MMS Information Collection Activity: 1010-0114, Subpart A-General, Revision of a Collection; Comment Request, 13563-13568 [2010-6106]

Download as PDF Federal Register / Vol. 75, No. 54 / Monday, March 22, 2010 / Notices drugs that are likely to be administered to patients with renal impairment, including drugs that are not primarily excreted by the kidney, PK should be assessed in patients with renal impairment to provide appropriate dosing recommendations. This draft guidance provides recommendations on when studies should be conducted to assess the influence of renal impairment on the pharmacokinetics of an investigational drug, the design of such studies, and how such studies should be carried out. In the Federal Register of May 15, 1998 (63 FR 27094), FDA announced the availability of a guidance entitled ‘‘Pharmacokinetics in Patients With Impaired Renal Function—Study Design, Data Analysis, and Impact on Dosing and Labeling.’’ The guidance has been revised at this time to indicate that a renal impairment study will be recommended for all drugs (with a few exceptions). In the original guidance, the agency stressed the need to evaluate only drugs that are renally eliminated. A second change is that in the 1998 guidance, only the Cockcroft-Gault equation was recommended to gauge renal function. The revised draft guidance adds the Modification of Diet in Renal Disease equation as another possible gauge for renal function and for dose adjustments. This draft guidance is being issued consistent with FDA’s good guidance practices regulation (21 CFR 10.115). The draft guidance represents the agency’s current thinking on conducting PK studies in patients with impaired renal function. It does not create or confer any rights for or on any person and does not operate to bind FDA or the public. An alternative approach may be used if such approach satisfies the requirement of the applicable statutes and regulations. pwalker on DSK8KYBLC1PROD with NOTICES II. Paperwork Reduction Act of 1995 This draft guidance refers to previously approved collections of information that are subject to review by the Office of Management and Budget (OMB) under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501–3520). The collections of information in 21 CFR 201.57 have been approved under OMB control number 0910–0572. III. Comments Interested persons may submit to the Division of Dockets Management (see ADDRESSES) written or electronic comments regarding this document. Submit a single copy of electronic comments or two paper copies of any mailed comments, except that individuals may submit one paper copy. VerDate Nov<24>2008 16:41 Mar 19, 2010 Jkt 220001 Comments are to be identified with the docket number found in brackets in the heading of this document. Received comments may be seen in the Division of Dockets Management between 9 a.m. and 4 p.m., Monday through Friday. IV. Electronic Access Persons with access to the Internet may obtain the document at either https://www.fda.gov/Drugs/Guidance ComplianceRegulatoryInformation/ Guidances or https:// www.regulations.gov. Dated: March 16, 2010. Leslie Kux, Acting Assistant Commissioner for Policy. [FR Doc. 2010–6171 Filed 3–19–10; 8:45 am] BILLING CODE 4160–01–S DEPARTMENT OF THE INTERIOR Minerals Management Service [Docket no. MMS–2010–OMM–0008] MMS Information Collection Activity: 1010–0114, Subpart A—General, Revision of a Collection; Comment Request AGENCY: Minerals Management Service (MMS), Interior. ACTION: Notice of revision of an information collection (1010–0114). SUMMARY: To comply with the Paperwork Reduction Act of 1995 (PRA), MMS is inviting comments on a collection of information that we will submit to the Office of Management and Budget (OMB) for review and approval. The information collection request concerns the paperwork requirements in the regulations under 30 CFR 250, subpart A, ‘‘General.’’ DATES: Submit written comments by May 21, 2010. FOR FURTHER INFORMATION CONTACT: Cheryl Blundon, Regulations and Standards Branch at (703) 787–1607. You may also contact Cheryl Blundon to obtain a copy, at no cost, of the regulations and the forms that require the subject collection of information. ADDRESSES: You may submit comments by either of the following methods listed below. • Electronically: go to https:// www.regulations.gov. In the entry titled ‘‘Enter Keyword or ID,’’ enter docket ID MMS–2010–OMM–0008 then click search. Follow the instructions to submit public comments and view supporting and related materials. The MMS will post all comments. • Mail or hand-carry comments to the Department of the Interior; Minerals PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 13563 Management Service; Attention: Cheryl Blundon; 381 Elden Street, MS–4024; Herndon, Virginia 20170–4817. Please reference Information Collection 1010– 0114 in your comment and include your name and return address. SUPPLEMENTARY INFORMATION: Title: 30 CFR 250, subpart A, General. Form(s): MMS–132, MMS–143, MMS–1123, and MMS–1832. OMB Control Number: 1010–0114. Abstract: The Outer Continental Shelf (OCS) Lands Act, as amended (43 U.S.C. 1331 et seq. and 43 U.S.C. 1801 et seq.), authorizes the Secretary of the Interior to prescribe rules and regulations to administer leasing of the OCS. Such rules and regulations will apply to all operations conducted under a lease. Operations in the OCS must preserve, protect, and develop oil and natural gas resources in a manner that is consistent with the need to make such resources available to meet the Nation’s energy needs as rapidly as possible; to balance orderly energy resource development with protection of human, marine, and coastal environments; to ensure the public a fair and equitable return on the resources of the OCS; and to preserve and maintain free enterprise competition. Section 1332(6) states that ‘‘operations in the [O]uter Continental Shelf should be conducted in a safe manner by well trained personnel using technology, precautions, and other techniques sufficient to prevent or minimize the likelihood of blowouts, loss of well control, fires, spillages, physical obstructions to other users of the waters or subsoil and seabed, or other occurrences which may cause damage to the environment or to property or endanger life or health.’’ The Independent Offices Appropriations Act (31 U.S.C. 9701), the Omnibus Appropriations Bill (Pub. L. 104–133, 110 Stat. 1321, April 26, 1996), and Office of Management and Budget (OMB) Circular A–25, authorize Federal agencies to recover the full cost of services that confer special benefits. Under the Department of the Interior’s (DOI) implementing policy, the Minerals Management Service (MMS) is required to charge fees for services that provide special benefits or privileges to an identifiable non-Federal recipient above and beyond those which accrue to the public at large. This information collection request covers 30 CFR 250, Subpart A, General. This request also covers the related Notices to Lessees and Operators (NTLs) that MMS issues to clarify and provide additional guidance on some aspects of our regulations. Requests for MMS approval may contain proprietary information related E:\FR\FM\22MRN1.SGM 22MRN1 pwalker on DSK8KYBLC1PROD with NOTICES 13564 Federal Register / Vol. 75, No. 54 / Monday, March 22, 2010 / Notices to performance standards or alternative approaches to conducting operations different from those approved and specified in MMS regulations. We will protect this proprietary information according to the Freedom of Information Act (5 U.S.C. 552), its implementing regulations (43 CFR 2), 30 CFR 252, and 30 CFR 250.197, ‘‘Data and information to be made available to the public or for limited inspection.’’ No items of a sensitive nature are collected. Responses are mandatory. The MMS uses the information collected under the Subpart A regulations to ensure that operations in the OCS are carried out in a safe and pollution-free manner, do not interfere with the rights of other users in the OCS, and balance the protection and development of OCS resources. Specifically, we use the information collected to: • Review records of formal crane operator training, rigger training, crane operator qualifications, crane inspections, testing, and maintenance to ensure that lessees perform operations in a safe and workmanlike manner and that equipment is maintained in a safe condition. The MMS also uses the information to make certain that all new and existing cranes installed on OCS fixed platforms must be equipped with anti-two block safety devices, and to assure that uniform methods are employed by lessees for load testing of cranes. • Review welding, burning, and hot tapping plans, procedures, and records to ensure that these activities are conducted in a safe and workmanlike manner by trained and experienced personnel. • Provide lessees greater flexibility to comply with regulatory requirements through approval of alternative equipment or procedures and departures to regulations if they demonstrate equal or better compliance with the appropriate performance standards. • Determine the capability of a well to produce oil or gas in paying quantities or to determine the possible need for additional wells resulting in minimum royalty status on a lease. If a well does not yield hydrocarbons in sufficient quantity to warrant continued operation and production, MMS uses the information to verify the claim and to release the lessee from lease obligations. Conversely, the information is used to extend the term of the lease if additional wells will warrant continued operation and production. • Ensure that injection of gas promotes conservation of natural resources, prevents waste, and that VerDate Nov<24>2008 16:41 Mar 19, 2010 Jkt 220001 subsurface storage of natural gas does not unduly interfere with development and production operations under existing leases. • Ensure the appropriateness of reimbursing lessees for costs incurred in reproducing geological and geophysical (G&G) data and information for submission to MMS and processing or reprocessing G&G information in a form and manner other than that normally used in the conduct of a lessee’s business, or to determine the proper reimbursement of costs incurred during inspections. • Record the designation of an operator authorized to act on behalf of the lessee and to fulfill the lessee’s obligations under the OCS Lands Act and implementing regulations, or to record the local agent empowered to receive notices and comply with regulatory orders issued (Form MMS– 1123). • Determine if an application for right-of-use and easement serves the purpose specified in the grant when conducting exploration, development, and production activities or other operations on or off the lease; is maintained for such purposes; and does not unreasonably interfere with the operations of any other lessee. • Provide for orderly development of leases through the use of information to determine the appropriateness of lessee requests for suspension of operations, including production. For example, MMS needs the information to determine that a suspension is necessary to: (1) Ensure proper lease development, (2) allow time to construct or negotiate use of transportation facilities, (3) allow reasonable time to enter into a sales contract, (4) allow for unavoidable situations, (5) avoid continued operations resulting in premature abandonment of a producing well(s) that would be uneconomic, (6) comply with the National Environmental Policy Act or to conduct an environmental analysis, (7) install equipment for safety and environmental protection, (8) allow time for inordinate delays encountered in obtaining required permits or consents, (9) comply with judicial decrees, or (10) avoid activities that pose a threat of serious, irreparable, or immediate harm. • Improve safety and environmental protection in the OCS through collection and analysis of accident reports to ascertain the cause of the accidents and to determine ways to prevent recurrences. • Ascertain when the lease ceases production or when the last well ceases production in order to determine the 180th day after the date of completion PO 00000 Frm 00082 Fmt 4703 Sfmt 4703 of the last production. This includes reporting when lease production is initiated, resumes before the end of the 180-day period after production ceased, and when lease holding operations occur during the referenced 180-day interval. The MMS will use this information to efficiently maintain the lessee/operator lease status. • Approve requests to cancel leases. • Be informed when there could be a major disruption in the availability and supply of natural gas and oil due to natural occurrences/hurricanes, to advise the U.S. Coast Guard (USCG) in case of the need to rescue offshore workers in distress, to monitor damage to offshore platforms and drilling rigs, and to advise the news media and interested public entities when production is shut in and when resumed. The OCS operations produce more than one-quarter of the Nation’s natural gas and more than one-sixth of its oil, and it is essential to know when production is interrupted. The Gulf of Mexico Region (GOMR) uses a reporting form for respondents to report evacuation statistics when necessary (Form MMS–132, Evacuation Statistics). It is sent to respondents at the onset of each ‘‘hurricane season’’ in the GOMR. • Form MMS–143, Facility/ Equipment Damage Report, assists lessees, lease operators, and pipeline right-of-way holders when reporting damage by a hurricane, earthquake, or other natural phenomenon. They are required to submit an initial damage report to the Regional Supervisor within 48 hours after completing the initial evaluation of the damage and then subsequent reports, monthly and immediately, whenever information previously submitted changes until the damaged structure or equipment is returned to service. • Allow operators who exhibit unacceptable performance an incremental approach to improving their overall performance prior to a final decision to disqualify an operator or to pursue debarment proceedings through the execution of a performance improvement plan (PIP). The Subpart A regulations do not address the actual process that we will follow in pursuing the disqualification of operators under §§ 250.135 and 250.136. However, our internal enforcement procedures include allowing such operators to demonstrate a commitment to acceptable performance by the submission of a PIP. • Determine that respondents have corrected all Incidents of NonCompliance (INC)(s) identified during inspections (Form MMS–1832). The MMS issues this form to the operator. E:\FR\FM\22MRN1.SGM 22MRN1 13565 Federal Register / Vol. 75, No. 54 / Monday, March 22, 2010 / Notices The operator then corrects the INC(s) and returns the form to the MMS Regional Supervisor no later than 14 days. • Review records of crane inspection, testing, maintenance, and crane operator qualifications to ensure that lessees perform operations in a safe and workmanlike manner and maintain equipment in a safe condition. Frequency: Primarily on occasion; monthly; form MMS–132, Evacuation Statistics submitted daily during the emergency situation. Description of Respondents: Federal, State, oil, gas, or sulphur lessees and/or operators. Estimated Reporting and Recordkeeping Hour Burden: The currently approved annual reporting burden for this collection is 36,739 hours. The following chart details the individual components and respective hour burden estimates of this information collection request. In calculating the burdens, we assumed that respondents perform certain requirements in the normal course of their activities. We consider these to be usual and customary and took that into account in estimating the burden. Hour burden Citation 30 CFR 250 Subpart A and related forms/NTLs Reporting or recordkeeping requirement Non-hour cost burdens Authority and Definition of Terms 104; 181; Form MMS–1832 ............ Appeal orders or decisions; appeal INCs; request hearing due to cancellation of lease. Exempt under 5 CFR 1320.4(a)(2), (c). Performance Standards 109(a); 110 ...................................... Submit welding, burning, and hot tapping plans ................................... 2 115; 116 .......................................... Request determination of well producibility; make available or submit data & information; notify MMS of test. 5 118; 119; 121; 124 .......................... Apply for injection or subsurface storage of gas; sign storage agreement. 10 Cost Recovery Fees 125; 126 .......................................... Cost Recovery/Service Fees; confirmation receipt etc., verbal approvals pertaining to fees (these requirements and associated items are covered individually throughout this subpart). 0 Forms 130–133; Form MMS–1832 ............ Submit ‘‘green’’ response copy of Form MMS–1832 indicating date violations (INCs) corrected. 2 143 .................................................. Report change of address; submit designation of local agent (requirements not considered IC under 5 CFR 1320.3(h)(1). 