Pine Prairie Energy Center, LLC; Notice of Intent to Prepare an Environmental Assessment for the Proposed Electric Compressor Project and Request for Comments on Environmental Issues, 11164-11165 [2010-5002]
Download as PDF
11164
Federal Register / Vol. 75, No. 46 / Wednesday, March 10, 2010 / Notices
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2010–5057 Filed 3–9–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM10–11–000]
Integration of Variable Energy
Resources; Notice Extending
Comment Period
erowe on DSK5CLS3C1PROD with NOTICES
March 3, 2010.
On February 23, 2010, Edison Electric
Institute (EEI) filed a motion requesting
an extension of the period in which to
file comments in response to the
Commission’s January 21, 2010 Notice
of Inquiry (NOI) in this proceeding.1 EEI
requests a fourteen-day extension of the
comment period, which would result in
a comment due date of April 12, 2010.
Additionally, on February 26, 2010,
Bonneville Power Administration (BPA)
filed a motion requesting an extension
of at least fourteen days.2
1 Integration of Variable Energy Resources, 130
FERC ¶ 61,053 (2010).
2 BPA indicates, however, that its preference
would be for a twenty-one day extension of the
comment period.
VerDate Nov<24>2008
15:07 Mar 09, 2010
Jkt 220001
Upon consideration, notice is hereby
given that the period during which
interested parties may file comments in
response to the Commission’s NOI in
this proceeding is extended by fourteen
days. Comments are now due on or
before April 12, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–5043 Filed 3–9–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP04–379–003]
Pine Prairie Energy Center, LLC;
Notice of Intent to Prepare an
Environmental Assessment for the
Proposed Electric Compressor Project
and Request for Comments on
Environmental Issues
March 2, 2010.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Electric Compressor Project (Project)
involving construction and operation of
facilities by Pine Prairie Energy Center,
LLC (Pine Prairie) in Evangeline Parish,
Louisiana. This EA will be used by the
Commission in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
staff determine what issues need to be
evaluated in the EA. Please note that the
scoping period will close on April 2,
2010.
Comments may be submitted in
written form or verbally. Further details
on how to submit written comments are
provided in the Public Participation
section of this notice.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives are
asked to notify their constituents of this
planned project and encourage them to
comment on their areas of concern.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ was attached to the project
notice Pine Prairie provided to
landowners. This fact sheet addresses a
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
number of typically asked questions,
and how to participate in the
Commission’s proceedings. It is also
available for viewing on the FERC Web
site (https://www.ferc.gov).
Summary of the Proposed Project
Pine Prairie proposes to construct and
operate the Project at and near the
existing Pine Prairie Energy Center
(PPEC) in Evangeline Parish, Louisiana.
The Project would provide Pine Prairie
with additional operational flexibility,
and reduce fuel costs. The Project
consists of the following facilities:
• Four 5,750 horsepower (hp) electric
motor driven compressors in lieu of four
previously authorized, as yet unbuilt,
4,700 hp natural gas engine driven
compressors; and
• Two additional 5,750 hp electric
motor drive compressor units.
In support of the Project, Pine Prairie
or the local electric utility would
construct the following non
jurisdictional electric power facilities:
• An electric substation at the
existing PPEC;
• Approximately 1,200 feet of electric
distribution line on poles at the PPEC;
• Approximately 2.1 miles of radial
electric transmission line;
• A Tie-In to the existing electric
transmission line; and
• Relocation to the north side of
Ambrose Road of approximately 700
feet of electric distribution line.
The general location of the project
facilities is shown in Appendix 1.1
Land Requirements for Construction
Construction of the proposed facilities
would disturb about 34.26 acres of land
for the aboveground facilities.
Nonjurisdictional facilities would
account for approximately 33.12 acres of
disturbed land. Following construction,
all of the above acres would be
maintained for permanent operation of
the project’s facilities.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us 2 to
1 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at https://
www.ferc.gov using the link called ‘‘eLibrary’’ or
from the Commission’s Public Reference Room, 888
First Street, NE., Washington, DC 20426, or call
(202) 502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
2 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the environmental
staff of the Commission’s Office of Energy Projects.
E:\FR\FM\10MRN1.SGM
10MRN1
Federal Register / Vol. 75, No. 46 / Wednesday, March 10, 2010 / Notices
erowe on DSK5CLS3C1PROD with NOTICES
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping’’. The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. All comments
received will be considered during the
preparation of the EA.
