Carolina Power & Light Company: H. B. Robinson Steam Electric Plant, Unit No. 2; Environmental Assessment and Finding of No Significant Impact, 8410-8411 [2010-3667]
Download as PDF
8410
Federal Register / Vol. 75, No. 36 / Wednesday, February 24, 2010 / Notices
pwalker on DSK8KYBLC1PROD with NOTICES
splimpto@nsf.gov. Individuals who use
a telecommunications device for the
deaf (TDD) may call the Federal
Information Relay Service (FIRS) at 1–
800–877–8339, which is accessible 24
hours a day, 7 days a week, 365 days a
year (including federal holidays).
SUPPLEMENTARY INFORMATION:
Title of Collection: 2010 National
Survey of Recent College Graduates.
OMB Approval Number: 3145–0077.
Expiration Date of Approval: July 31,
2011.
Type of Request: Intent to seek
approval to renew an information
collection for three years.
1. Abstract
The National Survey of Recent
College Graduates (NSRCG) has been
conducted biennially since 1974. The
2010 NSRCG will consist of a sample of
individuals who have completed
bachelor’s and master’s degrees in
science, engineering and health from
U.S. institutions during the academic
years 2008 and 2009. The purpose of the
NSRCG is to provide national estimates
on the new entrants into the science and
engineering workforce and to provide
estimates on the characteristics of recent
bachelor’s and master’s graduates with
science, engineering and health degrees.
The NSRCG is one of three component
surveys of the Scientists and Engineers
Statistical Data System (SESTAT),
which produces national estimates of
the size and characteristics of the
nation’s science and engineering
population. The 2010 NSRCG will
provide necessary input into the
SESTAT.
The National Science Foundation Act
of 1950, as subsequently amended,
includes a statutory charge to ‘‘* * *
provide a central clearinghouse for the
collection, interpretation, and analysis
of data on scientific and engineering
resources, and to provide a source of
information for policy formulation by
other agencies of the Federal
Government.’’ The NSRCG is designed
to comply with these mandates by
providing information on the supply
and utilization of the nation’s recent
bachelor’s and master’s level scientists
and engineers.
The NSF uses the information from
the NSRCG to prepare congressionallymandated reports such as Women,
Minorities and Persons with Disabilities
in Science and Engineering and Science
and Engineering Indicators. NSF
publishes statistics from the survey in
many reports, but primarily in the
biennial series, Characteristics of Recent
Science and Engineering Graduates in
the United States. A public release file
of collected data, designed to protect
VerDate Nov<24>2008
16:49 Feb 23, 2010
Jkt 220001
respondent confidentiality, will be
made available to researchers on CD–
ROM and on the Internet.
A nationally recognized survey firm
will conduct the 2010 NSRCG under
contract for NSF. Data will be obtained
by mail questionnaire, computerassisted telephone interviews and Web
survey beginning in October 2010. The
survey will be collected in conformance
with the Confidential Information
Protection and Statistical Efficiency Act
of 2002, and the individual’s response
to the survey is voluntary. NSF will
ensure that all information collected
will be kept strictly confidential and
will be used only for statistical
purposes.
2. Expected Respondents
A statistical sample of approximately
18,000 bachelor’s and master’s degree
recipients in science, engineering, and
health will be contacted in 2010. NSF
expects the response rate to be 70
percent.
3. Estimate of Burden
The amount of time to complete the
questionnaire may vary depending on
an individual’s circumstances; however,
on average it will take approximately 25
minutes to complete the survey. NSF
estimates that the total annual burden
will be 5,250 hours during the 2010
survey cycle.
Dated: February 18, 2010.
Suzanne H. Plimpton,
Reports Clearance Officer, National Science
Foundation.
