Energy Northwest; Notice of Authorization for Continued Project Operation, 11528 [2010-5204]
Download as PDF
11528
Federal Register / Vol. 75, No. 47 / Thursday, March 11, 2010 / Notices
contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13617) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–5210 Filed 3–10–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2244–000]
Energy Northwest; Notice of
Authorization for Continued Project
Operation
jlentini on DSKJ8SOYB1PROD with NOTICES
March 4, 2010.
On March 7, 2008, Energy Northwest,
licensee for the Packwood Lake
Hydroelectric Project, filed an
Application for a New License pursuant
to the Federal Power Act (FPA) and the
Commission’s regulations thereunder.
The Packwood Lake Hydroelectric
Project is located on Lake Creek, a
tributary to the Cowlitz River, in Lewis
County in southwestern Washington.
The license for Project No. 2244 was
issued for a period ending February 28,
2010. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
VerDate Nov<24>2008
16:35 Mar 10, 2010
Jkt 220001
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2244
is issued to Energy Northwest for a
period effective March 1, 2010 through
February 28, 2011, or until the issuance
of a new license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before February 28, 2011,
notice is hereby given that, pursuant to
18 CFR 16.18(c), an annual license
under section 15(a)(1) of the FPA is
renewed automatically without further
order or notice by the Commission,
unless the Commission orders
otherwise. If the project is not subject to
section 15 of the FPA, notice is hereby
given that Energy Northwest is
authorized to continue operation of the
Packwood Lake Hydroelectric Project,
until such time as the Commission acts
on its application for a subsequent
license.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–5204 Filed 3–10–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
March 4, 2010.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC10–44–000.
Applicants: Cresent Ridge, LLC.
Description: Supplemental
Information for Crescent Ridge LLC.
Filed Date: 03/04/2010.
Accession Number: 20100304–5045.
Comment Date: 5 p.m. Eastern Time
on Monday, March 15, 2010.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–689–001.
Applicants: Virginia Electric and
Power Company.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
Description: Dominion Virginia Power
submits substitute sheet to the JOA
reflects the modifications.
Filed Date: 03/03/2010.
Accession Number: 20100304–0209.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 24, 2010.
Docket Numbers: ER10–812–000.
Applicants: Power Choice, Inc.
Description: Application of Power
Choice Inc for an Order Accepting
Initial Market Based Rate Schedule and
Granting Waivers and Blanket
Authorizations.
Filed Date: 03/03/2010.
Accession Number: 20100303–0223.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 24, 2010.
Docket Numbers: ER10–820–000.
Applicants: Detroit Edison Company.
Description: Detroit Edison Company
submits Notice of Cancellation to Open
Access Transmission Tariff, FERC
Electric Tariff, Original Volume 2 to
confirm the cancellation of Detroit
Edison’s OATT, effective 3/4/2010.
Filed Date: 03/03/2010.
Accession Number: 20100303–0225.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 24, 2010.
Docket Numbers: ER10–821–000.
Applicants: Central Maine Power
Company
Description: Central Maine Power
Company submits its Engineering and
procurement Agreement dated February
3, 2010 with Spruce Mt Wind, LLC
designated as Original Service
Agreement CMP–EP–2–S under
Schedule 23 etc.
Filed Date: 03/03/2010.
Accession Number: 20100303–0224.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 24, 2010.
Docket Numbers: ER10–822–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits an executed Meter Agent
Service Agreement with Westar Energy,
Inc Generation Services.
Filed Date: 03/02/2010.
Accession Number: 20100303–0220.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 23, 2010.
Docket Numbers: ER10–823–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc submits an executed service
agreement for Network Integration
Transmission Service with Westar
Energy, Inc. et al.
Filed Date: 03/02/2010.
Accession Number: 20100303–0221.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 23, 2010.
Docket Numbers: ER10–824–000.
E:\FR\FM\11MRN1.SGM
11MRN1
Agencies
[Federal Register Volume 75, Number 47 (Thursday, March 11, 2010)]
[Notices]
[Page 11528]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-5204]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2244-000]
Energy Northwest; Notice of Authorization for Continued Project
Operation
March 4, 2010.
On March 7, 2008, Energy Northwest, licensee for the Packwood Lake
Hydroelectric Project, filed an Application for a New License pursuant
to the Federal Power Act (FPA) and the Commission's regulations
thereunder. The Packwood Lake Hydroelectric Project is located on Lake
Creek, a tributary to the Cowlitz River, in Lewis County in
southwestern Washington.
The license for Project No. 2244 was issued for a period ending
February 28, 2010. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1),
requires the Commission, at the expiration of a license term, to issue
from year-to-year an annual license to the then licensee under the
terms and conditions of the prior license until a new license is
issued, or the project is otherwise disposed of as provided in section
15 or any other applicable section of the FPA. If the project's prior
license waived the applicability of section 15 of the FPA, then, based
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c),
and as set forth at 18 CFR 16.21(a), if the licensee of such project
has filed an application for a subsequent license, the licensee may
continue to operate the project in accordance with the terms and
conditions of the license after the minor or minor part license
expires, until the Commission acts on its application. If the licensee
of such a project has not filed an application for a subsequent
license, then it may be required, pursuant to 18 CFR 16.21(b), to
continue project operations until the Commission issues someone else a
license for the project or otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 2244 is issued to
Energy Northwest for a period effective March 1, 2010 through February
28, 2011, or until the issuance of a new license for the project or
other disposition under the FPA, whichever comes first. If issuance of
a new license (or other disposition) does not take place on or before
February 28, 2011, notice is hereby given that, pursuant to 18 CFR
16.18(c), an annual license under section 15(a)(1) of the FPA is
renewed automatically without further order or notice by the
Commission, unless the Commission orders otherwise. If the project is
not subject to section 15 of the FPA, notice is hereby given that
Energy Northwest is authorized to continue operation of the Packwood
Lake Hydroelectric Project, until such time as the Commission acts on
its application for a subsequent license.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-5204 Filed 3-10-10; 8:45 am]