Application To Export Electric Energy; Integrys Energy Services, Inc., 12737 [2010-5802]
Download as PDF
Federal Register / Vol. 75, No. 51 / Wednesday, March 17, 2010 / Notices
FOR FURTHER INFORMATION CONTACT:
Requests for additional information or
copies of the information collection
instrument and instructions should be
directed to:
Bruce Tonn, Environment Sciences
Division, Oak Ridge National
Laboratory, One Bethel Valley Road,
P.O. Box 2008, MS–6038, Oak Ridge,
TN 37381–6038, Fax#: (865) 576–
8646, tonnbe@ornl.gov.
The plan for this evaluation can be
found at https://weatherization.ornl.gov.
The surveys and data forms that
comprise this emergency information
request can also be found at https://
weatherization.ornl.gov.
This
package contains: (1) OMB No.: New; (2)
Package Title: The Weatherization
Assistance Program Evaluation; (3) Type
of Review: Emergency; (4) Purpose: This
collection of information is necessary
for a complete evaluation of the program
that weatherized approximately 100,000
low-income homes in Program Years
2007 and 2008; (5) Information will be
collected from fifty states and
Washington DC, nine hundred local
weatherization agencies and
approximately one thousand utilities;
(6) The estimated burden is 69,136
hours; (7) There are no reporting or
recordkeeping burdens associated with
this request.
Statutory Authority: Section 6861 of
title 42 of the United States Code and 10
CFR 440.25 authorize the collection of
this information.
SUPPLEMENTARY INFORMATION:
Issued in Washington, DC, on March 10,
2010.
Cathy Zoi,
Assistant Secretary, Energy Efficiency and
Renewable Energy.
[FR Doc. 2010–5800 Filed 3–16–10; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[OE Docket No. EA–301–A]
Application To Export Electric Energy;
Integrys Energy Services, Inc.
wwoods2 on DSK1DXX6B1PROD with NOTICES_PART 1
AGENCY: Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of application.
SUMMARY: Integrys Energy Services, Inc.
(Integrys Energy) has applied to renew
its authority to transmit electric energy
from the United States to Canada
pursuant to section 202(e) of the Federal
Power Act.
DATES: Comments, protests, or requests
to intervene must be submitted on or
before April 16, 2010.
VerDate Nov<24>2008
15:08 Mar 16, 2010
Jkt 220001
Comments, protests or
requests to intervene should be
addressed as follows: Office of
Electricity Delivery and Energy
Reliability, Mail Code: OE–20, U.S.
Department of Energy, 1000
Independence Avenue, SW.,
Washington, DC 20585–0350 (FAX 202–
586–8008).
FOR FURTHER INFORMATION CONTACT:
Anthony Como (Program Office) 202–
586–5935 or Lot Cooke (Program
Attorney) 202–586–0503.
SUPPLEMENTARY INFORMATION: Exports of
electricity from the United States to a
foreign country are regulated by the
Department of Energy (DOE) pursuant to
sections 301(b) and 402(f) of the
Department of Energy Organization Act
(42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of
the FPA (16 U.S.C. 824a(e)).
On May 24, 2005, DOE issued Order
No. EA–301 authorizing Integrys Energy
to transmit electric energy from the
United States to Canada as a power
marketer for a period of five years. That
authorization will expire on May 24,
2010. On February 2, 2010, Integrys
Energy filed an application with DOE to
renew the export authority contained in
Order No. EA–301 for an additional
five-year term.
The electric energy which Integrys
Energy proposes to export to Canada
would be surplus energy purchased
from electric utilities, Federal power
marketing agencies and other entities
within the United States. Each of the
international transmission facilities to
be utilized by Integrys Energy has
previously been authorized by a
Presidential permit issued pursuant to
Executive Order 10485, as amended,
and are appropriate for open access
transmission by third parties.
Procedural Matters: Any person
desiring to become a party to these
proceedings or to be heard by filing
comments or protests to this application
should file a petition to intervene,
comment, or protest at the address
provided above in accordance with
§§ 385.211 or 385.214 of the Federal
Energy Regulatory Commission’s Rules
of Practice and Procedures (18 CFR
385.211, 385.214). Fifteen copies of each
petition and protest should be filed with
DOE on or before the date listed above.
Comments on the Integrys Energy
application to export electric energy to
Canada should be clearly marked with
Docket No. EA–301–A. Additional
copies are to be filed directly with
Elizabeth Whittle, Nixon Peabody LLP,
401 9th St., NW., Suite 900,
Washington, DC 20004 and Amy
Klatvier, Integrys Energy Services, Inc.,
ADDRESSES:
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
12737
500 W. Madison St., Suite 3300,
Chicago, IL 60661. A final decision will
be made on this application after the
environmental impacts have been
evaluated pursuant to the National
Environmental Policy Act of 1969, and
a determination is made by DOE that the
proposed action will not adversely
impact on the reliability of the U.S.
electric power supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program Web site at https://
www.oe.energy.gov/
permits_pending.htm, or by e-mailing
Odessa Hopkins at
Odessa.Hopkins@hq.doe.gov.
