1PROD with NOTICES
March 23, 2010.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-project use
of project lands and waters.
b. Project No: 1951–169.
c. Date Filed: February 22, 2010.
d. Applicant: Georgia Power
Company.
e. Name of Project: Sinclair
Hydroelectric Project.
f. Location: The proposed facilities
would be located on Lake Sinclair,
along Crooked Creek Drive, in Putnam
County, Georgia.
g. Filed Pursuant to: Federal Power
Act, 16 USC 791a–825r.
h. Applicant Contact: Mr. Herbie N.
Johnson, Oconee-Sinclair Lake
Resources Manager, Georgia Power
Company, 125 Wallace Dam Road, NE.,
Eatonton, Georgia, 31024; 706–485–
8704.
i. FERC Contact: Any questions
regarding this notice should be directed
to Isis Johnson, Telephone (202) 502–
6346, and e-mail: isis.johnson@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protest: April
23, 2010.
Comments, Motions to Intervene, and
Protests may be filed electronically via
the Internet. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site at
https://www.ferc.gov under the ‘‘e-Filing’’
link. If unable to be filed electronically,
documents may be paper-filed. To
paper-file, an original and eight copies
should be mailed to: Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
For more information on how to submit
these types of filings, please so to the
Commission’s Web site located at
https://www.ferc.gov.filingcomments.asp.
Please include the project number (P–
1951–169) on any comments or motions
filed.
The Commission’s Rules of Practice
and Procedure require all interveners
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
VerDate Nov<24>2008
16:22 Mar 29, 2010
Jkt 220001
Further, if an intervener files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Request: Georgia
Power Company requests Commission
authorization to permit Classic City
Marinas, LLC., to construct and install
new facilities associated with the
Crooked Creek Marina. The new
facilities include two 10-slip
community docks; a concrete ramp and
boat lift pier, with 2 associated
launching docks; 2 concrete boat ramps,
with a single launching dock; and an
additional 326 linear feet of wooden
seawall. The proposal also includes
removal of an existing trailer, wooden
deck, and a 42-foot-long section of the
existing wooden sea wall; and dredging
of 212 cubic yards of sediment. The
amount of concrete and asphalt paving
in the project boundary would increase,
however, a bio-retention area would be
established, fish habitat structures
would be installed, and native
vegetation would be planted in
disturbed areas.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
15701
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–6984 Filed 3–29–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13638–000]
City of Keene, NH; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, Protests,
Recommendations, and Terms and
Conditions
March 23, 2010.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Conduit
Exemption.
b. Project No.: P–13638–000.
c. Date filed: December 7, 2009.
d. Applicant: City of Keene, NH.
e. Name of Project: Keene Water
Treatment Facility Hydro Power Project.
f. Location: The Keene Water
Treatment Facility Hydro Power Project
would be located at the Keene, New
Hampshire Water Treatment Facility, in
Cheshire County, New Hampshire. The
land in which all the project structures
are located is owned by the applicant.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. John
MacLean, City Manager, City of Keene,
E:\FR\FM\30MRN1.SGM
30MRN1
jlentini on DSKJ8SOYB1PROD with NOTICES
15702
Federal Register / Vol. 75, No. 60 / Tuesday, March 30, 2010 / Notices
3 Washington Street, Keene, NH 03431;
(603) 357–9804;
JMacLean@ci.keene.nh.us.
i. FERC Contact: Kelly Houff, (202)
502–6393, Kelly.Houff@ferc.gov.
j. Status of Environmental Analysis:
This application is ready for
environmental analysis at this time, and
the Commission is requesting
comments, reply comments,
recommendations, terms and
conditions, and prescriptions.
k. Deadline for filing responsive
documents: Due to the small size and
location of the proposed project in a
closed system, as well as the resource
agency consultation letters filed with
the application, the 60-day timeframe
specified in 18 CFR 4.43(b) for filing all
comments, motions to intervene,
protests, recommendations, terms and
conditions, and prescriptions is
shortened to 30 days from the issuance
date of this notice. All reply comments
filed in response to comments
submitted by any resource agency,
Indian tribe, or person, must be filed
with the Commission within 45 days
from the issuance date of this notice.
Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper; see 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
l. Description of Project: The proposed
Keene Water Treatment Facility Hydro
Power Project consists of: (1) Two
proposed turbine generating units, with
nameplate capacities of 40 kilowatts and
22 kilowatts, for a maximum installed
capacity of 62 kilowatts, which will be
installed in parallel with the pressure
reducing valve at the Keene, New
Hampshire Water Treatment Facility;
and (2) appurtenant facilities. The
project would have an estimated annual
generation of 350,000 kilowatt-hours
that would be sold to a local utility.
m. This filing is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street, NE., Washington, DC
20426. The filing may also be viewed on
the web at https://www.ferc.gov using the
VerDate Nov<24>2008
16:22 Mar 29, 2010
Jkt 220001
‘‘eLibrary’’ link. Enter the docket
number, here P–13638–000, in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for review and reproduction at
the address in item h above.
n. Development Application—Any
qualified applicant desiring to file a
competing application must submit to
the Commission, on or before the
specified deadline date for the
particular application, a competing
development application, or a notice of
intent to file such an application.
Submission of a timely notice of intent
allows an interested person to file the
competing development application no
later than 120 days after the specified
deadline date for the particular
application. Applications for
preliminary permits will not be
accepted in response to this notice.
o. Notice of Intent—A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit a competing development
application. A notice of intent must be
served on the applicant(s) named in this
public notice.
p. Protests or Motions to Intervene—
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
q. All filings must (1) bear in all
capital letters the title ‘‘PROTEST’’,
‘‘MOTION TO INTERVENE’’, ‘‘NOTICE
OF INTENT TO FILE COMPETING
APPLICATION’’, ‘‘COMPETING
APPLICATION’’, ‘‘COMMENTS’’,
‘‘REPLY COMMENTS’’,
‘‘RECOMMENDATIONS’’, ‘‘TERMS AND
CONDITIONS’’, or ‘‘PRESCRIPTIONS’’;
(2) set forth in the heading the name of
the applicant and the project number of
the application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, recommendations, terms
and conditions or prescriptions must set
forth their evidentiary basis and
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Any of these documents
must be filed by providing the original
and eight copies to: The Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. An additional copy must be sent
to Director, Division of Hydropower
Administration and Compliance, Office
of Energy Projects, Federal Energy
Regulatory Commission, at the above
address. A copy of any protest or motion
to intervene must be served upon each
representative of the applicant specified
in the particular application. A copy of
all other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–6983 Filed 3–29–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
March 23, 2010.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC10–53–000.
Applicants: Sharyland Utilities, L.P.
Description: Sharyland Utilities, L.P.,
Joint Application for Approval of the
Disposition of Jurisdictional Facilities
Under Section 203 of the Federal Power
Act.
Filed Date: 03/18/2010.
Accession Number: 20100318–5078.
Comment Date: 5 p.m. Eastern Time
on Thursday, April 8, 2010.
Docket Numbers: EC10–54–000.
Applicants: Larswind, LLC.
Description: Application for
Authorization for Disposition of
Jurisdictional Facilities and Request for
Expedited Action of Larswind, LLC.
Filed Date: 03/22/2010.
Accession Number: 20100322–5110
Comment Date: 5 p.m. Eastern Time
on Monday, April 12, 2010.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER02–2551–005.
Applicants: Cargill Power Markets,
LLC.
E:\FR\FM\30MRN1.SGM
30MRN1
Agencies
[Federal Register Volume 75, Number 60 (Tuesday, March 30, 2010)]
[Notices]
[Pages 15701-15702]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-6983]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13638-000]
City of Keene, NH; Notice of Application Accepted for Filing and
Soliciting Comments, Motions To Intervene, Protests, Recommendations,
and Terms and Conditions
March 23, 2010.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Conduit Exemption.
b. Project No.: P-13638-000.
c. Date filed: December 7, 2009.
d. Applicant: City of Keene, NH.
e. Name of Project: Keene Water Treatment Facility Hydro Power
Project.