0 143; 144; 145; Form MMS–1123 .... Submit designation of operator (Form MMS–1123–15 mins. only); notice of termination; include pay.gov confirmation receipt. 1 $164 per application. 192; Form MMS–132 ...................... Daily report of evacuation statistics for natural occurrence/hurricane (Form MMS–132 in the GOMR) when circumstances warrant; inform MMS when you resume production. 1 192(b) .............................................. Use Form MMS–143 to submit an initial damage report to the Regional Supervisor. 4 192(b) .............................................. Use Form MMS–143 to submit subsequent damage reports on a monthly basis until damaged structure or equipment is returned to service; immediately when information changes; date item returned to service must be in final report. 1 Inspection of Operations VerDate Nov<24>2008 16:41 Mar 19, 2010 2 1 Notify MMS before returning to operations if shut-in. ........................... 133 .................................................. Request reconsideration from issuance of an INC ............................... Request waiver of 14-day response time .............................................. pwalker on DSK8KYBLC1PROD with NOTICES 130–133 .......................................... .5 Request reimbursement for food, quarters, and transportation provided to MMS representatives (OCS Lands Act specifies reimbursement; no requests received in many years; minimal burden). 2 Jkt 220001 PO 00000 Frm 00083 Fmt 4703 Sfmt 4703 E:\FR\FM\22MRN1.SGM 22MRN1 13566 Federal Register / Vol. 75, No. 54 / Monday, March 22, 2010 / Notices Hour burden Citation 30 CFR 250 Subpart A and related forms/NTLs Reporting or recordkeeping requirement Non-hour cost burdens Disqualification 135 MMS internal process .............. Submit PIP under MMS implementing procedures for enforcement actions. 40 Special Types of Approval 140 .................................................. Request various oral approvals not specifically covered elsewhere in regulatory requirements. 1 140(c) .............................................. Submit letter when stopping approved flaring with required information. Burden covered under 1010–0041. 141; 198 .......................................... Request approval to use new or alternative procedures, including BAST not specifically covered elsewhere in regulatory requirements. 20 142; 198 .......................................... Request approval of departure from operating requirements not specifically covered elsewhere in regulatory requirements. 3 Naming and Identifying Facilities and Wells (Does Not Include MODUs) 150; 151; 152; 154(a) ..................... Name and identify facilities, artificial islands, MODUs, helo landing facilities etc., with signs. 2 150; 154(b) ...................................... Name and identify wells with signs ....................................................... 1 Right-of-use and Easement 160; 161; 123 .................................. OCS lessees: Apply for new or modified right-of-use and easement to construct and maintain off-lease platforms, artificial islands, and installations and other devices; including notifications. 10 160(c) .............................................. Establish a Company File for qualification; submit updated information, submit qualifications for lessee/bidder, request exception. Burden covered under 1010–0006. 165; 123 .......................................... State lessees: Apply for new or modified right-of-use and easement to construct and maintain off-lease platforms, artificial islands, and installations and other devices; include pay.gov confirmation. 5 $2,569 per state lease. 166 .................................................. State lessees: Furnish surety bond; additional security if required ...... Burden covered under 1010–0006. Suspensions 168; 170; 171; 172; 174; 175; 177; 180(b), (d). Request suspension of operations or production; submit schedule of work leading to commencement. 10 $1,968 per request. Submit progress reports on SOO or SOP as condition of approval ..... 3 172(b); 177(a) ................................. Conduct site-specific study; submit results. No instances requiring this study in several years—could be necessary if a situation occurred such as severe damage to a platform or structure caused by a hurricane or a vessel collision. 100 177(b), (c), (d); 182; 183, 185; 194 Various references to submitting new, revised, or modified exploration plan, development/production plan, or development operations coordination document, and related surveys/reports. Burden covered under 1010–0151. Primary Lease Requirements, Lease Term Extensions, and Lease Cancellations Notify and submit report on various lease holding operations and lease production activities. 2 180(a), (b), (c) ................................. pwalker on DSK8KYBLC1PROD with NOTICES 180(a), (f), (g), (h), (i), (j) ................ When requested, submit production data to demonstrate production in paying quantities to maintain lease beyond primary term. 6 180(e) .............................................. Request more than 180 days to resume operations ............................. 5 181(d); 182(b), 183(b)(2) ................ Request termination of suspension and cancellation of lease (no requests in recent years for termination/cancellation of a lease; minimal burden). 20 VerDate Nov<24>2008 16:41 Mar 19, 2010 Jkt 220001 PO 00000 Frm 00084 Fmt 4703 Sfmt 4703 E:\FR\FM\22MRN1.SGM 22MRN1 13567 Federal Register / Vol. 75, No. 54 / Monday, March 22, 2010 / Notices Hour burden Citation 30 CFR 250 Subpart A and related forms/NTLs Reporting or recordkeeping requirement 184 .................................................. Request compensation for lease cancellation mandated by the OCS Lands Act (no qualified lease cancellations in many years; minimal burden compared to benefit). Non-hour cost burdens 50 Information and Reporting Requirements 186 .................................................. Submit information and reports as MMS requires ................................ 10 187; 188(a); 189; 190(c) ................. Report to the District Manager immediately via oral communication and written follow-up within 15 calendar days, incidents pertaining to: Fatalities; injuries; LoWC; fires; explosions; all collisions resulting in property or equipment damage >$25K; structural damage to an OCS facility; cranes; incidents that damage or disable safety systems or equipment (including firefighting systems). If requested, submit copy marked as public information. Oral .5. Written 4. 187(d) .............................................. Report all spills of oil or other liquid pollutants ..................................... Burden covered under 1010–0091. 188(a)(5) .......................................... Report to District Manager hydrogen sulfide (H2S) gas releases immediately by oral communication. Burden covered under 1010–0141. 188(b); 190(a), (b) ........................... Provide written report to the District Manager within 15 calendar days after incidents relating to: Injuries that result in 1 or more days away from work, on restricted work, or job transfer; gas releases that initiate equipment or process shutdown; property or equipment damage >$25K; operations personnel to muster for evacuation not related to weather or drills; any additional information required. 4 191 .................................................. Submit written statement/Request compensation mileage + services for testimony re: Accident investigation. Exempt under 5 CFR 1320.4(a)(2), (c). 193 .................................................. Report apparent violations or non-compliance ...................................... 1.5 194 NTL exception requests ........... Request departures from conducting archaeological resources surveys and/or submitting reports in GOMR. 1 194(c) .............................................. Report archaeological discoveries (only one instance in many years; minimal burden). 10 195 .................................................. Notify District Manager within 5 workdays of putting well in production status (usually oral). Follow-up with either fax/email within same 5 day period (burden includes oral and written). 1 196 .................................................. Submit data/information for post-lease G&G activity and request reimbursement. Burden covered under 1010–0048. 197(c) .............................................. Submit confidentiality agreement .......................................................... 