National Fuel Gas Supply Corporation; Notice of Intent To Prepare an Environmental Assessment for the Planned Line N Projects, Notice of Public Scoping Meeting, and Request for Comments on Environmental Issues, 8323-8325 [2010-3636]

Download as PDF Federal Register / Vol. 75, No. 36 / Wednesday, February 24, 2010 / Notices not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on March 1, 2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–3621 Filed 2–23–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF10–1–000] National Fuel Gas Supply Corporation; Notice of Intent To Prepare an Environmental Assessment for the Planned Line N Projects, Notice of Public Scoping Meeting, and Request for Comments on Environmental Issues pwalker on DSK8KYBLC1PROD with NOTICES February 18, 2010. The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Line N Relocation and Interconnect Project and the Line N Compressor Installation Expansion Project (the Line N Projects), proposed by National Fuel Gas Supply Corporation (National Fuel), in Greene and Washington Counties, VerDate Nov<24>2008 16:49 Feb 23, 2010 Jkt 220001 Pennsylvania (PA). The EA will be used by the Commission in its decisionmaking process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process we 1 will use to gather input from the public and interested agencies on the project. Your input will help the Commission staff determine what issues need to be evaluated in the EA. Please note that the scoping period will close on March 22, 2010. Comments may be submitted in written form or verbally. Further details on how to submit written comments are provided in the Public Participation section of this notice. In lieu of or in addition to sending written comments, we invite you to attend the public scoping meeting scheduled as follows: FERC Public Scoping Meeting—Line N Projects March 3, 2010, 6 p.m., Graysville Elementary, 1029 West Roy Furman Highway, Graysville, PA 15337. This notice is being sent to the Commission’s current environmental mailing list for this project, which includes affected landowners; Federal, State, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. State and local government representatives are asked to notify their constituents of this planned project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, you may be contacted by a pipeline company representative about the acquisition of an easement to construct, operate, and maintain the planned facilities. The company would seek to negotiate a mutually acceptable agreement. However, if the project is approved by the Commission, that approval conveys with it the right of eminent domain. Therefore, if easement negotiations fail to produce an agreement, the pipeline company could initiate condemnation proceedings in accordance with State law. A fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ is available for viewing on the FERC Web site (https://www.ferc.gov/ for-citizens/citizen-guides.asp). This fact sheet addresses a number of typically asked questions, including the use of 1 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to environmental staff of the Office of Energy Projects (OEP). PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 8323 eminent domain and how to participate in the Commission’s proceedings. Summary of the Planned Project National Fuel has proposed to construct, operate, and maintain the Line N Projects, which consist of the Line N Relocation and Interconnect Project (Line N R&I Project) and the Line N Compressor Installation Expansion Project (Line N CIE Project), located in Greene and Washington Counties, PA. The Line N Projects consists of the following facilities: • The Line N R&I Project consists of the construction of approximately 17.5 miles of new 20-inch diameter natural gas pipeline and a new metering and regulating facility in Green County, PA. • The Line N CIE Project consists of the construction of the new 5,000 horsepower Buffalo Compressor Station, and replacement of two miles of 20-inch diameter natural gas replacement pipeline located in Washington County, PA. The general location of the project facilities is shown in Appendix 1.2 Land Requirements for Construction Construction of the planned facilities would disturb about 157.6 acres of land for the aboveground facilities and the pipeline. Following construction, about 119.4 acres would be maintained for permanent operation of the project’s facilities; the remaining acreage would be restored and allowed to revert to former uses. The EA Process The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from an action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires us to discover and address concerns the public may have about proposals. This process is referred to as ‘‘scoping’’. The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this notice, the Commission requests public comments on the scope of the issues to address in the EA. All comments received will be considered during the preparation of the EA. To ensure your comments are considered, please carefully follow the instructions in the 2 The appendices referenced in this notice are not being printed in the Federal Register. Copies of appendices were sent to all those receiving this notice in the mail and are available at https:// www.ferc.gov using the link called ‘‘eLibrary’’ or from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426, or call (202) 502–8371. For instructions on connecting to eLibrary, refer to the last page of this notice. E:\FR\FM\24FEN1.SGM 24FEN1 pwalker on DSK8KYBLC1PROD with NOTICES 8324 Federal Register / Vol. 75, No. 36 / Wednesday, February 24, 2010 / Notices Public Participation section of this notice, beginning on page 4. In the EA we will discuss impacts that could occur as a result of the construction and operation of the planned project under these general headings: • Geology and soils; • land use, recreation and visual resources; • water resources, fisheries, and wetlands; • cultural resources; • vegetation and wildlife; • air quality and noise; • endangered and threatened species; • hazardous waste; • public safety; and, • cumulative impacts. We will also evaluate reasonable alternatives to the planned project or portions of the project, and make recommendations on how to lessen or avoid impacts on the various resource areas. Although no formal application has been filed, we have already initiated our NEPA review under the Commission’s pre-filing process. The purpose of the pre-filing process is to encourage early involvement of interested stakeholders and to identify and resolve issues before an application is filed with the FERC. As part of our pre-filing review, we have begun to contact some federal and state agencies to discuss their involvement in the scoping process and the preparation of the EA. Our independent analysis of the issues will be presented in the EA. Depending on the comments received during the scoping process, the EA may be published and mailed to those on our environmental mailing list. A comment period will be allotted for review of the EA if it is published. We will consider all comments on the EA before we make our recommendations to the Commission. With this notice, we are asking agencies with jurisdiction and/or special expertise with respect to environmental issues to formally cooperate with us in the preparation of the EA. These agencies may choose to participate once they have evaluated the proposal relative to their responsibilities. Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. Currently Identified Environmental Issues Based on a preliminary review of the planned facilities and the environmental information provided by National Fuel, we have identified VerDate Nov<24>2008 16:49 Feb 23, 2010 Jkt 220001 potential visual and land use impacts that we think deserve attention. National Fuel anticipates that long wall coal mining may proceed beneath the pipeline at some point in the future. Additional issues may be included in our analysis based on your comments. Public Participation You can make a difference by providing us with your specific comments or concerns about the project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that your written comments are timely and properly recorded, please send in your comments so that they will be received in Washington, DC on or before March 22, 2010. For your convenience, there are three methods which you can use to submit your written comments to the Commission. The Commission encourages electronic filing of comments and has expert eFiling staff available to assist you at 202–502–8258 or efiling@ferc.gov. (1) You may file your comments electronically by using the Quick Comment feature, which is located at https://www.ferc.gov under the link called ‘‘Documents and Filings’’. A Quick Comment is an easy method for interested persons to submit text-only comments on a project; (2) You may file your comments electronically by using the ‘‘eFiling’’ feature that is listed under the ‘‘Documents and Filings’’ link. eFiling involves preparing your submission in the same manner as you would if filing on paper, and then saving the file on your computer’s hard drive. You will attach that file to your submission. New eFiling users must first create an account by clicking on the links called ‘‘Sign up’’ or ‘‘eRegister’’. You will be asked to select the type of filing you are making. A comment on a particular project is considered a ‘‘Comment on a Filing’’; or (3) You may file a paper copy of your comments at the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1A, Washington, DC 20426. Environmental Mailing List The environmental mailing list includes Federal, State, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project. We will update the environmental mailing list as the analysis proceeds to ensure that we send the information related to this environmental review to all individuals, organizations, and government entities interested in and/or potentially affected by the planned project. If the EA is published for distribution, copies will be sent to the environmental mailing list for public review and comment. If you would prefer to receive a paper copy of the document instead of the CD version or would like to remove your name from the mailing list, please return the attached Information Request (Appendix 2). Becoming an Intervenor Once National Fuel files its application with the Commission, you may want to become an ‘‘intervenor’’, which is an official party to the Commission’s proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates the proceeding by filing a request to intervene. Instructions for becoming an intervenor are included in the User’s Guide under the ‘‘e-filing’’ link on the Commission’s Web site. Please note that you may not request intervenor status at this time. You must wait until a formal application for the project is filed with the Commission. Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at 1–866–208–FERC or on the FERC Web site (https://www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number, excluding the last three digits, in the Docket Number field (i.e., PF10–1). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. E:\FR\FM\24FEN1.SGM 24FEN1 Federal Register / Vol. 75, No. 36 / Wednesday, February 24, 2010 / Notices In addition, the Commission now offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries and direct links to the documents. Go to https:// www.ferc.gov/esubscribenow.htm. Finally, public meetings or site visits will be posted on the Commission’s calendar located at https://www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on March 9, 2010. Kimberly D. Bose, Secretary. [FR Doc. 2010–3622 Filed 2–23–10; 8:45 am] Kimberly D. Bose, Secretary. BILLING CODE 6717–01–P [FR Doc. 2010–3636 Filed 2–23–10; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. ER10–730–000] [Docket No. ER10–295–000] E.ON U.S. LLC; Notice of Filing pwalker on DSK8KYBLC1PROD with NOTICES February 17, 2010. Take notice that, on February 16, 2009, E.ON U.S. LLC filed to supplement its filing in the above captioned docket with information required under the Commission’s regulations. Such filing served to reset the filing date in this proceeding. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible online at https://www.ferc.gov, using the VerDate Nov<24>2008 16:49 Feb 23, 2010 Jkt 220001 Wheelabrator Portsmouth, Inc.; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization 8325 must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC, 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. 2010–3632 Filed 2–23–10; 8:45 am] BILLING CODE 6717–01–P February 18, 2010. This is a supplemental notice in the above-referenced proceeding of Wheelabrator Portsmouth, Inc.’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC, 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is March 9, 2010. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER10–727–000] AEP Retail Energy Partners, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization February 18, 2010. This is a supplemental notice in the above-referenced proceeding of AEP Retail Energy Partner, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC, 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket E:\FR\FM\24FEN1.SGM 24FEN1

