Free Flow Power Qualified Hydro 22, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 11153-11154 [2010-4996]
Download as PDF
Federal Register / Vol. 75, No. 46 / Wednesday, March 10, 2010 / Notices
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–4999 Filed 3–9–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13631–000]
Main Mill Street Investments, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘eFiling’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13631) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–4998 Filed 3–9–10; 8:45 am]
BILLING CODE 6717–01–P
erowe on DSK5CLS3C1PROD with NOTICES
March 1, 2010.
On November 16, Main Mill Street
Investments, LLC (Main Mill Street
Investments) filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the Imperial
Mill Dam Hydroelectric Project No.
13631, to be located at the existing
Imperial Mill Dam, on the on the
Saranac River, in Clinton County, New
York.
The proposed project would consist
of: (1) An existing 21-foot-high by 205foot-long concrete and masonry dam; (2)
an existing 68-acre impoundment; (3) an
existing 77-foot-long by 26-foot-wide
powerhouse; (4) two new turbine
generator units for a total installed
capacity of 1.7 megawatts; (5) a new 50foot-long, 46-kilovolt transmission line;
and (6) appurtenant facilities. The
proposed project would operate in runof-river mode and generate an estimated
average annual generation of 10,000
megawatt-hours.
Main Mill Street Investments: Rex
Jacobsma, Main Mill Street Investments,
LLC., 1508 Olive Street, Paso Robles, CA
93446, (805) 239–3090.
FERC Contact: Michael Watts, (202)
502–6123.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
VerDate Nov<24>2008
15:07 Mar 09, 2010
Jkt 220001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13627–000]
Hydro Energy Technologies, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On November 6, 2009, Hydro Energy
Technologies, LLC (Hydro Energy
Technologies) filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the
Harpersfield Dam Hydroelectric Project
No. 13627, to be located at the existing
Harpersfield Dam, on the Grand River,
in Ashtabula County, Ohio.
The proposed project would consist
of: (1) An existing 8.5-foot-high by 330foot-long gravity dam; (2) a existing 36acre impoundment with a storage
capacity of 250 acre feet.; (3) an existing
filtration plant to be converted into a
powerhouse and installed with three
new turbine-generator units for a total
installed capacity of 390 kilowatts; (4) a
new 150-foot-long, 480-volt
transmission line; and (5) appurtenant
facilities. The proposed project would
operate in a run-of-river mode and
generate an estimated average annual
generation of 2,200 megawatt-hours.
Frm 00050
Hydro Energy Technologies: Anthony
J. Marra Jr., President, Hydro Energy
Technologies, LLC., 33 Commercial
Street, Gloucester, MA 01930, (978)
283–2822.
FERC Contact: Michael Watts, (202)
502–6123.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘eFiling’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp.
Enter the docket number (P–13627) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–4997 Filed 3–9–10; 8:45 am]
March 1, 2010.
PO 00000
11153
Fmt 4703
Sfmt 4703
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13614–000]
Free Flow Power Qualified Hydro 22,
LLC; Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
March 1, 2010.
On November 05, 2009, Free Flow
Power Qualified Hydro 22, LLC (FFP
Qualified Hydro 22) filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act,
proposing to study the feasibility of the
Great Bend Hydroelectric Project No.
13614, to be located at an existing
partially breached dam at river mile
E:\FR\FM\10MRN1.SGM
10MRN1
11154
Federal Register / Vol. 75, No. 46 / Wednesday, March 10, 2010 / Notices
21.7, on the Black River, in Jefferson
County, New York.
The proposed project would consist
of: (1) A new 19-foot-high by 272-footlong concrete gravity dam; (2) a new
220-acre impoundment with a normal
water surface elevation of 609 feet mean
sea level; (3) an new 54-foot-long by 74foot-wide powerhouse to contain two
new turbine-generator units for a total
installed capacity of 5.0 megawatts; (4)
a new 3.8-mile-long, 23-kilovolt
transmission line; and (5) appurtenant
facilities. The proposed project would
operate in a run-of-river mode and
generate an estimated average annual
generation of 24,500 megawatt-hours.
FFP Qualified Hydro 22: Ramya
Swaminathan, FFP Qualified Hydro 22,
LLC., 33 Commercial Street, Gloucester,
MA 01930, (978) 283–2822.
