Energy Northwest; Notice of Authorization for Continued Project Operation, 11528 [2010-5204]

Download as PDF 11528 Federal Register / Vol. 75, No. 47 / Thursday, March 11, 2010 / Notices contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13617) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. 2010–5210 Filed 3–10–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2244–000] Energy Northwest; Notice of Authorization for Continued Project Operation jlentini on DSKJ8SOYB1PROD with NOTICES March 4, 2010. On March 7, 2008, Energy Northwest, licensee for the Packwood Lake Hydroelectric Project, filed an Application for a New License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Packwood Lake Hydroelectric Project is located on Lake Creek, a tributary to the Cowlitz River, in Lewis County in southwestern Washington. The license for Project No. 2244 was issued for a period ending February 28, 2010. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with VerDate Nov<24>2008 16:35 Mar 10, 2010 Jkt 220001 the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2244 is issued to Energy Northwest for a period effective March 1, 2010 through February 28, 2011, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before February 28, 2011, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that Energy Northwest is authorized to continue operation of the Packwood Lake Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. Kimberly D. Bose, Secretary. [FR Doc. 2010–5204 Filed 3–10–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 March 4, 2010. Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC10–44–000. Applicants: Cresent Ridge, LLC. Description: Supplemental Information for Crescent Ridge LLC. Filed Date: 03/04/2010. Accession Number: 20100304–5045. Comment Date: 5 p.m. Eastern Time on Monday, March 15, 2010. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–689–001. Applicants: Virginia Electric and Power Company. PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 Description: Dominion Virginia Power submits substitute sheet to the JOA reflects the modifications. Filed Date: 03/03/2010. Accession Number: 20100304–0209. Comment Date: 5 p.m. Eastern Time on Wednesday, March 24, 2010. Docket Numbers: ER10–812–000. Applicants: Power Choice, Inc. Description: Application of Power Choice Inc for an Order Accepting Initial Market Based Rate Schedule and Granting Waivers and Blanket Authorizations. Filed Date: 03/03/2010. Accession Number: 20100303–0223. Comment Date: 5 p.m. Eastern Time on Wednesday, March 24, 2010. Docket Numbers: ER10–820–000. Applicants: Detroit Edison Company. Description: Detroit Edison Company submits Notice of Cancellation to Open Access Transmission Tariff, FERC Electric Tariff, Original Volume 2 to confirm the cancellation of Detroit Edison’s OATT, effective 3/4/2010. Filed Date: 03/03/2010. Accession Number: 20100303–0225. Comment Date: 5 p.m. Eastern Time on Wednesday, March 24, 2010. Docket Numbers: ER10–821–000. Applicants: Central Maine Power Company Description: Central Maine Power Company submits its Engineering and procurement Agreement dated February 3, 2010 with Spruce Mt Wind, LLC designated as Original Service Agreement CMP–EP–2–S under Schedule 23 etc. Filed Date: 03/03/2010. Accession Number: 20100303–0224. Comment Date: 5 p.m. Eastern Time on Wednesday, March 24, 2010. Docket Numbers: ER10–822–000. Applicants: Southwest Power Pool, Inc. Description: Southwest Power Pool, Inc. submits an executed Meter Agent Service Agreement with Westar Energy, Inc Generation Services. Filed Date: 03/02/2010. Accession Number: 20100303–0220. Comment Date: 5 p.m. Eastern Time on Tuesday, March 23, 2010. Docket Numbers: ER10–823–000. Applicants: Southwest Power Pool, Inc. Description: Southwest Power Pool, Inc submits an executed service agreement for Network Integration Transmission Service with Westar Energy, Inc. et al. Filed Date: 03/02/2010. Accession Number: 20100303–0221. Comment Date: 5 p.m. Eastern Time on Tuesday, March 23, 2010. Docket Numbers: ER10–824–000. E:\FR\FM\11MRN1.SGM 11MRN1

Agencies

[Federal Register Volume 75, Number 47 (Thursday, March 11, 2010)]
[Notices]
[Page 11528]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-5204]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2244-000]


Energy Northwest; Notice of Authorization for Continued Project 
Operation

March 4, 2010.
    On March 7, 2008, Energy Northwest, licensee for the Packwood Lake 
Hydroelectric Project, filed an Application for a New License pursuant 
to the Federal Power Act (FPA) and the Commission's regulations 
thereunder. The Packwood Lake Hydroelectric Project is located on Lake 
Creek, a tributary to the Cowlitz River, in Lewis County in 
southwestern Washington.
    The license for Project No. 2244 was issued for a period ending 
February 28, 2010. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), 
requires the Commission, at the expiration of a license term, to issue 
from year-to-year an annual license to the then licensee under the 
terms and conditions of the prior license until a new license is 
issued, or the project is otherwise disposed of as provided in section 
15 or any other applicable section of the FPA. If the project's prior 
license waived the applicability of section 15 of the FPA, then, based 
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), 
and as set forth at 18 CFR 16.21(a), if the licensee of such project 
has filed an application for a subsequent license, the licensee may 
continue to operate the project in accordance with the terms and 
conditions of the license after the minor or minor part license 
expires, until the Commission acts on its application. If the licensee 
of such a project has not filed an application for a subsequent 
license, then it may be required, pursuant to 18 CFR 16.21(b), to 
continue project operations until the Commission issues someone else a 
license for the project or otherwise orders disposition of the project.
    If the project is subject to section 15 of the FPA, notice is 
hereby given that an annual license for Project No. 2244 is issued to 
Energy Northwest for a period effective March 1, 2010 through February 
28, 2011, or until the issuance of a new license for the project or 
other disposition under the FPA, whichever comes first. If issuance of 
a new license (or other disposition) does not take place on or before 
February 28, 2011, notice is hereby given that, pursuant to 18 CFR 
16.18(c), an annual license under section 15(a)(1) of the FPA is 
renewed automatically without further order or notice by the 
Commission, unless the Commission orders otherwise. If the project is 
not subject to section 15 of the FPA, notice is hereby given that 
Energy Northwest is authorized to continue operation of the Packwood 
Lake Hydroelectric Project, until such time as the Commission acts on 
its application for a subsequent license.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-5204 Filed 3-10-10; 8:45 am]
BILLING CODE 6717-01-P