Agencies

[Federal Register Volume 75, Number 36 (Wednesday, February 24, 2010)]
[Notices]
[Pages 8323-8325]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-3636]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. PF10-1-000]


National Fuel Gas Supply Corporation; Notice of Intent To Prepare 
an Environmental Assessment for the Planned Line N Projects, Notice of 
Public Scoping Meeting, and Request for Comments on Environmental 
Issues

February 18, 2010.
    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Line N Relocation and 
Interconnect Project and the Line N Compressor Installation Expansion 
Project (the Line N Projects), proposed by National Fuel Gas Supply 
Corporation (National Fuel), in Greene and Washington Counties, 
Pennsylvania (PA). The EA will be used by the Commission in its 
decision-making process to determine whether the project is in the 
public convenience and necessity.
    This notice announces the opening of the scoping process we \1\ 
will use to gather input from the public and interested agencies on the 
project. Your input will help the Commission staff determine what 
issues need to be evaluated in the EA. Please note that the scoping 
period will close on March 22, 2010.
---------------------------------------------------------------------------

    \1\ ``We,'' ``us,'' and ``our'' refer to environmental staff of 
the Office of Energy Projects (OEP).
---------------------------------------------------------------------------

    Comments may be submitted in written form or verbally. Further 
details on how to submit written comments are provided in the Public 
Participation section of this notice. In lieu of or in addition to 
sending written comments, we invite you to attend the public scoping 
meeting scheduled as follows:

FERC Public Scoping Meeting--Line N Projects

    March 3, 2010, 6 p.m., Graysville Elementary, 1029 West Roy Furman 
Highway, Graysville, PA 15337.
    This notice is being sent to the Commission's current environmental 
mailing list for this project, which includes affected landowners; 
Federal, State, and local government representatives and agencies; 
elected officials; environmental and public interest groups; Native 
American Tribes; other interested parties; and local libraries and 
newspapers. State and local government representatives are asked to 
notify their constituents of this planned project and encourage them to 
comment on their areas of concern.
    If you are a landowner receiving this notice, you may be contacted 
by a pipeline company representative about the acquisition of an 
easement to construct, operate, and maintain the planned facilities. 
The company would seek to negotiate a mutually acceptable agreement. 
However, if the project is approved by the Commission, that approval 
conveys with it the right of eminent domain. Therefore, if easement 
negotiations fail to produce an agreement, the pipeline company could 
initiate condemnation proceedings in accordance with State law.
    A fact sheet prepared by the FERC entitled ``An Interstate Natural 
Gas Facility On My Land? What Do I Need To Know?'' is available for 
viewing on the FERC Web site (https://www.ferc.gov/for-citizens/citizen-guides.asp). This fact sheet addresses a number of typically asked 
questions, including the use of eminent domain and how to participate 
in the Commission's proceedings.

Summary of the Planned Project

    National Fuel has proposed to construct, operate, and maintain the 
Line N Projects, which consist of the Line N Relocation and 
Interconnect Project (Line N R&I Project) and the Line N Compressor 
Installation Expansion Project (Line N CIE Project), located in Greene 
and Washington Counties, PA. The Line N Projects consists of the 
following facilities:
     The Line N R&I Project consists of the construction of 
approximately 17.5 miles of new 20-inch diameter natural gas pipeline 
and a new metering and regulating facility in Green County, PA.
     The Line N CIE Project consists of the construction of the 
new 5,000 horsepower Buffalo Compressor Station, and replacement of two 
miles of 20-inch diameter natural gas replacement pipeline located in 
Washington County, PA.
    The general location of the project facilities is shown in Appendix 
1.\2\
---------------------------------------------------------------------------

    \2\ The appendices referenced in this notice are not being 
printed in the Federal Register. Copies of appendices were sent to 
all those receiving this notice in the mail and are available at 
https://www.ferc.gov using the link called ``eLibrary'' or from the 
Commission's Public Reference Room, 888 First Street, NE., 
Washington, DC 20426, or call (202) 502-8371. For instructions on 
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the planned facilities would disturb about 157.6 
acres of land for the aboveground facilities and the pipeline. 
Following construction, about 119.4 acres would be maintained for 
permanent operation of the project's facilities; the remaining acreage 
would be restored and allowed to revert to former uses.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
to discover and address concerns the public may have about proposals. 
This process is referred to as ``scoping''. The main goal of the 
scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. All comments 
received will be considered during the preparation of the EA. To ensure 
your comments are considered, please carefully follow the instructions 
in the

