El Cajon Energy, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 11532 [2010-5206]
Download as PDF
11532
Federal Register / Vol. 75, No. 47 / Thursday, March 11, 2010 / Notices
(A) The following definition is added
at the end of Section 1:
1.13 Variable anti-sweat heater
control means an anti-sweat heater
where power supplied to the device is
determined by an operating condition
variable(s) and/or ambient condition
variable(s).
(B) Section 2.2 is revised to read as
follows:
2.2 Operational conditions. The
electric refrigerator or electric
refrigerator-freezer shall be installed and
its operating conditions maintained in
accordance with HRF–1–1979, section
7.2 through section 7.4.3.3. except that
the vertical ambient temperature
gradient at locations 10 inches (25.4 cm)
out from the centers of the two sides of
the unit being tested is to be maintained
during the test. Unless shields or baffles
obstruct the area, the gradient is to be
maintained from 2 inches (5.1 cm)
above the floor or supporting platform
to a height 1 foot (30.5 cm) above the
unit under test. Defrost controls are to
be operative. The anti-sweat heater
switch is to be off during one test and
on during the second test. In the case of
an electric refrigerator-freezer equipped
with variable anti-sweat heater control,
the result of the second test will be
derived by performing the calculation
described in 6.2.3. Other exceptions are
noted in 2.3, 2.4, and 5.1 below.
(C) New section 6.2.3. is inserted after
section 6.2.2.2.
6.2.3 Variable anti-sweat heater
control test. The energy consumption of
an electric refrigerator-freezer with a
variable anti-sweat heater control in the
on position (Eon), expressed in kilowatthours per day, shall be calculated
equivalent to: EON = E + (Correction
Factor)
Where E is determined by 6.2.1.1, 6.2.1.2,
6.2.2.1, or 6.2.2.2, whichever is
appropriate, with the anti-sweat heater
switch in the off position.
jlentini on DSKJ8SOYB1PROD with NOTICES
Correction Factor = (Anti-sweat Heater
Power × System-loss Factor) × (24
hrs/1 day) × (1 kW/1000 W)
Where:
Anti-sweat Heater Power = A1 * (Heater
Watts at 5%RH)
+ A2 * (Heater Watts at 15%RH)
+ A3 * (Heater Watts at 25%RH)
+ A4 * (Heater Watts at 35%RH)
+ A5 * (Heater Watts at 45%RH)
+ A6 * (Heater Watts at 55%RH)
+ A7 * (Heater Watts at 65%RH)
+ A8 * (Heater Watts at 75%RH)
+ A9 * (Heater Watts at 85%RH)
+ A10 * (Heater Watts at 95%RH)
Where A1–A10 are from the following table:
A1 = 0.034
A2 = 0.211
A3 = 0.204
VerDate Nov<24>2008
A6 = 0.119
A7 = 0.069
A8 = 0.047
16:35 Mar 10, 2010
Jkt 220001
A4 = 0.166
A5 = 0.126
A9 = 0.008
A10 = 0.015
Heater Watts at a specific relative
humidity = the nominal watts used by
all heaters at that specific relative
humidity, 72 °F ambient, and DOE
reference temperatures of fresh food
(FF) average temperature of 45 °F and
freezer (FZ) average temperature of 5 °F.
System-loss Factor = 1.3
(4) Representations. Electrolux may
make representations about the energy
use of its adaptive control anti-sweat
heater refrigerator-freezer products for
compliance, marketing, or other
purposes only to the extent that such
products have been tested in accordance
with the provisions outlined above and
such representations fairly disclose the
results of such testing.
(5) This waiver shall remain in effect
consistent with the provisions of 10 CFR
430.27(m).
(6) This waiver is issued on the
condition that the statements,
representations, and documentary
materials provided by the petitioner are
valid. DOE may revoke or modify this
waiver at any time if it determines the
factual basis underlying the petition for
waiver is incorrect, or the results from
the alternate test procedure are
unrepresentative of the basic models’
true energy consumption characteristics.
Issued in Washington, DC, on March 4,
2010.
Cathy Zoi,
Assistant Secretary, Energy Efficiency and
Renewable Energy.
[FR Doc. 2010–5228 Filed 3–10–10; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER10–790–000]
El Cajon Energy, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
March 4, 2010.
This is a supplemental notice in the
above-referenced proceeding of El Cajon
Energy, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
PO 00000
Frm 00028
Fmt 4703
Sfmt 9990
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is March 24,
2010.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list.
They are also available for review in
the Commission’s Public Reference
Room in Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–5206 Filed 3–10–10; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\11MRN1.SGM
11MRN1
Agencies
[Federal Register Volume 75, Number 47 (Thursday, March 11, 2010)]
[Notices]
[Page 11532]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-5206]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER10-790-000]
El Cajon Energy, LLC; Supplemental Notice That Initial Market-
Based Rate Filing Includes Request for Blanket Section 204
Authorization
March 4, 2010.
This is a supplemental notice in the above-referenced proceeding of
El Cajon Energy, LLC's application for market-based rate authority,
with an accompanying rate tariff, noting that such application includes
a request for blanket authorization, under 18 CFR part 34, of future
issuances of securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426, in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to intervene or protest must serve a
copy of that document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is March 24, 2010.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list.
They are also available for review in the Commission's Public
Reference Room in Washington, DC. There is an eSubscription link on the
Web site that enables subscribers to receive e-mail notification when a
document is added to a subscribed dockets(s). For assistance with any
FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call
(866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-5206 Filed 3-10-10; 8:45 am]
BILLING CODE 6717-01-P