Renewal of Approved Information Collection, 8986 [2010-3937]
Download as PDF
8986
Federal Register / Vol. 75, No. 38 / Friday, February 26, 2010 / Notices
call the toll-free Title V information line
at 800–927–7588.
SUPPLEMENTARY INFORMATION: In
accordance with the December 12, 1988
court order in National Coalition for the
Homeless v. Veterans Administration,
No. 88–2503–OG (D.D.C.), HUD
publishes a Notice, on a weekly basis,
identifying unutilized, underutilized,
excess and surplus Federal buildings
and real property that HUD has
reviewed for suitability for use to assist
the homeless. Today’s Notice is for the
purpose of announcing that no
additional properties have been
determined suitable or unsuitable this
week.
Dated: February 18, 2010.
Mark R. Johnston,
Deputy Assistant Secretary for Special Needs.
[FR Doc. 2010–3606 Filed 2–25–10; 8:45 am]
BILLING CODE 4210–67–P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[LLWO3200000–L19900000.PP0000; OMB
Control Number 1004–0114]
Renewal of Approved Information
Collection
AGENCY: Bureau of Land Management,
Interior.
ACTION: 30-day Notice and request for
comments.
The Bureau of Land
Management (BLM) has submitted an
information collection request to the
Office of Management and Budget
(OMB) for a 3-year renewal of OMB
Control Number 1004–0114 under the
Paperwork Reduction Act. This control
number covers paperwork requirements
in 43 CFR parts 3832 through 3838,
which pertain to mining claims, mill
sites, and tunnel sites.
DATES: The OMB is required to respond
to this information collection request
within 60 days but may respond after 30
days. Therefore, written comments
should be received on or before March
29, 2010.
ADDRESSES: You may submit comments
directly to the Desk Officer for the
Department of the Interior (OMB #1004–
0114), Office of Management and
Budget, Office of Information and
Regulatory Affairs, fax 202–395–5806,
or by electronic mail at
oira_docket@omb.eop.gov. Please mail a
copy of your comments to: Bureau
Information Collection Clearance Officer
(WO–630), Department of the Interior,
1849 C Street, NW., Mail Stop 401 LS,
Washington, DC 20240. You may also
sroberts on DSKD5P82C1PROD with NOTICES
SUMMARY:
VerDate Nov<24>2008
16:39 Feb 25, 2010
Jkt 220001
send a copy of your comments by
electronic mail to
jean_sonneman@blm.gov.
FOR FURTHER INFORMATION CONTACT: You
may contact Sonia Santillan, Mineral
Leasing Specialist, Bureau of Land
Management, Division of Solid
Minerals, (202) 452–0398 (Commercial
or FTS). Persons who use a
telecommunication device for the deaf
(TDD) may call the Federal Information
Relay Service (FIRS) on 1–800–877–
8330, to contact Ms. Santillan.
SUPPLEMENTARY INFORMATION:
Title: Recordation of Location Notices
and Mining Claims; Payment of Fees (43
CFR parts 3832–3838).
OMB Control Number: 1004–0114.
Abstract: This notice pertains to
information collections that are
necessary for the recordation of mining
claims, mill sites, and tunnel sites; the
annual maintenance of such claims and
sites; location and maintenance fee
waivers; and the adjudication of mineral
rights. The information collections
covered by this notice are found at 43
CFR parts 3832 through 3838, and in the
following forms:
• Form 3830–2, Maintenance Fee
Waiver Certification; and
• Form 3830–3, Notice of Intent to
Locate a Lode or Placer Mining Claim(s)
and/or a Tunnel Site(s) on Lands
Patented under the Stock Raising
Homestead Act of 1916, as Amended by
the Act of April 16, 1993.
60-Day Notice: As required in 5 CFR
1320.8(d), the BLM published a 60-day
notice in the Federal Register on July
31, 2009 (74 FR 38215), soliciting
comments from the public and other
interested parties. The comment period
closed on September 29, 2009. The BLM
did not receive any comments from the
public in response to this notice or
unsolicited comments from respondents
covered under these regulations.
Type of Review: Revision of a
currently approved information
collection.
Affected Public: Individuals,
associations, and corporations seeking
to obtain or maintain interests under the
General Mining Law and other mining
statutes.
Obligation To Respond: Required to
obtain or retain benefits.
Annual Responses: 197,154.
Completion Time per Response:
Varies from 20 to 30 minutes.
Annual Burden Hours: 97,658.
Annual Non-hour Burden Cost:
$1,629,025 for document processing fees
associated with some of these
information collection requirements.
The BLM requests comments on the
following subjects:
PO 00000
Frm 00092
Fmt 4703
Sfmt 4703
1. Whether the collection of
information is necessary for the proper
functioning of the BLM, including
whether the information will have
practical utility;
2. The accuracy of the BLM’s estimate
of the burden of collecting the
information, including the validity of
the methodology and assumptions used;
3. The quality, utility and clarity of
the information to be collected; and
4. How to minimize the information
collection burden on those who are to
respond, including the use of
appropriate automated, electronic,
mechanical, or other forms of
information technology.
Please send comments to the
addresses listed under ADDRESSES.
Please refer to OMB control number
1004–0114 in your correspondence.
Before including your address, phone
number, e-mail address, or other
personal identifying information in your
comment, you should be aware that
your entire comment—including your
personal identifying information—may
be made publicly available at any time.
While you can ask us in your comment
to withhold your personal identifying
information from public review, we
cannot guarantee that we will be able to
do so.
Jean Sonneman,
Acting Information Collection Clearance
Officer.
