Duke Energy Carolinas, LLC; Notice of Consideration of Issuance of Amendments to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information, 13314-13318 [2010-6071]
Download as PDF
13314
Federal Register / Vol. 75, No. 53 / Friday, March 19, 2010 / Notices
one day prior to the meeting to arrange
for a visitor’s badge. Call 703–292–7000
to request your badge, which will be
ready for pick-up at the visitor’s desk on
the day of the meeting. All visitors must
report to the NSF visitor desk at the 9th
and N. Stuart Streets entrance to receive
their visitor’s badge the day of the
teleconference.
Please refer to the National Science
Board Web site (https://www.nsf.gov/nsb)
for information or schedule updates, or
contact: Elizabeth Strickland, National
Science Foundation, 4201 Wilson Blvd.,
Arlington, VA 22230. Telephone: (703)
292–7000.
of the Code of Federal Regulations (10
CFR), Section 50.92, this means that
operation of the facility in accordance
with the proposed amendment would
not (1) involve a significant increase in
the probability or consequences of an
accident previously evaluated; or (2)
create the possibility of a new or
different kind of accident from any
accident previously evaluated; or (3)
involve a significant reduction in a
margin of safety. As required by 10 CFR
50.91(a), the licensee has provided its
analysis of the issue of no significant
hazards consideration, which is
presented below:
Ann Ferrante,
Technical Writer/Editor.
(1) Involve a significant increase in the
probability or consequences of an accident
previously evaluated.
The proposed change to allow the use of
the CASMO–4/SIMULATE–3 reload design
software to analyze reactor cores with fuel
containing lumped burnable and/or gadolinia
integral absorbers does not involve a
significant increase in the probability or
consequences of an accident previously
evaluated. The CASMO–4/SIMULATE–3
codes are used to perform reactivity and
power distribution calculations to develop
power distribution limits and provide
confirmation of reactivity and power
distribution input assumptions used in the
evaluation of UFSAR Chapter 15 accidents.
The SIMULATE–3 code is also used to
confirm the acceptability of thermal limits at
post accident conditions.
The benchmark calculations performed
verified the acceptability of the CASMO–4/
SIMULATE–3 code for performing reload
design calculations for reactor cores
containing both lumped burnable and/or
gadolinia integral absorbers. These
calculations confirmed the accuracy of the
codes and developed a methodology for
calculating power distribution uncertainties
for use in reload design calculations. The use
of appropriate power distribution
uncertainties applicable to core designs in
conjunction with predicted peaking factors
ensures that thermal accident acceptance
criteria are satisfied.
Therefore, the proposed amendment does
not involve a significant increase in the
probability or consequences of an accident
previously evaluated.
(2) Create the possibility of a new or
different kind of accident from any accident
previously evaluated.
The benchmark calculations performed
verified the acceptability of the CASMO–4/
SIMULATE–3 code for performing reload
design calculations for reactor cores
containing both lumped burnable and/or
gadolinia integral absorbers. These
calculations confirmed the accuracy of the
codes and developed a methodology for
calculating power distribution uncertainties
for use in reload design calculations.
The application of the CASMO–4/
SIMULATE–3 reload design software to
perform reload design calculations for reactor
cores containing lumped burnable and/or
gadolinia integral absorbers will not create
the possibility of a new or different kind of
[FR Doc. 2010–6263 Filed 3–17–10; 4:15 pm]
BILLING CODE 7555–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–269, 50–270, and 50–287;
NRC–2010–0102]
erowe on DSK5CLS3C1PROD with NOTICES
Duke Energy Carolinas, LLC; Notice of
Consideration of Issuance of
Amendments to Facility Operating
License, Proposed No Significant
Hazards Consideration Determination,
and Opportunity for a Hearing and
Order Imposing Procedures for Access
to Sensitive Unclassified NonSafeguards Information
The U.S. Nuclear Regulatory
Commission (NRC or the Commission)
is considering issuance of an
amendment to Renewed Facility
Operating Licenses DPR–38, DPR–47,
and DPR–55, issued to Duke Energy
Carolinas, LLC (the licensee), for
operation of the Oconee Nuclear
Station, Units 1, 2, and 3, located in
Oconee County, South Carolina.
The proposed amendment would
change the Technical Specifications
(TSs) to allow the use of methodology
report DPC–NE–1006–P, ‘‘Oconee
Nuclear Design Methodology Using
CASMO–4/SIMULATE–3.’’ The
amendment application dated June 10,
2009, as supplemented December 18,
2009, contains sensitive unclassified
non-safeguards information (SUNSI).
Before issuance of the proposed
license amendment, the Commission
will have made findings required by the
Atomic Energy Act of 1954, as amended
(the Act), and the Commission’s
regulations.
The Commission has made a
proposed determination that the
amendment request involves no
significant hazards consideration. Under
the Commission’s regulations in Title 10
VerDate Nov<24>2008
14:14 Mar 18, 2010
Jkt 220001
PO 00000
Frm 00071
Fmt 4703
Sfmt 4703
accident from any accident previously
evaluated. The CASMO–4/SIMULATE–3
software is not installed in plant equipment
and therefore the software is incapable of
initiating an equipment malfunction that
would result in a new or different type of
accident from any previously evaluated. The
evaluation of accidents and the associated
acceptance criteria for these accidents
remains unchanged.
(3) Involve a significant reduction in a
margin of safety.
The application of the CASMO–4/
SIMULATE–3 reload design software to
perform reload design calculations for reactor
cores containing lumped burnable and/or
gadolinia integral absorbers will not involve
a significant reduction in a margin of safety.
Margin of safety is related to the
confidence in the ability of the fission
product barriers to perform their design
function during and following an accident.
These barriers include the fuel cladding, the
reactor coolant system and the containment
system. The reload design process assures the
acceptability of thermal limits under normal,
transient, and accident conditions. The
CASMO–4/SIMULATE-reload design
software was qualified for the analysis of
reactor cores containing lumped burnable
and/or gadolinia integral absorbers and a
methodology for developing appropriate
power distribution uncertainties for
application in reload design analyses was
developed. The use of these uncertainties for
analysis of reload cores ensures that design
and safety limits are satisfied such that the
fission product barriers perform their design
function.