[FR Doc. 2010–3593 Filed 2–23–10; 8:45 am]
BILLING CODE 7555–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–261; NRC–2010–0062]
Carolina Power & Light Company:
H. B. Robinson Steam Electric Plant,
Unit No. 2; Environmental Assessment
and Finding of No Significant Impact
The U.S. Nuclear Regulatory
Commission (NRC) is considering
issuance of an exemption pursuant to
Title 10 of the Code of Federal
Regulations (10 CFR) Section 73.5,
‘‘Specific exemptions,’’ from the
implementation date for certain new
requirements of 10 CFR Part 73,
‘‘Physical protection of plants and
materials,’’ for Facility Operating
License No. DPR–23, issued to Carolina
Power & Light Company (the licensee),
for operation of the H. B. Robinson
Steam Electric Plant, Unit No. 2
(HBRSEP), located in Darlington
PO 00000
Frm 00117
Fmt 4703
Sfmt 4703
County, South Carolina. In accordance
with 10 CFR 51.21, ‘‘Criteria for and
identification of licensing and
regulatory actions requiring
environmental assessments,’’ the NRC
prepared an environmental assessment
documenting its finding. The NRC
concluded that the proposed action will
have no significant environmental
impact.
Environmental Assessment
Identification of the Proposed Action
The proposed action would exempt
HBRSEP from the required
implementation date of March 31, 2010,
for two new requirements of 10 CFR
part 73. Specifically, HBRSEP would be
granted an exemption from being in full
compliance with certain new
requirements contained in 10 CFR
73.55, ‘‘Requirements for physical
protection of licensed activities in
nuclear power reactors against
radiological sabotage,’’ by the March 31,
2010, deadline. The licensee has
proposed an alternate full compliance
implementation date of December 30,
2010, approximately 9 months beyond
the date required by 10 CFR part 73. The
proposed action, an extension of the
schedule for completion of certain
actions required by the revised 10 CFR
part 73, does not involve any physical
changes to the reactor, fuel, plant
structures, support structures, water, or
land at the HBRSEP site.
The proposed action is in accordance
with the licensee’s application dated
November 30, 2009.
The Need for the Proposed Action
The licensee has stated that it has
performed an extensive evaluation of
the revised 10 CFR part 73 and will
achieve compliance with a vast majority
of the revised rule by the March 31,
2010, compliance date. However, the
licensee has determined that
implementation of two specific
provisions of the rule will require more
time to implement because they involve
upgrades to the security system that
require significant physical
modifications (e.g., the relocation of
certain security assets to a new security
building that will be constructed, and
the addition of certain power supplies).
Therefore, the licensee proposes to
extend the compliance date beyond
March 31, 2010, to December 30, 2010,
in order to complete these security
modifications.
Environmental Impacts of the Proposed
Action
The NRC has completed its
environmental assessment of the
E:\FR\FM\24FEN1.SGM
24FEN1
Federal Register / Vol. 75, No. 36 / Wednesday, February 24, 2010 / Notices
pwalker on DSK8KYBLC1PROD with NOTICES
proposed exemption. The staff has
concluded that the proposed action to
extend the implementation deadline
would not significantly affect plant
safety and would not have a significant
adverse effect on the probability or
consequences of an accident.
The proposed action would not result
in an increased radiological hazard
beyond those previously analyzed in the
environmental assessment and finding
of no significant impact made by the
Commission in promulgating its
revisions to 10 CFR part 73 as discussed
in a Federal Register notice dated
March 27, 2009 (74 FR 13967). There
will be no change to radioactive
effluents that affect radiation exposures
to plant workers and members of the
public. Therefore, no changes or
different types of radiological impacts
are expected as a result of the proposed
exemption.
The proposed action does not result
in changes to land use or water use, or
result in changes to the quality or
quantity of non-radiological effluents.
No changes to the National Pollution
Discharge Elimination System permit
are needed. No effects on the aquatic or
terrestrial habitat in the vicinity of the
plant, or to threatened, endangered, or
protected species under the Endangered
Species Act, or impacts to essential fish
habitat covered by the MagnusonStevens Act are expected. There are no
impacts to the air or ambient air quality.