[[Page 8324]]

Public Participation section of this notice, beginning on page 4.
    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the planned project under these 
general headings:
     Geology and soils;
     land use, recreation and visual resources;
     water resources, fisheries, and wetlands;
     cultural resources;
     vegetation and wildlife;
     air quality and noise;
     endangered and threatened species;
     hazardous waste;
     public safety; and,
     cumulative impacts.
    We will also evaluate reasonable alternatives to the planned 
project or portions of the project, and make recommendations on how to 
lessen or avoid impacts on the various resource areas.
    Although no formal application has been filed, we have already 
initiated our NEPA review under the Commission's pre-filing process. 
The purpose of the pre-filing process is to encourage early involvement 
of interested stakeholders and to identify and resolve issues before an 
application is filed with the FERC. As part of our pre-filing review, 
we have begun to contact some federal and state agencies to discuss 
their involvement in the scoping process and the preparation of the EA.
    Our independent analysis of the issues will be presented in the EA. 
Depending on the comments received during the scoping process, the EA 
may be published and mailed to those on our environmental mailing list. 
A comment period will be allotted for review of the EA if it is 
published. We will consider all comments on the EA before we make our 
recommendations to the Commission.
    With this notice, we are asking agencies with jurisdiction and/or 
special expertise with respect to environmental issues to formally 
cooperate with us in the preparation of the EA. These agencies may 
choose to participate once they have evaluated the proposal relative to 
their responsibilities. Agencies that would like to request cooperating 
agency status should follow the instructions for filing comments 
provided under the Public Participation section of this notice.

Currently Identified Environmental Issues

    Based on a preliminary review of the planned facilities and the 
environmental information provided by National Fuel, we have identified 
potential visual and land use impacts that we think deserve attention. 
National Fuel anticipates that long wall coal mining may proceed 
beneath the pipeline at some point in the future. Additional issues may 
be included in our analysis based on your comments.

Public Participation

    You can make a difference by providing us with your specific 
comments or concerns about the project. Your comments should focus on 
the potential environmental effects, reasonable alternatives, and 
measures to avoid or lessen environmental impacts. The more specific 
your comments, the more useful they will be. To ensure that your 
written comments are timely and properly recorded, please send in your 
comments so that they will be received in Washington, DC on or before 
March 22, 2010.
    For your convenience, there are three methods which you can use to 
submit your written comments to the Commission. The Commission 
encourages electronic filing of comments and has expert eFiling staff 
available to assist you at 202-502-8258 or efiling@ferc.gov.
    (1) You may file your comments electronically by using the Quick 
Comment feature, which is located at https://www.ferc.gov under the link 
called ``Documents and Filings''. A Quick Comment is an easy method for 
interested persons to submit text-only comments on a project;
    (2) You may file your comments electronically by using the 
``eFiling'' feature that is listed under the ``Documents and Filings'' 
link. eFiling involves preparing your submission in the same manner as 
you would if filing on paper, and then saving the file on your 
computer's hard drive. You will attach that file to your submission. 
New eFiling users must first create an account by clicking on the links 
called ``Sign up'' or ``eRegister''. You will be asked to select the 
type of filing you are making. A comment on a particular project is 
considered a ``Comment on a Filing''; or
    (3) You may file a paper copy of your comments at the following 
address: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street, NE., Room 1A, Washington, DC 20426.

Environmental Mailing List

    The environmental mailing list includes Federal, State, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project. We will update the environmental mailing list 
as the analysis proceeds to ensure that we send the information related 
to this environmental review to all individuals, organizations, and 
government entities interested in and/or potentially affected by the 
planned project.
    If the EA is published for distribution, copies will be sent to the 
environmental mailing list for public review and comment. If you would 
prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (Appendix 2).

Becoming an Intervenor

    Once National Fuel files its application with the Commission, you 
may want to become an ``intervenor'', which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates the proceeding by filing a request 
to intervene. Instructions for becoming an intervenor are included in 
the User's Guide under the ``e-filing'' link on the Commission's Web 
site. Please note that you may not request intervenor status at this 
time. You must wait until a formal application for the project is filed 
with the Commission.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at 1-866-208-FERC or on the 
FERC Web site (https://www.ferc.gov) using the eLibrary link. Click on 
the eLibrary link, click on ``General Search'' and enter the docket 
number, excluding the last three digits, in the Docket Number field 
(i.e., PF10-1). Be sure you have selected an appropriate date range. 
For assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.

[[Page 8325]]

    In addition, the Commission now offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries and direct links to 
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at https://www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-3636 Filed 2-23-10; 8:45 am]
BILLING CODE 6717-01-P