Therefore, the proposed amendment does
not involve a significant reduction in a
margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
The Commission is seeking public
comments on this proposed
determination. Any comments received
within 30 days after the date of
publication of this notice will be
considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day period provided that its final
determination is that the amendment
involves no significant hazards
consideration. In addition, the
Commission may issue the amendment
prior to the expiration of the 30-day
comment period should circumstances
change during the 30-day comment
period such that failure to act in a
E:\FR\FM\19MRN1.SGM
19MRN1
erowe on DSK5CLS3C1PROD with NOTICES
Federal Register / Vol. 75, No. 53 / Friday, March 19, 2010 / Notices
timely way would result, for example,
in derating or shutdown of the facility.
Should the Commission take action
prior to the expiration of either the
comment period or the notice period, it
will publish in the Federal Register a
notice of issuance. Should the
Commission make a final No Significant
Hazards Consideration Determination,
any hearing will take place after
issuance. The Commission expects that
the need to take this action will occur
very infrequently.
Written comments may be submitted
by mail to the Chief, Rulemaking and
Directives Branch (RDB), TWB–05–
B01M, Division of Administrative
Services, Office of Administration, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, and
should cite the publication date and
page number of this Federal Register
notice. Written comments may also be
faxed to the RDB at 301–492–3446.
Documents may be examined, and/or
copied for a fee, at the NRC’s Public
Document Room (PDR), located at One
White Flint North, Room O1 F21, 11555
Rockville Pike (first floor), Rockville,
Maryland.
Within 60 days after the date of
publication of this notice, any person(s)
whose interest may be affected by this
action may file a request for a hearing
and a petition to intervene with respect
to issuance of the amendment to the
subject facility operating license.
Requests for a hearing and a petition for
leave to intervene shall be filed in
accordance with the Commission’s
‘‘Rules of Practice for Domestic
Licensing Proceedings’’ in 10 CFR Part
2. Interested person(s) should consult a
current copy of 10 CFR 2.309, which is
available at the NRC’s PDR. Publicly
available records will be accessible from
the Agencywide Documents Access and
Management System’s (ADAMS) Public
Electronic Reading Room on the Internet
at the NRC Web site, https://
www.nrc.gov/reading-rm/
doc-collections/cfr/. If a request for a
hearing or petition for leave to intervene
is filed by the above date, the
Commission or a presiding officer
designated by the Commission or by the
Chief Administrative Judge of the
Atomic Safety and Licensing Board
Panel, will rule on the request and/or
petition; and the Secretary or the Chief
Administrative Judge of the Atomic
Safety and Licensing Board will issue a
notice of a hearing or an appropriate
order.
As required by 10 CFR 2.309, a
petition for leave to intervene shall set
forth with particularity the interest of
the petitioner in the proceeding, and
how that interest may be affected by the
VerDate Nov<24>2008
14:14 Mar 18, 2010
Jkt 220001
results of the proceeding. The petition
should specifically explain the reasons
why intervention should be permitted
with particular reference to the
following general requirements: (1) The
name, address and telephone number of
the requestor or petitioner; (2) the
nature of the requestor’s/petitioner’s
right under the Act to be made a party
to the proceeding; (3) the nature and
extent of the requestor’s/petitioner’s
property, financial, or other interest in
the proceeding; and (4) the possible
effect of any decision or order which
may be entered in the proceeding on the
requestor’s/petitioner’s interest. The
petition must also identify the specific
contentions which the requestor/
petitioner seeks to have litigated at the
proceeding.
Each contention must consist of a
specific statement of the issue of law or
fact to be raised or controverted. In
addition, the requestor/petitioner shall
provide a brief explanation of the bases
for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the petitioner intends to
rely in proving the contention at the
hearing. The requestor/petitioner must
also provide references to those specific
sources and documents of which the
petitioner is aware and on which the
petitioner intends to rely to establish
those facts or expert opinion. The
petition must include sufficient
information to show that a genuine
dispute exists with the applicant on a
material issue of law or fact.
Contentions shall be limited to matters
within the scope of the amendment
under consideration. The contention
must be one which, if proven, would
entitle the petitioner to relief. A
requestor/petitioner who fails to satisfy
these requirements with respect to at
least one contention will not be
permitted to participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing.
If a hearing is requested, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to decide
when the hearing is held. If the final
determination is that the amendment
request involves no significant hazards
consideration, the Commission may
issue the amendment and make it
immediately effective, notwithstanding
the request for a hearing. Any hearing
held would take place after issuance of
the amendment. If the final
PO 00000
Frm 00072
Fmt 4703
Sfmt 4703
13315
determination is that the amendment
request involves a significant hazards
consideration, any hearing held would
take place before the issuance of any
amendment.
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
to the submission of a request for
hearing or petition to intervene, and
documents filed by interested
governmental entities participating
under 10 CFR 2.315(c), must be filed in
accordance with the NRC E-Filing rule
(72 FR 49139, August 28, 2007). The EFiling process requires participants to
submit and serve all adjudicatory
documents over the Internet, or in some
cases to mail copies on electronic
storage media. Participants may not
submit paper copies of their filings
unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least ten
(10) days prior to the filing deadline, the
participant should contact the Office of
the Secretary by e-mail at
hearing.docket@nrc.gov, or by telephone
at (301) 415–1677, to request (1) a
digital ID certificate, which allows the
participant (or its counsel or
representative) to digitally sign
documents and access the E-Submittal
server for any proceeding in which it is
participating; and (2) advise the
Secretary that the participant will be
submitting a request or petition for
hearing (even in instances in which the
participant, or its counsel or
representative, already holds an NRCissued digital ID certificate). Based upon
this information, the Secretary will
establish an electronic docket for the
hearing in this proceeding if the
Secretary has not already established an
electronic docket.
Information about applying for a
digital ID certificate is available on
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
apply-certificates.html. System
requirements for accessing the ESubmittal server are detailed in NRC’s
‘‘Guidance for Electronic Submission,’’
which is available on the agency’s
public Web site at https://www.nrc.gov/
site-help/e-submittals.html. Participants
may attempt to use other software not
listed on the Web site, but should note
that the NRC’s E-Filing system does not
support unlisted software, and the NRC
Meta System Help Desk will not be able
to offer assistance in using unlisted
software.