In the EA we will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• Land use;
• Water resources, fisheries, and
wetlands;
• Cultural resources;
• Vegetation and wildlife;
• Air quality and noise;
• Endangered and threatened species;
and
• Public safety.
We will also evaluate reasonable
alternatives to the proposed project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
Our independent analysis of the
issues will be presented in the EA. The
EA will be placed in the public record
and, depending on the comments
received during the scoping process,
may be published and distributed to the
public. A comment period will be
allotted if the EA is published for
review. We will consider all comments
on the EA before we make our
recommendations to the Commission.
To ensure your comments are
considered, please carefully follow the
instructions in the Public Participation
section below.
With this notice, we are asking
agencies with jurisdiction and/or
special expertise with respect to
environmental issues to formally
cooperate with us in the preparation of
the EA. These agencies may choose to
participate once they have evaluated the
proposal relative to their
responsibilities. Agencies that would
like to request cooperating agency status
should follow the instructions for filing
comments provided under the Public
Participation section of this notice.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
VerDate Nov<24>2008
15:07 Mar 09, 2010
Jkt 220001
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send your comments so
that they will be received in
Washington, DC on or before April 2,
2010.
For your convenience, there are three
methods which you can use to submit
your comments to the Commission. The
Commission encourages electronic filing
of comments and has expert eFiling staff
available to assist you at (202) 502–8258
or efiling@ferc.gov.
(1) You may file your comments
electronically by using the Quick
Comment feature, which is located at
https://www.ferc.gov under the link
called ‘‘Documents and Filings’’. A
Quick Comment is an easy method for
interested persons to submit text-only
comments on a project;
(2) You may file your comments
electronically by using the ‘‘eFiling’’
feature that is listed under the
‘‘Documents and Filings’’ link. eFiling
involves preparing your submission in
the same manner as you would if filing
on paper, and then saving the file on
your computer’s hard drive. You will
attach that file to your submission. New
eFiling users must first create an
account by clicking on the links called
‘‘Sign up’’ or ‘‘eRegister’’. You will be
asked to select the type of filing you are
making. A comment on a particular
project is considered a ‘‘Comment on a
Filing’’; or
(3) You may file a paper copy of your
comments at the following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Room 1A, Washington,
DC 20426.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
PO 00000
Frm 00062
Fmt 4703
Sfmt 9990
11165
If the EA is published for distribution,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(Appendix 2).
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor,’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are included in the User’s
Guide under the ‘‘e-filing’’ link on the
Commission’s Web site.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site at https://www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and enter
the docket number, excluding the last
three digits in the Docket Number field
(i.e., CP04–379). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–5002 Filed 3–9–10; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\10MRN1.SGM
10MRN1
Agencies
[Federal Register Volume 75, Number 46 (Wednesday, March 10, 2010)]
[Notices]
[Pages 11164-11165]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-5002]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP04-379-003]
Pine Prairie Energy Center, LLC; Notice of Intent to Prepare an
Environmental Assessment for the Proposed Electric Compressor Project
and Request for Comments on Environmental Issues
March 2, 2010.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Electric Compressor Project
(Project) involving construction and operation of facilities by Pine
Prairie Energy Center, LLC (Pine Prairie) in Evangeline Parish,
Louisiana. This EA will be used by the Commission in its decision-
making process to determine whether the project is in the public
convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help the Commission staff
determine what issues need to be evaluated in the EA. Please note that
the scoping period will close on April 2, 2010.
Comments may be submitted in written form or verbally. Further
details on how to submit written comments are provided in the Public
Participation section of this notice.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives are asked to notify their constituents of this planned
project and encourage them to comment on their areas of concern.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' was attached to the
project notice Pine Prairie provided to landowners. This fact sheet
addresses a number of typically asked questions, and how to participate
in the Commission's proceedings. It is also available for viewing on
the FERC Web site (https://www.ferc.gov).
Summary of the Proposed Project
Pine Prairie proposes to construct and operate the Project at and
near the existing Pine Prairie Energy Center (PPEC) in Evangeline
Parish, Louisiana. The Project would provide Pine Prairie with
additional operational flexibility, and reduce fuel costs. The Project
consists of the following facilities:
Four 5,750 horsepower (hp) electric motor driven
compressors in lieu of four previously authorized, as yet unbuilt,
4,700 hp natural gas engine driven compressors; and
Two additional 5,750 hp electric motor drive compressor
units.
