National Fuel Gas Supply Corporation; Notice of Intent To Prepare an Environmental Assessment for the Planned Line N Projects, Notice of Public Scoping Meeting, and Request for Comments on Environmental Issues, 8323-8325 [2010-3636]
Download as PDF
Federal Register / Vol. 75, No. 36 / Wednesday, February 24, 2010 / Notices
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on March 1, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–3621 Filed 2–23–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF10–1–000]
National Fuel Gas Supply Corporation;
Notice of Intent To Prepare an
Environmental Assessment for the
Planned Line N Projects, Notice of
Public Scoping Meeting, and Request
for Comments on Environmental
Issues
pwalker on DSK8KYBLC1PROD with NOTICES
February 18, 2010.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Line N Relocation and Interconnect
Project and the Line N Compressor
Installation Expansion Project (the Line
N Projects), proposed by National Fuel
Gas Supply Corporation (National Fuel),
in Greene and Washington Counties,
VerDate Nov<24>2008
16:49 Feb 23, 2010
Jkt 220001
Pennsylvania (PA). The EA will be used
by the Commission in its decisionmaking process to determine whether
the project is in the public convenience
and necessity.
This notice announces the opening of
the scoping process we 1 will use to
gather input from the public and
interested agencies on the project. Your
input will help the Commission staff
determine what issues need to be
evaluated in the EA. Please note that the
scoping period will close on March 22,
2010.
Comments may be submitted in
written form or verbally. Further details
on how to submit written comments are
provided in the Public Participation
section of this notice. In lieu of or in
addition to sending written comments,
we invite you to attend the public
scoping meeting scheduled as follows:
FERC Public Scoping Meeting—Line N
Projects
March 3, 2010, 6 p.m., Graysville
Elementary, 1029 West Roy Furman
Highway, Graysville, PA 15337.
This notice is being sent to the
Commission’s current environmental
mailing list for this project, which
includes affected landowners; Federal,
State, and local government
representatives and agencies; elected
officials; environmental and public
interest groups; Native American Tribes;
other interested parties; and local
libraries and newspapers. State and
local government representatives are
asked to notify their constituents of this
planned project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, you may be contacted by a
pipeline company representative about
the acquisition of an easement to
construct, operate, and maintain the
planned facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the project is
approved by the Commission, that
approval conveys with it the right of
eminent domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings in
accordance with State law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ is available for viewing on
the FERC Web site (https://www.ferc.gov/
for-citizens/citizen-guides.asp). This fact
sheet addresses a number of typically
asked questions, including the use of
1 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to environmental
staff of the Office of Energy Projects (OEP).
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
8323
eminent domain and how to participate
in the Commission’s proceedings.
Summary of the Planned Project
National Fuel has proposed to
construct, operate, and maintain the
Line N Projects, which consist of the
Line N Relocation and Interconnect
Project (Line N R&I Project) and the Line
N Compressor Installation Expansion
Project (Line N CIE Project), located in
Greene and Washington Counties, PA.
The Line N Projects consists of the
following facilities:
• The Line N R&I Project consists of
the construction of approximately 17.5
miles of new 20-inch diameter natural
gas pipeline and a new metering and
regulating facility in Green County, PA.
• The Line N CIE Project consists of
the construction of the new 5,000
horsepower Buffalo Compressor Station,
and replacement of two miles of 20-inch
diameter natural gas replacement
pipeline located in Washington County,
PA.
The general location of the project
facilities is shown in Appendix 1.2
Land Requirements for Construction
Construction of the planned facilities
would disturb about 157.6 acres of land
for the aboveground facilities and the
pipeline. Following construction, about
119.4 acres would be maintained for
permanent operation of the project’s
facilities; the remaining acreage would
be restored and allowed to revert to
former uses.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping’’. The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. All comments
received will be considered during the
preparation of the EA. To ensure your
comments are considered, please
carefully follow the instructions in the
2 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at https://
www.ferc.gov using the link called ‘‘eLibrary’’ or
from the Commission’s Public Reference Room, 888
First Street, NE., Washington, DC 20426, or call
(202) 502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
E:\FR\FM\24FEN1.SGM
24FEN1
pwalker on DSK8KYBLC1PROD with NOTICES
8324
Federal Register / Vol. 75, No. 36 / Wednesday, February 24, 2010 / Notices
Public Participation section of this
notice, beginning on page 4.