E:\FR\FM\19MRN1.SGM
19MRN1
erowe on DSK5CLS3C1PROD with NOTICES
13316
Federal Register / Vol. 75, No. 53 / Friday, March 19, 2010 / Notices
If a participant is electronically
submitting a document to the NRC in
accordance with the E-Filing rule, the
participant must file the document
using the NRC’s online, Web-based
submission form. In order to serve
documents through EIE, users will be
required to install a Web browser plugin from the NRC Web site. Further
information on the Web-based
submission form, including the
installation of the Web browser plug-in,
is available on the NRC’s public Web
site at https://www.nrc.gov/site-help/
e-submittals.html.
Once a participant has obtained a
digital ID certificate and a docket has
been created, the participant can then
submit a request for hearing or petition
for leave to intervene. Submissions
should be in Portable Document Format
(PDF) in accordance with NRC guidance
available on the NRC public Web site at
https://www.nrc.gov/site-help/
e-submittals.html. A filing is considered
complete at the time the documents are
submitted through the NRC’s E-Filing
system. To be timely, an electronic
filing must be submitted to the E-Filing
system no later than 11:59 p.m. Eastern
Time on the due date. Upon receipt of
a transmission, the E-Filing system
time-stamps the document and sends
the submitter an e-mail notice
confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access to the
document to the NRC Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing request/
petition to intervene is filed so that they
can obtain access to the document via
the E-Filing system.
A person filing electronically using
the agency’s adjudicatory E-Filing
system may seek assistance by
contacting the NRC Meta System Help
Desk through the ‘‘Contact Us’’ link
located on the NRC Web site at https://
www.nrc.gov/site-help/
e-submittals.html, by e-mail at
MSHD.Resource@nrc.gov, or by a tollfree call at (866) 672–7640. The NRC
Meta System Help Desk is available
between 8 a.m. and 8 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
VerDate Nov<24>2008
14:14 Mar 18, 2010
Jkt 220001
10 CFR 2.302(g), with their initial paper
filing requesting authorization to
continue to submit documents in paper
format. Such filings must be submitted
by: (1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier,
express mail, or expedited delivery
service to the Office of the Secretary,
Sixteenth Floor, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852, Attention: Rulemaking
and Adjudications Staff. Participants
filing a document in this manner are
responsible for serving the document on
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
service. A presiding officer, having
granted an exemption request from
using E-Filing, may require a participant
or party to use E-Filing if the presiding
officer subsequently determines that the
reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory
proceedings will appear in NRC’s
electronic hearing docket which is
available to the public at https://
ehd.nrc.gov/EHD_Proceeding/home.asp,
unless excluded pursuant to an order of
the Commission, or the presiding
officer. Participants are requested not to
include personal privacy information,
such as social security numbers, home
addresses, or home phone numbers in
their filings, unless an NRC regulation
or other law requires submission of such
information. With respect to
copyrighted works, except for limited
excerpts that serve the purpose of the
adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submission.
Petitions for leave to intervene must
be filed no later than 60 days from the
date of publication of this notice. Nontimely filings will not be entertained
absent a determination by the presiding
officer that the petition or request
should be granted or the contentions
should be admitted, based on a
balancing of the factors specified in 10
CFR 2.309(c)(1)(i)–(viii).
For further details with respect to this
license amendment application, see the
application for amendment dated June
10, 2009, as supplemented December
18, 2009, which is available for public
inspection at the Commission’s PDR,
located at One White Flint North, File
PO 00000
Frm 00073
Fmt 4703
Sfmt 4703
Public Area O1 F21, 11555 Rockville
Pike (first floor), Rockville, Maryland.
Publicly available records will be
accessible electronically from the
Agencywide Documents Access and
Management System’s (ADAMS) Public
Electronic Reading Room on the Internet
at the NRC Web site, https://
www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS, should contact the NRC PDR
Reference staff by telephone at 1–800–
397–4209, 301–415–4737, or by e-mail
to pdr.resource@nrc.gov.
Attorney for Licensee: Ms. Lisa F.
Vaughn, Associate General Counsel and
Managing Attorney, Duke Energy
Carolinas, LLC, 526 South Church
Street, EC07H, Charlotte, NC 28202.
Order Imposing Procedures for Access
to Sensitive Unclassified NonSafeguards Information for Contention
Preparation
A. This Order contains instructions
regarding how potential parties to this
proceeding may request access to
documents containing Sensitive
Unclassified Non-Safeguards
Information (SUNSI).
B. Within 10 days after publication of
this notice of hearing and opportunity to
petition for leave to intervene, any
potential party who believes access to
SUNSI is necessary to respond to this
notice may request such access. A
‘‘potential party’’ is any person who
intends to participate as a party by
demonstrating standing and filing an
admissible contention under 10 CFR
2.309. Requests for access to SUNSI
submitted later than 10 days after
publication will not be considered
absent a showing of good cause for the
late filing, addressing why the request
could not have been filed earlier.
C. The requestor shall submit a letter
requesting permission to access SUNSI
to the Office of the Secretary, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff,
and provide a copy to the Associate
General Counsel for Hearings,
Enforcement and Administration, Office
of the General Counsel, Washington, DC
20555–0001. The expedited delivery or
courier mail address for both offices is:
U.S. Nuclear Regulatory Commission,
11555 Rockville Pike, Rockville,
Maryland 20852. The e-mail address for
the Office of the Secretary and the
Office of the General Counsel are
Hearing.Docket@nrc.gov and
E:\FR\FM\19MRN1.SGM
19MRN1
Federal Register / Vol. 75, No. 53 / Friday, March 19, 2010 / Notices
OGCmailcenter@nrc.gov, respectively.1
The request must include the following
information:
(1) A description of the licensing
action with a citation to this Federal
Register notice;
(2) The name and address of the
potential party and a description of the
potential party’s particularized interest
that could be harmed by the action
identified in C.(1);
(3) The identity of the individual or
entity requesting access to SUNSI and
the requestor’s basis for the need for the
information in order to meaningfully
participate in this adjudicatory
proceeding. In particular, the request
must explain why publicly available
versions of the information requested
would not be sufficient to provide the
basis and specificity for a proffered
contention;
D. Based on an evaluation of the
information submitted under paragraph
C.(3) the NRC staff will determine
within 10 days of receipt of the request
whether:
(1) There is a reasonable basis to
believe the petitioner is likely to
establish standing to participate in this
NRC proceeding; and
(2) The requestor has established a
legitimate need for access to SUNSI.
