Application for Presidential Permit; Champlain Hudson Power Express, Inc., 10229-10230 [2010-4677]
Download as PDF
Federal Register / Vol. 75, No. 43 / Friday, March 5, 2010 / Notices
column, correct the SUMMARY caption to
read:
SUMMARY: Pursuant to sections
254(a)(11)(A) and 255(b) of the Help
America Vote Act (HAVA), Public Law
107–252, the U.S. Election Assistance
Commission (EAC) hereby causes to be
published in the Federal Register
changes to the HAVA State plans
previously submitted by Puerto Rico.
Dated: March 2, 2010.
Thomas R. Wilkey,
Executive Director.
[FR Doc. 2010–4707 Filed 3–4–10; 8:45 am]
BILLING CODE P
DEPARTMENT OF ENERGY
[OE Docket No. PP–362]
Application for Presidential Permit;
Champlain Hudson Power Express,
Inc.
AGENCY: Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of application.
SUMMARY: Champlain Hudson Power
Express, Inc. (CHPEI) has applied for a
Presidential permit to construct,
operate, maintain, and connect an
electric transmission line across the
United States border with Canada.
DATES: Comments, protests, or requests
to intervene must be submitted on or
before April 5, 2010.
ADDRESSES: Comments, protests, or
requests to intervene should be
addressed as follows: Dr. Jerry Pell,
Office of Electricity Delivery and Energy
Reliability (OE–20), U.S. Department of
Energy, 1000 Independence Avenue,
SW., Washington, DC 20585.
FOR FURTHER INFORMATION CONTACT: Dr.
Jerry Pell (Program Office) at 202–586–
3362 or via electronic mail at
Jerry.Pell@hq.doe.gov, or Lot H. Cooke
(Attorney-Adviser) at 202–586–0503 or
via electronic mail at
Lot.Cooke@hq.doe.gov.
The
construction, operation, maintenance,
and connection of facilities at the
international border of the United States
for the transmission of electric energy
between the United States and a foreign
country is prohibited in the absence of
a Presidential permit issued pursuant to
Executive Order (EO) 10485, as
amended by EO 12038.
On January 27, 2010, CHPEI filed an
application with the Office of Electricity
Delivery and Energy Reliability of the
Department of Energy (DOE) for a
Presidential permit. CHPEI is a joint
venture of TDI–USA Holdings
erowe on DSK5CLS3C1PROD with NOTICES
SUPPLEMENTARY INFORMATION:
VerDate Nov<24>2008
14:45 Mar 04, 2010
Jkt 220001
Corporation (TUHC), a Delaware
corporation, and National Resources
Energy, LLC (NRE). TUHC, the majority
shareholder in CHPEI, is a wholly
owned subsidiary of Transmission
Developers Inc. (TDI), a Canadian
Corporation. NRE is a wholly owned
subsidiary of National RE/sources
Group, a limited liability corporation
duly organized under the laws of the
State of Connecticut.
CHPEI proposes to construct and
operate a primarily underground and
submarine high-voltage direct current
(HVDC) electric transmission line that
will originate at an HVDC converter
station in Quebec, Canada, and
ultimately terminate in Yonkers, New
York, and Bridgeport, Connecticut.
The proposed CHPEI project (the
‘‘Project’’) would be a 2,000-megawatt
(MW) HVDC Voltage Source Converter
(VSC) controllable transmission system,
comprising two 1,000–MW HVDC
bipoles, each of which would include
two submarine or underground cables
connected as a bipole pair. Each bipole
will at all times utilize its partner in the
bipole pair as a metallic return. The
ground will never be used as a return.
In total, four cables would be laid
between Quebec and the converter
stations in New York City, where two
will be terminated. The remaining two
would continue to Bridgeport,
Connecticut.
From the U.S.-Canada border, the
submarine transmission cables would be
routed through Lake Champlain and
travel south to the northern entrance of
the Champlain Canal, near Whitehall,
New York. To the extent practicable, the
submerged cables would continue
through the Champlain Canal to Fort
Edward, where the canal joins the
Hudson River. CHPEI expects that the
transmission cables would exit the
Champlain Canal near Lock C8, and the
cables would be buried within a railroad
ROW for a distance of approximately
69.9 miles (107.7 km). The cables would
re-enter the Hudson River near the
Town of Coeymans, downstream from
the City of Albany, N.Y. South of
Coeymans, the proposed alignment
follows the Hudson River to the New
York City metropolitan area.
