Environmental Impacts Statements; Notice of Availability, 8936-8937 [2010-4010]
Download as PDF
sroberts on DSKD5P82C1PROD with NOTICES
8936
Federal Register / Vol. 75, No. 38 / Friday, February 26, 2010 / Notices
work with impacted residents, and to
consider ways to better inform the
public of training schedules. Rating
EC2.
EIS No. 20090363, ERP No. D–SFW–
G99004–TX, Hays County Regional
Habitat Conservation Plan,
Application for an Incidental Take
Permit, Hays County, TX.
Summary: EPA does not object to the
proposed action. Rating LO.
EIS No. 20090384, ERP No. D–NOA–
K39124–CA, Fruit Growers Supply
Company’s Multi-Species Habitat
Conservation Plan, Implementation,
Authorization for Incidental Take
Permit, Siskiyou County, CA.
Summary: EPA expressed
environmental concern about water
resource impacts, air quality impacts,
the timing of road decommissioning and
maintenance, and local requirements for
timber harvest. Rating EC2.
EIS No. 20090402, ERP No. D–NRC–
F06027–MN, Generic—License
Renewal of Nuclear Plants for the
Prairie Island Nuclear Generating
Plant, Units 1 and 2, Supplement 39,
NUREG–1437, Implementation, City
of Red Wing, Dakota County, MN.
Summary: EPA expressed
environmental concern about radiation,
emergency access, wetlands,
floodplains, environmental justice, and
noise. Rating EC2.
EIS No. 20090419, ERP No. D–COE–
F01003–MN, U.S. Steel Keetac
Taconite Mine Expansion Project,
Propose to Restart an Idled
Production Line and Expand
Contiguous Sections of the Open Pit
Iron Ore Mine, located near Keewatin,
Itasca and St. Louis Counties, MN.
Summary: EPA expressed
environmental objections because of
wetland impacts and insufficient
avoidance, minimization/mitigation
measures. EPA also offered comments
on water quality and air quality impacts.
Rating EO2.
EIS No. 20090426, ERP No. D–FRA–
D53011–VA, Richmond and the
Hampton Roads Passenger Rail
Project, Proposed Higher Speed
Intercity Passenger Rail, VA.
Summary: EPA expressed
environmental concerns about air and
water impacts. Rating EC2.
EIS No. 20090442, ERP No. D–COE–
G39053–00, Sabine-Neches Waterway
Channel Improvement Project,
Proposed Ocean Dredged Material
Disposal Site Designation, Southeast
Texas and Southwest Louisiana.
Summary: EPA does not object to the
proposed action. Rating LO.
VerDate Nov<24>2008
16:39 Feb 25, 2010
Jkt 220001
Final EISs
EIS No. 20090016, ERP No. F–FAA–
B40165–MA, New Bedford Regional
Airport Improvements Project, To
Enhance Aviation Capacity, Air
Traffic, Jet Traffic, Air Cargo and
General Aviation Traffic,
Southeastern Massachusetts Region,
City of New Bedford, Bristol County,
MA.
Summary: EPA does not object the
proposed project.
EIS No. 20090197, ERP No. F–WAP–
J08026–00, Big Stone II Power Plant
and Transmission Project, Addresses
the Impacts of Changes to the
Proposed Action relative to Cooling
Alternatives and the Use of
Groundwater as Backup Water
Source, US Army COE Section 10 and
404 Permits, Grant County, SD and
Big Stone County, MN.
Summary: EPA continues to have
environmental concerns about CO2
emissions.
EIS No. 20090398, ERP No. F–BPA–
L91029–WA, Chief Joseph Hatchery
Program, Construction, Operation and
Maintenance of a Chinook Salmon
Hatchery Production Program,
Confederated Tribes of the Colville
Reservation (Colville Tribes),
Okanogan River and Columbia River,
Okanogan County, WA.
Summary: EPA continues to have
environmental concerns about water
quality impacts. EPA recommended
including mitigation and terms and
conditions in the ROD to protect water
quality.
EIS No. 20090415, ERP No. F–FHW–
F59004–MI, Detroit Intermodal
Freight Terminal (DIFT) Project,
Proposes Improvement to Intermodal
Freight Terminals in Wayne and
Oakland Counties, MI.