1 101–199 .......................................... General departure or alternative compliance requests not specifically covered elsewhere in Subpart A. 2 Recordkeeping Retain records of design and construction for life of crane, including installation records for any anti-two block safety devices; all inspection, testing, and maintenance for at least 4 years; crane operator and all rigger personnel qualifications for at least 4 years. 2 109(b); 113(c) .................................. Retain welding, burning, and hot tapping plan for the life of the facility; keep plan and drawings of safe-welding areas at site; designated person advises in writing that it is safe to weld. .5 132(b)(3) .......................................... pwalker on DSK8KYBLC1PROD with NOTICES 108(e) .............................................. During inspections make records available as requested by inspectors. 2 Estimated Reporting and Recordkeeping Non-Hour Cost Burden: The currently approved non-hour cost burden for this collection is $810,200. We have identified three non-hour cost VerDate Nov<24>2008 16:41 Mar 19, 2010 Jkt 220001 burdens. Section 250.143 requires a fee for a change in designation of operator. Section 250.165 requires a State lessee applying for a right-of use and easement in the OCS to pay a cost recovery PO 00000 Frm 00085 Fmt 4703 Sfmt 4703 application fee. This cost is the same as the fee for a pipeline right-of-way grant specified in 30 CFR 250.1015 and is subject to change based on that regulation. We estimate receiving only E:\FR\FM\22MRN1.SGM 22MRN1 pwalker on DSK8KYBLC1PROD with NOTICES 13568 Federal Register / Vol. 75, No. 54 / Monday, March 22, 2010 / Notices one State lease application per year. Section 250.171 requests a fee for either a Suspension of Operations or Production Request (SOO/SOP). We have not identified any other non-hour paperwork cost burdens associated with this collection of information. Public Disclosure Statement: The PRA (44 U.S.C. 3501, et seq.) provides that an agency may not conduct or sponsor a collection of information unless it displays a currently valid OMB control number. Until OMB approves a collection of information, you are not obligated to respond. Comments: Before submitting an ICR to OMB, PRA section 3506(c)(2)(A) requires each agency ‘‘* * * to provide notice * * * and otherwise consult with members of the public and affected agencies concerning each proposed collection of information * * *’’. Agencies must specifically solicit comments to: (a) Evaluate whether the proposed collection of information is necessary for the agency to perform its duties, including whether the information is useful; (b) evaluate the accuracy of the agency’s estimate of the burden of the proposed collection of information; (c) enhance the quality, usefulness, and clarity of the information to be collected; and (d) minimize the burden on the respondents, including the use of automated collection techniques or other forms of information technology. Agencies must also estimate the nonhour paperwork cost burdens to respondents or recordkeepers resulting from the collection of information. Therefore, if you have costs to generate, maintain, and disclose this information, you should comment and provide your total capital and startup cost components or annual operation, maintenance, and purchase of service components. You should describe the methods you use to estimate major cost factors, including system and technology acquisition, expected useful life of capital equipment, discount rate(s), and the period over which you incur costs. Capital and startup costs include, among other items, computers and software you purchase to prepare for collecting information, monitoring, and record storage facilities. You should not include estimates for equipment or services purchased: (i) Before October 1, 1995; (ii) to comply with requirements not associated with the information collection; (iii) for reasons other than to provide information or keep records for the Government; or (iv) as part of customary and usual business or private practices. We will summarize written responses to this notice and address them in our VerDate Nov<24>2008 16:41 Mar 19, 2010 Jkt 220001 submission for OMB approval. As a result of your comments, we will make any necessary adjustments to the burden in our submission to OMB. Public Comment Procedures: Before including your address, phone number, e-mail address, or other personal identifying information in your comment, you should be aware that your entire comment—including your personal identifying information—may be made publicly available at any time. While you can ask us in your comment to withhold your personal identifying information from public review, we cannot guarantee that we will be able to do so. MMS Information Collection Clearance Officer: Arlene Bajusz (202) 208–7744. Dated: March 10, 2010. Sharon Buffington, Acting Chief, Office of Offshore Regulatory Programs. [FR Doc. 2010–6106 Filed 3–19–10; 8:45 am] BILLING CODE 4310–MR–P DEPARTMENT OF THE INTERIOR Minerals Management Service [Docket no. MMS–2010–OMM–0011] MMS Information Collection Activity: 1010–0142, Decommissioning Activities, Extension of a Collection; Comment Request AGENCY: Minerals Management Service (MMS), Interior. ACTION: Notice of extension of an information collection (1010–0142). SUMMARY: To comply with the Paperwork Reduction Act of 1995 (PRA), MMS is inviting comments on a collection of information that we will submit to the Office of Management and Budget (OMB) for review and approval. The information collection request (ICR) concerns the paperwork requirements in the regulations under 30 CFR 250, Subpart Q, ‘‘Decommissioning Activities.’’ DATES: Submit written comments by May 21, 2010. FOR FURTHER INFORMATION CONTACT: Cheryl Blundon, Regulations and Standards Branch at (703) 787–1607. You may also contact Cheryl Blundon to obtain a copy, at no cost, of the regulation that requires the subject collection of information. ADDRESSES: You may submit comments by either of the following methods listed below. • Electronically: go to https:// www.regulations.gov. In the entry titled PO 00000 Frm 00086 Fmt 4703 Sfmt 4703 ‘‘Enter Keyword or ID,’’ enter docket ID MMS–2010–OMM–0011 then click search. Follow the instructions to submit public comments and view supporting and related materials available for this collection. The MMS will post all comments. • Mail or hand-carry comments to the Department of the Interior; Minerals Management Service; Attention: Cheryl Blundon; 381 Elden Street, MS–4024; Herndon, Virginia 20170–4817. Please reference ICR 1010–0142 in your comment and include your name and return address. SUPPLEMENTARY INFORMATION: Title: 30 CFR Part 250, Subpart Q, Decommissioning Activities. OMB Control Number: 1010–0142. Abstract: The Outer Continental Shelf (OCS) Lands Act, as amended (43 U.S.C. 1331 et seq. and 43 U.S.C. 1801 et seq.), authorizes the Secretary of the Interior (Secretary) to prescribe rules and regulations to administer leasing of the OCS. Such rules and regulations will apply to all operations conducted under a lease. Operations on the OCS must preserve, protect, and develop oil and natural gas resources in a manner that is consistent with the need to make such resources available to meet the Nation’s energy needs as rapidly as possible; to balance orderly energy resource development with protection of human, marine, and coastal environments; to ensure the public a fair and equitable return on the resources of the OCS; and to preserve and maintain free enterprise competition. Section 1332(6) states that ‘‘operations in the [O]uter Continental Shelf should be conducted in a safe manner by well trained personnel using technology, precautions, and other techniques sufficient to prevent or minimize the likelihood of blowouts, loss of well control, fires, spillages, physical obstructions to other users of the waters or subsoil and seabed, or other occurrences which may cause damage to the environment or to property or endanger life or health.’’ This authority and responsibility are among those delegated to the Minerals Management Service (MMS). The regulations at 30 CFR 250, Subpart Q, concern decommissioning of platforms, wells, and pipelines, as well as site clearance and platform removal and are the subject of this collection. Regulations at 30 CFR 250, Subpart Q, implement these statutory requirements. We use the information for the following reasons: • To determine the necessity for allowing a well to be temporarily abandoned, the lessee/operator must E:\FR\FM\22MRN1.SGM 22MRN1