E. If the NRC staff determines that the
requestor satisfies both D.(1) and D.(2)
above, the NRC staff will notify the
requestor in writing that access to
SUNSI has been granted. The written
notification will contain instructions on
how the requestor may obtain copies of
the requested documents, and any other
conditions that may apply to access to
those documents. These conditions may
include, but are not limited to, the
signing of a Non-Disclosure Agreement
or Affidavit, or Protective Order 2 setting
forth terms and conditions to prevent
the unauthorized or inadvertent
disclosure of SUNSI by each individual
who will be granted access to SUNSI.
F. Filing of Contentions. Any
contentions in these proceedings that
are based upon the information received
as a result of the request made for
SUNSI must be filed by the requestor no
later than 25 days after the requestor is
granted access to that information.
However, if more than 25 days remain
between the date the petitioner is
granted access to the information and
the deadline for filing all other
contentions (as established in the notice
of hearing or opportunity for hearing),
the petitioner may file its SUNSI
contentions by that later deadline.
G. Review of Denials of Access.
(1) If the request for access to SUNSI
is denied by the NRC staff either after
a determination on standing and need
for access, or after a determination on
trustworthiness and reliability, the NRC
staff shall immediately notify the
requestor in writing, briefly stating the
reason or reasons for the denial.
(2) The requestor may challenge the
NRC staff’s adverse determination by
filing a challenge within 5 days of
receipt of that determination with: (a)
The presiding officer designated in this
proceeding; (b) if no presiding officer
has been appointed, the Chief
Administrative Judge, or if he or she is
unavailable, another administrative
judge, or an administrative law judge
with jurisdiction pursuant to 10 CFR
2.318(a); or (c) if another officer has
been designated to rule on information
access issues, with that officer.
H. Review of Grants of Access. A
party other than the requestor may
challenge an NRC staff determination
13317
granting access to SUNSI whose release
would harm that party’s interest
independent of the proceeding. Such a
challenge must be filed with the Chief
Administrative Judge within 5 days of
the notification by the NRC staff of its
grant of access.
If challenges to the NRC staff
determinations are filed, these
procedures give way to the normal
process for litigating disputes
concerning access to information. The
availability of interlocutory review by
the Commission of orders ruling on
such NRC staff determinations (whether
granting or denying access) is governed
by 10 CFR 2.311.3
I. The Commission expects that the
NRC staff and presiding officers (and
any other reviewing officers) will
consider and resolve requests for access
to SUNSI, and motions for protective
orders, in a timely fashion in order to
minimize any unnecessary delays in
identifying those petitioners who have
standing and who have propounded
contentions meeting the specificity and
basis requirements in 10 CFR Part 2.
Attachment 1 to this Order summarizes
the general target schedule for
processing and resolving requests under
these procedures.
It is so ordered.
Dated at Rockville, Maryland, this 15th day
of March 2010.
For the Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
Attachment 1—General Target
Schedule for Processing and Resolving
Requests for Access to Sensitive
Unclassified Non-Safeguards
Information in This Proceeding
Day
Event/Activity
0 ....................................
Publication of Federal Register notice of hearing and opportunity to petition for leave to intervene, including order
with instructions for access requests.
Deadline for submitting requests for access to Sensitive Unclassified Non-Safeguards Information (SUNSI) with information: supporting the standing of a potential party identified by name and address; describing the need for the information in order for the potential party to participate meaningfully in an adjudicatory proceeding.
Deadline for submitting petition for intervention containing: (i) Demonstration of standing; (ii) all contentions whose formulation does not require access to SUNSI (+25 Answers to petition for intervention; +7 requestor/petitioner reply).
Nuclear Regulatory Commission (NRC) staff informs the requestor of the staff’s determination whether the request for
access provides a reasonable basis to believe standing can be established and shows need for SUNSI. (NRC staff
also informs any party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information.) If NRC staff makes the finding of need for SUNSI and likelihood of standing, NRC staff
begins document processing (preparation of redactions or review of redacted documents).
10 ..................................
60 ..................................
erowe on DSK5CLS3C1PROD with NOTICES
20 ..................................
1 While a request for hearing or petition to
intervene in this proceeding must comply with the
filing requirements of the NRC’s ‘‘E-Filing Rule,’’ the
initial request to access SUNSI under these
procedures should be submitted as described in this
paragraph.
VerDate Nov<24>2008
14:14 Mar 18, 2010
Jkt 220001
2 Any motion for Protective Order or draft NonDisclosure Affidavit or Agreement for SUNSI must
be filed with the presiding officer or the Chief
Administrative Judge if the presiding officer has not
yet been designated, within 30 days of the deadline
for the receipt of the written access request.
PO 00000
Frm 00074
Fmt 4703
Sfmt 4703
3 Requestors should note that the filing
requirements of the NRC’s E-Filing Rule (72 FR
49139; August 28, 2007) apply to appeals of NRC
staff determinations (because they must be served
on a presiding officer or the Commission, as
applicable), but not to the initial SUNSI request
submitted to the NRC staff under these procedures.
E:\FR\FM\19MRN1.SGM
19MRN1
13318
Federal Register / Vol. 75, No. 53 / Friday, March 19, 2010 / Notices
Day
Event/Activity
25 ..................................
If NRC staff finds no ‘‘need’’ or no likelihood of standing, the deadline for requestor/petitioner to file a motion seeking
a ruling to reverse the NRC staff’s denial of access; NRC staff files copy of access determination with the presiding
officer (or Chief Administrative Judge or other designated officer, as appropriate). If NRC staff finds ‘‘need’’ for
SUNSI, the deadline for any party to the proceeding whose interest independent of the proceeding would be
harmed by the release of the information to file a motion seeking a ruling to reverse the NRC staff’s grant of access.
Deadline for NRC staff reply to motions to reverse NRC staff determination(s).
(Receipt +30) If NRC staff finds standing and need for SUNSI, deadline for NRC staff to complete information processing and file motion for Protective Order and draft Non-Disclosure Affidavit. Deadline for applicant/licensee to file
Non-Disclosure Agreement for SUNSI.
If access granted: Issuance of presiding officer or other designated officer decision on motion for protective order for
access to sensitive information (including schedule for providing access and submission of contentions) or decision
reversing a final adverse determination by the NRC staff.
Deadline for filing executed Non-Disclosure Affidavits. Access provided to SUNSI consistent with decision issuing the
protective order.
Deadline for submission of contentions whose development depends upon access to SUNSI. However, if more than
25 days remain between the petitioner’s receipt of (or access to) the information and the deadline for filing all other
contentions (as established in the notice of hearing or opportunity for hearing), the petitioner may file its SUNSI
contentions by that later deadline.