Two cables (one bipole) would
terminate approximately 318.7 miles
(512.9 km) south of the U.S.-Canada
border at an HVDC converter station
near Wells Avenue in Yonkers, New
York. The remaining two cables would
continue along the Hudson River to the
entrance of Spuyten Duyvil Creek, and
then follow a 65.8-mile-long (105.9 km)
route through Spuyten Duyvil Creek, the
Harlem River, and the East River into
Long Island Sound before terminating at
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
10229
a converter station near 1 W Avenue in
Bridgeport, Connecticut.
Submarine or underground
alternating current (AC) cables would
transmit electricity from the converter
stations to existing substations
connected to the electrical grid. From
the Yonkers converter station, 345-kV
AC cables would re-enter the Hudson
River and travel south along the East
River, Spuyten Duyvil Creek, and the
Harlem River for a distance of
approximately 6.7 miles (10.8 km). The
AC cables would terminate at the
existing Consolidated Edison (ConEd)
Sherman Creek/Academy substation,
near the intersection of West 201st
Street and 9th Street, in Manhattan.
From the Bridgeport converter station,
345–kV AC cables would extend for a
distance of approximately 150 feet (45.7
m) to the existing Singer substation,
owned and operated by the United
Illuminating Company.
The applicant represents that the
Project’s precise final route would be
subject to a number of factors, including
resource issues, permitting, land
acquisition, and stakeholder agreement.
The 384.5-mile-long (618.8 km) portion
of the Project located within the United
States would be owned and operated by
the applicant.
Since the restructuring of the electric
industry began, resulting in the
introduction of different types of
competitive entities into the
marketplace, DOE has consistently
expressed its policy that cross-border
trade in electric energy should be
subject to the same principles of
comparable open access and nondiscrimination that apply to
transmission in interstate commerce.
DOE has stated that policy in export
authorizations granted to entities
requesting authority to export over
international transmission facilities.
Specifically, DOE expects transmitting
utilities owning border facilities to
provide access across the border in
accordance with the principles of
comparable open access and nondiscrimination contained in the Federal
Power Act and articulated in Federal
Energy Regulatory Commission (FERC)
Order No. 888 (Promoting Wholesale
Competition Through Open Access
Non-Discriminatory Transmission
Services by Public Utilities; FERC Stats.
& Regs. ¶ 31,036 (1996)), as amended. In
furtherance of this policy, DOE invites
comments on whether it would be
appropriate to condition any
Presidential permit issued in this
proceeding on compliance with these
open access principles.
Procedural Matters: Any person
desiring to become a party to this
E:\FR\FM\05MRN1.SGM
05MRN1
10230
Federal Register / Vol. 75, No. 43 / Friday, March 5, 2010 / Notices
proceeding or to be heard by filing
comments on, or protests to, this
application should file a petition to
intervene, comment, or protest at the
address provided above in accordance
with §§ 385.211 or 385.214 of FERC’s
Rules of Practice and Procedures (18
CFR 385.211, 385.214). Fifteen copies of
each petition and protest should be filed
with DOE on or before the date listed
above.
Additional copies of such petitions to
intervene, comments, or protests should
also be filed directly with Mr. Donald
Jessome, President, Transmission
Developers Inc., Pieter Schuyler
Building, 600 Broadway, Albany, New
York 12207–2283.
Before a Presidential permit may be
issued or amended, DOE must
determine that the proposed action is in
the public interest. In making that
determination, DOE considers the
environmental impacts of the proposed
project pursuant to the National
Environmental Policy Act of 1969,
determines the project’s impact on
electric reliability by ascertaining
whether the proposed project would
adversely affect the operation of the U.S.
electric power supply system under
normal and contingency conditions, and
any other factors that DOE may also
consider relevant to the public interest.
Also, DOE must obtain the concurrences
of the Secretary of State and the
Secretary of Defense before taking final
action on a Presidential permit
application.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program Web site at https://
www.oe.energy.gov/
permits_pending.htm, or by emailing
Odessa Hopkins at
Odessa.hopkins@hq.doe.gov.
Issued in Washington, DC, on February 23,
2010.
Anthony J. Como,
Director, Permitting and Siting, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. 2010–4677 Filed 3–4–10; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
erowe on DSK5CLS3C1PROD with NOTICES
Federal Energy Regulatory
Commission
[Docket No. CP10–65–000]
Mississippi Hub, LLC; Notice of
Amendment Application
February 25, 2010.
