CenterPoint Energy Gas Transmission Company; Notice of Application, 13525-13526 [2010-6165]
Download as PDF
pwalker on DSK8KYBLC1PROD with NOTICES
Federal Register / Vol. 75, No. 54 / Monday, March 22, 2010 / Notices
the Commission and open to public
inspection. The filing may also be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding the
application should be directed to Glen
DiEleuterio, Project Manager, Eastern
Shore Natural Gas Company, 1110
Forrest Avenue, Dover, Delaware 19904,
at (302) 734–6710, ext. 6723 or via fax
(302) 734–6745 or by e-mail to
GDiElcutcrio@esng.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify Federal and
State agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
Federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
VerDate Nov<24>2008
16:41 Mar 19, 2010
Jkt 220001
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
13525
Comment Date: April 5, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–6164 Filed 3–19–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP10–78–000]
CenterPoint Energy Gas Transmission
Company; Notice of Application
March 15, 2010.
Take notice that on March 5, 2010,
CenterPoint Energy Gas Transmission
Company (CEGT), 1111 Louisiana
Street, Houston, Texas 77002–5231,
filed in the above referenced docket an
application pursuant to section 7(b) of
the Natural Gas Act (NGA) requesting
authorization to abandon Line L,
consisting of approximately 91 miles of
predominately 18-inch diameter
pipeline and appurtenances located in
Hot Spring, Clark, Nevada, and
Columbia Counties, Alabama. CEGT
states that Line L has been inactive for
more than 12 months and no customer
service will be abandoned as a result of
the proposal, all as more fully set forth
in the application which is on file with
the Commission and open to public
inspection. The filing is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site Web at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TTY, (202)
502–8659.
Any questions concerning this
application may be directed to Michelle
Willis, Manager, Regulatory and
Compliance, CenterPoint Energy Gas
Transmission Company, PO Box 21734,
Shreveport, Louisiana 71151, at (318)
429–3708.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
E:\FR\FM\22MRN1.SGM
22MRN1
13526
Federal Register / Vol. 75, No. 54 / Monday, March 22, 2010 / Notices
pwalker on DSK8KYBLC1PROD with NOTICES
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: April 5, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–6165 Filed 3–19–10; 8:45 am]
BILLING CODE 6717–01–P
VerDate Nov<24>2008
16:41 Mar 19, 2010
Jkt 220001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13632–000]
Muskingum Valley Hydro, LLC; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
March 15, 2010.
Frm 00044
Fmt 4703
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–6166 Filed 3–19–10; 8:45 am]
BILLING CODE 6717–01–P
On November 19, 2009, Muskingum
Valley Hydro, LLC filed an application,
pursuant to Section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Harsha Lake Dam
Project No. 13632, to be located at the
existing William H. Harsha Lake Dam
on the East Fork of the Little Miami
River, in Clermont County, Ohio. The
William H. Harsha Lake Dam is owned
and operated by the U.S. Army Corps of
Engineers.
The proposed project would consist
of: (1) Lining an existing 4 to 10-footdiameter, oblong conduit with steel; (2)
a new approximately 20-foot-long
conduit extension from the outlet works
to the powerhouse; (3) three new
Francis turbine-generator units with a
combined capacity of 9.15 megawatts;
(4) a new 50-foot-long, 30-foot-wide,
and 30-foot-high powerhouse to be
located downstream of the existing
outlet works; (5) a new tailrace; (6) a
new 17.7-kilovolt, .25-mile transmission
line; and (7) appurtenant facilities. The
project would have an estimated annual
generation of 19,500 megawatt-hours.
Applicant Contact: Randall Smith,
4950 Frazeysburg Road, Zanesville, OH
43701, (740) 891–5424.
FERC Contact: Brandon Cherry, (202)
502–8328.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing application: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘eFiling’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp.
PO 00000
More information about this project
can be viewed or printed on the
‘‘eLibrary’’ link of Commission’s Web
site at https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13632) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP10–3–001; CP10–3–000;
PF09–6–000]
Questar Overthrust Pipeline Company;
Notice of Application
March 15, 2010.
Take notice that on March 12, 2010,
Questar Overthrust Pipeline Company
(Overthrust), 180 East 100 South, Salt
Lake City, Utah 84111, filed an
amended application to section 7(c) of
the Natural Gas Act (NGA) seeking
authority to incorporate two pipeline
reroutes as part of its approximate 43.3mile Loop Expansion Project originally
filed in Docket No. CP10–3–000.
Overthrust states that the reroutes are
required to minimize impacts to certain
mining leaseholds and minimizes the
impacts of future mining activity upon
the Project. The Main Line (ML) 133
Loop Expansion Project begins at the
existing Rock Springs Compressor
Station in Sweetwater County,
Wyoming and ends at a tie-in facility
called Cabin 31, located within Uinta
County, Wyoming (The Main Line 133
Loop Expansion Project), all as more
fully set forth in the application. This
filing is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.fer.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659.
Specifically, The Main Line (ML) 133
Loop Expansion Project will enable
Overthrust to transport up to an
additional 800,000 Dth/d of natural gas
from receipt points on the east end of its
system, to delivery points on the west
end of its system. It is further explained
E:\FR\FM\22MRN1.SGM
22MRN1
Agencies
[Federal Register Volume 75, Number 54 (Monday, March 22, 2010)]
[Notices]
[Pages 13525-13526]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-6165]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP10-78-000]
CenterPoint Energy Gas Transmission Company; Notice of
Application
March 15, 2010.
Take notice that on March 5, 2010, CenterPoint Energy Gas
Transmission Company (CEGT), 1111 Louisiana Street, Houston, Texas
77002-5231, filed in the above referenced docket an application
pursuant to section 7(b) of the Natural Gas Act (NGA) requesting
authorization to abandon Line L, consisting of approximately 91 miles
of predominately 18-inch diameter pipeline and appurtenances located in
Hot Spring, Clark, Nevada, and Columbia Counties, Alabama. CEGT states
that Line L has been inactive for more than 12 months and no customer
service will be abandoned as a result of the proposal, all as more
fully set forth in the application which is on file with the Commission
and open to public inspection. The filing is available for review at
the Commission in the Public Reference Room or may be viewed on the
Commission's Web site Web at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or
TTY, (202) 502-8659.
Any questions concerning this application may be directed to
Michelle Willis, Manager, Regulatory and Compliance, CenterPoint Energy
Gas Transmission Company, PO Box 21734, Shreveport, Louisiana 71151, at
(318) 429-3708.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below file with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211)
[[Page 13526]]
and the Regulations under the NGA (18 CFR 157.10). A person obtaining
party status will be placed on the service list maintained by the
Secretary of the Commission and will receive copies of all documents
filed by the applicant and by all other parties. A party must submit 14
copies of filings made in the proceeding with the Commission and must
mail a copy to the applicant and to every other party. Only parties to
the proceeding can ask for court review of Commission orders in the
proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 14 copies of the protest or intervention to the
Federal Energy regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: April 5, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-6165 Filed 3-19-10; 8:45 am]
BILLING CODE 6717-01-P