(Contention receipt +25) Answers to contentions whose development depends upon access to SUNSI.
(Answer receipt +7) Petitioner/Intervenor reply to answers.
Decision on contention admission.
30 ..................................
40 ..................................
A ....................................
A + 3 .............................
A + 28 ...........................
A + 53 ...........................
A + 60 ...........................
>A + 60 .........................
1 and 2, respectively, approximately 5
months for Unit 1 and 17 months for
Unit 2 beyond the date required by 10
CFR part 73.’’
[FR Doc. 2010–6071 Filed 3–18–10; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–280 and 50–281; NRC–
2010–0079]
Virginia Electric and Power Company;
Surry Power Station, Unit Nos. 1 and
2 (Surry 1 and 2); Correction to
Environmental Assessment and
Finding of No Significant Impact
erowe on DSK5CLS3C1PROD with NOTICES
AGENCY: Nuclear Regulatory
Commission.
ACTION: Correction notice.
14:14 Mar 18, 2010
[FR Doc. 2010–6054 Filed 3–18–10; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
SUMMARY: This document corrects a
notice appearing in the Federal Register
on March 3, 2010 (75 FR 9618), that
cited the implementation date for
compliance with Title 10 of the Code of
Federal Regulations (10 CFR), part 73 as
‘‘August 31, 2010,’’ rather than ‘‘August
31, 2010, and August 31, 2011, for Surry
1 and 2, respectively.’’ This action is
necessary to add an implementation
date for Surry Unit 2.
FOR FURTHER INFORMATION CONTACT:
Karen Cotton, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001; telephone, (301) 415–1438; e-mail,
Karen.Cotton@nrc.gov.
SUPPLEMENTARY INFORMATION: On page
9619, in the first column, second line,
it reads ‘‘implementation dated of
August 31, 2010, approximately 5
months beyond the date required by 10
CFR Part 73,’’ and it is corrected to read
‘‘* * * implementation date of August
31, 2010 and August 31, 2011, for Surry
VerDate Nov<24>2008
Dated in Rockville, Maryland, this 12th
day of March 2010.
For the Nuclear Regulatory Commission.
Karen Cotton,
Project Manager, Plant Licensing Branch II–
1, Division of Operating Licensing, Office of
Nuclear Reactor Regulation.
Jkt 220001
[Docket No. 50–331; NRC–2010–0107]
Nextera Energy Duane Arnold, LLC;
Duane Arnold Energy Center;
Environmental Assessment and
Finding of No Significant Impact
The U.S. Nuclear Regulatory
Commission (NRC) is considering
issuance of an exemption, pursuant to
10 CFR 50.12, from 10 CFR Part 50,
Appendix J, Option B and associated
changes to the Technical Specifications
(TSs) for main steamline isolation valve
local leakage rate testing for Facility
Operating License No. DPR–49, issued
to NextEra Energy Duane Arnold, LLC
(the licensee), for operation of the
Duane Arnold Energy Center, located in
Palo, Iowa. In accordance with 10 CFR
51.21, the NRC prepared an
environmental assessment documenting
its finding. The NRC concluded that the
proposed actions will have no
significant environmental impact.
PO 00000
Frm 00075
Fmt 4703
Sfmt 4703
Environmental Assessment
Identification of the Proposed Action
The proposed action would exempt
the licensee from certain portions of 10
CFR part 50, Appendix J, Option B.
Specifically, the licensee requests to be
exempted from the measured leakage
rate for the main steamline isolation
valves (MSIV), and associated inboard
drainline, from inclusion in both the
overall measured leakage rate for Type
A integrated tests and from the sum of
the local leakage rates for Type B and
Type C tests as required by Appendix J,
Option B, Paragraphs III.A and Ill.B,
respectively.
In conjunction with the exemption
request, the licensee also requests
approval, pursuant to the requirements
of 10 CFR 50.90, of associated changes
to the Duane Arnold Energy Center TS,
Section 5.5.12 (Primary Containment
Leakage Rate Testing Program) that
reflects the exemption to Appendix J
requested above. Also, there is an
additional proposed TS change to TS
Section 3.6.1.3 (Primary Containment
Isolation Valves) associated with MSIV
leakage testing requirements, which
does not require a corresponding
exemption from 10 CFR part 50,
Appendix J. The change to TS Section
3.6.1.3, is included in the amendment
request to remove the repair criterion for
MSIVs that fail their as-found leakage
rate acceptance criterion found in the
licensee’s Surveillance Requirement
3.6.1.3.9.
The Need for the Proposed Action
The proposed action is needed to
reconcile the requirements of 10 CFR
part 50, Appendix J, Option B and their
E:\FR\FM\19MRN1.SGM
19MRN1
Agencies
[Federal Register Volume 75, Number 53 (Friday, March 19, 2010)]
[Notices]
[Pages 13314-13318]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-6071]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-269, 50-270, and 50-287; NRC-2010-0102]
Duke Energy Carolinas, LLC; Notice of Consideration of Issuance
of Amendments to Facility Operating License, Proposed No Significant
Hazards Consideration Determination, and Opportunity for a Hearing and
Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is
considering issuance of an amendment to Renewed Facility Operating
Licenses DPR-38, DPR-47, and DPR-55, issued to Duke Energy Carolinas,
LLC (the licensee), for operation of the Oconee Nuclear Station, Units
1, 2, and 3, located in Oconee County, South Carolina.
The proposed amendment would change the Technical Specifications
(TSs) to allow the use of methodology report DPC-NE-1006-P, ``Oconee
Nuclear Design Methodology Using CASMO-4/SIMULATE-3.'' The amendment
application dated June 10, 2009, as supplemented December 18, 2009,
contains sensitive unclassified non-safeguards information (SUNSI).
Before issuance of the proposed license amendment, the Commission
will have made findings required by the Atomic Energy Act of 1954, as
amended (the Act), and the Commission's regulations.
The Commission has made a proposed determination that the amendment
request involves no significant hazards consideration. Under the
Commission's regulations in Title 10 of the Code of Federal Regulations
(10 CFR), Section 50.92, this means that operation of the facility in
accordance with the proposed amendment would not (1) involve a
significant increase in the probability or consequences of an accident
previously evaluated; or (2) create the possibility of a new or
different kind of accident from any accident previously evaluated; or
(3) involve a significant reduction in a margin of safety. As required
by 10 CFR 50.91(a), the licensee has provided its analysis of the issue
of no significant hazards consideration, which is presented below:
(1) Involve a significant increase in the probability or
consequences of an accident previously evaluated.
