Inglis Hydropower, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests, 10230-10231 [2010-4621]

Download as PDF 10230 Federal Register / Vol. 75, No. 43 / Friday, March 5, 2010 / Notices proceeding or to be heard by filing comments on, or protests to, this application should file a petition to intervene, comment, or protest at the address provided above in accordance with §§ 385.211 or 385.214 of FERC’s Rules of Practice and Procedures (18 CFR 385.211, 385.214). Fifteen copies of each petition and protest should be filed with DOE on or before the date listed above. Additional copies of such petitions to intervene, comments, or protests should also be filed directly with Mr. Donald Jessome, President, Transmission Developers Inc., Pieter Schuyler Building, 600 Broadway, Albany, New York 12207–2283. Before a Presidential permit may be issued or amended, DOE must determine that the proposed action is in the public interest. In making that determination, DOE considers the environmental impacts of the proposed project pursuant to the National Environmental Policy Act of 1969, determines the project’s impact on electric reliability by ascertaining whether the proposed project would adversely affect the operation of the U.S. electric power supply system under normal and contingency conditions, and any other factors that DOE may also consider relevant to the public interest. Also, DOE must obtain the concurrences of the Secretary of State and the Secretary of Defense before taking final action on a Presidential permit application. Copies of this application will be made available, upon request, for public inspection and copying at the address provided above, by accessing the program Web site at https:// www.oe.energy.gov/ permits_pending.htm, or by emailing Odessa Hopkins at Odessa.hopkins@hq.doe.gov. Issued in Washington, DC, on February 23, 2010. Anthony J. Como, Director, Permitting and Siting, Office of Electricity Delivery and Energy Reliability. [FR Doc. 2010–4677 Filed 3–4–10; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY erowe on DSK5CLS3C1PROD with NOTICES Federal Energy Regulatory Commission [Docket No. CP10–65–000] Mississippi Hub, LLC; Notice of Amendment Application February 25, 2010. On February 8, 2010, Mississippi Hub, LLC (MS Hub), pursuant to section VerDate Nov<24>2008 14:45 Mar 04, 2010 Jkt 220001 7(c) of the Natural Gas Act, as amended, and parts 157 and 284 of the Federal Energy Regulatory Commission’s (Commission) regulations, filed to amend its certificate. The amendment would expand the gas storage project certificated in CP09–19–000 on September 17, 2009, by adding 37,305 horsepower of additional compression and adding working gas capacity totaling 15 billion cubic feet (Bcf) in two new salt dome storage caverns. The amendment would expand total storage project working gas capacity to 30 Bcf and project delivery and injection capabilities, respectively to 2.8 and 1.5 Bcf per day. MS Hub also requests that the Commission reaffirm its marketbased rates authority and issue all required authorizations by June 1, 2010. Questions regarding this application should be directed to William Rapp, Mississippi Hub, LLC, 101 Ash Street, San Diego, CA 92101, (619) 699–5050. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on March 18, 2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–4606 Filed 3–4–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12783–003] Inglis Hydropower, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests February 26, 2010. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Original Major License. b. Project No.: P–12783–003. c. Date filed: July 22, 2009. d. Applicant: Inglis Hydropower, LLC. e. Name of Project: Inglis Hydropower Project. f. Location: The proposed project would be located at the existing Inglis Bypass Channel and Spillway on the Withlacoochee River, west of Lake Rousseau and Inglis dam, within the town of Inglis, in Levy, Citrus, and Marion counties, Florida. No federal lands would be occupied by the proposed project. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)–825(r). h. Applicant Contacts: Mr. Dean Edwards, P.O. Box 1565, Dover, FL E:\FR\FM\05MRN1.SGM 05MRN1 erowe on DSK5CLS3C1PROD with NOTICES Federal Register / Vol. 75, No. 43 / Friday, March 5, 2010 / Notices 33527; Mr. Kevin Edwards, P.O. Box 143, Mayodan, NC 27027. i. FERC Contact: Jennifer Adams at (202) 502–8087, or jennifer.adams@ferc.gov. j. Deadline for filing motions to intervene and protests: 60 days from the issuance date of this notice, or April 27, 2010. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov/docs-filing/ ferconline.asp) under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice and Procedure require all interveners filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted for filing, but is not ready for environmental analysis at this time. l. The proposed 2.0-megawatt Inglis Hydropower Project would operate in a run-of-river mode by using flows released to maintain the surface elevation of Lake Rousseau at 27.5 feet mean sea level. Flow releases would be determined by the Southwest Florida Water Management District. The proposed powerhouse would be 60 feet long by 80 feet wide by 30 feet high, and contain three vertical shaft turbines. The penstock would be 130 feet in length. The project would generate about 12,300,000 kilowatt hours annually, which would be fed into the interconnected transmission system via an existing 3.4-mile-long, 12,470kilovolt transmission line. m. A copy of the application is available for review at the Commission in the Public Reference Room, or may be viewed on the Commission’s Web site at https://www.ferc.gov, using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits VerDate Nov<24>2008 14:45 Mar 04, 2010 Jkt 220001 in the docket number field, to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified intervention deadline date, a competing development application no later than 120 days after the specified intervention deadline date. Applications for preliminary permits will not be accepted in response to this notice. A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a development application. A notice of intent must be served on the applicant(s) names in this public notice. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on, or before, the specified deadline date for the particular application. When the application is ready for environmental analysis, the Commission will issue a public notice requesting comments, recommendations, terms and conditions, or prescriptions. All filings must: (1) Bear in all capital letters the title ‘‘PROTEST’’ or ‘‘MOTION TO INTERVENE;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 10231 the applicant specified in the particular application. Kimberly D. Bose, Secretary. [FR Doc. 2010–4621 Filed 3–4–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13658–000] City of Pittsfield, MA; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions February 26, 2010. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Conduit Exemption. b. Project No.: 13658–000. c. Date filed: January 27, 2010. d. Applicant: City of Pittsfield, Massachusetts. e. Name of Project: Coltsville Flow Control Station Project. f. Location: The proposed Coltsville Flow Control Station Project would be located on a flow control pipeline in the City of Pittsfield’s water distribution system located in Berkshire County, Massachusetts. The land on which all the project structures are located is owned by the applicant. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a–825r. h. Applicant Contact: Mr. Bruce Collingwood, P.E., Commissioner, Department of Public Works & Utilities, 70 Allen Street, Room 200, Pittsfield, Massachusetts 01201; telephone (413) 499–9330. i. FERC Contact: Linda Stewart, telephone (202) 502–6680, and e-mail address linda.stewart@ferc.gov. j. Status of Environmental Analysis: This application is ready for environmental analysis at this time, and the Commission is requesting comments, reply comments, recommendations, terms and conditions, and prescriptions. k. Deadline for filing responsive documents: Due to the small size and location of the proposed project in a closed system, as well as the resource agency consultation letters filed with the application, the 60-day timeframe specified in 18 CFR 4.43(b) for filing all comments, motions to intervene, E:\FR\FM\05MRN1.SGM 05MRN1