In support of the Project, Pine Prairie or the local electric
utility would construct the following non jurisdictional electric power
facilities:
An electric substation at the existing PPEC;
Approximately 1,200 feet of electric distribution line on
poles at the PPEC;
Approximately 2.1 miles of radial electric transmission
line;
A Tie-In to the existing electric transmission line; and
Relocation to the north side of Ambrose Road of
approximately 700 feet of electric distribution line.
The general location of the project facilities is shown in Appendix
1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of appendices were sent to
all those receiving this notice in the mail and are available at
https://www.ferc.gov using the link called ``eLibrary'' or from the
Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426, or call (202) 502-8371. For instructions on
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would disturb about 34.26
acres of land for the aboveground facilities. Nonjurisdictional
facilities would account for approximately 33.12 acres of disturbed
land. Following construction, all of the above acres would be
maintained for permanent operation of the project's facilities.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
\2\ to
[[Page 11165]]
discover and address concerns the public may have about proposals. This
process is referred to as ``scoping''. The main goal of the scoping
process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of the issues to address in the EA. All comments
received will be considered during the preparation of the EA.
---------------------------------------------------------------------------
\2\ ``We'', ``us'', and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA we will discuss impacts that could occur as a result of
the construction and operation of the proposed project under these
general headings:
Geology and soils;
Land use;
Water resources, fisheries, and wetlands;
Cultural resources;
Vegetation and wildlife;
Air quality and noise;
Endangered and threatened species; and
Public safety.
We will also evaluate reasonable alternatives to the proposed
project or portions of the project, and make recommendations on how to
lessen or avoid impacts on the various resource areas.
Our independent analysis of the issues will be presented in the EA.
The EA will be placed in the public record and, depending on the
comments received during the scoping process, may be published and
distributed to the public. A comment period will be allotted if the EA
is published for review. We will consider all comments on the EA before
we make our recommendations to the Commission. To ensure your comments
are considered, please carefully follow the instructions in the Public
Participation section below.
With this notice, we are asking agencies with jurisdiction and/or
special expertise with respect to environmental issues to formally
cooperate with us in the preparation of the EA. These agencies may
choose to participate once they have evaluated the proposal relative to
their responsibilities. Agencies that would like to request cooperating
agency status should follow the instructions for filing comments
provided under the Public Participation section of this notice.
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. Your comments should focus on
the potential environmental effects, reasonable alternatives, and
measures to avoid or lessen environmental impacts. The more specific
your comments, the more useful they will be. To ensure that your
comments are timely and properly recorded, please send your comments so
that they will be received in Washington, DC on or before April 2,
2010.
For your convenience, there are three methods which you can use to
submit your comments to the Commission. The Commission encourages
electronic filing of comments and has expert eFiling staff available to
assist you at (202) 502-8258 or efiling@ferc.gov.
(1) You may file your comments electronically by using the Quick
Comment feature, which is located at https://www.ferc.gov under the link
called ``Documents and Filings''. A Quick Comment is an easy method for
interested persons to submit text-only comments on a project;
(2) You may file your comments electronically by using the
``eFiling'' feature that is listed under the ``Documents and Filings''
link. eFiling involves preparing your submission in the same manner as
you would if filing on paper, and then saving the file on your
computer's hard drive. You will attach that file to your submission.
New eFiling users must first create an account by clicking on the links
called ``Sign up'' or ``eRegister''. You will be asked to select the
type of filing you are making. A comment on a particular project is
considered a ``Comment on a Filing''; or
(3) You may file a paper copy of your comments at the following
address: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Room 1A, Washington, DC 20426.
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. We will update the environmental mailing list
as the analysis proceeds to ensure that we send the information related
to this environmental review to all individuals, organizations, and
government entities interested in and/or potentially affected by the
proposed project.
If the EA is published for distribution, copies will be sent to the
environmental mailing list for public review and comment. If you would
prefer to receive a paper copy of the document instead of the CD
version or would like to remove your name from the mailing list, please
return the attached Information Request (Appendix 2).
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an ``intervenor,'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Instructions for becoming an intervenor are
included in the User's Guide under the ``e-filing'' link on the
Commission's Web site.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site at https://www.ferc.gov using the ``eLibrary'' link. Click
on the eLibrary link, click on ``General Search'' and enter the docket
number, excluding the last three digits in the Docket Number field
(i.e., CP04-379). Be sure you have selected an appropriate date range.
For assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries and direct links to
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at https://www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-5002 Filed 3-9-10; 8:45 am]
BILLING CODE 6717-01-P