Agencies

[Federal Register Volume 75, Number 54 (Monday, March 22, 2010)]
[Notices]
[Pages 13563-13568]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-6106]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Minerals Management Service

[Docket no. MMS-2010-OMM-0008]


MMS Information Collection Activity: 1010-0114, Subpart A--
General, Revision of a Collection; Comment Request

AGENCY: Minerals Management Service (MMS), Interior.

ACTION: Notice of revision of an information collection (1010-0114).

-----------------------------------------------------------------------

SUMMARY: To comply with the Paperwork Reduction Act of 1995 (PRA), MMS 
is inviting comments on a collection of information that we will submit 
to the Office of Management and Budget (OMB) for review and approval. 
The information collection request concerns the paperwork requirements 
in the regulations under 30 CFR 250, subpart A, ``General.''

DATES: Submit written comments by May 21, 2010.

FOR FURTHER INFORMATION CONTACT: Cheryl Blundon, Regulations and 
Standards Branch at (703) 787-1607. You may also contact Cheryl Blundon 
to obtain a copy, at no cost, of the regulations and the forms that 
require the subject collection of information.

ADDRESSES: You may submit comments by either of the following methods 
listed below.
     Electronically: go to https://www.regulations.gov. In the 
entry titled ``Enter Keyword or ID,'' enter docket ID MMS-2010-OMM-0008 
then click search. Follow the instructions to submit public comments 
and view supporting and related materials. The MMS will post all 
comments.
     Mail or hand-carry comments to the Department of the 
Interior; Minerals Management Service; Attention: Cheryl Blundon; 381 
Elden Street, MS-4024; Herndon, Virginia 20170-4817. Please reference 
Information Collection 1010-0114 in your comment and include your name 
and return address.

SUPPLEMENTARY INFORMATION:
    Title: 30 CFR 250, subpart A, General.
    Form(s): MMS-132, MMS-143, MMS-1123, and MMS-1832.
    OMB Control Number: 1010-0114.
    Abstract: The Outer Continental Shelf (OCS) Lands Act, as amended 
(43 U.S.C. 1331 et seq. and 43 U.S.C. 1801 et seq.), authorizes the 
Secretary of the Interior to prescribe rules and regulations to 
administer leasing of the OCS. Such rules and regulations will apply to 
all operations conducted under a lease. Operations in the OCS must 
preserve, protect, and develop oil and natural gas resources in a 
manner that is consistent with the need to make such resources 
available to meet the Nation's energy needs as rapidly as possible; to 
balance orderly energy resource development with protection of human, 
marine, and coastal environments; to ensure the public a fair and 
equitable return on the resources of the OCS; and to preserve and 
maintain free enterprise competition. Section 1332(6) states that 
``operations in the [O]uter Continental Shelf should be conducted in a 
safe manner by well trained personnel using technology, precautions, 
and other techniques sufficient to prevent or minimize the likelihood 
of blowouts, loss of well control, fires, spillages, physical 
obstructions to other users of the waters or subsoil and seabed, or 
other occurrences which may cause damage to the environment or to 
property or endanger life or health.''
    The Independent Offices Appropriations Act (31 U.S.C. 9701), the 
Omnibus Appropriations Bill (Pub. L. 104-133, 110 Stat. 1321, April 26, 
1996), and Office of Management and Budget (OMB) Circular A-25, 
authorize Federal agencies to recover the full cost of services that 
confer special benefits. Under the Department of the Interior's (DOI) 
implementing policy, the Minerals Management Service (MMS) is required 
to charge fees for services that provide special benefits or privileges 
to an identifiable non-Federal recipient above and beyond those which 
accrue to the public at large.
    This information collection request covers 30 CFR 250, Subpart A, 
General. This request also covers the related Notices to Lessees and 
Operators (NTLs) that MMS issues to clarify and provide additional 
guidance on some aspects of our regulations.
    Requests for MMS approval may contain proprietary information 
related

[[Page 13564]]