Summary: EPA reiterated its position
about the need for a hot spot analysis for
fine particulate matter. EPA also
recommended the Record of Decision
commit to additional construction and
terminal operation mitigation measures.
EIS No. 20090428, ERP No. F–NOA–
L91033–AK, Bering Sea Chinook
Salmon Bycatch Management,
Establish New Measures to Minimize
Chinook Salmon Bycatch, To Amend
the Fishery Management Plan,
Implementation, Bering Sea Pollock
Fishery, AK.
Summary: EPA’s primary concerns
were addressed; therefore, EPA does not
object to the proposed amendment.
EIS No. 20090430, ERP No. F–AFS–
L65550–00, Selway-Bitterroot
Wilderness Plants Management
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
Project, To Prevent the Establishment
of New Invaders and Reduce the
Impacts of Established Invasive Plants
on Native Plant Community Stability,
Sustainability and Diversity, Nez
Perce, Clearwater, Lolo, and Bitterroot
National Forests, ID and MT.
Summary: EPA does not object to the
proposed project.
EIS No. 20090443, ERP No. F–FHW–
D80032–DC, ADOPTION—
Department of Homeland Security
Headquarters at the St. Elizabeth’s
West Campus, To Consolidate Federal
Office Space on a Secure Site,
Washington, DC.
Summary: EPA continues to have
environmental concerns about the East
Campus resource impacts.
EIS No. 20090448, ERP No. F–FHW–
L40228–WA, South Park Bridge
Project, Proposes to Rehabilitate or
Replace the Historic South Park
Bridge over the Duwamish Waterway
at 14th/16 Avenue S, US Coast Guard
Permit and U.S. Army COE Section 10
and 404 Permits, King County, WA.
Summary: EPA continues to have
environmental concerns about
contaminated sediment impacts.
EIS No. 20100002, ERP No. F–AFS–
K65380–NV, Middle Kyle Canyon
Complex Project, Construction and
Operation of a Recreation Complex
within the Spring Mountains National
Recreation Area, Humboldt-Toiyabe
National Forest, Clark County, NV.
Summary: While EPA’s previous
issues have been resolved, EPA did
request that mitigation plans developed
for ‘‘biodiversity hotspots’’ are closely
monitored and enforced.
Dated: February 23, 2010.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2010–4021 Filed 2–25–10; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8988–3]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements.
Filed 02/15/2010 through 02/19/2010.
Pursuant to 40 CFR 1506.9.
E:\FR\FM\26FEN1.SGM
26FEN1
sroberts on DSKD5P82C1PROD with NOTICES
Federal Register / Vol. 75, No. 38 / Friday, February 26, 2010 / Notices
Notice
In accordance with Section 309(a) of
the Clean Air Act, EPA is required to
make its comments on EISs issued by
other Federal agencies public.
Historically, EPA has met this mandate
by publishing weekly notices of
availability of EPA comments, which
includes a brief summary of EPA’s
comment letters, in the Federal
Register. Since February 2008, EPA has
been including its comment letters on
EISs on its Web site at: https://
www.epa.gov/compliance/nepa/
eisdata.html. Including the entire EIS
comment letters on the Web site
satisfies the Section 309(a) requirement
to make EPA’s comments on EISs
available to the public. Accordingly,
after March 31, 2010, EPA will
discontinue the publication of this
notice of availability of EPA comments
in the Federal Register.
EIS No. 20100045, Draft Supplement,
BIA, CA, Campo Regional Landfill
Project, Construction and Operation,
Permit Lease and Sublease Use of
Reservation Land, Campo Indian
Reservation, San Diego County, CA,
Comment Period Ends: 04/28/2010,
Contact: John Rydzik 916–978–6051.
EIS No. 20100046, Second Final EIS
(Tiering), USFS, ID, South Fork
Salmon River Subbasin Noxious and
Invasive Weed Management Program,
Implementation, Krassel and McCall
Ranger Districts, Payette National
Forest and Cascade Ranger District,
Valley and Idaho Counties, ID, Wait
Period Ends: 03/29/2010, Contact:
Cyd Weiland 208–373–4135.