In the EA we will discuss impacts that
could occur as a result of the
construction and operation of the
planned project under these general
headings:
• Geology and soils;
• land use, recreation and visual
resources;
• water resources, fisheries, and
wetlands;
• cultural resources;
• vegetation and wildlife;
• air quality and noise;
• endangered and threatened species;
• hazardous waste;
• public safety; and,
• cumulative impacts.
We will also evaluate reasonable
alternatives to the planned project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
Although no formal application has
been filed, we have already initiated our
NEPA review under the Commission’s
pre-filing process. The purpose of the
pre-filing process is to encourage early
involvement of interested stakeholders
and to identify and resolve issues before
an application is filed with the FERC.
As part of our pre-filing review, we have
begun to contact some federal and state
agencies to discuss their involvement in
the scoping process and the preparation
of the EA.
Our independent analysis of the
issues will be presented in the EA.
Depending on the comments received
during the scoping process, the EA may
be published and mailed to those on our
environmental mailing list. A comment
period will be allotted for review of the
EA if it is published. We will consider
all comments on the EA before we make
our recommendations to the
Commission.
With this notice, we are asking
agencies with jurisdiction and/or
special expertise with respect to
environmental issues to formally
cooperate with us in the preparation of
the EA. These agencies may choose to
participate once they have evaluated the
proposal relative to their
responsibilities. Agencies that would
like to request cooperating agency status
should follow the instructions for filing
comments provided under the Public
Participation section of this notice.
Currently Identified Environmental
Issues
Based on a preliminary review of the
planned facilities and the
environmental information provided by
National Fuel, we have identified
VerDate Nov<24>2008
16:49 Feb 23, 2010
Jkt 220001
potential visual and land use impacts
that we think deserve attention.
National Fuel anticipates that long wall
coal mining may proceed beneath the
pipeline at some point in the future.
Additional issues may be included in
our analysis based on your comments.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your written comments are timely and
properly recorded, please send in your
comments so that they will be received
in Washington, DC on or before March
22, 2010.
For your convenience, there are three
methods which you can use to submit
your written comments to the
Commission. The Commission
encourages electronic filing of
comments and has expert eFiling staff
available to assist you at 202–502–8258
or efiling@ferc.gov.
(1) You may file your comments
electronically by using the Quick
Comment feature, which is located at
https://www.ferc.gov under the link
called ‘‘Documents and Filings’’. A
Quick Comment is an easy method for
interested persons to submit text-only
comments on a project;
(2) You may file your comments
electronically by using the ‘‘eFiling’’
feature that is listed under the
‘‘Documents and Filings’’ link. eFiling
involves preparing your submission in
the same manner as you would if filing
on paper, and then saving the file on
your computer’s hard drive. You will
attach that file to your submission. New
eFiling users must first create an
account by clicking on the links called
‘‘Sign up’’ or ‘‘eRegister’’. You will be
asked to select the type of filing you are
making. A comment on a particular
project is considered a ‘‘Comment on a
Filing’’; or
(3) You may file a paper copy of your
comments at the following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Room 1A, Washington,
DC 20426.
Environmental Mailing List
The environmental mailing list
includes Federal, State, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the planned project.
If the EA is published for distribution,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(Appendix 2).
Becoming an Intervenor
Once National Fuel files its
application with the Commission, you
may want to become an ‘‘intervenor’’,
which is an official party to the
Commission’s proceeding. Intervenors
play a more formal role in the process
and are able to file briefs, appear at
hearings, and be heard by the courts if
they choose to appeal the Commission’s
final ruling. An intervenor formally
participates the proceeding by filing a
request to intervene. Instructions for
becoming an intervenor are included in
the User’s Guide under the ‘‘e-filing’’
link on the Commission’s Web site.
Please note that you may not request
intervenor status at this time. You must
wait until a formal application for the
project is filed with the Commission.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Web site (https://www.ferc.gov) using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number, excluding the last three
digits, in the Docket Number field (i.e.,
PF10–1). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at 1–866–208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
E:\FR\FM\24FEN1.SGM
24FEN1
Federal Register / Vol. 75, No. 36 / Wednesday, February 24, 2010 / Notices
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on March 9, 2010.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–3622 Filed 2–23–10; 8:45 am]
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
[FR Doc. 2010–3636 Filed 2–23–10; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. ER10–730–000]
[Docket No. ER10–295–000]
E.ON U.S. LLC; Notice of Filing
pwalker on DSK8KYBLC1PROD with NOTICES
February 17, 2010.