The proposed change to allow the use of the CASMO-4/SIMULATE-3
reload design software to analyze reactor cores with fuel containing
lumped burnable and/or gadolinia integral absorbers does not involve
a significant increase in the probability or consequences of an
accident previously evaluated. The CASMO-4/SIMULATE-3 codes are used
to perform reactivity and power distribution calculations to develop
power distribution limits and provide confirmation of reactivity and
power distribution input assumptions used in the evaluation of UFSAR
Chapter 15 accidents. The SIMULATE-3 code is also used to confirm
the acceptability of thermal limits at post accident conditions.
The benchmark calculations performed verified the acceptability
of the CASMO-4/SIMULATE-3 code for performing reload design
calculations for reactor cores containing both lumped burnable and/
or gadolinia integral absorbers. These calculations confirmed the
accuracy of the codes and developed a methodology for calculating
power distribution uncertainties for use in reload design
calculations. The use of appropriate power distribution
uncertainties applicable to core designs in conjunction with
predicted peaking factors ensures that thermal accident acceptance
criteria are satisfied.
Therefore, the proposed amendment does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
(2) Create the possibility of a new or different kind of
accident from any accident previously evaluated.
The benchmark calculations performed verified the acceptability
of the CASMO-4/SIMULATE-3 code for performing reload design
calculations for reactor cores containing both lumped burnable and/
or gadolinia integral absorbers. These calculations confirmed the
accuracy of the codes and developed a methodology for calculating
power distribution uncertainties for use in reload design
calculations.
The application of the CASMO-4/SIMULATE-3 reload design software
to perform reload design calculations for reactor cores containing
lumped burnable and/or gadolinia integral absorbers will not create
the possibility of a new or different kind of accident from any
accident previously evaluated. The CASMO-4/SIMULATE-3 software is
not installed in plant equipment and therefore the software is
incapable of initiating an equipment malfunction that would result
in a new or different type of accident from any previously
evaluated. The evaluation of accidents and the associated acceptance
criteria for these accidents remains unchanged.
(3) Involve a significant reduction in a margin of safety.
The application of the CASMO-4/SIMULATE-3 reload design software
to perform reload design calculations for reactor cores containing
lumped burnable and/or gadolinia integral absorbers will not involve
a significant reduction in a margin of safety.
Margin of safety is related to the confidence in the ability of
the fission product barriers to perform their design function during
and following an accident. These barriers include the fuel cladding,
the reactor coolant system and the containment system. The reload
design process assures the acceptability of thermal limits under
normal, transient, and accident conditions. The CASMO-4/SIMULATE-
reload design software was qualified for the analysis of reactor
cores containing lumped burnable and/or gadolinia integral absorbers
and a methodology for developing appropriate power distribution
uncertainties for application in reload design analyses was
developed. The use of these uncertainties for analysis of reload
cores ensures that design and safety limits are satisfied such that
the fission product barriers perform their design function.
Therefore, the proposed amendment does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day
comment period such that failure to act in a
[[Page 13315]]
timely way would result, for example, in derating or shutdown of the
facility. Should the Commission take action prior to the expiration of
either the comment period or the notice period, it will publish in the
Federal Register a notice of issuance. Should the Commission make a
final No Significant Hazards Consideration Determination, any hearing
will take place after issuance. The Commission expects that the need to
take this action will occur very infrequently.
Written comments may be submitted by mail to the Chief, Rulemaking
and Directives Branch (RDB), TWB-05-B01M, Division of Administrative
Services, Office of Administration, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, and should cite the publication date and
page number of this Federal Register notice. Written comments may also
be faxed to the RDB at 301-492-3446. Documents may be examined, and/or
copied for a fee, at the NRC's Public Document Room (PDR), located at
One White Flint North, Room O1 F21, 11555 Rockville Pike (first floor),
Rockville, Maryland.
Within 60 days after the date of publication of this notice, any
person(s) whose interest may be affected by this action may file a
request for a hearing and a petition to intervene with respect to
issuance of the amendment to the subject facility operating license.
Requests for a hearing and a petition for leave to intervene shall be
filed in accordance with the Commission's ``Rules of Practice for
Domestic Licensing Proceedings'' in 10 CFR Part 2. Interested person(s)
should consult a current copy of 10 CFR 2.309, which is available at
the NRC's PDR. Publicly available records will be accessible from the
Agencywide Documents Access and Management System's (ADAMS) Public
Electronic Reading Room on the Internet at the NRC Web site, https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a
hearing or petition for leave to intervene is filed by the above date,
the Commission or a presiding officer designated by the Commission or
by the Chief Administrative Judge of the Atomic Safety and Licensing
Board Panel, will rule on the request and/or petition; and the
Secretary or the Chief Administrative Judge of the Atomic Safety and
Licensing Board will issue a notice of a hearing or an appropriate
order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following general requirements: (1) The name, address and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's/petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's/petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the requestor's/petitioner's interest. The petition must
also identify the specific contentions which the requestor/petitioner
seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
requestor/petitioner shall provide a brief explanation of the bases for
the contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
requestor/petitioner must also provide references to those specific
sources and documents of which the petitioner is aware and on which the
petitioner intends to rely to establish those facts or expert opinion.
The petition must include sufficient information to show that a genuine
dispute exists with the applicant on a material issue of law or fact.
Contentions shall be limited to matters within the scope of the
amendment under consideration. The contention must be one which, if
proven, would entitle the petitioner to relief. A requestor/petitioner
who fails to satisfy these requirements with respect to at least one
contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing.
If a hearing is requested, the Commission will make a final
determination on the issue of no significant hazards consideration. The
final determination will serve to decide when the hearing is held. If
the final determination is that the amendment request involves no
significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment. If the final determination is that the amendment
request involves a significant hazards consideration, any hearing held
would take place before the issuance of any amendment.