EIS No. 20100047, Draft EIS, USFWS,
00, Lewis and Clark National Wildlife
Refuge and Julia Butler Hansen
Refuge for the Columbian Whitetailed Deer, Comprehensive
Conservation Plan, Implementation,
Wahkiakum County, WA and Clatsop
and Columbia Counties, OR,
Comment Period Ends: 04/12/2010,
Contact: Charlie Stenvall 360–484–
3482.
EIS No. 20100048, Final Supplement,
FHWA, HI, Saddle Road (HI–200)
Improvements Project. Proposed
Improvement from Mamalahoa
Highway (HI–190) to Milepost 41,
Hawaii County, HI, Wait Period Ends:
03/29/2010, Contact: Melissa Dickard
720–963–3691.
EIS No. 20100049, Final EIS, IBWC, TX,
Presidio Flood Control Project, Flood
Control Improvements and Partial
Levee Relocation, Presidio, TX, Wait
Period Ends: 03/29/2010, Contact:
Daniel Borunda 915–832–4767.
EIS No. 20100050, Draft EIS, BLM, CA,
Stirling Energy Systems (SES) Solar 2
VerDate Nov<24>2008
16:39 Feb 25, 2010
Jkt 220001
Project, Construct and Operate,
Electric-Generating Facility, Imperial
Valley, Imperial County, CA,
Comment Period Ends: 04/12/2010,
Contact: Erin Dreyfuss 916–978–4642.
EIS No. 20100051, Draft EIS, USAF, UT,
South Unit Oil and Gas Development
Project, Master Development Plan,
Implementation, Duchesne/Roosevelt
Ranger District, Ashley National
Forest, Duchesne County, UT,
Comment Period Ends: 04/12/2010,
Contact: David Herron 435–781–5218.
EIS No. 20100052, Draft Supplement,
USFS, CA, Tahoe National Forest
Motorized Travel Management,
Implementation, Corrections to the
National Forest Transportation
System Data, Sierra Nevada
Mountains, Nevada, Placer, Plumas,
Sierra and Yuba Counties, CA,
Comment Period Ends: 04/12/2010,
Contact: David Arrasmith 530–478–
6220.
EIS No. 20100053, Draft EIS, NRC, NE,
Generic—License Renewal of Nuclear
Plants, Regarding Cooper Nuclear
Station, Unit 1, Supplement 41 to
NUREG–1437, Nemaha County, NE,
Comment Period Ends: 05/05/2010,
Contact: Bennett Brady 301–415–
2981.
EIS No. 20100054, Draft EIS, NOAA,
VA, Wallops Flight Facility, Shoreline
Restoration and Infrastructure
Protection Program, Implementation,
Wallops Island, VA, Comment Period
Ends: 04/12/2010, Contact: Joshua A.
Bundick 757–824–2319.
EIS No. 20100055, Final EIS, NPS, CA,
Yosemite National Park Project,
Construction of Yosemite Institute
Environment Education Campus,
Implementation, Mariposa County,
CA, Wait Period Ends: 03/29/2010,
Contact: Ann Roberts 209–379–1383.
EIS No. 20100056, Draft EIS, USFS, MT,
Sparring Bulls Project, Proposes
Timber Harvest, Non-commercial
Fuels Reduction, Prescribed Burning,
and Watershed Improvement
Activities, Three Rivers Ranger
District, Kootenal National Forest,
Lincoln County, MT, Comment Period
Ends: 04/12/2010, Contact: Timory
Peel 406–295–4893.
Amended Notices
EIS No. 20090421, Draft EIS, NRC, WY,
Moore Ranch In-Situ Uranium
Recovery (ISR) Project, Proposal to
Construct, Operate, Conduct Aquifer
Restoration, and Decommission an InSitu Recovery (ISR) Facility, NUREG–
1910, Campbell County, WY,
Comment Period Ends: 03/03/2010,
Contact: Behram Shroff 301–415–
0666. Revision to FR Notice Published
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
8937
12/11/2009: Extending Comment from
02/01/2010 to 03/03/2010.
EIS No. 20090423, Draft EIS, NRC, WY,
Nichols Ranch In-Situ Uranium
Recovery (ISR) Project, Proposal to
Construct, Operate, Conduct Aquifer
Restoration, and Decommission and
In-Situ Recovery Uranium Milling
Facility, Campbell and Johnson
Counties, WY, Comment Period Ends:
03/03/2010, Contact: Irene Yu 301–
415–1951. Revision to FR Notice
Published 12/11/2009: Extending
Comment Period from 02/01/2010 to
03/03/2010.
