Processed Raspberry Promotion, Research, and Information Order; Delay of Referendum, 13238 [2010-5757]

Download as PDF 13238 Proposed Rules Federal Register Vol. 75, No. 53 Friday, March 19, 2010 This section of the FEDERAL REGISTER contains notices to the public of the proposed issuance of rules and regulations. The purpose of these notices is to give interested persons an opportunity to participate in the rule making prior to the adoption of the final rules. DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 1208 [Doc. No. AMS–FV–07–0077; FV–07–705– PR–2B] RIN 0581–AC79 Processed Raspberry Promotion, Research, and Information Order; Delay of Referendum AGENCY: Agricultural Marketing Service, Agriculture, USDA. ACTION: Proposed rule and referendum order; delay of referendum. This action delays indefinitely the referendum to determine whether producers of raspberries for processing and importers of processed raspberries approve the issuance of the proposed Processed Raspberry Promotion, Research, and Information Order. The referendum was scheduled to be held March 22 through April 2, 2010. The Washington Red Raspberry Commission has asked for a delay in the referendum as it considers further modifications to its proposal. FOR FURTHER INFORMATION CONTACT: Kimberly Coy, Marketing Specialist, Research and Promotion Branch, By, AMS, USDA, Stop 0244, Room 0634–S, 1400 Independence Avenue, SW., Washington, DC 20250–0244; telephone 202–720–9915 or (888) 720–9917 (toll free) or e-mail kimberly.coy@usda.gov. SUPPLEMENTARY INFORMATION: On April 9, 2009, the Department published in the Federal Register a proposal to establish the proposed Processed Raspberry Promotion, Research, and Information Order (Proposed Order) (7 CFR part 1208) [74 FR 16266] and proposed referendum procedures [74 FR 16289]. A second proposal addressing the comments received for the Proposed Order was published in the February 8, 2010 issue of the Federal Register [75 FR 6131]. Included in that document was a Referendum Order for a referendum to be conducted among erowe on DSK5CLS3C1PROD with PROPOSALS-1 SUMMARY: VerDate Nov<24>2008 14:13 Mar 18, 2010 Jkt 220001 eligible producers of raspberries for processing and importers of processed raspberries to determine whether they favor issuance of the Proposed Order. The referendum was scheduled for the period March 22 through April 2, 2010. Notice of this Referendum Order was published in the February 8, 2010 issue of the Federal Register [75 FR 6131]. The Department of Agriculture (Department) received a request from the Washington Red Raspberry Commission (WRRC) on February 19, 2010 to delay the scheduled referendum. The WRRC has asked for a delay in the referendum as they consider further modifications to their proposal. Therefore, taking into consideration the WRRC request, the referendum scheduled for the period of March 22 through April 2, 2010 that appears in the Referendum Order published in the Federal Register on April 9, 2009 in 74 FR 16266 is hereby delayed indefinitely. List of Subjects in 7 CFR Part 1208 Administrative practice and procedure, Advertising, Consumer information, Marketing agreements, Processed raspberries, Promotion, Reporting and recordkeeping requirements. Authority: 7 U.S.C. 7411–7425; 7 U.S.C. 7401. Dated: March 11, 2010. David R. Shipman, Acting Administrator, Agricultural Marketing Service. [FR Doc. 2010–5757 Filed 3–18–10; 8:45 am] BILLING CODE M DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 35 [Docket No. NE128; Notice No. 35–06–01– SC] Special Conditions: McCauley Propeller Systems, Model Propeller 3D15C1401/C80MWX–X Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed special conditions, withdrawal. AGENCY: SUMMARY: The FAA is withdrawing a previously published notice that PO 00000 Frm 00001 Fmt 4702 Sfmt 4702 proposed special conditions for McCauley Propeller Systems for model propeller 3D15C1401/C80MWX–X. We are withdrawing the notice in response to McCauley Propeller Systems notification to cancel the application for certification. FOR FURTHER INFORMATION CONTACT: Jay Turnberg, ANE–110, Engine and Propeller Directorate, Aircraft Certification Service, 12 New England Executive Park, Burlington, Massachusetts 01803–5299; telephone (781) 238–7116; facsimile (781) 238– 7199; e-mail jay.turnberg@faa.gov. SUPPLEMENTARY INFORMATION: Background On August 2, 2006, the FAA published a notice of proposed special conditions, Notice No. 35–06–01–SC, for McCauley Propeller Systems for model propeller 3D15C1401/C80MWX– X (71 FR 43674). On November 29, 2004, McCauley Propeller applied for type certification for a new model 3D15C1401/C80MWX–X propeller. The model propeller 3D15C1401/C80MWX– X has novel or unusual design features when compared to the state of technology described in the airworthiness standards under part 35. The design feature uses blades that are constructed of composite material. The blade has a carbon fiber spar, a shell composed of braided carbon fiber and fiberglass, and metallic leading edge erosion protection to give the material strength properties and durability. The material properties depend on the carbon fiber and fiberglass lay-up and the resin matrix material that bind the blade together. Composite materials introduce fatigue characteristics and failure modes that differ from metallic materials. The proposed special conditions pertain to the effects of novel or unusual design features such as effects on the structural performance of the propellers. We requested comments on these proposed special conditions by September 1, 2006. Reason for Withdraw We are withdrawing Notice No. 35– 06–01–SC because McCauley Propeller Systems canceled the application for certification. Conclusion Withdrawal of Notice No. 35–06–01– SC does not preclude the FAA from E:\FR\FM\19MRP1.SGM 19MRP1