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC E-Filing rule (72 FR 49139,
August 28, 2007). The E-Filing process requires participants to submit
and serve all adjudicatory documents over the Internet, or in some
cases to mail copies on electronic storage media. Participants may not
submit paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least
ten (10) days prior to the filing deadline, the participant should
contact the Office of the Secretary by e-mail at
hearing.docket@nrc.gov, or by telephone at (301) 415-1677, to request
(1) a digital ID certificate, which allows the participant (or its
counsel or representative) to digitally sign documents and access the
E-Submittal server for any proceeding in which it is participating; and
(2) advise the Secretary that the participant will be submitting a
request or petition for hearing (even in instances in which the
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the
Secretary will establish an electronic docket for the hearing in this
proceeding if the Secretary has not already established an electronic
docket.
Information about applying for a digital ID certificate is
available on NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing
the E-Submittal server are detailed in NRC's ``Guidance for Electronic
Submission,'' which is available on the agency's public Web site at
https://www.nrc.gov/site-help/e-submittals.html. Participants may
attempt to use other software not listed on the Web site, but should
note that the NRC's E-Filing system does not support unlisted software,
and the NRC Meta System Help Desk will not be able to offer assistance
in using unlisted software.
[[Page 13316]]
If a participant is electronically submitting a document to the NRC
in accordance with the E-Filing rule, the participant must file the
document using the NRC's online, Web-based submission form. In order to
serve documents through EIE, users will be required to install a Web
browser plug-in from the NRC Web site. Further information on the Web-
based submission form, including the installation of the Web browser
plug-in, is available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a request for
hearing or petition for leave to intervene. Submissions should be in
Portable Document Format (PDF) in accordance with NRC guidance
available on the NRC public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the
documents are submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an e-mail notice confirming receipt of the document. The
E-Filing system also distributes an e-mail notice that provides access
to the document to the NRC Office of the General Counsel and any others
who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System
Help Desk through the ``Contact Us'' link located on the NRC Web site
at https://www.nrc.gov/site-help/e-submittals.html, by e-mail at
MSHD.Resource@nrc.gov, or by a toll-free call at (866) 672-7640. The
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m.,
Eastern Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland
20852, Attention: Rulemaking and Adjudications Staff. Participants
filing a document in this manner are responsible for serving the
document on all other participants. Filing is considered complete by
first-class mail as of the time of deposit in the mail, or by courier,
express mail, or expedited delivery service upon depositing the
document with the provider of the service. A presiding officer, having
granted an exemption request from using E-Filing, may require a
participant or party to use E-Filing if the presiding officer
subsequently determines that the reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
https://ehd.nrc.gov/EHD_Proceeding/home.asp, unless excluded pursuant
to an order of the Commission, or the presiding officer. Participants
are requested not to include personal privacy information, such as
social security numbers, home addresses, or home phone numbers in their
filings, unless an NRC regulation or other law requires submission of
such information. With respect to copyrighted works, except for limited
excerpts that serve the purpose of the adjudicatory filings and would
constitute a Fair Use application, participants are requested not to
include copyrighted materials in their submission.
Petitions for leave to intervene must be filed no later than 60
days from the date of publication of this notice. Non-timely filings
will not be entertained absent a determination by the presiding officer
that the petition or request should be granted or the contentions
should be admitted, based on a balancing of the factors specified in 10
CFR 2.309(c)(1)(i)-(viii).
For further details with respect to this license amendment
application, see the application for amendment dated June 10, 2009, as
supplemented December 18, 2009, which is available for public
inspection at the Commission's PDR, located at One White Flint North,
File Public Area O1 F21, 11555 Rockville Pike (first floor), Rockville,
Maryland. Publicly available records will be accessible electronically
from the Agencywide Documents Access and Management System's (ADAMS)
Public Electronic Reading Room on the Internet at the NRC Web site,
https://www.nrc.gov/reading-rm/adams.html. Persons who do not have
access to ADAMS or who encounter problems in accessing the documents
located in ADAMS, should contact the NRC PDR Reference staff by
telephone at 1-800-397-4209, 301-415-4737, or by e-mail to
pdr.resource@nrc.gov.
Attorney for Licensee: Ms. Lisa F. Vaughn, Associate General
Counsel and Managing Attorney, Duke Energy Carolinas, LLC, 526 South
Church Street, EC07H, Charlotte, NC 28202.
Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation
A. This Order contains instructions regarding how potential parties
to this proceeding may request access to documents containing Sensitive
Unclassified Non-Safeguards Information (SUNSI).
B. Within 10 days after publication of this notice of hearing and
opportunity to petition for leave to intervene, any potential party who
believes access to SUNSI is necessary to respond to this notice may
request such access. A ``potential party'' is any person who intends to
participate as a party by demonstrating standing and filing an
admissible contention under 10 CFR 2.309. Requests for access to SUNSI
submitted later than 10 days after publication will not be considered
absent a showing of good cause for the late filing, addressing why the
request could not have been filed earlier.
C. The requestor shall submit a letter requesting permission to
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemakings and
Adjudications Staff, and provide a copy to the Associate General
Counsel for Hearings, Enforcement and Administration, Office of the
General Counsel, Washington, DC 20555-0001. The expedited delivery or
courier mail address for both offices is: U.S. Nuclear Regulatory
Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The e-mail
address for the Office of the Secretary and the Office of the General
Counsel are Hearing.Docket@nrc.gov and
[[Page 13317]]
OGCmailcenter@nrc.gov, respectively.\1\ The request must include the
following information:
---------------------------------------------------------------------------
\1\ While a request for hearing or petition to intervene in this
proceeding must comply with the filing requirements of the NRC's
``E-Filing Rule,'' the initial request to access SUNSI under these
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------
(1) A description of the licensing action with a citation to this
Federal Register notice;
(2) The name and address of the potential party and a description
of the potential party's particularized interest that could be harmed
by the action identified in C.(1);
(3) The identity of the individual or entity requesting access to
SUNSI and the requestor's basis for the need for the information in
order to meaningfully participate in this adjudicatory proceeding. In
particular, the request must explain why publicly available versions of
the information requested would not be sufficient to provide the basis
and specificity for a proffered contention;
D. Based on an evaluation of the information submitted under
paragraph C.(3) the NRC staff will determine within 10 days of receipt
of the request whether:
(1) There is a reasonable basis to believe the petitioner is likely
to establish standing to participate in this NRC proceeding; and
(2) The requestor has established a legitimate need for access to
SUNSI.