EIS No. 20090425, Draft EIS, NRC, WY,
Lost Creek In-Situ Uranium Recovery
(ISR) Project, Proposal to Construct,
Operate, Conduit Aquifer Restoration,
and Decommission an In-Situ
Recovery (ISR) Uranium Milling
Facility, Sweetwater County, WY,
Comment Period Ends: 03/03/2010,
Contact: Alan B. Bjornsen 301–415–
1195. Revision to FR Published 12/11/
2009: Extending Comment Period
from 02/01/2010 to 03/03/2010.
Dated: February 23, 2010.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2010–4010 Filed 2–25–10; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9119–4; Docket ID No. EPA–HQ–ORD–
2010–0047]
Development of a Relative Potency
Factor (RPF) Approach for Polycyclic
Aromatic Hydrocarbon (PAH) Mixtures
AGENCY: Environmental Protection
Agency (EPA).
ACTION: Notice of public comment
period and listening session.
SUMMARY: EPA is announcing a 60-day
public comment period and a public
listening session for the external review
draft document titled, ‘‘Development of
a Relative Potency Factor (RPF)
Approach for Polycyclic Aromatic
Hydrocarbon (PAH) Mixtures’’ (EPA/
635/R–08/012A). The draft document
was prepared by the National Center for
Environmental Assessment (NCEA)
within the EPA’s Office of Research and
Development (ORD). The public
comment period and the EPA Science
Advisory Board (SAB) peer review
meeting, which will be scheduled at a
later date and announced in the Federal
Register, are separate processes that
provide opportunities for all interested
parties to comment on the document.
E:\FR\FM\26FEN1.SGM
26FEN1
Agencies
[Federal Register Volume 75, Number 38 (Friday, February 26, 2010)]
[Notices]
[Pages 8936-8937]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-4010]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8988-3]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements.
Filed 02/15/2010 through 02/19/2010.
Pursuant to 40 CFR 1506.9.
[[Page 8937]]
Notice
In accordance with Section 309(a) of the Clean Air Act, EPA is
required to make its comments on EISs issued by other Federal agencies
public. Historically, EPA has met this mandate by publishing weekly
notices of availability of EPA comments, which includes a brief summary
of EPA's comment letters, in the Federal Register. Since February 2008,
EPA has been including its comment letters on EISs on its Web site at:
https://www.epa.gov/compliance/nepa/eisdata.html. Including the entire
EIS comment letters on the Web site satisfies the Section 309(a)
requirement to make EPA's comments on EISs available to the public.
Accordingly, after March 31, 2010, EPA will discontinue the publication
of this notice of availability of EPA comments in the Federal Register.
EIS No. 20100045, Draft Supplement, BIA, CA, Campo Regional Landfill
Project, Construction and Operation, Permit Lease and Sublease Use of
Reservation Land, Campo Indian Reservation, San Diego County, CA,
Comment Period Ends: 04/28/2010, Contact: John Rydzik 916-978-6051.
EIS No. 20100046, Second Final EIS (Tiering), USFS, ID, South Fork
Salmon River Subbasin Noxious and Invasive Weed Management Program,
Implementation, Krassel and McCall Ranger Districts, Payette National
Forest and Cascade Ranger District, Valley and Idaho Counties, ID, Wait
Period Ends: 03/29/2010, Contact: Cyd Weiland 208-373-4135.
EIS No. 20100047, Draft EIS, USFWS, 00, Lewis and Clark National
Wildlife Refuge and Julia Butler Hansen Refuge for the Columbian White-
tailed Deer, Comprehensive Conservation Plan, Implementation, Wahkiakum
County, WA and Clatsop and Columbia Counties, OR, Comment Period Ends:
04/12/2010, Contact: Charlie Stenvall 360-484-3482.
EIS No. 20100048, Final Supplement, FHWA, HI, Saddle Road (HI-200)
Improvements Project. Proposed Improvement from Mamalahoa Highway (HI-
190) to Milepost 41, Hawaii County, HI, Wait Period Ends: 03/29/2010,
Contact: Melissa Dickard 720-963-3691.