On February 8, 2010, Mississippi
Hub, LLC (MS Hub), pursuant to section
VerDate Nov<24>2008
14:45 Mar 04, 2010
Jkt 220001
7(c) of the Natural Gas Act, as amended,
and parts 157 and 284 of the Federal
Energy Regulatory Commission’s
(Commission) regulations, filed to
amend its certificate. The amendment
would expand the gas storage project
certificated in CP09–19–000 on
September 17, 2009, by adding 37,305
horsepower of additional compression
and adding working gas capacity
totaling 15 billion cubic feet (Bcf) in two
new salt dome storage caverns. The
amendment would expand total storage
project working gas capacity to 30 Bcf
and project delivery and injection
capabilities, respectively to 2.8 and 1.5
Bcf per day. MS Hub also requests that
the Commission reaffirm its marketbased rates authority and issue all
required authorizations by June 1, 2010.
Questions regarding this application
should be directed to William Rapp,
Mississippi Hub, LLC, 101 Ash Street,
San Diego, CA 92101, (619) 699–5050.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on March 18, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–4606 Filed 3–4–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12783–003]
Inglis Hydropower, LLC; Notice of
Application Accepted for Filing and
Soliciting Motions To Intervene and
Protests
February 26, 2010.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original Major
License.
b. Project No.: P–12783–003.
c. Date filed: July 22, 2009.
d. Applicant: Inglis Hydropower, LLC.
e. Name of Project: Inglis Hydropower
Project.
f. Location: The proposed project
would be located at the existing Inglis
Bypass Channel and Spillway on the
Withlacoochee River, west of Lake
Rousseau and Inglis dam, within the
town of Inglis, in Levy, Citrus, and
Marion counties, Florida. No federal
lands would be occupied by the
proposed project.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contacts: Mr. Dean
Edwards, P.O. Box 1565, Dover, FL
E:\FR\FM\05MRN1.SGM
05MRN1
Agencies
[Federal Register Volume 75, Number 43 (Friday, March 5, 2010)]
[Notices]
[Pages 10229-10230]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-4677]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[OE Docket No. PP-362]
Application for Presidential Permit; Champlain Hudson Power
Express, Inc.
AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.
ACTION: Notice of application.
-----------------------------------------------------------------------
SUMMARY: Champlain Hudson Power Express, Inc. (CHPEI) has applied for a
Presidential permit to construct, operate, maintain, and connect an
electric transmission line across the United States border with Canada.
DATES: Comments, protests, or requests to intervene must be submitted
on or before April 5, 2010.
ADDRESSES: Comments, protests, or requests to intervene should be
addressed as follows: Dr. Jerry Pell, Office of Electricity Delivery
and Energy Reliability (OE-20), U.S. Department of Energy, 1000
Independence Avenue, SW., Washington, DC 20585.
FOR FURTHER INFORMATION CONTACT: Dr. Jerry Pell (Program Office) at
202-586-3362 or via electronic mail at Jerry.Pell@hq.doe.gov, or Lot H.
Cooke (Attorney-Adviser) at 202-586-0503 or via electronic mail at
Lot.Cooke@hq.doe.gov.
SUPPLEMENTARY INFORMATION: The construction, operation, maintenance,
and connection of facilities at the international border of the United
States for the transmission of electric energy between the United
States and a foreign country is prohibited in the absence of a
Presidential permit issued pursuant to Executive Order (EO) 10485, as
amended by EO 12038.
On January 27, 2010, CHPEI filed an application with the Office of
Electricity Delivery and Energy Reliability of the Department of Energy
(DOE) for a Presidential permit. CHPEI is a joint venture of TDI-USA
Holdings Corporation (TUHC), a Delaware corporation, and National
Resources Energy, LLC (NRE). TUHC, the majority shareholder in CHPEI,
is a wholly owned subsidiary of Transmission Developers Inc. (TDI), a
Canadian Corporation. NRE is a wholly owned subsidiary of National RE/
sources Group, a limited liability corporation duly organized under the
laws of the State of Connecticut.
CHPEI proposes to construct and operate a primarily underground and
submarine high-voltage direct current (HVDC) electric transmission line
that will originate at an HVDC converter station in Quebec, Canada, and
ultimately terminate in Yonkers, New York, and Bridgeport, Connecticut.
The proposed CHPEI project (the ``Project'') would be a 2,000-
megawatt (MW) HVDC Voltage Source Converter (VSC) controllable
transmission system, comprising two 1,000-MW HVDC bipoles, each of
which would include two submarine or underground cables connected as a
bipole pair. Each bipole will at all times utilize its partner in the
bipole pair as a metallic return. The ground will never be used as a
return. In total, four cables would be laid between Quebec and the
converter stations in New York City, where two will be terminated. The
remaining two would continue to Bridgeport, Connecticut.
From the U.S.-Canada border, the submarine transmission cables
would be routed through Lake Champlain and travel south to the northern
entrance of the Champlain Canal, near Whitehall, New York. To the
extent practicable, the submerged cables would continue through the
Champlain Canal to Fort Edward, where the canal joins the Hudson River.
