KC Hydro LLC; Notice of Competing Preliminary Permit Application Accepted for Filing and Soliciting Comments, 11527-11528 [2010-5210]
Download as PDF
Federal Register / Vol. 75, No. 47 / Thursday, March 11, 2010 / Notices
• Update on USDA Biomass R&D
Activities and Budgets
• Update on DOE Biomass R&D
Activities and Budgets
• Panel Discussion on the Arundo
donax
• Presentation from ARPA–E
• Presentation from EPA
• Committee Discussion on 2010
Work Plan
Public Participation: In keeping with
procedures, members of the public are
welcome to observe the business of the
Biomass Research and Development
Technical Advisory Committee. To
attend the meeting and/or to make oral
statements regarding any of the items on
the agenda, you should contact Laura
McCann at 202–586–7766; E-mail:
laura.mccann@ee.doe.gov or T.J. Heibel
at (410) 997–7778 ext. 223; E-mail:
theibel@bcs-hq.com. You must make
your request for an oral statement at
least 5 business days before the meeting.
Members of the public will be heard in
the order in which they sign up at the
beginning of the meeting. Reasonable
provision will be made to include the
scheduled oral statements on the
agenda. The Chair of the Committee will
make every effort to hear the views of
all interested parties. If you would like
to file a written statement with the
Committee, you may do so either before
or after the meeting. The Chair will
conduct the meeting to facilitate the
orderly conduct of business.
Minutes: The minutes of the meeting
will be available for public review and
copying at https://
www.brdisolutions.com/publications/
default.aspx#meetings.
Issued at Washington, DC, on March 4,
2010.
Rachel Samuel,
Deputy Committee Management Officer.
[FR Doc. 2010–5079 Filed 3–10–10; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jlentini on DSKJ8SOYB1PROD with NOTICES
[Project No. 12715–002]
Fairlawn Hydroelectric Company, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
March 4, 2010.
On January 4, 2010, the Fairlawn
Hydroelectric Company, LLC filed an
application, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of the Jennings
VerDate Nov<24>2008
16:35 Mar 10, 2010
Jkt 220001
Randolph Project, to be located the U.S.
Army Corps of Engineers Jennings
Randolph Dam, on the North Branch
Potomac River, Garrett County,
Maryland, and Mineral County, West
Virginia.
The proposed project would utilize
the existing U.S. Army Corps of
Engineers’ Jennings Randolph Dam and
would consist of: (1) A proposed intake
structure to be built on the upstream
face of the dam; (2) a 720-foot-long
penstock through the dam; (3) a
proposed powerhouse containing 2
generating units with a total generating
capacity of 14.0 MW; (4) a proposed 2/
3-mile-long, 138 kV transmission line;
(5) a tailrace, and (6) appurtenant
facilities. The project would have an
estimated average annual generation of
52.0 gigawatts-hours.
Applicant Contact: Mr. M. Clifford
Phillips, Advanced Hydro Solutions
LLC, 150 North Miller Road, Suite 450
C, Fairlawn, OH 44333, phone (330)
869–8451.
FERC Contact: Michael Spencer, (202)
502–6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp.
Enter the docket number (P–12715) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–5208 Filed 3–10–10; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
11527
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13617–000]
KC Hydro LLC; Notice of Competing
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments
March 4, 2010.
On November 6, 2009, KC Hydro LLC
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act, proposing to study
the feasibility of a hydropower
development at North Unit Diversion
Dam on the Deschutes River in
Deschutes County, Oregon. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would utilize
the existing North Canal Diversion Dam,
which is used by three irrigation
districts, and would consist of the
following new facilities: (1) An
approximately 50-foot-long, 8- to 10foot-diameter penstock to accommodate
flows up to 800 cubic feet per second
downstream of the dam; (2) a
powerhouse containing a Francis
turbine with an installed capacity of 1.8
megawatts; (3) an approximately 500foot-long, 21-kilovolt transmission line;
and (4) appurtenant facilities. The
proposed project would have an average
annual generation of 7.2 gigawatt-hours.
Applicant Contact: Kelly Sackheim,
KC Hydro LLC, 5096 Cocoa Palm Way,
Fair Oaks, CA 95628, phone: (916) 962–
2271, e-mail: oregon@kchydro.com.
FERC Contact: Gina Krump, phone:
(202) 502–6704, e-mail:
gina.krump@ferc.gov.
Competing Applications: This
application competes with Project No.
13560–000 filed August 27, 2009, and
Project No. 13639–000 filed December 9,
2009.
Deadline for filing comments and
motions to intervene: 60 days from the
issuance of this notice. Comments and
motions to intervene may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov/docs-filing/
ferconline.asp) under the ‘‘eFiling’’ link.
For a simpler method of submitting text
only comments, click on ‘‘Quick
Comment.’’ For assistance, please
E:\FR\FM\11MRN1.SGM
11MRN1
11528
Federal Register / Vol. 75, No. 47 / Thursday, March 11, 2010 / Notices
contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13617) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–5210 Filed 3–10–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2244–000]
Energy Northwest; Notice of
Authorization for Continued Project
Operation
jlentini on DSKJ8SOYB1PROD with NOTICES
March 4, 2010.
On March 7, 2008, Energy Northwest,
licensee for the Packwood Lake
Hydroelectric Project, filed an
Application for a New License pursuant
to the Federal Power Act (FPA) and the
Commission’s regulations thereunder.
The Packwood Lake Hydroelectric
Project is located on Lake Creek, a
tributary to the Cowlitz River, in Lewis
County in southwestern Washington.