to performance standards or alternative approaches to conducting 
operations different from those approved and specified in MMS 
regulations. We will protect this proprietary information according to 
the Freedom of Information Act (5 U.S.C. 552), its implementing 
regulations (43 CFR 2), 30 CFR 252, and 30 CFR 250.197, ``Data and 
information to be made available to the public or for limited 
inspection.'' No items of a sensitive nature are collected. Responses 
are mandatory.
    The MMS uses the information collected under the Subpart A 
regulations to ensure that operations in the OCS are carried out in a 
safe and pollution-free manner, do not interfere with the rights of 
other users in the OCS, and balance the protection and development of 
OCS resources. Specifically, we use the information collected to:
     Review records of formal crane operator training, rigger 
training, crane operator qualifications, crane inspections, testing, 
and maintenance to ensure that lessees perform operations in a safe and 
workmanlike manner and that equipment is maintained in a safe 
condition. The MMS also uses the information to make certain that all 
new and existing cranes installed on OCS fixed platforms must be 
equipped with anti-two block safety devices, and to assure that uniform 
methods are employed by lessees for load testing of cranes.
     Review welding, burning, and hot tapping plans, 
procedures, and records to ensure that these activities are conducted 
in a safe and workmanlike manner by trained and experienced personnel.
     Provide lessees greater flexibility to comply with 
regulatory requirements through approval of alternative equipment or 
procedures and departures to regulations if they demonstrate equal or 
better compliance with the appropriate performance standards.
     Determine the capability of a well to produce oil or gas 
in paying quantities or to determine the possible need for additional 
wells resulting in minimum royalty status on a lease. If a well does 
not yield hydrocarbons in sufficient quantity to warrant continued 
operation and production, MMS uses the information to verify the claim 
and to release the lessee from lease obligations. Conversely, the 
information is used to extend the term of the lease if additional wells 
will warrant continued operation and production.
     Ensure that injection of gas promotes conservation of 
natural resources, prevents waste, and that subsurface storage of 
natural gas does not unduly interfere with development and production 
operations under existing leases.
     Ensure the appropriateness of reimbursing lessees for 
costs incurred in reproducing geological and geophysical (G&G) data and 
information for submission to MMS and processing or reprocessing G&G 
information in a form and manner other than that normally used in the 
conduct of a lessee's business, or to determine the proper 
reimbursement of costs incurred during inspections.
     Record the designation of an operator authorized to act on 
behalf of the lessee and to fulfill the lessee's obligations under the 
OCS Lands Act and implementing regulations, or to record the local 
agent empowered to receive notices and comply with regulatory orders 
issued (Form MMS-1123).
     Determine if an application for right-of-use and easement 
serves the purpose specified in the grant when conducting exploration, 
development, and production activities or other operations on or off 
the lease; is maintained for such purposes; and does not unreasonably 
interfere with the operations of any other lessee.
     Provide for orderly development of leases through the use 
of information to determine the appropriateness of lessee requests for 
suspension of operations, including production. For example, MMS needs 
the information to determine that a suspension is necessary to: (1) 
Ensure proper lease development, (2) allow time to construct or 
negotiate use of transportation facilities, (3) allow reasonable time 
to enter into a sales contract, (4) allow for unavoidable situations, 
(5) avoid continued operations resulting in premature abandonment of a 
producing well(s) that would be uneconomic, (6) comply with the 
National Environmental Policy Act or to conduct an environmental 
analysis, (7) install equipment for safety and environmental 
protection, (8) allow time for inordinate delays encountered in 
obtaining required permits or consents, (9) comply with judicial 
decrees, or (10) avoid activities that pose a threat of serious, 
irreparable, or immediate harm.
     Improve safety and environmental protection in the OCS 
through collection and analysis of accident reports to ascertain the 
cause of the accidents and to determine ways to prevent recurrences.
     Ascertain when the lease ceases production or when the 
last well ceases production in order to determine the 180th day after 
the date of completion of the last production. This includes reporting 
when lease production is initiated, resumes before the end of the 180-
day period after production ceased, and when lease holding operations 
occur during the referenced 180-day interval. The MMS will use this 
information to efficiently maintain the lessee/operator lease status.
     Approve requests to cancel leases.
     Be informed when there could be a major disruption in the 
availability and supply of natural gas and oil due to natural 
occurrences/hurricanes, to advise the U.S. Coast Guard (USCG) in case 
of the need to rescue offshore workers in distress, to monitor damage 
to offshore platforms and drilling rigs, and to advise the news media 
and interested public entities when production is shut in and when 
resumed. The OCS operations produce more than one-quarter of the 
Nation's natural gas and more than one-sixth of its oil, and it is 
essential to know when production is interrupted. The Gulf of Mexico 
Region (GOMR) uses a reporting form for respondents to report 
evacuation statistics when necessary (Form MMS-132, Evacuation 
Statistics). It is sent to respondents at the onset of each ``hurricane 
season'' in the GOMR.
     Form MMS-143, Facility/Equipment Damage Report, assists 
lessees, lease operators, and pipeline right-of-way holders when 
reporting damage by a hurricane, earthquake, or other natural 
phenomenon. They are required to submit an initial damage report to the 
Regional Supervisor within 48 hours after completing the initial 
evaluation of the damage and then subsequent reports, monthly and 
immediately, whenever information previously submitted changes until 
the damaged structure or equipment is returned to service.
     Allow operators who exhibit unacceptable performance an 
incremental approach to improving their overall performance prior to a 
final decision to disqualify an operator or to pursue debarment 
proceedings through the execution of a performance improvement plan 
(PIP). The Subpart A regulations do not address the actual process that 
we will follow in pursuing the disqualification of operators under 
Sec. Sec.  250.135 and 250.136. However, our internal enforcement 
procedures include allowing such operators to demonstrate a commitment 
to acceptable performance by the submission of a PIP.
     Determine that respondents have corrected all Incidents of 
Non-Compliance (INC)(s) identified during inspections (Form MMS-1832). 
The MMS issues this form to the operator.

[[Page 13565]]

The operator then corrects the INC(s) and returns the form to the MMS 
Regional Supervisor no later than 14 days.
     Review records of crane inspection, testing, maintenance, 
and crane operator qualifications to ensure that lessees perform 
operations in a safe and workmanlike manner and maintain equipment in a 
safe condition.
    Frequency: Primarily on occasion; monthly; form MMS-132, Evacuation 
Statistics submitted daily during the emergency situation.
    Description of Respondents: Federal, State, oil, gas, or sulphur 
lessees and/or operators.
    Estimated Reporting and Recordkeeping Hour Burden: The currently 
approved annual reporting burden for this collection is 36,739 hours. 
The following chart details the individual components and respective 
hour burden estimates of this information collection request. In 
calculating the burdens, we assumed that respondents perform certain 
requirements in the normal course of their activities. We consider 
these to be usual and customary and took that into account in 
estimating the burden.

------------------------------------------------------------------------
                                                           Hour burden
 Citation 30 CFR 250 Subpart A       Reporting or      -----------------
    and related forms/NTLs           recordkeeping        Non-hour cost
                                      requirement            burdens
------------------------------------------------------------------------
                    Authority and Definition of Terms
------------------------------------------------------------------------
104; 181; Form MMS-1832.......  Appeal orders or        Exempt under 5
                                 decisions; appeal       CFR
                                 INCs; request hearing   1320.4(a)(2),
                                 due to cancellation     (c).
                                 of lease.
------------------------------------------------------------------------
                          Performance Standards
------------------------------------------------------------------------
109(a); 110...................  Submit welding,         2
                                 burning, and hot
                                 tapping plans.
------------------------------------------------------------------------
115; 116......................  Request determination   5
                                 of well
                                 producibility; make
                                 available or submit
                                 data & information;
                                 notify MMS of test.
------------------------------------------------------------------------
118; 119; 121; 124............  Apply for injection or  10
                                 subsurface storage of
                                 gas; sign storage
                                 agreement.
------------------------------------------------------------------------
                           Cost Recovery Fees
------------------------------------------------------------------------
125; 126......................  Cost Recovery/Service   0
                                 Fees; confirmation
                                 receipt etc., verbal
                                 approvals pertaining
                                 to fees (these
                                 requirements and
                                 associated items are
                                 covered individually
                                 throughout this
                                 subpart).
------------------------------------------------------------------------
                                  Forms
------------------------------------------------------------------------
130-133; Form MMS-1832........  Submit ``green''        2
                                 response copy of Form
                                 MMS-1832 indicating
                                 date violations
                                 (INCs) corrected.
------------------------------------------------------------------------
143...........................  Report change of        0
                                 address; submit
                                 designation of local
                                 agent (requirements
                                 not considered IC
                                 under 5 CFR
                                 1320.3(h)(1).
------------------------------------------------------------------------
143; 144; 145; Form MMS-1123..  Submit designation of   1
                                 operator (Form MMS-    $164 per
                                 1123-15 mins. only);    application.
                                 notice of
                                 termination; include
                                 pay.gov confirmation
                                 receipt.
------------------------------------------------------------------------
192; Form MMS-132.............  Daily report of         1
                                 evacuation statistics
                                 for natural
                                 occurrence/hurricane
                                 (Form MMS-132 in the
                                 GOMR) when
                                 circumstances
                                 warrant; inform MMS
                                 when you resume
                                 production.
------------------------------------------------------------------------
192(b)........................  Use Form MMS-143 to     4
                                 submit an initial
                                 damage report to the
                                 Regional Supervisor.
------------------------------------------------------------------------
192(b)........................  Use Form MMS-143 to     1
                                 submit subsequent
                                 damage reports on a
                                 monthly basis until
                                 damaged structure or
                                 equipment is returned
                                 to service;
                                 immediately when
                                 information changes;
                                 date item returned to
                                 service must be in
                                 final report.
------------------------------------------------------------------------
                        Inspection of Operations
------------------------------------------------------------------------
130-133.......................  Request                 2
                                 reconsideration from
                                 issuance of an INC.
------------------------------------------------------------------------
                                Request waiver of 14-   1
                                 day response time.
------------------------------------------------------------------------
                                Notify MMS before       .5
                                 returning to
                                 operations if shut-
                                 in..
------------------------------------------------------------------------
133...........................  Request reimbursement   2
                                 for food, quarters,
                                 and transportation
                                 provided to MMS
                                 representatives (OCS
                                 Lands Act specifies
                                 reimbursement; no
                                 requests received in
                                 many years; minimal
                                 burden).
------------------------------------------------------------------------