There are no impacts to historical and
cultural resources. There would be no
impact to socioeconomic resources.
Therefore, no changes to or different
types of non-radiological environmental
impacts are expected as a result of the
proposed exemption.
Accordingly, the NRC concludes that
there are no significant environmental
impacts associated with the proposed
action. In addition, in promulgating its
revisions to 10 CFR part 73, the
Commission prepared an environmental
assessment and published a finding of
no significant impact (March 27, 2009,
74 FR 13967).
The NRC staff’s safety evaluation will
be provided as part of a letter to the
licensee approving the exemption to the
regulation, if granted.
Environmental Impacts of the
Alternatives to the Proposed Action
As an alternative to the proposed
action, the NRC staff considered denial
of the proposed action (i.e., the ‘‘no
action’’ alternative). Denial of the
exemption request would result in no
change in current environmental
impacts. If the proposed action were
denied, the licensee would have to
comply with the March 31, 2010,
VerDate Nov<24>2008
16:49 Feb 23, 2010
Jkt 220001
8411
implementation deadline. The
environmental impacts of the proposed
exemption and the ‘‘no action’’
alternative are similar.
Alternative Use of Resources
For the Nuclear Regulatory Commission.
Tracy J. Orf,
Project Manager, Plant Licensing Branch II–
2, Division of Operating Reactor Licensing,
Office of Nuclear Reactor Regulation.
[FR Doc. 2010–3667 Filed 2–23–10; 8:45 am]
The action does not involve the use of
any different resources than those
considered in the Final Environmental
Statement for the HBRSEP, dated April
1975, as supplemented through the
‘‘Generic Environmental Impact
Statement for License Renewal of
Nuclear Plants: H.B. Robinson Steam
Electric Plant, Unit 2—Final Report
(NUREG—1437, Supplement 13).’’
Agencies and Persons Consulted
In accordance with its stated policy,
on January 22, 2010, the staff consulted
with the South Carolina State official,
Mike Gandy of the South Carolina
Bureau of Land and Waste Management,
regarding the environmental impact of
the proposed action. The State official
had no comments.
Finding of No Significant Impact
On the basis of the environmental
assessment, the NRC concludes that the
proposed action will not have a
significant effect on the quality of the
human environment. Accordingly, the
NRC has determined not to prepare an
environmental impact statement for the
proposed action.
For further details with respect to the
proposed action, see the licensee’s letter
dated November 30, 2009. Portions of
the November 30, 2009, submittal
contain proprietary and security-related
information, and accordingly, are not
available to the public. Other parts of
these documents may be examined,
and/or copied for a fee, at the NRC’s
Public Document Room (PDR), located
at One White Flint North, Public File
Area O1 F21, 11555 Rockville Pike (first
floor), Rockville, Maryland. Publicly
available records will be accessible
electronically from the Agencywide
Documents Access and Management
System (ADAMS) Public Electronic
Reading Room on the Internet at the
NRC Web site, https://www.nrc.gov/
reading-rm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS should contact the NRC PDR
Reference staff by telephone at 1–800–
397–4209 or 301–415–4737, or send an
e-mail to pdr.resource@nrc.gov.
Dated at Rockville, Maryland, this 16th day
of February 2010.
PO 00000
Frm 00118
Fmt 4703
Sfmt 4703
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2009–0189]
Office of New Reactors: Interim Staff
Guidance on Assessing the
Consequences of an Accidental
Release of Radioactive Materials From
Liquid Waste Tanks; Reopening of
Comment Period
AGENCY: Nuclear Regulatory
Commission (NRC).
ACTION: Reopening of comment period.