EIS No. 20100049, Final EIS, IBWC, TX, Presidio Flood Control Project,
Flood Control Improvements and Partial Levee Relocation, Presidio, TX,
Wait Period Ends: 03/29/2010, Contact: Daniel Borunda 915-832-4767.
EIS No. 20100050, Draft EIS, BLM, CA, Stirling Energy Systems (SES)
Solar 2 Project, Construct and Operate, Electric-Generating Facility,
Imperial Valley, Imperial County, CA, Comment Period Ends: 04/12/2010,
Contact: Erin Dreyfuss 916-978-4642.
EIS No. 20100051, Draft EIS, USAF, UT, South Unit Oil and Gas
Development Project, Master Development Plan, Implementation, Duchesne/
Roosevelt Ranger District, Ashley National Forest, Duchesne County, UT,
Comment Period Ends: 04/12/2010, Contact: David Herron 435-781-5218.
EIS No. 20100052, Draft Supplement, USFS, CA, Tahoe National Forest
Motorized Travel Management, Implementation, Corrections to the
National Forest Transportation System Data, Sierra Nevada Mountains,
Nevada, Placer, Plumas, Sierra and Yuba Counties, CA, Comment Period
Ends: 04/12/2010, Contact: David Arrasmith 530-478-6220.
EIS No. 20100053, Draft EIS, NRC, NE, Generic--License Renewal of
Nuclear Plants, Regarding Cooper Nuclear Station, Unit 1, Supplement 41
to NUREG-1437, Nemaha County, NE, Comment Period Ends: 05/05/2010,
Contact: Bennett Brady 301-415-2981.
EIS No. 20100054, Draft EIS, NOAA, VA, Wallops Flight Facility,
Shoreline Restoration and Infrastructure Protection Program,
Implementation, Wallops Island, VA, Comment Period Ends: 04/12/2010,
Contact: Joshua A. Bundick 757-824-2319.
EIS No. 20100055, Final EIS, NPS, CA, Yosemite National Park Project,
Construction of Yosemite Institute Environment Education Campus,
Implementation, Mariposa County, CA, Wait Period Ends: 03/29/2010,
Contact: Ann Roberts 209-379-1383.
EIS No. 20100056, Draft EIS, USFS, MT, Sparring Bulls Project, Proposes
Timber Harvest, Non-commercial Fuels Reduction, Prescribed Burning, and
Watershed Improvement Activities, Three Rivers Ranger District,
Kootenal National Forest, Lincoln County, MT, Comment Period Ends: 04/
12/2010, Contact: Timory Peel 406-295-4893.
Amended Notices
EIS No. 20090421, Draft EIS, NRC, WY, Moore Ranch In-Situ Uranium
Recovery (ISR) Project, Proposal to Construct, Operate, Conduct Aquifer
Restoration, and Decommission an In-Situ Recovery (ISR) Facility,
NUREG-1910, Campbell County, WY, Comment Period Ends: 03/03/2010,
Contact: Behram Shroff 301-415-0666. Revision to FR Notice Published
12/11/2009: Extending Comment from 02/01/2010 to 03/03/2010.
EIS No. 20090423, Draft EIS, NRC, WY, Nichols Ranch In-Situ Uranium
Recovery (ISR) Project, Proposal to Construct, Operate, Conduct Aquifer
Restoration, and Decommission and In-Situ Recovery Uranium Milling
Facility, Campbell and Johnson Counties, WY, Comment Period Ends: 03/
03/2010, Contact: Irene Yu 301-415-1951. Revision to FR Notice
Published 12/11/2009: Extending Comment Period from 02/01/2010 to 03/
03/2010.
EIS No. 20090425, Draft EIS, NRC, WY, Lost Creek In-Situ Uranium
Recovery (ISR) Project, Proposal to Construct, Operate, Conduit Aquifer
Restoration, and Decommission an In-Situ Recovery (ISR) Uranium Milling
Facility, Sweetwater County, WY, Comment Period Ends: 03/03/2010,
Contact: Alan B. Bjornsen 301-415-1195. Revision to FR Published 12/11/
2009: Extending Comment Period from 02/01/2010 to 03/03/2010.
Dated: February 23, 2010.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2010-4010 Filed 2-25-10; 8:45 am]
BILLING CODE 6560-50-P