Issued in Washington, DC, on February 19,
2010.
Anthony J. Como,
Director, Permitting and Siting, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. 2010–5802 Filed 3–16–10; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[OE Docket Nos. EA–363 and EA–364]
Applications To Export Electric
Energy; Noble Energy Marketing and
Trade Corp.
AGENCY: Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of application.
SUMMARY: Under two separate
applications, Noble Energy Marketing
and Trade Corp. (NEMT) has applied for
authority to transmit electric energy
from the United States to Mexico and
from the United States to Canada
pursuant to section 202(e) of the Federal
Power Act.
DATES: Comments, protests, or requests
to intervene must be submitted on or
before April 16, 2010.
ADDRESSES: Comments, protests, or
requests to intervene should be
addressed as follows: Office of
Electricity Delivery and Energy
Reliability, Mail Code: OE–20, U.S.
Department of Energy, 1000
Independence Avenue, SW.,
Washington, DC 20585–0350 (FAX 202–
586–8008).
FOR FURTHER INFORMATION CONTACT:
Anthony Como (Program Office) 202–
586–5935 or Lot Cooke (Program
Attorney) 202–586–0503.
SUPPLEMENTARY INFORMATION: Exports of
electricity from the United States to a
foreign country are regulated by the
Department of Energy (DOE) pursuant to
sections 301(b) and 402(f) of the
E:\FR\FM\17MRN1.SGM
17MRN1
Agencies
[Federal Register Volume 75, Number 51 (Wednesday, March 17, 2010)]
[Notices]
[Page 12737]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-5802]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[OE Docket No. EA-301-A]
Application To Export Electric Energy; Integrys Energy Services,
Inc.
AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.
ACTION: Notice of application.
-----------------------------------------------------------------------
SUMMARY: Integrys Energy Services, Inc. (Integrys Energy) has applied
to renew its authority to transmit electric energy from the United
States to Canada pursuant to section 202(e) of the Federal Power Act.
DATES: Comments, protests, or requests to intervene must be submitted
on or before April 16, 2010.
ADDRESSES: Comments, protests or requests to intervene should be
addressed as follows: Office of Electricity Delivery and Energy
Reliability, Mail Code: OE-20, U.S. Department of Energy, 1000
Independence Avenue, SW., Washington, DC 20585-0350 (FAX 202-586-8008).
FOR FURTHER INFORMATION CONTACT: Anthony Como (Program Office) 202-586-
5935 or Lot Cooke (Program Attorney) 202-586-0503.
SUPPLEMENTARY INFORMATION: Exports of electricity from the United
States to a foreign country are regulated by the Department of Energy
(DOE) pursuant to sections 301(b) and 402(f) of the Department of
Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of the FPA (16 U.S.C. 824a(e)).
On May 24, 2005, DOE issued Order No. EA-301 authorizing Integrys
Energy to transmit electric energy from the United States to Canada as
a power marketer for a period of five years. That authorization will
expire on May 24, 2010. On February 2, 2010, Integrys Energy filed an
application with DOE to renew the export authority contained in Order
No. EA-301 for an additional five-year term.
The electric energy which Integrys Energy proposes to export to
Canada would be surplus energy purchased from electric utilities,
Federal power marketing agencies and other entities within the United
States. Each of the international transmission facilities to be
utilized by Integrys Energy has previously been authorized by a
Presidential permit issued pursuant to Executive Order 10485, as
amended, and are appropriate for open access transmission by third
parties.
Procedural Matters: Any person desiring to become a party to these
proceedings or to be heard by filing comments or protests to this
application should file a petition to intervene, comment, or protest at
the address provided above in accordance with Sec. Sec. 385.211 or
385.214 of the Federal Energy Regulatory Commission's Rules of Practice
and Procedures (18 CFR 385.211, 385.214). Fifteen copies of each
petition and protest should be filed with DOE on or before the date
listed above.
Comments on the Integrys Energy application to export electric
energy to Canada should be clearly marked with Docket No. EA-301-A.
Additional copies are to be filed directly with Elizabeth Whittle,
Nixon Peabody LLP, 401 9th St., NW., Suite 900, Washington, DC 20004
and Amy Klatvier, Integrys Energy Services, Inc., 500 W. Madison St.,
Suite 3300, Chicago, IL 60661. A final decision will be made on this
application after the environmental impacts have been evaluated
pursuant to the National Environmental Policy Act of 1969, and a
determination is made by DOE that the proposed action will not
adversely impact on the reliability of the U.S. electric power supply
system.
Copies of this application will be made available, upon request,
for public inspection and copying at the address provided above, by
accessing the program Web site at https://www.oe.energy.gov/permits_pending.htm, or by e-mailing Odessa Hopkins at
Odessa.Hopkins@hq.doe.gov.
Issued in Washington, DC, on February 19, 2010.
Anthony J. Como,
Director, Permitting and Siting, Office of Electricity Delivery and
Energy Reliability.
[FR Doc. 2010-5802 Filed 3-16-10; 8:45 am]