Take notice that, on February 16,
2009, E.ON U.S. LLC filed to
supplement its filing in the above
captioned docket with information
required under the Commission’s
regulations. Such filing served to reset
the filing date in this proceeding.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
VerDate Nov<24>2008
16:49 Feb 23, 2010
Jkt 220001
Wheelabrator Portsmouth, Inc.;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
8325
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC,
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
dockets(s). For assistance with any
FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010–3632 Filed 2–23–10; 8:45 am]
BILLING CODE 6717–01–P
February 18, 2010.
This is a supplemental notice in the
above-referenced proceeding of
Wheelabrator Portsmouth, Inc.’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC,
20426, in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is March 9,
2010.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER10–727–000]
AEP Retail Energy Partners, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
February 18, 2010.
This is a supplemental notice in the
above-referenced proceeding of AEP
Retail Energy Partner, LLC’s application
for market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC,
20426, in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
E:\FR\FM\24FEN1.SGM
24FEN1
Agencies
[Federal Register Volume 75, Number 36 (Wednesday, February 24, 2010)]
[Notices]
[Pages 8323-8325]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2010-3636]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PF10-1-000]
National Fuel Gas Supply Corporation; Notice of Intent To Prepare
an Environmental Assessment for the Planned Line N Projects, Notice of
Public Scoping Meeting, and Request for Comments on Environmental
Issues
February 18, 2010.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Line N Relocation and
Interconnect Project and the Line N Compressor Installation Expansion
Project (the Line N Projects), proposed by National Fuel Gas Supply
Corporation (National Fuel), in Greene and Washington Counties,
Pennsylvania (PA). The EA will be used by the Commission in its
decision-making process to determine whether the project is in the
public convenience and necessity.
This notice announces the opening of the scoping process we \1\
will use to gather input from the public and interested agencies on the
project. Your input will help the Commission staff determine what
issues need to be evaluated in the EA. Please note that the scoping
period will close on March 22, 2010.
---------------------------------------------------------------------------
\1\ ``We,'' ``us,'' and ``our'' refer to environmental staff of
the Office of Energy Projects (OEP).
---------------------------------------------------------------------------
Comments may be submitted in written form or verbally. Further
details on how to submit written comments are provided in the Public
Participation section of this notice. In lieu of or in addition to
sending written comments, we invite you to attend the public scoping
meeting scheduled as follows:
FERC Public Scoping Meeting--Line N Projects
March 3, 2010, 6 p.m., Graysville Elementary, 1029 West Roy Furman
Highway, Graysville, PA 15337.
This notice is being sent to the Commission's current environmental
mailing list for this project, which includes affected landowners;
Federal, State, and local government representatives and agencies;
elected officials; environmental and public interest groups; Native
American Tribes; other interested parties; and local libraries and
newspapers. State and local government representatives are asked to
notify their constituents of this planned project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this notice, you may be contacted
by a pipeline company representative about the acquisition of an
easement to construct, operate, and maintain the planned facilities.
The company would seek to negotiate a mutually acceptable agreement.
However, if the project is approved by the Commission, that approval
conveys with it the right of eminent domain. Therefore, if easement
negotiations fail to produce an agreement, the pipeline company could
initiate condemnation proceedings in accordance with State law.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' is available for
viewing on the FERC Web site (https://www.ferc.gov/for-citizens/citizen-guides.asp). This fact sheet addresses a number of typically asked
questions, including the use of eminent domain and how to participate
in the Commission's proceedings.
Summary of the Planned Project
National Fuel has proposed to construct, operate, and maintain the
Line N Projects, which consist of the Line N Relocation and
Interconnect Project (Line N R&I Project) and the Line N Compressor
Installation Expansion Project (Line N CIE Project), located in Greene
and Washington Counties, PA. The Line N Projects consists of the
following facilities:
The Line N R&I Project consists of the construction of
approximately 17.5 miles of new 20-inch diameter natural gas pipeline
and a new metering and regulating facility in Green County, PA.
The Line N CIE Project consists of the construction of the
new 5,000 horsepower Buffalo Compressor Station, and replacement of two
miles of 20-inch diameter natural gas replacement pipeline located in
Washington County, PA.
The general location of the project facilities is shown in Appendix
1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of appendices were sent to
all those receiving this notice in the mail and are available at
https://www.ferc.gov using the link called ``eLibrary'' or from the
Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426, or call (202) 502-8371. For instructions on
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the planned facilities would disturb about 157.6
acres of land for the aboveground facilities and the pipeline.
Following construction, about 119.4 acres would be maintained for
permanent operation of the project's facilities; the remaining acreage
would be restored and allowed to revert to former uses.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
to discover and address concerns the public may have about proposals.