[[Page 13566]]

 
                            Disqualification
------------------------------------------------------------------------
135 MMS internal process......  Submit PIP under MMS    40
                                 implementing
                                 procedures for
                                 enforcement actions.
------------------------------------------------------------------------
                        Special Types of Approval
------------------------------------------------------------------------
140...........................  Request various oral    1
                                 approvals not
                                 specifically covered
                                 elsewhere in
                                 regulatory
                                 requirements.
------------------------------------------------------------------------
140(c)........................  Submit letter when      Burden covered
                                 stopping approved       under 1010-
                                 flaring with required   0041.
                                 information.
------------------------------------------------------------------------
141; 198......................  Request approval to     20
                                 use new or
                                 alternative
                                 procedures, including
                                 BAST not specifically
                                 covered elsewhere in
                                 regulatory
                                 requirements.
------------------------------------------------------------------------
142; 198......................  Request approval of     3
                                 departure from
                                 operating
                                 requirements not
                                 specifically covered
                                 elsewhere in
                                 regulatory
                                 requirements.
------------------------------------------------------------------------
  Naming and Identifying Facilities and Wells (Does Not Include MODUs)
------------------------------------------------------------------------
150; 151; 152; 154(a).........  Name and identify       2
                                 facilities,
                                 artificial islands,
                                 MODUs, helo landing
                                 facilities etc., with
                                 signs.
------------------------------------------------------------------------
150; 154(b)...................  Name and identify       1
                                 wells with signs.
------------------------------------------------------------------------
                        Right-of-use and Easement
------------------------------------------------------------------------
160; 161; 123.................  OCS lessees: Apply for  10
                                 new or modified right-
                                 of-use and easement
                                 to construct and
                                 maintain off-lease
                                 platforms, artificial
                                 islands, and
                                 installations and
                                 other devices;
                                 including
                                 notifications.
------------------------------------------------------------------------
160(c)........................  Establish a Company     Burden covered
                                 File for                under 1010-
                                 qualification; submit   0006.
                                 updated information,
                                 submit qualifications
                                 for lessee/bidder,
                                 request exception.
------------------------------------------------------------------------
165; 123......................  State lessees: Apply    5
                                 for new or modified    $2,569 per state
                                 right-of-use and        lease.
                                 easement to construct
                                 and maintain off-
                                 lease platforms,
                                 artificial islands,
                                 and installations and
                                 other devices;
                                 include pay.gov
                                 confirmation.
------------------------------------------------------------------------
166...........................  State lessees: Furnish  Burden covered
                                 surety bond;            under 1010-
                                 additional security     0006.
                                 if required.
------------------------------------------------------------------------
                               Suspensions
------------------------------------------------------------------------
168; 170; 171; 172; 174; 175;   Request suspension of   10
 177; 180(b), (d).               operations or          $1,968 per
                                 production; submit      request.
                                 schedule of work
                                 leading to
                                 commencement.
------------------------------------------------------------------------
                                Submit progress         3
                                 reports on SOO or SOP
                                 as condition of
                                 approval.
------------------------------------------------------------------------
172(b); 177(a)................  Conduct site-specific   100
                                 study; submit
                                 results. No instances
                                 requiring this study
                                 in several years--
                                 could be necessary if
                                 a situation occurred
                                 such as severe damage
                                 to a platform or
                                 structure caused by a
                                 hurricane or a vessel
                                 collision.
------------------------------------------------------------------------
177(b), (c), (d); 182; 183,     Various references to   Burden covered
 185; 194.                       submitting new,         under 1010-
                                 revised, or modified    0151.
                                 exploration plan,
                                 development/
                                 production plan, or
                                 development
                                 operations
                                 coordination
                                 document, and related
                                 surveys/reports.
------------------------------------------------------------------------
      Primary Lease Requirements, Lease Term Extensions, and Lease
                              Cancellations
------------------------------------------------------------------------
180(a), (f), (g), (h), (i),     Notify and submit       2
 (j).                            report on various
                                 lease holding
                                 operations and lease
                                 production activities.
------------------------------------------------------------------------
180(a), (b), (c)..............  When requested, submit  6
                                 production data to
                                 demonstrate
                                 production in paying
                                 quantities to
                                 maintain lease beyond
                                 primary term.
------------------------------------------------------------------------
180(e)........................  Request more than 180   5
                                 days to resume
                                 operations.
------------------------------------------------------------------------
181(d); 182(b), 183(b)(2).....  Request termination of  20
                                 suspension and
                                 cancellation of lease
                                 (no requests in
                                 recent years for
                                 termination/
                                 cancellation of a
                                 lease; minimal
                                 burden).
------------------------------------------------------------------------

[[Page 13567]]