Agencies

[Federal Register Volume 75, Number 43 (Friday, March 5, 2010)]
[Notices]
[Pages 10230-10231]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-4621]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12783-003]


Inglis Hydropower, LLC; Notice of Application Accepted for Filing 
and Soliciting Motions To Intervene and Protests

February 26, 2010.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Original Major License.
    b. Project No.: P-12783-003.
    c. Date filed: July 22, 2009.
    d. Applicant: Inglis Hydropower, LLC.
    e. Name of Project: Inglis Hydropower Project.
    f. Location: The proposed project would be located at the existing 
Inglis Bypass Channel and Spillway on the Withlacoochee River, west of 
Lake Rousseau and Inglis dam, within the town of Inglis, in Levy, 
Citrus, and Marion counties, Florida. No federal lands would be 
occupied by the proposed project.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contacts: Mr. Dean Edwards, P.O. Box 1565, Dover, FL

[[Page 10231]]

33527; Mr. Kevin Edwards, P.O. Box 143, Mayodan, NC 27027.
    i. FERC Contact: Jennifer Adams at (202) 502-8087, or 
jennifer.adams@ferc.gov.
    j. Deadline for filing motions to intervene and protests: 60 days 
from the issuance date of this notice, or April 27, 2010.
    All documents may be filed electronically via the Internet. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (https://www.ferc.gov/docs-filing/ferconline.asp) under the 
``eFiling'' link. For a simpler method of submitting text only 
comments, click on ``Quick Comment.'' For assistance, please contact 
FERC Online Support at FERCOnlineSupport@ferc.gov; call toll-free at 
(866) 208-3676; or, for TTY, contact (202) 502-8659. Although the 
Commission strongly encourages electronic filing, documents may also be 
paper-filed. To paper-file, mail an original and eight copies to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426.
    The Commission's Rules of Practice and Procedure require all 
interveners filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    k. This application has been accepted for filing, but is not ready 
for environmental analysis at this time.
    l. The proposed 2.0-megawatt Inglis Hydropower Project would 
operate in a run-of-river mode by using flows released to maintain the 
surface elevation of Lake Rousseau at 27.5 feet mean sea level. Flow 
releases would be determined by the Southwest Florida Water Management 
District. The proposed powerhouse would be 60 feet long by 80 feet wide 
by 30 feet high, and contain three vertical shaft turbines. The 
penstock would be 130 feet in length. The project would generate about 
12,300,000 kilowatt hours annually, which would be fed into the 
interconnected transmission system via an existing 3.4-mile-long, 
12,470-kilovolt transmission line.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room, or may be viewed on the 
Commission's Web site at https://www.ferc.gov, using the ``eLibrary'' 
link. Enter the docket number, excluding the last three digits in the 
docket number field, to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.
    n. Any qualified applicant desiring to file a competing application 
must submit to the Commission, on or before the specified intervention 
deadline date, a competing development application no later than 120 
days after the specified intervention deadline date. Applications for 
preliminary permits will not be accepted in response to this notice.
    A notice of intent must specify the exact name, business address, 
and telephone number of the prospective applicant, and must include an 
unequivocal statement of intent to submit a development application. A 
notice of intent must be served on the applicant(s) names in this 
public notice.
    Anyone may submit a protest or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210, 385.211, and 385.214. In determining the appropriate action to 
take, the Commission will consider all protests filed, but only those 
who file a motion to intervene in accordance with the Commission's 
Rules may become a party to the proceeding. Any protests or motions to 
intervene must be received on, or before, the specified deadline date 
for the particular application.
    When the application is ready for environmental analysis, the 
Commission will issue a public notice requesting comments, 
recommendations, terms and conditions, or prescriptions.
    All filings must: (1) Bear in all capital letters the title 
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading 
the name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-4621 Filed 3-4-10; 8:45 am]
BILLING CODE 6717-01-P