f. Location: The Keene Water Treatment Facility Hydro Power Project
would be located at the Keene, New Hampshire Water Treatment Facility,
in Cheshire County, New Hampshire. The land in which all the project
structures are located is owned by the applicant.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. John MacLean, City Manager, City of
Keene,
[[Page 15702]]
3 Washington Street, Keene, NH 03431; (603) 357-9804;
JMacLean@ci.keene.nh.us.
i. FERC Contact: Kelly Houff, (202) 502-6393, Kelly.Houff@ferc.gov.
j. Status of Environmental Analysis: This application is ready for
environmental analysis at this time, and the Commission is requesting
comments, reply comments, recommendations, terms and conditions, and
prescriptions.
k. Deadline for filing responsive documents: Due to the small size
and location of the proposed project in a closed system, as well as the
resource agency consultation letters filed with the application, the
60-day timeframe specified in 18 CFR 4.43(b) for filing all comments,
motions to intervene, protests, recommendations, terms and conditions,
and prescriptions is shortened to 30 days from the issuance date of
this notice. All reply comments filed in response to comments submitted
by any resource agency, Indian tribe, or person, must be filed with the
Commission within 45 days from the issuance date of this notice.
Comments, protests, and interventions may be filed electronically
via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site under the ``e-Filing''
link. The Commission strongly encourages electronic filings.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
l. Description of Project: The proposed Keene Water Treatment
Facility Hydro Power Project consists of: (1) Two proposed turbine
generating units, with nameplate capacities of 40 kilowatts and 22
kilowatts, for a maximum installed capacity of 62 kilowatts, which will
be installed in parallel with the pressure reducing valve at the Keene,
New Hampshire Water Treatment Facility; and (2) appurtenant facilities.
The project would have an estimated annual generation of 350,000
kilowatt-hours that would be sold to a local utility.
m. This filing is available for review and reproduction at the
Commission in the Public Reference Room, Room 2A, 888 First Street,
NE., Washington, DC 20426. The filing may also be viewed on the web at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number, here P-13638-000, in the docket number field to access the
document. For assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for review and reproduction at the address in item h
above.
n. Development Application--Any qualified applicant desiring to
file a competing application must submit to the Commission, on or
before the specified deadline date for the particular application, a
competing development application, or a notice of intent to file such
an application. Submission of a timely notice of intent allows an
interested person to file the competing development application no
later than 120 days after the specified deadline date for the
particular application. Applications for preliminary permits will not
be accepted in response to this notice.
o. Notice of Intent--A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit a competing development application. A notice of intent must be
served on the applicant(s) named in this public notice.
p. Protests or Motions to Intervene--Anyone may submit a protest or
a motion to intervene in accordance with the requirements of Rules of
Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In
determining the appropriate action to take, the Commission will
consider all protests filed, but only those who file a motion to
intervene in accordance with the Commission's Rules may become a party
to the proceeding. Any protests or motions to intervene must be
received on or before the specified deadline date for the particular
application.
q. All filings must (1) bear in all capital letters the title
``PROTEST'', ``MOTION TO INTERVENE'', ``NOTICE OF INTENT TO FILE
COMPETING APPLICATION'', ``COMPETING APPLICATION'', ``COMMENTS'',
``REPLY COMMENTS'', ``RECOMMENDATIONS'', ``TERMS AND CONDITIONS'', or
``PRESCRIPTIONS''; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. All comments,
recommendations, terms and conditions or prescriptions must set forth
their evidentiary basis and otherwise comply with the requirements of
18 CFR 4.34(b). Agencies may obtain copies of the application directly
from the applicant. Any of these documents must be filed by providing
the original and eight copies to: The Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An
additional copy must be sent to Director, Division of Hydropower
Administration and Compliance, Office of Energy Projects, Federal
Energy Regulatory Commission, at the above address. A copy of any
protest or motion to intervene must be served upon each representative
of the applicant specified in the particular application. A copy of all
other filings in reference to this application must be accompanied by
proof of service on all persons listed in the service list prepared by
the Commission in this proceeding, in accordance with 18 CFR 4.34(b)
and 385.2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-6983 Filed 3-29-10; 8:45 am]
BILLING CODE 6717-01-P