 
184...........................  Request compensation    50
                                 for lease
                                 cancellation mandated
                                 by the OCS Lands Act
                                 (no qualified lease
                                 cancellations in many
                                 years; minimal burden
                                 compared to benefit).
------------------------------------------------------------------------
                 Information and Reporting Requirements
------------------------------------------------------------------------
186...........................  Submit information and  10
                                 reports as MMS
                                 requires.
------------------------------------------------------------------------
187; 188(a); 189; 190(c)......  Report to the District  Oral .5.
                                 Manager immediately    Written 4.
                                 via oral
                                 communication and
                                 written follow-up
                                 within 15 calendar
                                 days, incidents
                                 pertaining to:
                                 Fatalities; injuries;
                                 LoWC; fires;
                                 explosions; all
                                 collisions resulting
                                 in property or
                                 equipment damage
                                 >$25K; structural
                                 damage to an OCS
                                 facility; cranes;
                                 incidents that damage
                                 or disable safety
                                 systems or equipment
                                 (including
                                 firefighting
                                 systems). If
                                 requested, submit
                                 copy marked as public
                                 information.
------------------------------------------------------------------------
187(d)........................  Report all spills of    Burden covered
                                 oil or other liquid     under 1010-
                                 pollutants.             0091.
------------------------------------------------------------------------
188(a)(5).....................  Report to District      Burden covered
                                 Manager hydrogen        under 1010-
                                 sulfide (H2S) gas       0141.
                                 releases immediately
                                 by oral communication.
------------------------------------------------------------------------
188(b); 190(a), (b)...........  Provide written report  4
                                 to the District
                                 Manager within 15
                                 calendar days after
                                 incidents relating
                                 to: Injuries that
                                 result in 1 or more
                                 days away from work,
                                 on restricted work,
                                 or job transfer; gas
                                 releases that
                                 initiate equipment or
                                 process shutdown;
                                 property or equipment
                                 damage >$25K;
                                 operations personnel
                                 to muster for
                                 evacuation not
                                 related to weather or
                                 drills; any
                                 additional
                                 information required.
------------------------------------------------------------------------
191...........................  Submit written          Exempt under 5
                                 statement/Request       CFR
                                 compensation mileage    1320.4(a)(2),
                                 + services for          (c).
                                 testimony re:
                                 Accident
                                 investigation.
------------------------------------------------------------------------
193...........................  Report apparent         1.5
                                 violations or non-
                                 compliance.
------------------------------------------------------------------------
194 NTL exception requests....  Request departures      1
                                 from conducting
                                 archaeological
                                 resources surveys and/
                                 or submitting reports
                                 in GOMR.
------------------------------------------------------------------------
194(c)........................  Report archaeological   10
                                 discoveries (only one
                                 instance in many
                                 years; minimal
                                 burden).
------------------------------------------------------------------------
195...........................  Notify District         1
                                 Manager within 5
                                 workdays of putting
                                 well in production
                                 status (usually
                                 oral). Follow-up with
                                 either fax/email
                                 within same 5 day
                                 period (burden
                                 includes oral and
                                 written).
------------------------------------------------------------------------
196...........................  Submit data/            Burden covered
                                 information for post-   under 1010-
                                 lease G&G activity      0048.
                                 and request
                                 reimbursement.
------------------------------------------------------------------------
197(c)........................  Submit confidentiality  1
                                 agreement.
------------------------------------------------------------------------
101-199.......................  General departure or    2
                                 alternative
                                 compliance requests
                                 not specifically
                                 covered elsewhere in
                                 Subpart A.
------------------------------------------------------------------------
                              Recordkeeping
------------------------------------------------------------------------
108(e)........................  Retain records of       2
                                 design and
                                 construction for life
                                 of crane, including
                                 installation records
                                 for any anti-two
                                 block safety devices;
                                 all inspection,
                                 testing, and
                                 maintenance for at
                                 least 4 years; crane
                                 operator and all
                                 rigger personnel
                                 qualifications for at
                                 least 4 years.
------------------------------------------------------------------------
109(b); 113(c)................  Retain welding,         .5
                                 burning, and hot
                                 tapping plan for the
                                 life of the facility;
                                 keep plan and
                                 drawings of safe-
                                 welding areas at
                                 site; designated
                                 person advises in
                                 writing that it is
                                 safe to weld.
------------------------------------------------------------------------
132(b)(3).....................  During inspections      2
                                 make records
                                 available as
                                 requested by
                                 inspectors.
------------------------------------------------------------------------

    Estimated Reporting and Recordkeeping Non-Hour Cost Burden: The 
currently approved non-hour cost burden for this collection is 
$810,200. We have identified three non-hour cost burdens. Section 
250.143 requires a fee for a change in designation of operator. Section 
250.165 requires a State lessee applying for a right-of use and 
easement in the OCS to pay a cost recovery application fee. This cost 
is the same as the fee for a pipeline right-of-way grant specified in 
30 CFR 250.1015 and is subject to change based on that regulation. We 
estimate receiving only

[[Page 13568]]

one State lease application per year. Section 250.171 requests a fee 
for either a Suspension of Operations or Production Request (SOO/SOP). 
We have not identified any other non-hour paperwork cost burdens 
associated with this collection of information.
    Public Disclosure Statement: The PRA (44 U.S.C. 3501, et seq.) 
provides that an agency may not conduct or sponsor a collection of 
information unless it displays a currently valid OMB control number. 
Until OMB approves a collection of information, you are not obligated 
to respond.
    Comments: Before submitting an ICR to OMB, PRA section 
3506(c)(2)(A) requires each agency ``* * * to provide notice * * * and 
otherwise consult with members of the public and affected agencies 
concerning each proposed collection of information * * *''. Agencies 
must specifically solicit comments to: (a) Evaluate whether the 
proposed collection of information is necessary for the agency to 
perform its duties, including whether the information is useful; (b) 
evaluate the accuracy of the agency's estimate of the burden of the 
proposed collection of information; (c) enhance the quality, 
usefulness, and clarity of the information to be collected; and (d) 
minimize the burden on the respondents, including the use of automated 
collection techniques or other forms of information technology.
    Agencies must also estimate the non-hour paperwork cost burdens to 
respondents or recordkeepers resulting from the collection of 
information. Therefore, if you have costs to generate, maintain, and 
disclose this information, you should comment and provide your total 
capital and startup cost components or annual operation, maintenance, 
and purchase of service components. You should describe the methods you 
use to estimate major cost factors, including system and technology 
acquisition, expected useful life of capital equipment, discount 
rate(s), and the period over which you incur costs. Capital and startup 
costs include, among other items, computers and software you purchase 
to prepare for collecting information, monitoring, and record storage 
facilities. You should not include estimates for equipment or services 
purchased: (i) Before October 1, 1995; (ii) to comply with requirements 
not associated with the information collection; (iii) for reasons other 
than to provide information or keep records for the Government; or (iv) 
as part of customary and usual business or private practices.
    We will summarize written responses to this notice and address them 
in our submission for OMB approval. As a result of your comments, we 
will make any necessary adjustments to the burden in our submission to 
OMB.
    Public Comment Procedures: Before including your address, phone 
number, e-mail address, or other personal identifying information in 
your comment, you should be aware that your entire comment--including 
your personal identifying information--may be made publicly available 
at any time. While you can ask us in your comment to withhold your 
personal identifying information from public review, we cannot 
guarantee that we will be able to do so.
    MMS Information Collection Clearance Officer: Arlene Bajusz (202) 
208-7744.

    Dated: March 10, 2010.
Sharon Buffington,
Acting Chief, Office of Offshore Regulatory Programs.
[FR Doc. 2010-6106 Filed 3-19-10; 8:45 am]
BILLING CODE 4310-MR-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.