Agencies

[Federal Register Volume 75, Number 53 (Friday, March 19, 2010)]
[Proposed Rules]
[Page 13238]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-5757]


========================================================================
Proposed Rules
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains notices to the public of 
the proposed issuance of rules and regulations. The purpose of these 
notices is to give interested persons an opportunity to participate in 
the rule making prior to the adoption of the final rules.

========================================================================


Federal Register / Vol. 75, No. 53 / Friday, March 19, 2010 / 
Proposed Rules

[[Page 13238]]



DEPARTMENT OF AGRICULTURE

Agricultural Marketing Service

7 CFR Part 1208

[Doc. No. AMS-FV-07-0077; FV-07-705-PR-2B]
RIN 0581-AC79


Processed Raspberry Promotion, Research, and Information Order; 
Delay of Referendum

AGENCY: Agricultural Marketing Service, Agriculture, USDA.

ACTION: Proposed rule and referendum order; delay of referendum.

-----------------------------------------------------------------------

SUMMARY: This action delays indefinitely the referendum to determine 
whether producers of raspberries for processing and importers of 
processed raspberries approve the issuance of the proposed Processed 
Raspberry Promotion, Research, and Information Order. The referendum 
was scheduled to be held March 22 through April 2, 2010. The Washington 
Red Raspberry Commission has asked for a delay in the referendum as it 
considers further modifications to its proposal.

FOR FURTHER INFORMATION CONTACT: Kimberly Coy, Marketing Specialist, 
Research and Promotion Branch, By, AMS, USDA, Stop 0244, Room 0634-S, 
1400 Independence Avenue, SW., Washington, DC 20250-0244; telephone 
202-720-9915 or (888) 720-9917 (toll free) or e-mail 
kimberly.coy@usda.gov.

SUPPLEMENTARY INFORMATION: On April 9, 2009, the Department published 
in the Federal Register a proposal to establish the proposed Processed 
Raspberry Promotion, Research, and Information Order (Proposed Order) 
(7 CFR part 1208) [74 FR 16266] and proposed referendum procedures [74 
FR 16289]. A second proposal addressing the comments received for the 
Proposed Order was published in the February 8, 2010 issue of the 
Federal Register [75 FR 6131]. Included in that document was a 
Referendum Order for a referendum to be conducted among eligible 
producers of raspberries for processing and importers of processed 
raspberries to determine whether they favor issuance of the Proposed 
Order. The referendum was scheduled for the period March 22 through 
April 2, 2010. Notice of this Referendum Order was published in the 
February 8, 2010 issue of the Federal Register [75 FR 6131].
    The Department of Agriculture (Department) received a request from 
the Washington Red Raspberry Commission (WRRC) on February 19, 2010 to 
delay the scheduled referendum. The WRRC has asked for a delay in the 
referendum as they consider further modifications to their proposal. 
Therefore, taking into consideration the WRRC request, the referendum 
scheduled for the period of March 22 through April 2, 2010 that appears 
in the Referendum Order published in the Federal Register on April 9, 
2009 in 74 FR 16266 is hereby delayed indefinitely.

List of Subjects in 7 CFR Part 1208

    Administrative practice and procedure, Advertising, Consumer 
information, Marketing agreements, Processed raspberries, Promotion, 
Reporting and recordkeeping requirements.

    Authority: 7 U.S.C. 7411-7425; 7 U.S.C. 7401.

    Dated: March 11, 2010.
David R. Shipman,
Acting Administrator, Agricultural Marketing Service.
[FR Doc. 2010-5757 Filed 3-18-10; 8:45 am]
BILLING CODE M
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.