E. If the NRC staff determines that the requestor satisfies both
D.(1) and D.(2) above, the NRC staff will notify the requestor in
writing that access to SUNSI has been granted. The written notification
will contain instructions on how the requestor may obtain copies of the
requested documents, and any other conditions that may apply to access
to those documents. These conditions may include, but are not limited
to, the signing of a Non-Disclosure Agreement or Affidavit, or
Protective Order \2\ setting forth terms and conditions to prevent the
unauthorized or inadvertent disclosure of SUNSI by each individual who
will be granted access to SUNSI.
---------------------------------------------------------------------------
\2\ Any motion for Protective Order or draft Non-Disclosure
Affidavit or Agreement for SUNSI must be filed with the presiding
officer or the Chief Administrative Judge if the presiding officer
has not yet been designated, within 30 days of the deadline for the
receipt of the written access request.
---------------------------------------------------------------------------
F. Filing of Contentions. Any contentions in these proceedings that
are based upon the information received as a result of the request made
for SUNSI must be filed by the requestor no later than 25 days after
the requestor is granted access to that information. However, if more
than 25 days remain between the date the petitioner is granted access
to the information and the deadline for filing all other contentions
(as established in the notice of hearing or opportunity for hearing),
the petitioner may file its SUNSI contentions by that later deadline.
G. Review of Denials of Access.
(1) If the request for access to SUNSI is denied by the NRC staff
either after a determination on standing and need for access, or after
a determination on trustworthiness and reliability, the NRC staff shall
immediately notify the requestor in writing, briefly stating the reason
or reasons for the denial.
(2) The requestor may challenge the NRC staff's adverse
determination by filing a challenge within 5 days of receipt of that
determination with: (a) The presiding officer designated in this
proceeding; (b) if no presiding officer has been appointed, the Chief
Administrative Judge, or if he or she is unavailable, another
administrative judge, or an administrative law judge with jurisdiction
pursuant to 10 CFR 2.318(a); or (c) if another officer has been
designated to rule on information access issues, with that officer.
H. Review of Grants of Access. A party other than the requestor may
challenge an NRC staff determination granting access to SUNSI whose
release would harm that party's interest independent of the proceeding.
Such a challenge must be filed with the Chief Administrative Judge
within 5 days of the notification by the NRC staff of its grant of
access.
If challenges to the NRC staff determinations are filed, these
procedures give way to the normal process for litigating disputes
concerning access to information. The availability of interlocutory
review by the Commission of orders ruling on such NRC staff
determinations (whether granting or denying access) is governed by 10
CFR 2.311.\3\
---------------------------------------------------------------------------
\3\ Requestors should note that the filing requirements of the
NRC's E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals
of NRC staff determinations (because they must be served on a
presiding officer or the Commission, as applicable), but not to the
initial SUNSI request submitted to the NRC staff under these
procedures.
---------------------------------------------------------------------------
I. The Commission expects that the NRC staff and presiding officers
(and any other reviewing officers) will consider and resolve requests
for access to SUNSI, and motions for protective orders, in a timely
fashion in order to minimize any unnecessary delays in identifying
those petitioners who have standing and who have propounded contentions
meeting the specificity and basis requirements in 10 CFR Part 2.
Attachment 1 to this Order summarizes the general target schedule for
processing and resolving requests under these procedures.
It is so ordered.
Dated at Rockville, Maryland, this 15th day of March 2010.
For the Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
Attachment 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards
Information in This Proceeding
------------------------------------------------------------------------
Day Event/Activity
------------------------------------------------------------------------
0............................ Publication of Federal Register notice of
hearing and opportunity to petition for
leave to intervene, including order with
instructions for access requests.
10........................... Deadline for submitting requests for
access to Sensitive Unclassified Non-
Safeguards Information (SUNSI) with
information: supporting the standing of
a potential party identified by name and
address; describing the need for the
information in order for the potential
party to participate meaningfully in an
adjudicatory proceeding.
60........................... Deadline for submitting petition for
intervention containing: (i)
Demonstration of standing; (ii) all
contentions whose formulation does not
require access to SUNSI (+25 Answers to
petition for intervention; +7 requestor/
petitioner reply).
20........................... Nuclear Regulatory Commission (NRC) staff
informs the requestor of the staff's
determination whether the request for
access provides a reasonable basis to
believe standing can be established and
shows need for SUNSI. (NRC staff also
informs any party to the proceeding
whose interest independent of the
proceeding would be harmed by the
release of the information.) If NRC
staff makes the finding of need for
SUNSI and likelihood of standing, NRC
staff begins document processing
(preparation of redactions or review of
redacted documents).
[[Page 13318]]
25........................... If NRC staff finds no ``need'' or no
likelihood of standing, the deadline for
requestor/petitioner to file a motion
seeking a ruling to reverse the NRC
staff's denial of access; NRC staff
files copy of access determination with
the presiding officer (or Chief
Administrative Judge or other designated
officer, as appropriate). If NRC staff
finds ``need'' for SUNSI, the deadline
for any party to the proceeding whose
interest independent of the proceeding
would be harmed by the release of the
information to file a motion seeking a
ruling to reverse the NRC staff's grant
of access.
30........................... Deadline for NRC staff reply to motions
to reverse NRC staff determination(s).
40........................... (Receipt +30) If NRC staff finds standing
and need for SUNSI, deadline for NRC
staff to complete information processing
and file motion for Protective Order and
draft Non-Disclosure Affidavit. Deadline
for applicant/licensee to file Non-
Disclosure Agreement for SUNSI.
A............................ If access granted: Issuance of presiding
officer or other designated officer
decision on motion for protective order
for access to sensitive information
(including schedule for providing access
and submission of contentions) or
decision reversing a final adverse
determination by the NRC staff.
A + 3........................ Deadline for filing executed Non-
Disclosure Affidavits. Access provided
to SUNSI consistent with decision
issuing the protective order.
A + 28....................... Deadline for submission of contentions
whose development depends upon access to
SUNSI. However, if more than 25 days
remain between the petitioner's receipt
of (or access to) the information and
the deadline for filing all other
contentions (as established in the
notice of hearing or opportunity for
hearing), the petitioner may file its
SUNSI contentions by that later
deadline.
A + 53....................... (Contention receipt +25) Answers to
contentions whose development depends
upon access to SUNSI.
A + 60....................... (Answer receipt +7) Petitioner/Intervenor
reply to answers.
>A + 60...................... Decision on contention admission.
------------------------------------------------------------------------
[FR Doc. 2010-6071 Filed 3-18-10; 8:45 am]