SUMMARY: The NRC published a request
for public comment in the Federal
Register on May 4, 2009, on proposed
Interim Staff Guidance (ISG) DC/COL–
ISG–013, ‘‘Assessing the Consequences
of an Accidental Release of Radioactive
Materials from Liquid Waste Tanks’’
(Agencywide Documents Access and
Management System (ADAMS)
Accession No. ML090830488). The NRC
has completed a related ISG, DC/COL–
ISG–014, ‘‘Assessing Ground Water
Flow and Transport of Accidental
Radionuclide Releases,’’ and is making it
available for public comment by
separate document published today in
the Federal Register. The NRC believes
that the public will be better served by
being able to review and comment on
both documents at this time. This action
is necessary to reopen the comment
period for ISG DC/COL–ISG–013.
ADDRESSES: Please include Docket ID
NRC–2009–0189 in the subject line of
your comments. Comments submitted in
writing or in electronic form will be
posted on the NRC Web site and on the
Federal rulemaking Web site
Regulations.gov. Because your
comments will not be edited to remove
any identifying or contact information,
the NRC cautions you against including
any information in your submission that
you do not want to be publicly
disclosed.
The NRC requests that any party
soliciting or aggregating comments
received from other persons for
submission to the NRC inform those
persons that the NRC will not edit their
comments to remove any identifying or
contact information, and therefore, they
should not include any information in
their comments that they do not want
publicly disclosed.
E:\FR\FM\24FEN1.SGM
24FEN1
Agencies
[Federal Register Volume 75, Number 36 (Wednesday, February 24, 2010)]
[Notices]
[Pages 8410-8411]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-3667]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-261; NRC-2010-0062]
Carolina Power & Light Company: H. B. Robinson Steam Electric
Plant, Unit No. 2; Environmental Assessment and Finding of No
Significant Impact
The U.S. Nuclear Regulatory Commission (NRC) is considering
issuance of an exemption pursuant to Title 10 of the Code of Federal
Regulations (10 CFR) Section 73.5, ``Specific exemptions,'' from the
implementation date for certain new requirements of 10 CFR Part 73,
``Physical protection of plants and materials,'' for Facility Operating
License No. DPR-23, issued to Carolina Power & Light Company (the
licensee), for operation of the H. B. Robinson Steam Electric Plant,
Unit No. 2 (HBRSEP), located in Darlington County, South Carolina. In
accordance with 10 CFR 51.21, ``Criteria for and identification of
licensing and regulatory actions requiring environmental assessments,''
the NRC prepared an environmental assessment documenting its finding.
The NRC concluded that the proposed action will have no significant
environmental impact.
Environmental Assessment
Identification of the Proposed Action
The proposed action would exempt HBRSEP from the required
implementation date of March 31, 2010, for two new requirements of 10
CFR part 73. Specifically, HBRSEP would be granted an exemption from
being in full compliance with certain new requirements contained in 10
CFR 73.55, ``Requirements for physical protection of licensed
activities in nuclear power reactors against radiological sabotage,''
by the March 31, 2010, deadline. The licensee has proposed an alternate
full compliance implementation date of December 30, 2010, approximately
9 months beyond the date required by 10 CFR part 73. The proposed
action, an extension of the schedule for completion of certain actions
required by the revised 10 CFR part 73, does not involve any physical
changes to the reactor, fuel, plant structures, support structures,
water, or land at the HBRSEP site.
The proposed action is in accordance with the licensee's
application dated November 30, 2009.
The Need for the Proposed Action
The licensee has stated that it has performed an extensive
evaluation of the revised 10 CFR part 73 and will achieve compliance
with a vast majority of the revised rule by the March 31, 2010,
compliance date. However, the licensee has determined that
implementation of two specific provisions of the rule will require more
time to implement because they involve upgrades to the security system
that require significant physical modifications (e.g., the relocation
of certain security assets to a new security building that will be
constructed, and the addition of certain power supplies). Therefore,
the licensee proposes to extend the compliance date beyond March 31,
2010, to December 30, 2010, in order to complete these security
modifications.