[FR Doc. 2010–3937 Filed 2–25–10; 8:45 am]
BILLING CODE 4310–84–P
DEPARTMENT OF THE INTERIOR
Bureau of Indian Affairs
Draft Supplemental Environmental
Impact Statement for the Proposed
Campo Regional Landfill Project on the
Campo Indian Reservation, San Diego
County, CA
AGENCY: Bureau of Indian Affairs,
Interior.
ACTION: Notice of Availability.
SUMMARY: This notice announces the
availability for public comment of a
Draft Supplemental Environmental
Impact Statement (DSEIS) for an
amended lease and sublease for the
proposed Campo Regional Landfill
Project (proposed action) on the Campo
Indian Reservation in San Diego County,
California. A Final Environmental
Impact Statement (FEIS) for the
proposed action was issued in
November 1992 and a Record of
Decision (ROD) was executed in April
1993. This notice also announces the
dates, times and locations of the public
E:\FR\FM\26FEN1.SGM
26FEN1
Agencies
[Federal Register Volume 75, Number 38 (Friday, February 26, 2010)]
[Notices]
[Page 8986]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-3937]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[LLWO3200000-L19900000.PP0000; OMB Control Number 1004-0114]
Renewal of Approved Information Collection
AGENCY: Bureau of Land Management, Interior.
ACTION: 30-day Notice and request for comments.
-----------------------------------------------------------------------
SUMMARY: The Bureau of Land Management (BLM) has submitted an
information collection request to the Office of Management and Budget
(OMB) for a 3-year renewal of OMB Control Number 1004-0114 under the
Paperwork Reduction Act. This control number covers paperwork
requirements in 43 CFR parts 3832 through 3838, which pertain to mining
claims, mill sites, and tunnel sites.
DATES: The OMB is required to respond to this information collection
request within 60 days but may respond after 30 days. Therefore,
written comments should be received on or before March 29, 2010.
ADDRESSES: You may submit comments directly to the Desk Officer for the
Department of the Interior (OMB 1004-0114), Office of
Management and Budget, Office of Information and Regulatory Affairs,
fax 202-395-5806, or by electronic mail at oira_docket@omb.eop.gov.
Please mail a copy of your comments to: Bureau Information Collection
Clearance Officer (WO-630), Department of the Interior, 1849 C Street,
NW., Mail Stop 401 LS, Washington, DC 20240. You may also send a copy
of your comments by electronic mail to jean_sonneman@blm.gov.
FOR FURTHER INFORMATION CONTACT: You may contact Sonia Santillan,
Mineral Leasing Specialist, Bureau of Land Management, Division of
Solid Minerals, (202) 452-0398 (Commercial or FTS). Persons who use a
telecommunication device for the deaf (TDD) may call the Federal
Information Relay Service (FIRS) on 1-800-877-8330, to contact Ms.
Santillan.
SUPPLEMENTARY INFORMATION:
Title: Recordation of Location Notices and Mining Claims; Payment
of Fees (43 CFR parts 3832-3838).
OMB Control Number: 1004-0114.
Abstract: This notice pertains to information collections that are
necessary for the recordation of mining claims, mill sites, and tunnel
sites; the annual maintenance of such claims and sites; location and
maintenance fee waivers; and the adjudication of mineral rights. The
information collections covered by this notice are found at 43 CFR
parts 3832 through 3838, and in the following forms:
Form 3830-2, Maintenance Fee Waiver Certification; and
Form 3830-3, Notice of Intent to Locate a Lode or Placer
Mining Claim(s) and/or a Tunnel Site(s) on Lands Patented under the
Stock Raising Homestead Act of 1916, as Amended by the Act of April 16,
1993.
60-Day Notice: As required in 5 CFR 1320.8(d), the BLM published a
60-day notice in the Federal Register on July 31, 2009 (74 FR 38215),
soliciting comments from the public and other interested parties. The
comment period closed on September 29, 2009. The BLM did not receive
any comments from the public in response to this notice or unsolicited
comments from respondents covered under these regulations.
Type of Review: Revision of a currently approved information
collection.
Affected Public: Individuals, associations, and corporations
seeking to obtain or maintain interests under the General Mining Law
and other mining statutes.
Obligation To Respond: Required to obtain or retain benefits.
Annual Responses: 197,154.
Completion Time per Response: Varies from 20 to 30 minutes.
Annual Burden Hours: 97,658.
Annual Non-hour Burden Cost: $1,629,025 for document processing
fees associated with some of these information collection requirements.
The BLM requests comments on the following subjects:
1. Whether the collection of information is necessary for the
proper functioning of the BLM, including whether the information will
have practical utility;
2. The accuracy of the BLM's estimate of the burden of collecting
the information, including the validity of the methodology and
assumptions used;
3. The quality, utility and clarity of the information to be
collected; and
4. How to minimize the information collection burden on those who
are to respond, including the use of appropriate automated, electronic,
mechanical, or other forms of information technology.
Please send comments to the addresses listed under ADDRESSES.
Please refer to OMB control number 1004-0114 in your correspondence.
Before including your address, phone number, e-mail address, or other
personal identifying information in your comment, you should be aware
that your entire comment--including your personal identifying
information--may be made publicly available at any time. While you can
ask us in your comment to withhold your personal identifying
information from public review, we cannot guarantee that we will be
able to do so.
Jean Sonneman,
Acting Information Collection Clearance Officer.
[FR Doc. 2010-3937 Filed 2-25-10; 8:45 am]
BILLING CODE 4310-84-P