This process is referred to as ``scoping''. The main goal of the
scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of the issues to address in the EA. All comments
received will be considered during the preparation of the EA. To ensure
your comments are considered, please carefully follow the instructions
in the
[[Page 8324]]
Public Participation section of this notice, beginning on page 4.
In the EA we will discuss impacts that could occur as a result of
the construction and operation of the planned project under these
general headings:
Geology and soils;
land use, recreation and visual resources;
water resources, fisheries, and wetlands;
cultural resources;
vegetation and wildlife;
air quality and noise;
endangered and threatened species;
hazardous waste;
public safety; and,
cumulative impacts.
We will also evaluate reasonable alternatives to the planned
project or portions of the project, and make recommendations on how to
lessen or avoid impacts on the various resource areas.
Although no formal application has been filed, we have already
initiated our NEPA review under the Commission's pre-filing process.
The purpose of the pre-filing process is to encourage early involvement
of interested stakeholders and to identify and resolve issues before an
application is filed with the FERC. As part of our pre-filing review,
we have begun to contact some federal and state agencies to discuss
their involvement in the scoping process and the preparation of the EA.
Our independent analysis of the issues will be presented in the EA.
Depending on the comments received during the scoping process, the EA
may be published and mailed to those on our environmental mailing list.
A comment period will be allotted for review of the EA if it is
published. We will consider all comments on the EA before we make our
recommendations to the Commission.
With this notice, we are asking agencies with jurisdiction and/or
special expertise with respect to environmental issues to formally
cooperate with us in the preparation of the EA. These agencies may
choose to participate once they have evaluated the proposal relative to
their responsibilities. Agencies that would like to request cooperating
agency status should follow the instructions for filing comments
provided under the Public Participation section of this notice.
Currently Identified Environmental Issues
Based on a preliminary review of the planned facilities and the
environmental information provided by National Fuel, we have identified
potential visual and land use impacts that we think deserve attention.
National Fuel anticipates that long wall coal mining may proceed
beneath the pipeline at some point in the future. Additional issues may
be included in our analysis based on your comments.
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. Your comments should focus on
the potential environmental effects, reasonable alternatives, and
measures to avoid or lessen environmental impacts. The more specific
your comments, the more useful they will be. To ensure that your
written comments are timely and properly recorded, please send in your
comments so that they will be received in Washington, DC on or before
March 22, 2010.
For your convenience, there are three methods which you can use to
submit your written comments to the Commission. The Commission
encourages electronic filing of comments and has expert eFiling staff
available to assist you at 202-502-8258 or efiling@ferc.gov.
(1) You may file your comments electronically by using the Quick
Comment feature, which is located at https://www.ferc.gov under the link
called ``Documents and Filings''. A Quick Comment is an easy method for
interested persons to submit text-only comments on a project;
(2) You may file your comments electronically by using the
``eFiling'' feature that is listed under the ``Documents and Filings''
link. eFiling involves preparing your submission in the same manner as
you would if filing on paper, and then saving the file on your
computer's hard drive. You will attach that file to your submission.
New eFiling users must first create an account by clicking on the links
called ``Sign up'' or ``eRegister''. You will be asked to select the
type of filing you are making. A comment on a particular project is
considered a ``Comment on a Filing''; or
(3) You may file a paper copy of your comments at the following
address: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Room 1A, Washington, DC 20426.
Environmental Mailing List
The environmental mailing list includes Federal, State, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. We will update the environmental mailing list
as the analysis proceeds to ensure that we send the information related
to this environmental review to all individuals, organizations, and
government entities interested in and/or potentially affected by the
planned project.
If the EA is published for distribution, copies will be sent to the
environmental mailing list for public review and comment. If you would
prefer to receive a paper copy of the document instead of the CD
version or would like to remove your name from the mailing list, please
return the attached Information Request (Appendix 2).
Becoming an Intervenor
Once National Fuel files its application with the Commission, you
may want to become an ``intervenor'', which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates the proceeding by filing a request
to intervene. Instructions for becoming an intervenor are included in
the User's Guide under the ``e-filing'' link on the Commission's Web
site. Please note that you may not request intervenor status at this
time. You must wait until a formal application for the project is filed
with the Commission.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC or on the
FERC Web site (https://www.ferc.gov) using the eLibrary link. Click on
the eLibrary link, click on ``General Search'' and enter the docket
number, excluding the last three digits, in the Docket Number field
(i.e., PF10-1). Be sure you have selected an appropriate date range.
For assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
[[Page 8325]]
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries and direct links to
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at https://www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. 2010-3636 Filed 2-23-10; 8:45 am]