Environmental Impacts of the Proposed Action
The NRC has completed its environmental assessment of the
[[Page 8411]]
proposed exemption. The staff has concluded that the proposed action to
extend the implementation deadline would not significantly affect plant
safety and would not have a significant adverse effect on the
probability or consequences of an accident.
The proposed action would not result in an increased radiological
hazard beyond those previously analyzed in the environmental assessment
and finding of no significant impact made by the Commission in
promulgating its revisions to 10 CFR part 73 as discussed in a Federal
Register notice dated March 27, 2009 (74 FR 13967). There will be no
change to radioactive effluents that affect radiation exposures to
plant workers and members of the public. Therefore, no changes or
different types of radiological impacts are expected as a result of the
proposed exemption.
The proposed action does not result in changes to land use or water
use, or result in changes to the quality or quantity of non-
radiological effluents. No changes to the National Pollution Discharge
Elimination System permit are needed. No effects on the aquatic or
terrestrial habitat in the vicinity of the plant, or to threatened,
endangered, or protected species under the Endangered Species Act, or
impacts to essential fish habitat covered by the Magnuson-Stevens Act
are expected. There are no impacts to the air or ambient air quality.
There are no impacts to historical and cultural resources. There
would be no impact to socioeconomic resources. Therefore, no changes to
or different types of non-radiological environmental impacts are
expected as a result of the proposed exemption.
Accordingly, the NRC concludes that there are no significant
environmental impacts associated with the proposed action. In addition,
in promulgating its revisions to 10 CFR part 73, the Commission
prepared an environmental assessment and published a finding of no
significant impact (March 27, 2009, 74 FR 13967).
The NRC staff's safety evaluation will be provided as part of a
letter to the licensee approving the exemption to the regulation, if
granted.
Environmental Impacts of the Alternatives to the Proposed Action
As an alternative to the proposed action, the NRC staff considered
denial of the proposed action (i.e., the ``no action'' alternative).
Denial of the exemption request would result in no change in current
environmental impacts. If the proposed action were denied, the licensee
would have to comply with the March 31, 2010, implementation deadline.
The environmental impacts of the proposed exemption and the ``no
action'' alternative are similar.
Alternative Use of Resources
The action does not involve the use of any different resources than
those considered in the Final Environmental Statement for the HBRSEP,
dated April 1975, as supplemented through the ``Generic Environmental
Impact Statement for License Renewal of Nuclear Plants: H.B. Robinson
Steam Electric Plant, Unit 2--Final Report (NUREG--1437, Supplement
13).''
Agencies and Persons Consulted
In accordance with its stated policy, on January 22, 2010, the
staff consulted with the South Carolina State official, Mike Gandy of
the South Carolina Bureau of Land and Waste Management, regarding the
environmental impact of the proposed action. The State official had no
comments.
Finding of No Significant Impact
On the basis of the environmental assessment, the NRC concludes
that the proposed action will not have a significant effect on the
quality of the human environment. Accordingly, the NRC has determined
not to prepare an environmental impact statement for the proposed
action.
For further details with respect to the proposed action, see the
licensee's letter dated November 30, 2009. Portions of the November 30,
2009, submittal contain proprietary and security-related information,
and accordingly, are not available to the public. Other parts of these
documents may be examined, and/or copied for a fee, at the NRC's Public
Document Room (PDR), located at One White Flint North, Public File Area
O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland.
Publicly available records will be accessible electronically from the
Agencywide Documents Access and Management System (ADAMS) Public
Electronic Reading Room on the Internet at the NRC Web site, https://www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to ADAMS or who encounter problems
in accessing the documents located in ADAMS should contact the NRC PDR
Reference staff by telephone at 1-800-397-4209 or 301-415-4737, or send
an e-mail to pdr.resource@nrc.gov.
Dated at Rockville, Maryland, this 16th day of February 2010.
For the Nuclear Regulatory Commission.
Tracy J. Orf,
Project Manager, Plant Licensing Branch II-2, Division of Operating
Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 2010-3667 Filed 2-23-10; 8:45 am]