The license for Project No. 2244 was
issued for a period ending February 28,
2010. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
VerDate Nov<24>2008
16:35 Mar 10, 2010
Jkt 220001
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2244
is issued to Energy Northwest for a
period effective March 1, 2010 through
February 28, 2011, or until the issuance
of a new license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before February 28, 2011,
notice is hereby given that, pursuant to
18 CFR 16.18(c), an annual license
under section 15(a)(1) of the FPA is
renewed automatically without further
order or notice by the Commission,
unless the Commission orders
otherwise. If the project is not subject to
section 15 of the FPA, notice is hereby
given that Energy Northwest is
authorized to continue operation of the
Packwood Lake Hydroelectric Project,
until such time as the Commission acts
on its application for a subsequent
license.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–5204 Filed 3–10–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
March 4, 2010.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC10–44–000.
Applicants: Cresent Ridge, LLC.
Description: Supplemental
Information for Crescent Ridge LLC.
Filed Date: 03/04/2010.
Accession Number: 20100304–5045.
Comment Date: 5 p.m. Eastern Time
on Monday, March 15, 2010.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–689–001.
Applicants: Virginia Electric and
Power Company.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
Description: Dominion Virginia Power
submits substitute sheet to the JOA
reflects the modifications.
Filed Date: 03/03/2010.
Accession Number: 20100304–0209.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 24, 2010.
Docket Numbers: ER10–812–000.
Applicants: Power Choice, Inc.
Description: Application of Power
Choice Inc for an Order Accepting
Initial Market Based Rate Schedule and
Granting Waivers and Blanket
Authorizations.
Filed Date: 03/03/2010.
Accession Number: 20100303–0223.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 24, 2010.
Docket Numbers: ER10–820–000.
Applicants: Detroit Edison Company.
Description: Detroit Edison Company
submits Notice of Cancellation to Open
Access Transmission Tariff, FERC
Electric Tariff, Original Volume 2 to
confirm the cancellation of Detroit
Edison’s OATT, effective 3/4/2010.
Filed Date: 03/03/2010.
Accession Number: 20100303–0225.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 24, 2010.
Docket Numbers: ER10–821–000.
Applicants: Central Maine Power
Company
Description: Central Maine Power
Company submits its Engineering and
procurement Agreement dated February
3, 2010 with Spruce Mt Wind, LLC
designated as Original Service
Agreement CMP–EP–2–S under
Schedule 23 etc.
Filed Date: 03/03/2010.
Accession Number: 20100303–0224.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 24, 2010.
Docket Numbers: ER10–822–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits an executed Meter Agent
Service Agreement with Westar Energy,
Inc Generation Services.
Filed Date: 03/02/2010.
Accession Number: 20100303–0220.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 23, 2010.
Docket Numbers: ER10–823–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc submits an executed service
agreement for Network Integration
Transmission Service with Westar
Energy, Inc. et al.
Filed Date: 03/02/2010.
Accession Number: 20100303–0221.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 23, 2010.
Docket Numbers: ER10–824–000.
E:\FR\FM\11MRN1.SGM
11MRN1
Agencies
[Federal Register Volume 75, Number 47 (Thursday, March 11, 2010)]
[Notices]
[Pages 11527-11528]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-5210]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13617-000]
KC Hydro LLC; Notice of Competing Preliminary Permit Application
Accepted for Filing and Soliciting Comments
March 4, 2010.
On November 6, 2009, KC Hydro LLC filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of a hydropower development at North
Unit Diversion Dam on the Deschutes River in Deschutes County, Oregon.
The sole purpose of a preliminary permit, if issued, is to grant the
permit holder priority to file a license application during the permit
term. A preliminary permit does not authorize the permit holder to
perform any land disturbing activities or otherwise enter upon lands or
waters owned by others without the owners' express permission.
The proposed project would utilize the existing North Canal
Diversion Dam, which is used by three irrigation districts, and would
consist of the following new facilities: (1) An approximately 50-foot-
long, 8- to 10-foot-diameter penstock to accommodate flows up to 800
cubic feet per second downstream of the dam; (2) a powerhouse
containing a Francis turbine with an installed capacity of 1.8
megawatts; (3) an approximately 500-foot-long, 21-kilovolt transmission
line; and (4) appurtenant facilities. The proposed project would have
an average annual generation of 7.2 gigawatt-hours.
Applicant Contact: Kelly Sackheim, KC Hydro LLC, 5096 Cocoa Palm
Way, Fair Oaks, CA 95628, phone: (916) 962-2271, e-mail:
oregon@kchydro.com.
FERC Contact: Gina Krump, phone: (202) 502-6704, e-mail:
gina.krump@ferc.gov.
Competing Applications: This application competes with Project No.
13560-000 filed August 27, 2009, and Project No. 13639-000 filed
December 9, 2009.
Deadline for filing comments and motions to intervene: 60 days from
the issuance of this notice. Comments and motions to intervene may be
filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the Commission's Web site (https://www.ferc.gov/docs-filing/ferconline.asp) under the ``eFiling'' link. For a simpler
method of submitting text only comments, click on ``Quick Comment.''
For assistance, please
[[Page 11528]]
contact FERC Online Support at FERCOnlineSupport@ferc.gov; call toll-
free at (866) 208-3676; or, for TTY, contact (202) 502-8659. Although
the Commission strongly encourages electronic filing, documents may
also be paper-filed. To paper-file, mail an original and eight copies
to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13617) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-5210 Filed 3-10-10; 8:45 am]
BILLING CODE 6717-01-P