CHPEI expects that the transmission cables would exit the Champlain
Canal near Lock C8, and the cables would be buried within a railroad
ROW for a distance of approximately 69.9 miles (107.7 km). The cables
would re-enter the Hudson River near the Town of Coeymans, downstream
from the City of Albany, N.Y. South of Coeymans, the proposed alignment
follows the Hudson River to the New York City metropolitan area.
Two cables (one bipole) would terminate approximately 318.7 miles
(512.9 km) south of the U.S.-Canada border at an HVDC converter station
near Wells Avenue in Yonkers, New York. The remaining two cables would
continue along the Hudson River to the entrance of Spuyten Duyvil
Creek, and then follow a 65.8-mile-long (105.9 km) route through
Spuyten Duyvil Creek, the Harlem River, and the East River into Long
Island Sound before terminating at a converter station near 1 W Avenue
in Bridgeport, Connecticut.
Submarine or underground alternating current (AC) cables would
transmit electricity from the converter stations to existing
substations connected to the electrical grid. From the Yonkers
converter station, 345-kV AC cables would re-enter the Hudson River and
travel south along the East River, Spuyten Duyvil Creek, and the Harlem
River for a distance of approximately 6.7 miles (10.8 km). The AC
cables would terminate at the existing Consolidated Edison (ConEd)
Sherman Creek/Academy substation, near the intersection of West 201st
Street and 9th Street, in Manhattan.
From the Bridgeport converter station, 345-kV AC cables would
extend for a distance of approximately 150 feet (45.7 m) to the
existing Singer substation, owned and operated by the United
Illuminating Company.
The applicant represents that the Project's precise final route
would be subject to a number of factors, including resource issues,
permitting, land acquisition, and stakeholder agreement. The 384.5-
mile-long (618.8 km) portion of the Project located within the United
States would be owned and operated by the applicant.
Since the restructuring of the electric industry began, resulting
in the introduction of different types of competitive entities into the
marketplace, DOE has consistently expressed its policy that cross-
border trade in electric energy should be subject to the same
principles of comparable open access and non-discrimination that apply
to transmission in interstate commerce. DOE has stated that policy in
export authorizations granted to entities requesting authority to
export over international transmission facilities. Specifically, DOE
expects transmitting utilities owning border facilities to provide
access across the border in accordance with the principles of
comparable open access and non-discrimination contained in the Federal
Power Act and articulated in Federal Energy Regulatory Commission
(FERC) Order No. 888 (Promoting Wholesale Competition Through Open
Access Non-Discriminatory Transmission Services by Public Utilities;
FERC Stats. & Regs. ] 31,036 (1996)), as amended. In furtherance of
this policy, DOE invites comments on whether it would be appropriate to
condition any Presidential permit issued in this proceeding on
compliance with these open access principles.
Procedural Matters: Any person desiring to become a party to this
[[Page 10230]]
proceeding or to be heard by filing comments on, or protests to, this
application should file a petition to intervene, comment, or protest at
the address provided above in accordance with Sec. Sec. 385.211 or
385.214 of FERC's Rules of Practice and Procedures (18 CFR 385.211,
385.214). Fifteen copies of each petition and protest should be filed
with DOE on or before the date listed above.
Additional copies of such petitions to intervene, comments, or
protests should also be filed directly with Mr. Donald Jessome,
President, Transmission Developers Inc., Pieter Schuyler Building, 600
Broadway, Albany, New York 12207-2283.
Before a Presidential permit may be issued or amended, DOE must
determine that the proposed action is in the public interest. In making
that determination, DOE considers the environmental impacts of the
proposed project pursuant to the National Environmental Policy Act of
1969, determines the project's impact on electric reliability by
ascertaining whether the proposed project would adversely affect the
operation of the U.S. electric power supply system under normal and
contingency conditions, and any other factors that DOE may also
consider relevant to the public interest. Also, DOE must obtain the
concurrences of the Secretary of State and the Secretary of Defense
before taking final action on a Presidential permit application.
Copies of this application will be made available, upon request,
for public inspection and copying at the address provided above, by
accessing the program Web site at https://www.oe.energy.gov/permits_pending.htm, or by emailing Odessa Hopkins at
Odessa.hopkins@hq.doe.gov.
Issued in Washington, DC, on February 23, 2010.
Anthony J. Como,
Director, Permitting and Siting, Office of Electricity Delivery and
Energy Reliability.
[FR Doc. 2010-4677 Filed 3-4-10; 8:45 am]