FERC Contact: Michael Watts, (202)
502–6123.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘eFiling’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13614) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
erowe on DSK5CLS3C1PROD with NOTICES
[FR Doc. 2010–4996 Filed 3–9–10; 8:45 am]
BILLING CODE 6717–01–P
VerDate Nov<24>2008
15:07 Mar 09, 2010
Jkt 220001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13351–000]
Marseilles Land and Water Company;
Notice of Application Ready for
Environmental Analysis and Soliciting
Comments, Recommendations, Terms
and Conditions, and Prescriptions
March 3, 2010.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original Major
License.
b. Project No.: P–13351–000.
c. Date filed: December 30, 2008.
d. Applicant: Marseilles Land and
Water Company.
e. Name of Project: Marseilles Lock
and Dam Project.
f. Location: On the Illinois River, in
the town of Marseilles, La Salle County,
Illinois. This project would not occupy
any Federal lands.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Lee W. Mueller,
Architect and Vice President, Marseilles
Land & Water Company, 4132 S.
Rainbow Blvd., #247, Las Vegas, NV
89103, (702) 367–7302.
i. FERC Contact: Steve Kartalia, (202)
502–6131 or Stephen.kartalia@ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions is 60 days
from the issuance of this notice; reply
comments are due 105 days from the
issuance date of this notice.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov/docs-filing/
ferconline.asp) under the ‘‘eFiling’’ link.
For a simpler method of submitting text
only comments, click on ‘‘Quick
Comment.’’ For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
and is now ready for environmental
analysis.
l. Project Description: The Marseilles
Lock and Dam Project would utilize the
head created by the existing 24-foothigh Army Corps of Engineers (Corps)
Marseilles Lock and Dam and two
existing Corps headgate structures and
would consist of: (1) The existing north
and south headraces in which a portion
of the south headrace would be filled in
and joined to the existing north
headrace which would be deepened to
accommodate the flow from both
headraces leading to; (2) a new intake
structure and forebay leading to; (3) a
new powerhouse containing four
generating units with a total installed
capacity of 10.26 megawatts (MW); (4) a
new tailrace discharging water back to
the Illinois River; (5) a new
underground transmission line; and (6)
appurtenant facilities.
The project would operate in a run-ofriver mode.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
All filings must (1) Bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘REPLY COMMENTS’’,
‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND
CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’
(2) set forth in the heading the name of
the applicant and the project number of
the application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
submitting the filing; and (4) otherwise
comply with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Each filing must be
accompanied by proof of service on all
persons listed on the service list
prepared by the Commission in this
E:\FR\FM\10MRN1.SGM
10MRN1
Agencies
[Federal Register Volume 75, Number 46 (Wednesday, March 10, 2010)]
[Notices]
[Pages 11153-11154]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-4996]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13614-000]
Free Flow Power Qualified Hydro 22, LLC; Notice of Preliminary
Permit Application Accepted for Filing and Soliciting Comments, Motions
To Intervene, and Competing Applications
March 1, 2010.
On November 05, 2009, Free Flow Power Qualified Hydro 22, LLC (FFP
Qualified Hydro 22) filed an application for a preliminary permit,
pursuant to section 4(f) of the Federal Power Act, proposing to study
the feasibility of the Great Bend Hydroelectric Project No. 13614, to
be located at an existing partially breached dam at river mile
[[Page 11154]]
21.7, on the Black River, in Jefferson County, New York.
The proposed project would consist of: (1) A new 19-foot-high by
272-foot-long concrete gravity dam; (2) a new 220-acre impoundment with
a normal water surface elevation of 609 feet mean sea level; (3) an new
54-foot-long by 74-foot-wide powerhouse to contain two new turbine-
generator units for a total installed capacity of 5.0 megawatts; (4) a
new 3.8-mile-long, 23-kilovolt transmission line; and (5) appurtenant
facilities. The proposed project would operate in a run-of-river mode
and generate an estimated average annual generation of 24,500 megawatt-
hours.
FFP Qualified Hydro 22: Ramya Swaminathan, FFP Qualified Hydro 22,
LLC., 33 Commercial Street, Gloucester, MA 01930, (978) 283-2822.
FERC Contact: Michael Watts, (202) 502-6123.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``eFiling'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13614) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-4996 Filed 3-9-10; 8:45 am]
BILLING CODE 6717-01-P